JPH0270141A - System for testing communication line - Google Patents

System for testing communication line

Info

Publication number
JPH0270141A
JPH0270141A JP63222913A JP22291388A JPH0270141A JP H0270141 A JPH0270141 A JP H0270141A JP 63222913 A JP63222913 A JP 63222913A JP 22291388 A JP22291388 A JP 22291388A JP H0270141 A JPH0270141 A JP H0270141A
Authority
JP
Japan
Prior art keywords
line
communication
test
lines
communication processing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP63222913A
Other languages
Japanese (ja)
Inventor
Hideo Abe
英雄 阿部
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujitsu Ltd
Original Assignee
Fujitsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujitsu Ltd filed Critical Fujitsu Ltd
Priority to JP63222913A priority Critical patent/JPH0270141A/en
Publication of JPH0270141A publication Critical patent/JPH0270141A/en
Pending legal-status Critical Current

Links

Landscapes

  • Data Exchanges In Wide-Area Networks (AREA)
  • Maintenance And Management Of Digital Transmission (AREA)

Abstract

PURPOSE:To conduct the test of communication lines without deteriorating communication processing capacity by connecting communication processors with a maintenance operation device by means of testing lines. CONSTITUTION:Respective line switching means 100 switch and connect the communication lines 4 designated from the maintenance operation device 2 via the test lines 7 to the lines 7. A line test means 200 transmits an instruction for switching and connecting the lines 4 to be tested to the lines 7 to respective communication processors 1 via the lines 7, and conducts the test of the lines 4 which has been switched and connected to the lines 7 via the lines 7. Since all the test processings of the lines 4 are executed by the means 200 of the device 2 after the means 100 switch and connect the lines 4 to the device 2, the increase of loads with respect to the test processing of the lines 4 is eliminated in the processors 1, whereby communication processing capacity is prevented from deteriorating due to the test processing of the communication lines.

Description

【発明の詳細な説明】 〔概要〕 複数の通信処理装置と保守運用装置とを具備する通信処
理システムにおいて、各通信処理装置に収容される通信
回線の試験を実行する通信回線試験方式の改良に関し、 当該通信処理システムの通信処理能力を低下させること
無く、収容する通信回線の試験を実行可能とすることを
目的とし、 各通信処理装置と保守運用装置との間をそれぞれ接続す
る試験用回線を設け、各通信処理装置に、試験用回線を
経由して保守運用装置から指定される通信回線を、試験
用回線に切替え接続する回線切替手段を設け、保守運用
装置に、試験用回線を経由して各通信処理装置に、試験
対象とする通信回線を試験用回線に切替え接続する指示
を伝達した後、試験用回線を経由して該試験用回線に切
替え接続された通信回線の試験を実行する回線試験手段
を設ける様に構成する。
[Detailed Description of the Invention] [Summary] This invention relates to an improvement in a communication line testing method for testing a communication line accommodated in each communication processing unit in a communication processing system comprising a plurality of communication processing units and maintenance and operation equipment. , with the aim of making it possible to test the communication lines accommodated without reducing the communication processing capacity of the communication processing system, test lines that connect each communication processing device and the maintenance and operation equipment are installed. and each communication processing device is provided with a line switching means for switching and connecting the communication line specified by the maintenance operation equipment via the test line to the test line, and transmits an instruction to each communication processing device to switch and connect the communication line to be tested to the test line, and then executes a test on the communication line that has been switched and connected to the test line via the test line. It is configured to provide line testing means.

〔産業上の利用分野〕[Industrial application field]

本発明は、複数の通信処理装置と保守運用装置とを具備
する通信処理システムにおいて、各通信処理装置に収容
される通信回線の試験を実行する通信回線試験方式の改
良に関する。
The present invention relates to an improvement in a communication line testing method for testing a communication line accommodated in each communication processing apparatus in a communication processing system including a plurality of communication processing apparatuses and a maintenance and operation apparatus.

〔従来の技術〕[Conventional technology]

第3図は従来あるデータ交換機の一例を示す図である。 FIG. 3 is a diagram showing an example of a conventional data exchanger.

