JPH03187414A - Steep slope banking - Google Patents

Steep slope banking

Info

Publication number
JPH03187414A
JPH03187414A JP32525589A JP32525589A JPH03187414A JP H03187414 A JPH03187414 A JP H03187414A JP 32525589 A JP32525589 A JP 32525589A JP 32525589 A JP32525589 A JP 32525589A JP H03187414 A JPH03187414 A JP H03187414A
Authority
JP
Japan
Prior art keywords
embankment
wall
geotextile
sandbags
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP32525589A
Other languages
Japanese (ja)
Other versions
JPH0765317B2 (en
Inventor
Hirotaka Kawasaki
廣貴 川崎
Kiyoyasu Kitagawa
北川 精保
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Shimizu Corp
Original Assignee
Shimizu Construction Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd, Shimizu Corp filed Critical Shimizu Construction Co Ltd
Priority to JP32525589A priority Critical patent/JPH0765317B2/en
Publication of JPH03187414A publication Critical patent/JPH03187414A/en
Publication of JPH0765317B2 publication Critical patent/JPH0765317B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

PURPOSE:To maintain excellent stability for a long period of time, even if the wall part is steep and high, by embedding the geotextiles laid in the banking materials behind the wall part into selfhardening fixing materials so as to be fixed to each other. CONSTITUTION:In the inside of banking materials 3 stacked on the ground G behind a steep wall part H, geotextiles 2 which have been fixed to the wall part H are nearly horizontally laid leaving a vertical space between them. Then, the geotextiles 2 are adjacently embedded into selfhardening fixing materials 13 in appropriate positions in the banking materials 3 behind the wall part H so as to be fixed to each other. And behind the wall part H, stay bankings 6 which have been structurally integrated with the wall part H in such a state that they have been surrounded by the upper and lower geotextiles are formed. Thus, the earth pressure from the interior of the banking M can be restrained on the inside of the wall part H, enabling the end part of the banking M to be very strongly supported.

Description

【発明の詳細な説明】 「産業上の利用分野」 この発明は、急勾配の壁部を有し、かつその背後の盛土
材中にジオテキスタイルが敷設されている急勾配盛土に
関するものである。
DETAILED DESCRIPTION OF THE INVENTION "Industrial Application Field" The present invention relates to a steeply sloped embankment having a steeply sloped wall, and a geotextile is laid in the embankment material behind the steeply sloped wall.

「従来の技術」 第7図中Mは、従来工法によって造成された盛土を示し
ている。
"Conventional technology" M in Figure 7 shows an embankment constructed using the conventional construction method.

すなわち、盛土Mを造成するには、地盤G上にジオテキ
スタイル2を敷き、盛土Mの壁面3aを形成する土嚢2
0を例えば−度に三層積み上げた後、上記ジオテキスタ
イル2の上に盛土材3を盛って所定高さに転圧し、次い
で、上記ジオテキスタイル2の端部を巻き込むことによ
って上記土嚢20を覆い、引き続き上記の工程を繰り返
し、土嚢20およびその背後の盛土材3を重畳させるこ
とによって、上記土嚢20により壁部Hを形成しつつそ
の背後の盛土Mを造成している。
That is, in order to create the embankment M, the geotextile 2 is laid on the ground G, and the sandbags 2 forming the wall surface 3a of the embankment M are
After piling up the sandbags 20 in three layers, for example, on top of the geotextile 2, the embankment material 3 is piled up on top of the geotextile 2 and compacted to a predetermined height, and then the end of the geotextile 2 is rolled up to cover the sandbag 20, and then By repeating the above steps and overlapping the sandbags 20 and the embankment material 3 behind them, the sandbags 20 form the wall H and the embankment M behind them is created.

