JPH0260272A - Line switching control system - Google Patents
Line switching control systemInfo
- Publication number
- JPH0260272A JPH0260272A JP21112888A JP21112888A JPH0260272A JP H0260272 A JPH0260272 A JP H0260272A JP 21112888 A JP21112888 A JP 21112888A JP 21112888 A JP21112888 A JP 21112888A JP H0260272 A JPH0260272 A JP H0260272A
- Authority
- JP
- Japan
- Prior art keywords
- line
- line switching
- switching control
- data
- terminal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Detection And Prevention Of Errors In Transmission (AREA)
- Monitoring And Testing Of Exchanges (AREA)
- Data Exchanges In Wide-Area Networks (AREA)
Abstract
Description
【発明の詳細な説明】
産業上の利用分野
本発明は、回線切替制御方式に関し、特に、多数の伝送
路で構成される大規模な通信ネットワークにおける多数
の障害回線のバックアップを種々の障害状況にそれぞれ
対応し、かつ迅速に行なう回線切替制御方式に関する。DETAILED DESCRIPTION OF THE INVENTION Field of the Invention The present invention relates to a line switching control system, and in particular to a method for backing up a large number of faulty lines in a large-scale communication network consisting of a large number of transmission lines in various fault situations. This invention relates to a line switching control system that can respond to each and perform it quickly.
従来の技術
従来、この種の回線切替制御方式は、伝送路が複数集中
し1通信ネットワーク上重要なノードに回線切替接続部
をそれぞれ設置し、中央の操作員が接続すべき端末と回
線又は回線と回線を指定し、制御部にてその情報を回線
切替接続部のクロスポイントのオン/オフ情報に分解し
、必要な回線切替接続部に情報を伝送して回線の切替接
続を行なっていた。Conventional technology Conventionally, in this type of line switching control system, a line switching connection unit is installed at each important node in a communication network where multiple transmission lines are concentrated, and a central operator selects the terminals and lines or lines to be connected. The controller then analyzes the information into cross-point on/off information for the line switching connection, transmits the information to the necessary line switching connection, and switches the line.
発明が解決しようとする課題
上述した従来の回線切替制御方式は、制御時に操作員が
接続回線の情報を入力し、制御部にてその情報を回線切
替接続部の個々のクロスポイントに対応した切替データ
に分解した後に各々の回線切替接続部に回線を経由して
伝送しているので、回線の切替接続に要する時間が大き
いという欠点がある。Problems to be Solved by the Invention In the conventional line switching control system described above, an operator inputs information about the connected line during control, and the control unit uses that information to perform switching corresponding to each crosspoint of the line switching connection. Since the data is decomposed into data and then transmitted to each line switching connection section via the line, there is a drawback that it takes a long time to switch and connect the lines.
本発明は従来の技術に内在する上記欠点を解消する為に
なされたものであり、従って本発明の目的は、多数の回
線切替接続を迅速に実行することを可能とした新規な回
線切替制御方式を提供することにある。The present invention has been made in order to eliminate the above-mentioned drawbacks inherent in the conventional technology, and therefore, an object of the present invention is to provide a new line switching control method that makes it possible to quickly execute a large number of line switching connections. Our goal is to provide the following.
課題を解決するための手段
上記目的を達成する為に、本発明に係る回線切替i#1
1g1方式は、回線の切替接続を行なう手段と、その回
線切替接続に必要な回線切替接続データを収納する手段
と、その回線切替接続データを使用して回線の切替接続
を駆動する手段と1通信ネットワーク全体の回線切替接
続を一元的に制御する手段とを有している。Means for Solving the Problems In order to achieve the above object, line switching i#1 according to the present invention
The 1g1 system consists of a means for performing line switching connection, a means for storing line switching connection data necessary for the line switching connection, a means for driving line switching connection using the line switching connection data, and one communication. and means for centrally controlling line switching connections for the entire network.
実施例
次に1本発明をその好ましい一実施例について図面を参
照して具体的に説明する。Embodiment Next, a preferred embodiment of the present invention will be specifically explained with reference to the drawings.
