JPH03182497A - Forked jib crane - Google Patents
Forked jib craneInfo
- Publication number
- JPH03182497A JPH03182497A JP32219989A JP32219989A JPH03182497A JP H03182497 A JPH03182497 A JP H03182497A JP 32219989 A JP32219989 A JP 32219989A JP 32219989 A JP32219989 A JP 32219989A JP H03182497 A JPH03182497 A JP H03182497A
- Authority
- JP
- Japan
- Prior art keywords
- jib
- pronged
- boom
- forked
- wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000005484 gravity Effects 0.000 abstract description 2
- 229910000831 Steel Inorganic materials 0.000 description 16
- 239000010959 steel Substances 0.000 description 16
- 238000010276 construction Methods 0.000 description 3
- 230000036544 posture Effects 0.000 description 3
- 239000000725 suspension Substances 0.000 description 2
- 239000004566 building material Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
Landscapes
- Jib Cranes (AREA)
Abstract
Description
【発明の詳細な説明】
産業上の利用分野
この発明は、建設現場などで建築資材や重量物の揚重、
運搬などに使用されるジブクレーンに係り、さらに云え
ばブームの先端部に三叉に分かれたジブを有する二叉ジ
ブクレーンに間する。[Detailed Description of the Invention] Industrial Application Field This invention is applicable to lifting of building materials and heavy objects at construction sites, etc.
It relates to jib cranes used for transportation, and more specifically to two-pronged jib cranes that have a three-pronged jib at the tip of the boom.
従来の技術
従来、ジブクレーンは種々公知に属し、多くの建設現場
で多用されている(第5図と第6図)。BACKGROUND OF THE INVENTION Hitherto, various jib cranes have been known and are widely used at many construction sites (FIGS. 5 and 6).
いずれにしてもブームaは単純な直線状のボックストラ
ス構造であり、そのブーム先端にシーブbを設置し、こ
れにワイヤーCを張設して物品dを吊る構成とされてい
る。In any case, the boom a has a simple linear box truss structure, and a sheave b is installed at the tip of the boom, and a wire C is stretched over the sheave b to suspend the article d.
本発明が解決しようとする課題
建設現場では、ジブクレーンによる物品の揚重、運搬の
作業内容、!Jl様は多種多様である。然るに第2図A
、 Hに示した如く、井桁状の柱梁鉄骨9をまず垂直
に吊り上げ、次いで上下を制限された狭い位置に柱鉄骨
の高さ位置を適正に調節した上で矢印方向に水平運搬し
て鉄骨建方を行なうこと、あるいは第3図A、 Bに
示した如く、建物の縦孔(ダクト)を利用して下層階か
ら鉄骨10などを垂直姿勢で吊り上げ、最上階11に引
き上げた上で水平姿勢に寝かせて横置きする等の揚重、
運搬作業は、従来のジブクレーンではとうてい不可能で
あり、これらが解決するべきr1題になっている。Problems to be Solved by the Invention At construction sites, the work involved in lifting and transporting goods using a jib crane is... Jl-sama is diverse. However, Figure 2 A
As shown in , H, the cross-shaped column-beam steel frame 9 is first lifted vertically, then the height of the column steel frame is properly adjusted to a narrow position with vertical restrictions, and the steel frame is transported horizontally in the direction of the arrow. Or, as shown in Figure 3 A and B, the steel frame 10, etc. can be lifted vertically from the lower floors using vertical holes (ducts) in the building, lifted to the top floor 11, and then horizontally lifted. Lifting such as laying it down and laying it horizontally,
Transport operations are simply impossible with conventional jib cranes, and these have become a major problem to be solved.
課題を解決するための手段
上記従来の課題を解決するための手段として、この発明
に係る二叉ジブクレーンは、図面の第1図〜第4図に実
に倒を示した如く、
ジブクレーンにおいて、そのブームlの先端部に二叉ジ
ブ2.2を突設し、各二叉ジブ2.2の先端にシーブ3
を設置し、ワイヤー4を張設して物品9.10の陽重が
可能に構成したことを特徴とする。Means for Solving the Problems As a means for solving the above-mentioned conventional problems, a two-pronged jib crane according to the present invention, as shown in FIGS. 1 to 4 of the drawings, has a boom. A two-pronged jib 2.2 is protruded from the tip of the l, and a sheave 3 is attached to the tip of each two-pronged jib 2.2.
is installed, and the wire 4 is stretched so that the articles 9 and 10 can be positively loaded.