「発明が解決しようとする課題」 ところで、上記のように土嚢20を用いて壁部を形成し
た盛土Mでは、その高さを著しく高くした場合、あるい
は壁面3aが急傾斜の場合には、ジオテキスタイル2の
接触面どうしが滑り易いことに加えて土嚢20がジオテ
キスタイル2としっかりと定着されていないために土嚢
20自体の変形や移動による壁面3aの経時変位が大き
くなるが、その場合、このような従来の盛土構造では、
壁面3aの経時変位を十分に抑制することができないた
め、盛土M自身の長期的な安定性に欠けるといった不具
合が生じる恐れがある。
"Problems to be Solved by the Invention" By the way, in the embankment M in which the wall portion is formed using the sandbags 20 as described above, if the height of the embankment M is increased significantly or if the wall surface 3a is steeply sloped, geotextile In addition to the fact that the contact surfaces of the sandbags 2 and 2 are slippery, and the sandbags 20 are not firmly fixed to the geotextile 2, the displacement of the wall surface 3a over time due to the deformation and movement of the sandbags 20 itself becomes large. In the conventional embankment structure,
Since the displacement of the wall surface 3a over time cannot be sufficiently suppressed, problems such as a lack of long-term stability of the embankment M itself may occur.

この発明は、上記事情に鑑みてなされたもので、敷地を
多くとらない急勾配の壁部を有し、かつその高さに拘わ
らず長期に亙って優れた安定性が確保されて信頼性が向
上する上、施工が容易で工期の短縮化を図ることができ
る急勾配盛土を提供することを目的としている。
This invention was made in view of the above circumstances, and has a steeply sloped wall that does not take up much land, and has excellent stability and reliability over a long period of time regardless of its height. The purpose of this project is to provide a steeply sloped embankment that is easy to construct and can shorten the construction period.

「課題を解決するための手段」 この発明の急勾配盛土は、急勾配の壁部を有し、その背
後の地盤上に盛られた盛土材中にジオテキスタイルが敷
設され、そのジオテキスタイルが上記壁部に定着されて
いる急勾配盛土であって、該壁部の上下に間隔を隔てた
各位置に定着されている各ノオテキスタイル相互が該壁
部の背後の盛土材中の任意の位置において近接した状態
で自硬性定着材に埋め込まれて定着されているものであ
る。
"Means for Solving the Problems" The steep slope embankment of the present invention has a steep wall part, a geotextile is laid in the embankment material piled up on the ground behind the steep wall part, and the geotextile is placed in the wall part. A steeply sloped embankment that is anchored to the wall, where the nootextiles that are anchored at spaced positions above and below the wall are close to each other at any position in the embankment material behind the wall. It is embedded in a self-hardening fixing material and fixed therein.

「作用 」 この発明の急勾配盛土では、急勾配の壁部を有し、その
背後の地盤上に盛られた盛土材中にジオテキスタイルが
敷設され、そのジオテキスタイルが上記壁部に定着され
ていると共に、該壁部の上下に間隔を隔てた各位置に定
着されている各ジオテキスタイル相互が該壁部の背後の
盛土材中の任意の位置において近接した状態で自硬性定
着材に埋め込まれて定着されていることによって、上記
壁部の背後に、上下のジオテキスタイルで囲まれた状態
で壁部と構造的に一体化された控盛土が形成され、この
控盛土がその後方の盛土材中のジオテキスタイルに支持
された巨大な土嚢構造として作用することにより、その
控盛土が盛土内部からの土圧を壁部の内側で抑えて盛土
の端部を極めて強固に支持している。このため、この急
勾配盛土では、壁部の外壁面の経時変位が極めて小さく
なって、その安定性が非常に高くなると共に、盛土自体
の安定性も極めて高くなる。
"Function" The steep slope embankment of the present invention has a steep wall part, a geotextile is laid in the embankment material piled up on the ground behind the wall part, and the geotextile is fixed to the wall part and , the geotextiles fixed at spaced apart positions on the top and bottom of the wall are embedded and fixed in a self-hardening material in close proximity to each other at arbitrary positions in the embankment material behind the wall. By doing so, a backfill is formed behind the wall that is structurally integrated with the wall and surrounded by the upper and lower geotextiles, and this backfill is connected to the geotextile in the embankment material behind it. By acting as a huge supported sandbag structure, the backing embankment suppresses the earth pressure from inside the embankment inside the wall and extremely firmly supports the end of the embankment. Therefore, in this steeply sloped embankment, the displacement over time of the outer wall surface of the wall portion becomes extremely small, and its stability becomes extremely high, and the stability of the embankment itself also becomes extremely high.