第3図において、通信処理システムは複数の通信処理装
置1と、各通信処理装置1に共通に設けられた保守運用
装置2とを具備しており、リンク3により互いに接続さ
れている。
In FIG. 3, the communication processing system includes a plurality of communication processing devices 1 and a maintenance and operation device 2 provided in common to each communication processing device 1, which are connected to each other by a link 3.

各通信処理装置1にはそれぞれ複数のデータ伝送用の通
信回線4が収容されており、各通信回線4に対するデー
タリンクレベルの制御を実行する回線制御部11が、各
通信回線4に対応して設けられ1、また各通信回線4相
互間の通信処理を実行する共通制御部12が、各回線制
御部11に対して共通に設けられている。
Each communication processing device 1 accommodates a plurality of communication lines 4 for data transmission, and a line control unit 11 that executes data link level control for each communication line 4 corresponds to each communication line 4. A common control unit 12 is provided in common for each line control unit 11, and a common control unit 12 that executes communication processing between each communication line 4 is provided.

また各共通制御部12内には、各回線制御部11に収容
される通信回線4に対する試験を実行する回線試験部1
21が設けられている。
Each common control unit 12 also includes a line test unit 1 that executes a test on the communication line 4 accommodated in each line control unit 11.
21 are provided.

成る通信処理装置1に収容される成る通信回線4に障害
が発生し、該通信回線4を対象として試験を実行する場
合には(以後試験の対象となる通信処理装置1、通信回
線4等には、通信処理装置l1、通信回線4を等と添字
「、」を付加して他と識別する、以下同様)、保守者は
通信回線4Lを含む伝送系5、または通信回線4Lによ
り接続される対向通信処理装置6の保守者に対し、通信
回線4、に対して折返し経路の設定を依頼した後、保守
運用装置2からリンク3を経由して通信処理装置1tに
、試験対象とする通信回線4tを指定する試験開始コマ
ンドを伝達する。
When a failure occurs in the communication line 4 accommodated in the communication processing device 1, and a test is performed on the communication line 4 (hereinafter, the communication processing device 1, communication line 4, etc. to be tested) The communication processing device l1, the communication line 4 is identified by adding a subscript "," etc., and the same applies hereinafter), and the maintenance person is connected by the transmission system 5 including the communication line 4L, or by the communication line 4L. After requesting the maintainer of the opposing communication processing device 6 to set a return route for the communication line 4, the communication line to be tested is sent from the maintenance operation device 2 to the communication processing device 1t via the link 3. A test start command specifying 4t is transmitted.

通信処理装置l、においては、共通制御部12が保守運
用装置2からリンク3を経由して伝達される試験開始コ
マンドを受信すると、回線試験部121を起動する。
In the communication processing device l, when the common control unit 12 receives the test start command transmitted from the maintenance and operation device 2 via the link 3, it starts the line testing unit 121.

起動された回線試験部121は、試験用コマンドにより
指定された通信回線れに対して試験データを送信し、伝
送系5または対向通信処理装置6において設定された折
返し経路を経由して返送される試験データを受信し、送
信した試験データと照合することにより通信回線れの状
態を分析し、試験結果をリンク3を経由して保守運用装
置2に返送する。
The activated line test section 121 transmits test data to the communication line specified by the test command, and the test data is returned via the return route set in the transmission system 5 or the opposing communication processing device 6. The test data is received and compared with the transmitted test data to analyze the state of the communication line, and the test results are returned to the maintenance operation device 2 via the link 3.

保守者は、通信処理装置1tから保守運用装置2に返送
された通信回線4.に対する試験結果を分析し、通信回
線4.の障害状態を判定する。
The maintenance person receives the communication line 4. which is sent back from the communication processing device 1t to the maintenance operation device 2. Analyze test results for communication lines 4. Determine the failure status of.

所要の試験が終了すると、保守者は保守運用装置2から
リンク3を経由して通信処理装置1tに、通信回線れを
指定する試験終了コマンドを伝達する。
When the required test is completed, the maintenance person transmits a test end command specifying the communication line fault from the maintenance operation device 2 to the communication processing device 1t via the link 3.

通信処理装置1.においては、共通制御部12が保守運
用装置2からリンク3を経由して伝達される試験終了コ
マンドを受信すると、回線試験部121を起動停止する
Communication processing device 1. In this case, when the common control unit 12 receives a test end command transmitted from the maintenance operation device 2 via the link 3, it starts and stops the line testing unit 121.