作 用
二叉ジブ2.2のシーブ3.3に張設された2本のワイ
ヤー4.4で物品を吊ると、2点吊りが出来る(第4図
Bを参照)、さらにブームlのシーブ5に張設されたワ
イヤー6を併用すると、物品の3点吊りが出来るから吊
り物品の姿勢制御も容易に可能である(第3図B参照)
。Function: By suspending the article with two wires 4.4 stretched over the sheave 3.3 of the two-pronged jib 2.2, two-point suspension is possible (see Figure 4B). When used in conjunction with the wire 6 stretched over the wire 5, the article can be suspended from three points, making it easy to control the posture of the suspended article (see Figure 3B).
.
また、二叉ジブ2.2のシーブ3.3のワイヤー4.4
で2点吊りした物品、例えば井桁状の柱梁鉄骨9は、同
ワイヤー4.4の巻き上げにより柱の上端を二叉ジブ2
.2の位置よりも高い姿勢として支持し運搬することが
出来る(第2図B)。Also, the wire 4.4 of the sheave 3.3 of the two-pronged jib 2.2
An article suspended at two points, for example, a column-beam steel frame 9 in the form of a parallel cross, can be suspended at two points by hoisting the upper end of the column with the two-pronged jib 2.
.. It can be supported and transported in a higher position than position 2 (Figure 2B).
実に例 次に、図示した本発明の詳細な説明する。a real example The illustrated invention will now be described in detail.
第1図A、 Bに示した二叉ジブクレーンは、基本た
るブームlの先端部に、任意の位11Fを中心とする二
叉の配置で二叉ジブ2.2が突設された構成とされてい
る。二叉ジブ2.2は、これを平面的に見るとブームl
を中心として左右対称的な配置とされ、正面方向にみる
とブーム1よりは若干下向きの角度に突設され、各々の
シーブ3と5の位置がほぼ同しヘルとなる構成とされて
いる。The two-pronged jib crane shown in Figures 1A and B has a two-pronged jib 2.2 protruding from the tip of the basic boom l in a two-pronged arrangement centered on 11F. ing. If you look at the two-pronged jib 2.2 from above, the boom l
The sheaves 3 and 5 are arranged symmetrically with respect to the center, projecting at a slightly downward angle from the boom 1 when viewed from the front, and each sheave 3 and 5 are arranged in substantially the same position.
二叉ジブ2.2はさして長くは必要としない。The two-pronged jib 2.2 does not need to be very long.
ブーム1の先端及び二叉ジブ2.2の先端部にそれぞれ
シーブ5及び3が設置され、各々にワイヤー6及び4を
張設して物品の揚重が可能に構成されている。特に二叉
ジブ2.2のワイヤー4.4は、ステー7で支持された
テンションシーブ8を介して張設され、吊りモーメント
の軽減化が図られている。Sheaves 5 and 3 are installed at the tip of the boom 1 and the tip of the two-pronged jib 2.2, respectively, and wires 6 and 4 are stretched over them, respectively, so that articles can be lifted. In particular, the wire 4.4 of the two-pronged jib 2.2 is stretched through a tension sheave 8 supported by a stay 7, thereby reducing the lifting moment.
上記二叉ジブクレーンの主なる使用例を第2TJ!Jと
第31!Iに示した。The main usage example of the two-pronged jib crane mentioned above is the 2nd TJ! J and the 31st! Shown in I.
まず第2図Aでは、井桁状の柱梁鉄骨9の柱上端部がブ
ームlのワイヤー6で垂直に吊られ、二叉ジブ2.2の
ワイヤー4は梁部に正着されているが緩んで遊んでいる
0次に第2[!IBでは、およそ梁の位置に止着された
二叉ジブ2,2のワイヤー4が巻き上げられ、柱の上部
は二叉ジブ2.2の閏を抜き上がってジブ2の位置より
も高くなり、ブームIの方のワイヤー6は緩んで遊んで
いる。First, in Fig. 2 A, the upper end of the column-shaped beam steel frame 9 is vertically suspended by the wire 6 of the boom l, and the wire 4 of the two-pronged jib 2.2 is properly attached to the beam, but it is loose. The second [! At IB, the wire 4 of the two-pronged jib 2.2, which is fixed at approximately the position of the beam, is wound up, and the top of the column lifts up the lever of the two-pronged jib 2.2, becoming higher than the position of the jib 2. The wire 6 on the boom I side is loose and playing.