「実施例」 以下、この発明の一実施例を第1図ないし第8図を参照
して説明する。
"Embodiment" An embodiment of the present invention will be described below with reference to FIGS. 1 to 8.

第1図は、この発明の急勾配盛土の一実施例を示す図で
あり、この図において符号Mは、既存の地盤G上に造成
された盛土である。
FIG. 1 is a diagram showing an embodiment of a steep slope embankment according to the present invention, and in this figure, reference numeral M indicates an embankment constructed on an existing ground G.

この急勾配盛土は、第1図に示すように、地盤G上に土
砂等の盛土材3が転圧された状態で盛土され、かつその
盛土材3中に複数のジオテキスタイル2が上下に間隔を
隔てて敷設されていると共に、その端部に複数の土嚢2
0が層状に積み上げられ、その土嚢20が盛土内部側へ
やや傾斜した状態で上下方向へほぼ重畳されて急勾配の
壁部Hが形成されているものである。
As shown in Fig. 1, this steep-slope embankment consists of embankment material 3 such as earth and sand being compacted onto the ground G, and a plurality of geotextiles 2 in the embankment material 3 are vertically spaced apart. Sandbags 2 are laid apart, and a plurality of sandbags 2 are placed at the ends.
0 are piled up in layers, and the sandbags 20 are substantially overlapped in the vertical direction with a slight incline toward the inside of the embankment to form a steeply sloped wall H.

この急勾配盛土では、地盤G上およびその上の六層目ご
との土r120の上面に沿った盛土材3中に上下に間隔
を隔ててそれぞれ略水平状態で敷設されている各ジオテ
キスタイル2が、壁部Hから盛土M後方へ所定距離隔て
た位置においてUビン4で盛土材3に仮固定され、かつ
その仮固定位置よりも壁部H側において盛土材3中を該
壁部Hへ向かって斜め上方へ傾斜状態で敷設され、該壁
部Hにおいて、上述のUビン4による仮固定位置におけ
る当該ジオテキスタイル2敷設レベルよりも土嚢2〇六
層分高いレベルで上下の土嚢20.20の間に挾み込ま
れている。
In this steep slope embankment, each geotextile 2 is laid in a substantially horizontal state at intervals vertically in the embankment material 3 along the top surface of the soil r120 on the ground G and every sixth layer above it. It is temporarily fixed to the embankment material 3 with the U-bin 4 at a position separated by a predetermined distance from the wall H to the rear of the embankment M, and is moved through the embankment material 3 toward the wall H on the side of the wall H from the temporarily fixed position. It is laid diagonally upward, and on the wall H, between the upper and lower sandbags 20 and 20 at a level that is 206 layers of sandbags higher than the level at which the geotextile 2 is laid at the temporary fixing position with the U-bin 4 mentioned above. It's wedged in.

そして、各ジオテキスタイル2は、その壁部H外面側が
下方の土嚢20の上端面に沿って下方へ屈曲し、その下
方の六層の土嚢20をひとまとめにした状態で壁部Hの
外面側に張り付けられて、上述の六層ひとまとめの土嚢
20のうちの最下部の土嚢20の下端面に沿って盛土M
内部側へ屈曲し、その土嚢20とその下の土嚢20  
(または地盤G)との間に挾み込まれている。
The outer surface of each geotextile 2 is bent downward along the upper end surface of the sandbag 20 below, and the six layers of sandbags 20 below are attached to the outer surface of the wall H. The embankment M is placed along the lower end surface of the lowest sandbag 20 of the six layers of sandbags 20 mentioned above.
The sandbag 20 and the sandbag 20 below are bent inward.
(or ground G).