第1図は本発明の一実施例を示すブロック構成図である
。FIG. 1 is a block diagram showing one embodiment of the present invention.
第1図を参照するに、参照番号1と2.3と4及び5と
6はそれぞれ端末装置を示し、これらの端末装置はそれ
ぞれ通信ネットワーク上で伝送路の異なる回線7,8及
び9と回線切替接続部1O111及び12により接続さ
れている。13.14及び15はデータベース部であり
、回線切替接続部10.11及び12のクロスポイント
を切替制御するためのデータを同一の制御のデータにつ
いては、同一の識別番号を付与して収納する。制御実行
時に、回線切替制御部16.17及びI8は、制御部I
9からのデータ識別番号のメツセージを受け、データベ
ース部13.14及び15より識別番号に対応したデー
タを取り出し、回線切替接続部10.11及び12を駆
動する。Referring to FIG. 1, reference numbers 1, 2, 3, 4, 5, and 6 indicate terminal devices, respectively, and these terminal devices are connected to different transmission lines 7, 8, and 9 on the communication network, respectively. They are connected by switching connection parts 1O111 and 12. Reference numerals 13, 14 and 15 are database units, which store data for switching and controlling the cross points of the line switching connection units 10, 11 and 12, with data for the same control assigned the same identification number. During control execution, the line switching control units 16, 17 and I8 control the control unit I.
Upon receiving the message of the data identification number from the database section 9, data corresponding to the identification number is taken out from the database sections 13, 14 and 15, and the line switching connection sections 10.11 and 12 are driven.
第1図において1回線7が伝送路の障害により回線断と
なった場合には、制御部19より回線切替制御を起動す
ると、その制御に対応したデータの識別番号がメツセー
ジとして回線切替制御部16.17及び18に伝送され
る。回線切替制御部16.17及び18は、メツセージ
を受信すると、データベース部13.14及び15より
識別番号に対応したデータを取り出し、回線切替接続部
10−11及び12を駆動する。回線切替接続部10は
、端末1と回線7及び端末3と回線8の接続を解除し、
端末1と回線8を接続する1回線切替接続部11は、回
線8と端末4及び端末5と回線9の接続を解除し1回線
8と回線9を接続する。そして2回線切替接続部12は
、回[7と端末2及び回iI9と端末6の接続を解除し
1回線9と端末2を接続する。In FIG. 1, when one line 7 is disconnected due to a fault in the transmission path, when line switching control is activated by the control unit 19, the identification number of the data corresponding to the control is sent as a message to the line switching control unit 16. .17 and 18. When the line switching control units 16, 17 and 18 receive the message, they retrieve data corresponding to the identification number from the database units 13, 14 and 15, and drive the line switching connection units 10-11 and 12. The line switching connection unit 10 disconnects the terminal 1 and the line 7 and the terminal 3 and the line 8,
A single-line switching connection unit 11 that connects the terminal 1 and the line 8 disconnects the line 8 from the terminal 4 and between the terminal 5 and the line 9, and connects the first line 8 and the line 9. Then, the two-line switching connection unit 12 disconnects the line [7 and the terminal 2 and the line iI9 and the terminal 6, and connects the first line 9 and the terminal 2.
以上の動作により1回線断となった端末1と端末2の間
は回線8と回線9を経由して接続される。As a result of the above operation, the terminal 1 and the terminal 2, which had one line disconnected, are connected via the line 8 and the line 9.
発明の詳細
な説明したように、本発明によれば1回線の切替接続に
必要な情報をあらかじめデータベース化し、かつ回線切
替接続部毎にデータを保有することにより、多数の回線
切替接続を迅速に実行できる効果が得られる。As described in detail, according to the present invention, by creating a database in advance of the information necessary for one line switching connection and storing data for each line switching connection, it is possible to quickly perform a large number of line switching connections. You can get actionable effects.