このように二叉ジブ2の高さ如何に拘らず、吊られた柱
の高さ位置を調整できるので、上下にスラブ等の障害物
12がある場所であっても、柱梁鉄骨9(又はその池の
物品)の高さ位置を適正に調整し矢印方向へ水平運搬し
て鉄骨建て方作業(又は逆に解体作業)を行なうことが
出来る。In this way, regardless of the height of the two-pronged jib 2, the height position of the suspended column can be adjusted, so even in places where there are obstacles 12 such as slabs above and below, the column-beam steel frame 9 (or The height position of the items (in the pond) can be adjusted appropriately and horizontally transported in the direction of the arrow to perform steel frame erection work (or conversely, demolition work).
次に、第3図Aは、建物の縦穴(ダクト)を通じて下層
階部分から鉄骨10をブームlのワイヤー6によって垂
直姿勢で吊り上げている。二叉ジブ2のワイヤー4は同
鉄骨10の下部に正着されてはいるが緩んで遊んでいる
。第3図Bは、前記鉄骨10を建物の最上P#11の上
まで吊り上げた段階で、二叉ジブ2のワイヤー4を巻き
上げることにまりで鉄骨lOを水平姿勢に寝かせ、最上
階11の上に横置きする作業状態を示している。Next, in FIG. 3A, the steel frame 10 is lifted up from the lower floor through a vertical hole (duct) of the building in a vertical position by the wire 6 of the boom l. The wire 4 of the two-pronged jib 2 is properly attached to the lower part of the steel frame 10, but it is loose and playing around. FIG. 3B shows that when the steel frame 10 has been hoisted to the top of the building, the wire 4 of the two-pronged jib 2 is hoisted up and the steel frame 1O is laid down in a horizontal position using a jammer. The work condition is shown in which the machine is placed horizontally.
第2の実施例
第4図A、 Bに示した二叉ジブ2は、ブームlの先
端部に平面形状がコ字状に突設され、各二叉ジブ2.2
の先端にシーブ3.3を設置し、各々に張設した2本の
ワイヤー4.4で物品9または10の揚重が可能に構成
されている。従って、2木のワイヤー4.4で柱梁鉄骨
9又はH形鋼などの鉄骨10を2点吊りが出来るのであ
り、用途、機能は上記第1実施例のものと同じである。Second Embodiment The two-pronged jib 2 shown in FIGS.
A sheave 3.3 is installed at the tip of the sheave 3.3, and the article 9 or 10 can be lifted by two wires 4.4 stretched on each wire. Therefore, the column and beam steel frame 9 or the steel frame 10 such as H-shaped steel can be suspended at two points using two wires 4.4, and the use and function are the same as those of the first embodiment.
本発明が奏する効果
以上に実施例と併せて詳述した通りであって、この発明
に係る二叉ジブクレーンによれば、物品を2点又は3点
の所謂多点吊りが出来るので、種型物品の重心位置との
釣合を4jIfシて様々な姿勢、態様の横目、運搬が出
来、かつ横型物品の姿勢制御や位置制御なども自在に出
来るので、様々な物品の揚重、運搬作業あるいは鉄骨建
方作業に対する適応性、自在性に富み、クレーン作業の
応用範囲の拡大とII能の向上、多様化に大きく寄与す
るのである。As described in detail in conjunction with the embodiments above and beyond the effects of the present invention, the two-pronged jib crane according to the present invention allows articles to be hung from two or three points, so-called multi-point suspension. It is possible to balance the center of gravity of the object and carry it in various postures and modes, and it is also possible to freely control the posture and position of horizontal objects, so it can be used for lifting and transporting various objects, or for steel frames. It is highly adaptable and flexible for erection work, and greatly contributes to expanding the scope of application of crane work, improving II capabilities, and diversifying it.