また、上記各ジオテキスタイル2は、上述の六層ひとま
とめの土嚢20のうち最下部の土嚢20とその下の土嚢
20との間において、その下方に敷設されたジオテキス
タイル2の上に重ね合わされており、さらに、当該ジオ
テキスタイル2の端部が、該壁部Hから盛土M後方へ所
定距離隔てた上記Uピン4による仮固定位置において、
上述のUピン4に仮固定状態の当該ジオテキスタイル2
途中部の下面に重ね合わされた状態で該Uピン4により
盛土材3に仮固定され、かつ、上記Uピン4による仮固
定位置に自硬性定着材13が打設されて該壁部Hと所定
距離隔てた位置に水平方向へ帯状に延在する定着部が形
成され、この定着部に、当該ノオテキスタイル2の途中
部とその下の端部とが上記Uビン4ごと埋設されて定着
されている。
Further, each of the geotextiles 2 is superimposed on the geotextile 2 laid below between the bottom sandbag 20 and the sandbag 20 below it among the six layers of sandbags 20, Furthermore, the end of the geotextile 2 is temporarily fixed by the U pin 4 at a predetermined distance from the wall H to the rear of the embankment M,
The geotextile 2 temporarily fixed to the above-mentioned U pin 4
It is temporarily fixed to the embankment material 3 by the U-pin 4 while overlapping the lower surface of the middle part, and a self-hardening fixing material 13 is driven at the temporary fixing position by the U-pin 4 to be fixed to the wall part H in a predetermined manner. A fixing section extending horizontally in a strip shape is formed at a distance apart, and the middle part and the lower end of the Noo textile 2 are buried and fixed together with the U-bin 4 in this fixing section. There is.

このため、この急勾配盛土では、上記壁部Hの背後に、
上下のジオテキスタイル2.2で挾まれた状態で壁部H
と構造的に一体化された控盛土6が形成され、この控盛
土6がその後方の盛土材3中のジオテキスタイル2に支
持された巨大な土嚢構造として作用することにより、そ
の控盛土6が盛土M内部からの土庄を壁部Hの内側で抑
えて盛土Mの端部を極めて強固に支持している。
Therefore, in this steep slope embankment, behind the wall H,
Wall H sandwiched between upper and lower geotextiles 2.2
A retaining embankment 6 is formed that is structurally integrated with the retaining embankment 6, and this retaining embankment 6 acts as a huge sandbag structure supported by the geotextile 2 in the embankment material 3 behind it, so that the retaining embankment 6 becomes an embankment. The edge of the embankment M is extremely firmly supported by suppressing the soil from inside the wall H inside the wall H.

また、この実施例においては、上記壁部Hにおいて二枚
重ね合わされた状態でその上下の土嚢20.20に挾ま
れたジオテキスタイル2.2は、Uピン4により下側の
土嚢20に仮固定され、かつそれらの各土嚢20.20
間に挟設された自硬性定着材13により定着されている
In addition, in this embodiment, the geotextile 2.2, which is sandwiched between the upper and lower sandbags 20.20 in the above-mentioned wall portion H in a state where they are stacked in two layers, is temporarily fixed to the lower sandbag 20 by the U pin 4, and Each of those sandbags 20.20
It is fixed by a self-hardening fixing material 13 interposed therebetween.

さらに、各々の六層ひとまとめの土嚢2oのうち、三層
目の±lI20と四層目の土嚢20との間にはアンカー
5が取り付けられている。このアンカー5は、鋼製で、
例えば第2図に示すように棒状の基部5aとその基部5
aの中央部に溶接された掛止部5bとにより略J字形を
なしているものであって、上記基部5aの上下端部がそ
れぞれ三層目の土1120の上部および四層目の土嚢2
oの下部に差し込まれた状態で取り付けられ、かつ上記
掛止部5bが、該土嚢20.2oの間から壁面へ突出し
、その壁部外面を覆って保持するジオテキスタイル2を
引き付けた状態で掛止している。
Further, among the sandbags 2o in each of the six layers, an anchor 5 is attached between the third layer ±lI20 and the fourth layer sandbag 20. This anchor 5 is made of steel,
For example, as shown in FIG. 2, a rod-shaped base 5a and its base 5
The upper and lower ends of the base 5a are connected to the top of the third layer of soil 1120 and the fourth layer of sandbag 2, respectively.
o, and the above-mentioned hanging part 5b protrudes from between the sandbags 20.2o to the wall surface, and is hung while attracting the geotextile 2 that covers and holds the outer surface of the wall part. are doing.