回線試験部121は、通信回線4.に関する試験処理を
、総て共通制御部12が実行する通常の通信処理と並行
して実行する。
The line testing section 121 conducts communication line 4. The test processing related to the above is executed in parallel with the normal communication processing executed by the common control unit 12.

〔発明が解決しようとする課題〕[Problem to be solved by the invention]

以上の説明から明らかな如く、従来あるデータ交換機に
おいては、通信処理装置1が共通制御部12内に回線試
験部121を具備し、通常の通信処理と並行して収容す
る通信回線4の試験処理を実行する為、回線試験部12
1を含む共通制御部12の構成が複雑となり、また通信
回線の試験処理が共通制御部12の通信処理能力を圧迫
することとなり、当該データ交換機の通信処理能力を低
下させる問題点があった。
As is clear from the above description, in a conventional data exchange, the communication processing device 1 includes a line test section 121 in the common control section 12, and performs test processing of the communication line 4 accommodated in parallel with normal communication processing. In order to execute
The configuration of the common control unit 12 including the data exchanger 1 becomes complicated, and the communication line test processing puts pressure on the communication processing capacity of the common control unit 12, resulting in a problem in that the communication processing capacity of the data exchanger is reduced.

本発明は、当該通信処理システムの通信処理能力を低下
させること無く、収容する通信回線の試験を実行可能と
することを目的とする。
An object of the present invention is to enable testing of communication lines to be accommodated without reducing the communication processing capacity of the communication processing system.

〔課題を解決するための手段〕[Means to solve the problem]

第1図は本発明の原理を示す図である。 FIG. 1 is a diagram showing the principle of the present invention.

第1図において、1は複数の通信回線4を収容する通信
処理装置、2は各通信処理装置1に共通に設けられ、各
通信処理装置1の保守動作を制御する保守運用装置で、
本発明の対象となる通信処理システムを構成する。
In FIG. 1, 1 is a communication processing device that accommodates a plurality of communication lines 4, and 2 is a maintenance operation device that is provided in common to each communication processing device 1 and controls maintenance operations of each communication processing device 1.
A communication processing system to which the present invention is applied is configured.

7は、本発明により各通信処理装置lと保守運用装置2
との間にそれぞれ設けられた試験用回線である。
7 includes each communication processing device l and maintenance operation device 2 according to the present invention.
These are test lines established between the two companies.

100は、本発明により各通信処理装置1に設けられた
回線切替手段である。
100 is a line switching means provided in each communication processing device 1 according to the present invention.

200は、本発明により保守運用装置2に設けられた回
線試験手段である。
Reference numeral 200 denotes line testing means provided in the maintenance and operation device 2 according to the present invention.

〔作用〕[Effect]

各回線切替手段100は、試験用回線7を経由して保守
運用装置2から指定される通信回線4を、試験用回線7
に切替え接続する。
Each line switching means 100 connects the communication line 4 designated by the maintenance operation device 2 via the test line 7 to the test line 7.
Switch to connect.

回線試験手段200は、試験用回線7を経由して各通信
処理装置1に、試験対象とする通信回線4を試験用回線
7に切替え接続する指示を伝達した後、試験用回線7を
経由して試験用回線7に切替え接続された通信回線4の
試験を実行する。
The line testing means 200 transmits an instruction to switch and connect the communication line 4 to be tested to the test line 7 to each communication processing device 1 via the test line 7 , and then transfers the communication line 4 to the test line 7 via the test line 7 . Then, a test of the communication line 4 which is switched and connected to the test line 7 is executed.

従って、回線切替手段が通信回線を保守運用装置に切替
え接続した後は、通信回線に対する総ての試験処理は保
守運用装置に設けられた回線試験手段により実行される
為、通信処理装置には通信回線の試験処理に関する負荷
の増加が無くなり、当該通信処理システムの通信処理能
力が、通信回線の試験処理により低下することが防止さ
れる。
Therefore, after the line switching means switches and connects the communication line to the maintenance and operation equipment, all test processing for the communication line is performed by the line test means provided in the maintenance and operation equipment. There is no increase in the load related to line test processing, and the communication processing capacity of the communication processing system is prevented from decreasing due to communication line test processing.