第1図A、 Bはこの発明に係る二叉ジブクレーンの
要部を示した平面図と正面図、第2図A、 Bと第3
FIA、Bは二叉ジブクレーンの応用作業を簡単に示し
た立面図、第4図A、 Bは二叉ジブクレーンの第2
実施例を示した斜視図、第5図と第6図は従来一般のジ
ブクレーンを示した斜視図である。
l・・・ブーム 2・・・二叉ジブ第
図
第
図
b
第
図
第
図FIGS. 1A and 1B are a plan view and a front view showing the main parts of a two-pronged jib crane according to the present invention, and FIGS. 2A, B, and 3 are
FIA, B is an elevation view that simply shows the application work of a two-pronged jib crane, and Figure 4 A and B are the second elevational views of a two-pronged jib crane.
A perspective view showing an embodiment, and FIGS. 5 and 6 are perspective views showing a conventional general jib crane. l...Boom 2...Two-pronged jib Fig. b Fig. Fig.
Claims (1)
叉ジブが突設され、各二叉ジブの先端にシーブが設置さ
れ、各シーブにワイヤーが張設され物品の揚重が可能に
構成されていることを特徴とする二叉ジブクレーン。[Scope of Claims] [1] In a jib crane, a two-pronged jib is provided protruding from the tip of the boom, a sheave is installed at the tip of each of the two-pronged jibs, and a wire is stretched across each sheave to lift goods. A two-pronged jib crane characterized by being configured to enable.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP32219989A JPH03182497A (en) | 1989-12-12 | 1989-12-12 | Forked jib crane |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP32219989A JPH03182497A (en) | 1989-12-12 | 1989-12-12 | Forked jib crane |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH03182497A true JPH03182497A (en) | 1991-08-08 |
Family
ID=18141058
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP32219989A Pending JPH03182497A (en) | 1989-12-12 | 1989-12-12 | Forked jib crane |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH03182497A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2017145143A (en) * | 2017-05-18 | 2017-08-24 | 株式会社クボタ | Assist suit |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS4914826U (en) * | 1972-05-10 | 1974-02-07 | ||
| JPS5577590A (en) * | 1978-12-05 | 1980-06-11 | Canon Inc | Feed mechanism for printing head |
| JPS62114660A (en) * | 1985-11-11 | 1987-05-26 | ハ−シヤウ ヒエミ− ビ−.ヴイ. | Manufacture of catalyst with carrier |
-
1989
- 1989-12-12 JP JP32219989A patent/JPH03182497A/en active Pending
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS4914826U (en) * | 1972-05-10 | 1974-02-07 | ||
| JPS5577590A (en) * | 1978-12-05 | 1980-06-11 | Canon Inc | Feed mechanism for printing head |
| JPS62114660A (en) * | 1985-11-11 | 1987-05-26 | ハ−シヤウ ヒエミ− ビ−.ヴイ. | Manufacture of catalyst with carrier |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2017145143A (en) * | 2017-05-18 | 2017-08-24 | 株式会社クボタ | Assist suit |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2021000720A (en) | Work system | |
| KR101114030B1 (en) | Jib crane | |
| JPH03192093A (en) | Suspension attitude control for curved plate and suspending tool for curved plate | |
| JP5555440B2 (en) | Quay crane | |
| KR101112128B1 (en) | Supportor for wire of crane | |
| JP2012026257A (en) | Guide device for lifting and lifting method using the same | |
| JP2551161Y2 (en) | Overhead traveling crane equipment | |
| JP4477205B2 (en) | Suspension device for suspended loads | |
| JP2007099402A (en) | Long material suspension | |
| KR20240123581A (en) | Lifting device | |
| JP2023111751A (en) | Suspended load rotating device | |
| JPH0623989U (en) | Lifting equipment lifting device | |
| JP3036563U (en) | Jib crane | |
| JPH0681481A (en) | Material hoisting/lowering equipment | |
| JPH10182066A (en) | Vertical transfer device | |
| JPH06211483A (en) | Beam device for lifting work | |
| JPH0743116Y2 (en) | Hook block | |
| JP2002037585A (en) | Portal cranes and bridge cranes | |
| JP3811419B2 (en) | Building material lifting device and building material lifting method | |
| JPH0714314Y2 (en) | Posture adjustment mechanism for crane load | |
| JP2659112B2 (en) | Multifunctional crane for construction work | |
| JPH0617828Y2 (en) | Crane boom rope guide device | |
| JP3085909U (en) | Heavy lifting equipment | |
| JPS60183791U (en) | container crane | |
| JPH0352786Y2 (en) |