なお、上述のアンカー5としては、第2図に示すものの
ほか、第3図に示すものを用いても良い。
In addition to the anchor 5 shown in FIG. 2, the anchor 5 shown in FIG. 3 may be used.

このアンカー5は、第2図に示したアンカー5と同様に
基部5aと掛止部5bとを有するものであるが、このア
ンカー5では、−本の鋼棒を曲げ加工して基部5aと掛
止部5bとを形成した構成となっている。
This anchor 5 has a base portion 5a and a hooking portion 5b like the anchor 5 shown in FIG. It has a structure in which a stop portion 5b is formed.

そして、上記三層目の土嚢20と四層目の土嚢20との
間にも上述の自硬性定着材13が充填されており、この
自硬性定着材13と上記アンカー5の基部5aとによっ
て該三層目と四層目の土嚢5.5どうしおよびアンカー
5.5と土嚢20.20とが定着固定されている。
The above-mentioned self-hardening fixing material 13 is also filled between the third layer sandbag 20 and the fourth layer sandbag 20, and the self-hardening fixing material 13 and the base portion 5a of the anchor 5 The third and fourth layer sandbags 5.5 and the anchor 5.5 and sandbag 20.20 are fixedly fixed.

上記自硬性定着材13としては、現場近くで入手した土
砂などにセメント系固化材などを混合してなる硬練りの
ソイルモルタルまたはフィルセメント等が用いられるほ
か、RCDコンクリート等の硬練りコンクリート、石灰
混合処理強化上などを用いても良く、また、普通のコン
クリート、モルタル、セメントペースト等のセメント系
固化材、あるいは早強モルタル等の早強性セメント系固
化材などを用いても差し支えない。
As the above-mentioned self-hardening fixing material 13, hard-mixed soil mortar or fill cement, which is made by mixing cement-based hardening agent with earth and sand obtained near the site, is used, as well as hard-mixed concrete such as RCD concrete, lime Mixing treatment reinforcement may be used, or ordinary concrete, mortar, cement paste, or other cement-based solidifying agents, or early-strengthening cement-based solidifying agents such as early-strengthening mortar may be used.

また、上記ジオテキスタイル2としては、織布、不織布
等のジオファブリックやジオネットを用いても差し支え
ないが、好ましくは、高分子材料を格子状に成形したい
わゆるポリマーグリッドやファイバーグリッド等のジオ
グリッドを用いた方が良く、そのジオグリッドのなかで
も特にファイバーグリッドを用いることが望ましい。
Furthermore, as the geotextile 2, geofabrics such as woven fabrics and nonwoven fabrics or geonets may be used, but preferably geogrids such as so-called polymer grids or fiber grids formed from polymeric materials in a lattice shape are preferably used. Among these geogrids, it is particularly desirable to use fiber grids.

このファイバーグリッドは、具体的には、引き揃えられ
た複数本の連続繊維からなる繊維束が互いに交差して格
子状をなし、それら繊維束の各繊維が樹脂材料により結
束された構成となっているものであって、強度、引張剛
性、剪断剛性およびクリープ特性等の力学的特性に優れ
た格子状補強材となっているものである。
Specifically, this fiber grid has a structure in which fiber bundles made of a plurality of aligned continuous fibers cross each other to form a lattice shape, and each fiber of the fiber bundles is bound by a resin material. It is a lattice-shaped reinforcing material with excellent mechanical properties such as strength, tensile rigidity, shear rigidity, and creep properties.