(実施例〕 以下、本発明の一実施例を図面により説明する。(Example〕 An embodiment of the present invention will be described below with reference to the drawings.

第2図は本発明の一実施例によるデータ交換機を示す図
である。なお、全図を通じて同一符号は同一対象物を示
す。
FIG. 2 is a diagram illustrating a data exchange according to an embodiment of the present invention. Note that the same reference numerals indicate the same objects throughout the figures.

第2図においては、第1図における回線切替手段100
として、レベル変換部(LVC)13、試験開始監視部
(SUP)14および切替回線制御部(SWC)15が
収容される通信回線4に共通に、また切替駆動部(SW
A)16および切替部17が各通信回線4に対応して設
けられ、また第1図における回線試験手段200として
回線試験部21および回線制御部22が設けられている
In FIG. 2, the line switching means 100 in FIG.
The communication line 4, which accommodates the level converter (LVC) 13, test start monitoring unit (SUP) 14, and switching line control unit (SWC) 15, is commonly used as a switching drive unit (SWC).
A) 16 and a switching unit 17 are provided corresponding to each communication line 4, and a line testing unit 21 and a line control unit 22 are provided as the line testing means 200 in FIG.

第2図において、成る通信処理装置1.に収容される成
る通信回線4.に障害が発生し、該通信回線4.を対象
として試験を実行する場合には、保守者は第3図におけ
ると同様に、通信回線4tを含む図示されぬ伝送系5、
または通信回線4tにより接続される図示されぬ対向通
信処理装置6の保守者に対し、通信回線4.に対して折
返し経路の設定を依頼した後、保守運用装置2からリン
ク3を経由して通信処理装置1tに、試験対象とする通
信回線4.を閉塞させる回線閉塞コマンドを伝達する。
In FIG. 2, a communication processing device 1. 4. Communication line accommodated in A failure occurs in the communication line 4. When carrying out a test targeting , the maintenance person installs a transmission system 5 (not shown) including a communication line 4t, as in FIG.
Alternatively, the communication line 4. After requesting the setting of a return route from the maintenance operation device 2 to the communication processing device 1t via the link 3, the communication line 4 to be tested is sent to the communication processing device 1t. transmits a line blocking command to block the line.

通信処理装置1tにおいては、共通制御部12が保守運
用装置2からリンク3を経由して伝達される回線閉塞コ
マンドを受信すると、通信回線4、を閉塞し、通信回線
4.を収容する回線制御部11Lから対応する切替駆動
部(SWA)16Lに閉塞信号りを伝達する。
In the communication processing device 1t, when the common control unit 12 receives the line blocking command transmitted from the maintenance and operation device 2 via the link 3, it blocks the communication line 4, and closes the communication line 4. A blockage signal is transmitted from the line control unit 11L accommodating the line control unit 11L to the corresponding switching drive unit (SWA) 16L.

以後通信処理装置1.は、通信回線4tに関する一切の
通信処理を停止する。
Hereinafter, communication processing device 1. stops all communication processing regarding the communication line 4t.

次に保守者は、保守運用装置2内の回線試験部21を起
動し、試験対象となる通信処理装置I。
Next, the maintenance person starts up the line testing section 21 in the maintenance and operation device 2, and tests the communication processing device I to be tested.

および通信回線4Lを指定する。and the communication line 4L.

起動された回線試験部21は、指定された通信処理装置
l、と保守運用装置2とを接続する試験用回線7tを収
容する回線制御部22t、並びに試験用回線7.を経由
して通信処理装置1.に、通信回線4.を指定する回線
指定信号Xを伝達する。
The activated line test section 21 includes a line control section 22t that accommodates the test line 7t connecting the designated communication processing device l and the maintenance operation device 2, and a line control section 22t that accommodates the test line 7t that connects the designated communication processing device l and the maintenance and operation device 2, as well as the test line 7t. Communication processing device 1. 4. Communication line 4. A line designation signal X is transmitted to designate the line.

通信処理装置1tにおいては、試験開始監視部(SUP
)14がレベル変換部(LVC)13を介して試験用回
線7の受信レベルを監視しており、保守運用装置2から
伝達される回線指定信号Xを検出すると、切替回線制御
部(SWC)15に、回線指定信号Xにより指定された
通信回線4tを通知する。
In the communication processing device 1t, a test start monitoring unit (SUP
) 14 monitors the reception level of the test line 7 via the level converter (LVC) 13, and when detecting the line designation signal X transmitted from the maintenance operation device 2, the switching line control unit (SWC) 15 The communication line 4t specified by the line designation signal X is notified to the communication line 4t.

