JPH0283609U - - Google Patents
Info
- Publication number
- JPH0283609U JPH0283609U JP16230888U JP16230888U JPH0283609U JP H0283609 U JPH0283609 U JP H0283609U JP 16230888 U JP16230888 U JP 16230888U JP 16230888 U JP16230888 U JP 16230888U JP H0283609 U JPH0283609 U JP H0283609U
- Authority
- JP
- Japan
- Prior art keywords
- buried pipe
- cable
- removal conveyor
- excavation
- underground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Description
図面は本考案に係る地中配線工法の実施例を示
し、第1図は地中配線工法を示す図、第2図は推
進工法を示す図、第3図は第1図の―線断面
図である。
5…埋設管、8…排土用コンベア、9…ケーブ
ル、11…配管用スペーサ。
The drawings show an example of the underground wiring method according to the present invention, FIG. 1 is a diagram showing the underground wiring method, FIG. 2 is a diagram showing the propulsion method, and FIG. 3 is a cross-sectional view taken along the line - - in FIG. 1. It is. 5... Buried pipe, 8... Soil removal conveyor, 9... Cable, 11... Piping spacer.
Claims (1)
削土砂を、前記埋設管5内に挿入された排土用コ
ンベア8によつて搬出するとともに、掘削の進行
に伴つて前記埋設管5の後端に次の埋設管5を継
ぎ足していく推進工法による掘削作業の終了後、
前記排土用コンベア8の一端にケーブル9を接続
し、前記排土用コンベア8の他端側からの抜き出
しに伴つて、前記ケーブル9を前記埋設管5内に
引き込んでいく地中配線工法。 2 前記ケーブル9の引き込みに伴つて、前記ケ
ーブル9に配管用スペーサ11を順次装着してい
く請求項1記載の地中配線工法。[Scope of Claim for Utility Model Registration] 1. Underground excavation is carried out in advance of the buried pipe 5, and the excavated soil is carried out by the soil removal conveyor 8 inserted into the buried pipe 5, and the excavation progresses. After completing the excavation work using the propulsion method, in which the next buried pipe 5 is added to the rear end of the buried pipe 5,
An underground wiring method in which a cable 9 is connected to one end of the earth removal conveyor 8, and as the earth removal conveyor 8 is pulled out from the other end, the cable 9 is drawn into the buried pipe 5. 2. The underground wiring method according to claim 1, wherein piping spacers 11 are sequentially attached to the cable 9 as the cable 9 is pulled in.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP16230888U JPH0283609U (en) | 1988-12-13 | 1988-12-13 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP16230888U JPH0283609U (en) | 1988-12-13 | 1988-12-13 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH0283609U true JPH0283609U (en) | 1990-06-28 |
Family
ID=31446013
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP16230888U Pending JPH0283609U (en) | 1988-12-13 | 1988-12-13 |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0283609U (en) |
-
1988
- 1988-12-13 JP JP16230888U patent/JPH0283609U/ja active Pending
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP0246865A3 (en) | Method of and apparatus for providing an underground tunnel | |
| JP4317843B2 (en) | Construction method for underground structures | |
| JP3236580B2 (en) | Shield machine, excavation method of shield machine, and construction method of inclined shaft or shaft | |
| JPS6429597A (en) | Method of constructing subway | |
| JP2670734B2 (en) | Protective construction method for box body propulsion method | |
| JPH0131679Y2 (en) | ||
| JPH06229187A (en) | Constructing method of subsurface structure | |
| JPH0358040B2 (en) | ||
| JPH09279980A (en) | Underground structure constructing method | |
| JP2565478B2 (en) | Underground box promotion method | |
| JPH0432200B2 (en) | ||
| JPS61191725A (en) | Stressed material drawing method | |
| JPS6410826A (en) | Method and tool for burying underground tube | |
| JPH0344198B2 (en) | ||
| JP2001323774A (en) | Starting method of shield machine | |
| JPH0681878B2 (en) | Construction method of underground structure | |
| JPH0681879B2 (en) | Construction method of underground structure | |
| JPH10110591A (en) | Underground pipe jacking method | |
| JPH0115756Y2 (en) | ||
| JPS5516172A (en) | Excavation work method and apparatus for preventing landslide at ditch scooping | |
| JPS63206594A (en) | Propulsive device for propulsive pipe | |
| JPH0230897A (en) | Light-weight and large-size segment | |
| JP2003227289A (en) | Working face protection method in construction method of underground structure | |
| JPH09119285A (en) | Constructing method for subsurface structure | |
| JPS63156298U (en) |