次に、このような急勾配盛土を造成する方法について説
明する。
Next, a method for constructing such a steeply sloped embankment will be explained.

まず、第5図に示すように、盛土を造成すべき既存の地
盤G上の壁部H形成予定位置から盛土内部側へ所定距離
隔てた位置にジオテキスタイル2の一方の端部を位置さ
せ、かつその一方の端部をUビン4により地盤Gに仮止
めした状態で、そのジオテキスタイル2を該地盤G上の
壁部H側へ敷設してさらに上記壁部H形成予定位置の外
側へ延出させておき、次いでそのジオテキスタイル2上
の壁部Hが構築されるべき位置に一層目の土嚢20を複
数並べて配設し、かつ第4図に示すように、それらの土
嚢20の上に二層目の土W20および三層目の土嚢20
を千鳥に積み上げると共に、その三層目までの土嚢20
により形成された壁部Hの背後の地盤G上の上記Uビン
4仮止め位置よりも壁部H側に、該三層目の土嚢20の
高さまで盛土材3を盛り、必要に応じてその盛土材3を
転圧する。
First, as shown in Fig. 5, one end of the geotextile 2 is positioned at a predetermined distance from the planned position for forming the wall H on the existing ground G on which the embankment is to be constructed, toward the inside of the embankment, and With one end of the geotextile 2 temporarily fixed to the ground G by a U-bin 4, the geotextile 2 is laid on the ground G to the side of the wall H, and further extended to the outside of the planned position where the wall H is to be formed. Then, as shown in FIG. soil W20 and third layer sandbag 20
20 sandbags up to the third layer.
Fill the embankment material 3 up to the height of the third layer of sandbags 20 on the ground G behind the wall H formed by the above-mentioned temporary fixing position of the U-bin 4 on the side of the wall H, and fill it as necessary. The embankment material 3 is compacted.

このようにした後、上述の三層目の土嚢20の上部中央
を壁部Hの延在方向に沿って溝状に凹ませて凹部を形成
し、その凹部内に例えば第2図に示すアンカー5の基部
5aを差し絵んでその下端部を取り付け、かつそのアン
カー5の掛止部5bを三層目の土!I20の上端から壁
面へ突出させた状態で、−層目の土嚢20の下から壁部
H外面側へ延出しているジオテキスタイル2を持ち上げ
てその土嚢20の外面側下端面に沿って上方へ屈曲させ
ることにより、該壁部Hの壁面に沿ってぴったりと土嚢
20に接した状態を保って張り付けた状態で立ち上げ、
上記アンカー5の掛止部5bに掛止させる。
After this, the center of the upper part of the third layer sandbag 20 is recessed in a groove shape along the extending direction of the wall H to form a recess, and the anchor shown in FIG. 2 is inserted into the recess. Insert the base 5a of the anchor 5 and attach its lower end, and attach the hooking part 5b of the anchor 5 to the third layer of soil! With the upper end of I20 protruding toward the wall surface, lift the geotextile 2 extending from below the -th layer sandbag 20 to the outer surface side of the wall H and bend it upward along the lower end surface of the outer surface side of the sandbag 20. By doing so, the sandbags 20 are stood up along the wall surface of the wall H in a state in which the sandbags 20 are kept tightly in contact with the sandbags 20, and
The anchor 5 is hooked onto the hook portion 5b of the anchor 5.

そして、さらに上記三層目の土嚢20の凹部内に自硬性
定着材13を充填すると共に、その土嚢20上のアンカ
ー5の基部5aの上端部に四層目の土嚢20を差し込み
、かつその四層目の土!I20の下面中央を溝状に凹ま
せてその凹部内が上述の自硬性定着材13で満たされる
ようにした状態でその四層目の土嚢20を三層目の土嚢
20の上に積み重ねることによって、それらの各土嚢2
0゜20を上記アンカー5および上記自硬性定着材13
により定着固定する。
Then, the self-hardening fixing material 13 is further filled into the recess of the third layer sandbag 20, and the fourth layer sandbag 20 is inserted into the upper end of the base 5a of the anchor 5 on the sandbag 20. Layered soil! By recessing the center of the lower surface of I20 into a groove shape and filling the recess with the above-mentioned self-hardening fixing material 13, the fourth layer of sandbags 20 is stacked on top of the third layer of sandbags 20. , each of those sandbags 2
0°20 to the anchor 5 and the self-hardening fixing material 13
Fix it by fixing it.