切替回線制御部(SWC)15は、試験開始監視部(S
UP)14から通知された通信回線4tに対応して設け
られた切替駆動部(SWA)16、を起動する。
The switching line control unit (SWC) 15 is a test start monitoring unit (SWC).
A switching drive unit (SWA) 16 provided corresponding to the communication line 4t notified from the UP) 14 is activated.

起動された切替駆動部(SWA)16tは、対応する回
線制御部11.から閉塞信号りが伝達されていることを
確認した上で、対応する切替部17tを動作させる。
The activated switching drive unit (SWA) 16t switches the corresponding line control unit 11. After confirming that the blockage signal is being transmitted from the controller, the corresponding switching unit 17t is operated.

以上により通信回線4tは、切替部17.により対応す
る回線制御部11tから切離されて試験用回線7tに接
続され、回線制御部22tを経由して回線試験部21に
収容される。
As described above, the communication line 4t is connected to the switching unit 17. is separated from the corresponding line control section 11t, connected to the test line 7t, and accommodated in the line test section 21 via the line control section 22t.

以後回線試験部21は、回線制御部22L、試験用回線
7.および切替部17tを経由して接続された通信回線
4.に対して試験データを送信し、第3図におけると同
様に伝送系5または対向通信処理装置6において設定さ
れた折返し経路を経由して返送される試験データを受信
し、送信した試験データと照合することにより通信回線
4Lの状態を分析し、試験結果を保守者に表示する。
Thereafter, the line test section 21 operates the line control section 22L, the test line 7. and a communication line 4 connected via the switching unit 17t. As in FIG. 3, the test data sent back via the return route set in the transmission system 5 or the opposing communication processing device 6 is received, and compared with the sent test data. By doing so, the status of the communication line 4L is analyzed and the test results are displayed to the maintenance personnel.

保守者は、回線試験部21により表示された通信回線4
.に対する試験結果を分析し、通信回線4、の障害状態
を判定する。
The maintenance person checks the communication line 4 displayed by the line testing section 21.
.. The test results for the communication line 4 are analyzed to determine the failure state of the communication line 4.

所要の試験が終了すると、保守者は保守運用装置2から
リンク3を経由して通信処理装置1tに、通信回線4t
を閉塞解除させる閉塞解除コマンドを伝達する。
When the required tests are completed, the maintenance person connects the communication line 4t from the maintenance operation device 2 to the communication processing device 1t via the link 3.
A command to release the blockage is transmitted.

通信処理装置1tにおいては、共通制御部12が保守運
用装置2からリンク3を経由して伝達される閉塞解除コ
マンドを受信すると、通信回線4、を閉塞解除し、通信
回線4tを収容する回線制御部11、から対応する切替
駆動部(SWA)16、に伝達中の閉塞信号りを停止す
る。
In the communication processing device 1t, when the common control unit 12 receives the blockage release command transmitted from the maintenance and operation device 2 via the link 3, it releases the blockage of the communication line 4, and performs line control to accommodate the communication line 4t. The blockage signal being transmitted from the section 11 to the corresponding switching actuator (SWA) 16 is stopped.

起動中の切替駆動部(SWA)16cは、対応する回線
制御部litから伝達中の閉塞信号りが停止したことを
検出すると、対応する切替部171を復旧させる。
When the activated switching drive unit (SWA) 16c detects that the blocking signal being transmitted from the corresponding line control unit lit has stopped, it restores the corresponding switching unit 171.

以上により通信回vA4 tは、切替部17、により接
続中の試験用回線7tから切離され、対応する回線制御
部11Lに収容される。
As described above, the communication line vA4t is disconnected from the currently connected test line 7t by the switching unit 17 and accommodated in the corresponding line control unit 11L.

以後通信処理装置Itは、通信回線4tに関する通常の
通信処理を開始する。
Thereafter, the communication processing device It starts normal communication processing regarding the communication line 4t.