第1図は本発明の一実施例を示すブロック構成図である
。
1.2.3,4.5.6.、、端末装置、7,8.9
、、、回線、 10.11.12.、、回線切替接続部
(SV)。
1:L 14.15.、、データベース部(DB)、1
6.17.18゜00回回線切替接続(CPU)、19
.、、制御部、(CPtl)1〜6:端末装置
16〜18二回線切替制御部
19:制御部FIG. 1 is a block diagram showing one embodiment of the present invention. 1.2.3, 4.5.6. ,,terminal device,7,8.9
,,,line, 10.11.12. ,, line switching connection (SV). 1:L 14.15. ,,Database section (DB), 1
6.17.18゜00 line switching connection (CPU), 19
.. ,,control unit, (CPtl) 1 to 6: terminal devices 16 to 18 two-line switching control unit 19: control unit
Claims (1)
なうための回線切替制御方式において、回線の切替接続
に必要な情報をあらかじめ回線切替制御毎にデータベー
ス化し、かつ各々の回線切替接続部に同一の回線切替制
御で使用するデータについては全て同じ識別番号を付与
した上で分散してデータを保有させ、制御部から前記回
線切替接続部に対してデータの識別番号を送信すること
により回線の切替接続を行なうことを特徴とする回線切
替制御方式。In a line switching control method for backing up faulty lines in communication networks, the information necessary for line switching connections is created in advance in a database for each line switching control, and is used in the same line switching control for each line switching connection. All the data to be transferred are assigned the same identification number and stored in a distributed manner, and the line switching connection is performed by transmitting the identification number of the data from the control unit to the line switching connection unit. Line switching control method.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP21112888A JPH0260272A (en) | 1988-08-25 | 1988-08-25 | Line switching control system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP21112888A JPH0260272A (en) | 1988-08-25 | 1988-08-25 | Line switching control system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH0260272A true JPH0260272A (en) | 1990-02-28 |
Family
ID=16600854
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP21112888A Pending JPH0260272A (en) | 1988-08-25 | 1988-08-25 | Line switching control system |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0260272A (en) |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS52129208A (en) * | 1976-04-22 | 1977-10-29 | Nec Corp | Circuit switching system for transmission network |
-
1988
- 1988-08-25 JP JP21112888A patent/JPH0260272A/en active Pending
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS52129208A (en) * | 1976-04-22 | 1977-10-29 | Nec Corp | Circuit switching system for transmission network |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH0260272A (en) | Line switching control system | |
| JP2819942B2 (en) | Remote test method | |
| JP3497761B2 (en) | Disaster prevention monitoring control panel | |
| US5459772A (en) | External apparatus for monitoring a communication system | |
| JP3011051B2 (en) | Overload test equipment for centralized maintenance management system | |
| CN211180581U (en) | Network bypass circuit | |
| JPH01231539A (en) | multipoint terminal system | |
| JPH03135143A (en) | Line switching controller | |
| JP3539779B2 (en) | Signal band control device | |
| JPH0637910A (en) | Preliminary switching system for no7 signal link controller | |
| JP3022971B2 (en) | Terminal control failure monitoring method in electronic exchange | |
| JP2749278B2 (en) | Communication control system | |
| JP2715126B2 (en) | Condition monitoring / control circuit for air conditioning equipment | |
| JP2953183B2 (en) | Maintenance operation module monitoring method | |
| JPS62213347A (en) | Line switching system | |
| JP2969748B2 (en) | Interface control method | |
| JPS6043550B2 (en) | Communication line control device | |
| JPH05316140A (en) | Alternate route setting system for atm exchange system | |
| JPH07121033B2 (en) | Test relay drive circuit | |
| JPH07118730B2 (en) | Online data transmission system | |
| JPS6374239A (en) | Data transmission equipment | |
| JPS63151155A (en) | Fault detection system for space-division switch | |
| JPH07154831A (en) | Parallel installation type automatic MDF device | |
| JPS61200737A (en) | Exchange service system | |
| JPS63122396A (en) | Telephone system |