以上の説明から明らかな如く、本実施例によれば、通信
回線4.に対する試験を開始する際に、保守運用装置2
からリンク3を経由して回線閉塞コマンドが伝達され、
更に試験用回線7.を経由して回線指定信号Xが伝達さ
れると、通信処理装置1.は通信回線4tを閉塞して試
験用回線7゜に切替え接続した後は、通信回線4.に関
する通信処理、並びに試験処理は一切行わず、試験処理
は総て保守運用装置2内の回線試験部21に一任する為
に、従来あるデータ交換機の如く、通信処理装置1が通
常の通信処理と並行して試験処理を実行する為に生ずる
問題点、即ち共通制御部12の構成の複雑化、並びに当
該データ交換機の通信処理能力の低下が生ずる恐れは無
くなる。
As is clear from the above description, according to this embodiment, the communication line 4. When starting the test for maintenance operation equipment 2
A line blockage command is transmitted via link 3 from
Furthermore, test line 7. When the line designation signal X is transmitted via the communication processing device 1. After blocking the communication line 4t and switching to the test line 7°, the communication line 4. The communication processing device 1 does not perform any communication processing or test processing, and all test processing is left to the line testing section 21 in the maintenance and operation device 2. Therefore, the communication processing device 1 performs normal communication processing, like a conventional data exchanger. Problems caused by executing test processing in parallel, that is, the risk of complicating the configuration of the common control unit 12 and deteriorating the communication processing capacity of the data exchange device, are eliminated.

なお、第2図はあく迄本発明の一実施例に過ぎず、例え
ば回線切替手段100の構成は図示されるものに限定さ
れることは無く、他に幾多の変形が考慮されるが、何れ
の場合にも本発明の効果は変わらない。また本発明の対
象となる通信処理システムは、図示されるデータ交換機
に限定されぬことは言う迄も無い9 〔発明の効果〕 以上、本発明によれば、前記通信処理システムにおいて
、回線切替手段が通信回線を保守運用装置に切替え接続
した後は、通(1,回線に対する総ての試験処理は保守
運用装置に設けられた回線試験手段により実行される為
、通信処理装置には通信回線の試験処理に関する負荷の
増加が無くなり、当該通信処理システムの通信処理能力
が、通信回線の試験処理により低下することが防止され
る。
Note that FIG. 2 is only one embodiment of the present invention, and for example, the configuration of the line switching means 100 is not limited to that shown in the figure, and many other modifications may be considered, but any The effect of the present invention does not change even in this case. Furthermore, it goes without saying that the communication processing system to which the present invention is directed is not limited to the illustrated data exchanger.9 [Effects of the Invention] As described above, according to the present invention, After the communication line is switched and connected to the maintenance operation equipment, the communication line is connected to the communication processing equipment. There is no increase in the load related to test processing, and the communication processing capacity of the communication processing system is prevented from decreasing due to communication line test processing.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明の原理を示す図、第2図は本発明の一実
施例によるデータ交換機を示す図、第3図は従来あるデ
ータ交換機の一例を示す図である。 図において、1は通信処理装置、2は保守運用装置、3
はリンク、4は通信回線、5は伝送系、6は対向通信処
理装置、7は試験用回線、11および22は回線制御部
、12は共通制御部、13はレベル変換部(LVC)、
14は試験開始監視部(SUP) 、15は切替回線制
御部(SWC)、16は切替駆動部(SWA) 、17
は切替部、21は回線試験部、100は回線切替手段、
121は回線試験部、200は回線試験手段、を示ず。 本亮明の原理図 第 1 図 従来あろテ′−タ女換序灸 第 3  図
FIG. 1 is a diagram showing the principle of the present invention, FIG. 2 is a diagram showing a data exchange according to an embodiment of the present invention, and FIG. 3 is a diagram showing an example of a conventional data exchange. In the figure, 1 is a communication processing device, 2 is a maintenance operation device, and 3 is a communication processing device.
is a link, 4 is a communication line, 5 is a transmission system, 6 is an opposite communication processing device, 7 is a test line, 11 and 22 are line control units, 12 is a common control unit, 13 is a level conversion unit (LVC),
14 is a test start monitoring unit (SUP), 15 is a switching line control unit (SWC), 16 is a switching drive unit (SWA), 17
21 is a switching unit, 21 is a line testing unit, 100 is a line switching means,
Reference numeral 121 indicates a line testing section, and reference numeral 200 indicates a line testing means. Ryomei's Principle Diagram 1 Figure 3 Conventional Aro-ta Female Switching Moxibustion Figure 3

Claims (1)

【特許請求の範囲】 それぞれ複数の通信回線(4)を収容する複数の通信処
理装置(1)と、前記各通信処理装置(1)の保守動作
を制御する保守運用装置(2)とを具備する通信処理シ
ステムにおいて、 前記各通信処理装置(1)と前記保守運用装置(2)と
の間をそれぞれ接続する試験用回線(7)を設け、 前記各通信処理装置(1)に、前記試験用回線(7)を
経由して前記保守運用装置(2)から指定される通信回
線(4)を、前記試験用回線(7)に切替え接続する回
線切替手段(100)を設け、 前記保守運用装置(2)に、前記試験用回線(7)を経
由して前記各通信処理装置(1)に、試験対象とする通
信回線(4)を前記試験用回線(7)に切替え接続する
指示を伝達した後、前記試験用回線(7)を経由して該
試験用回線(7)に切替え接続された通信回線(4)の
試験を実行する回線試験手段(200)を設けることを
特徴とする通信回線試験方式。
[Scope of Claims] Comprising a plurality of communication processing devices (1) each accommodating a plurality of communication lines (4), and a maintenance operation device (2) that controls maintenance operations of each of the communication processing devices (1). In the communication processing system, a test line (7) is provided to connect each communication processing device (1) and the maintenance operation device (2), and each communication processing device (1) is connected to the test line (7). a line switching means (100) for switching and connecting a communication line (4) designated by the maintenance operation device (2) via the service line (7) to the test line (7); Instruct the device (2) to switch and connect the communication line (4) to be tested to the test line (7) to each communication processing device (1) via the test line (7). The invention is characterized by providing a line testing means (200) for testing the communication line (4) that is switched and connected to the test line (7) via the test line (7) after the communication. Communication line test method.
JP63222913A 1988-09-06 1988-09-06 System for testing communication line Pending JPH0270141A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP63222913A JPH0270141A (en) 1988-09-06 1988-09-06 System for testing communication line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP63222913A JPH0270141A (en) 1988-09-06 1988-09-06 System for testing communication line

Publications (1)

Publication Number Publication Date
JPH0270141A true JPH0270141A (en) 1990-03-09

Family

ID=16789826

Family Applications (1)

Application Number Title Priority Date Filing Date
JP63222913A Pending JPH0270141A (en) 1988-09-06 1988-09-06 System for testing communication line

Country Status (1)

Country Link
JP (1) JPH0270141A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010278496A (en) * 2009-05-26 2010-12-09 Nec Corp Test system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010278496A (en) * 2009-05-26 2010-12-09 Nec Corp Test system

Similar Documents

Publication Publication Date Title
JPH0270141A (en) System for testing communication line
JPH0223120B2 (en)
JP2535594B2 (en) Disaster prevention monitoring device
JPH0865331A (en) Monitor and control device
JP3480214B2 (en) Remote monitoring system
JPH04116473A (en) Distributed control system with signal cable connection monitoring function
JPH09244740A (en) Remote monitoring and control device
JP2871920B2 (en) Abnormality detection device for elevator control device
JPH02141041A (en) Switching control system for data communication line
JPH04290032A (en) Line changeover device in data transmission system utilizing isdn
JPH09231097A (en) CPU device
JPS60153547A (en) Testing system of monitoring device
JPH07319503A (en) Duplex control system
JPH0830477A (en) Data equalization method for redundant control system
JPS6112422B2 (en)
JPH0484230A (en) Activation maintenance system for supervisory device
JPH11353018A (en) Slave station for supervisory and control system and storage medium recording program therefor
JP2000276456A (en) Multiplexed distributed control system
JPH0630002A (en) Redundant system
JP2001356802A (en) Dual computer system
JPH0436857A (en) Bus diagnostic system for multiprocessor system
JPS6225545A (en) Fault diagnosis system
JPH01241956A (en) Electronic switching equipment
JPH04179335A (en) Data transmission system
JPS634341A (en) Remote maintenance diagnosis system