このようにした後、第6図に示すように、上述の四層目
の土嚢20の上に五層目の土嚢20および六層目の土嚢
20を第4図に示すように千鳥に積み上げていくと共に
、その六層目までの土嚢20により形成された壁部Hの
背後の盛土材3上にさらに盛土材3を盛ってその上面が
該壁部H側から上記Uピン4仮止め位置へ向かって斜め
下方へ傾斜した断面三角形状の控盛土6を形成し、さら
にその控盛土6を転圧する。
After doing this, as shown in FIG. 6, the fifth layer of sandbags 20 and the sixth layer of sandbags 20 are stacked in a staggered manner on top of the fourth layer of sandbags 20 described above. At the same time, the embankment material 3 is further piled up on the embankment material 3 behind the wall H formed by the sandbags 20 up to the sixth layer, and the upper surface of the embankment material 3 is moved from the wall H side to the temporary fixing position of the U pin 4. A retaining embankment 6 having a triangular cross-section slanting diagonally downward is formed, and the retaining embankment 6 is further compacted.

なお、上記控盛土6は転圧が不十分となり易い部分なの
で、この部分の盛土材3としては砂質系の良質土を用い
ることが望ましいが、転圧し難い上に排水効率の悪い粘
性土質を用いる場合には、控盛土6からの排水を行なわ
せるための排水手段として、例えば砂質層による排水層
あるいは排水シート (不織布シート等)などをジオテ
キスタイル2の下面に沿って設けるなどすれば良い。
Furthermore, since the above-mentioned backing embankment 6 is a part where compaction is likely to be insufficient, it is desirable to use good quality sandy soil as the embankment material 3 for this part. When used, a drainage layer made of a sandy layer or a drainage sheet (such as a nonwoven fabric sheet) may be provided along the lower surface of the geotextile 2 as a drainage means for draining water from the retaining earth 6.

そして、このようにした後、上述のアンカー5により掛
止されたジオテキスタイル2の端部を持ち上げて六層目
までの土嚢20からなる壁部Hの壁面に沿って立ち上げ
、かつ六層目の土嚢20の上端面に沿って盛土内部側へ
屈曲させることによりそのジオテキスタイル2を六層目
の土嚢20の上に覆い被せ、そのジオテキスタイル2の
上から該土嚢20の上部にUビン4を墓し込むことによ
りそのジオテキスタイル2を土嚢20に固定し、かつそ
のジオテキスタイル2を控盛土6の上面に覆い被せて上
記地盤GのUピン4仮止め位置まで延出させ、さらに、
そのジオテキスタイル2の端部を上記Uピン4仮止め位
置のUビン4を差し替えて該地盤G上のジオテキスタイ
ル2途中部の上に重ね合わせた状態で地盤G上に仮固定
する。
After doing this, the end of the geotextile 2, which is hung by the above-mentioned anchor 5, is lifted up and raised along the wall surface of the wall H consisting of the sandbags 20 up to the sixth layer, and The geotextile 2 is bent toward the inside of the embankment along the upper end surface of the sandbag 20 to cover the sixth layer of the sandbag 20, and the U-bin 4 is placed over the top of the geotextile 2 and onto the top of the sandbag 20. The geotextile 2 is fixed to the sandbag 20 by inserting the geotextile 2 into the sandbag 20, and the geotextile 2 is made to cover the upper surface of the backing embankment 6 and extend to the temporary fixing position of the U pin 4 in the ground G, and further,
The end of the geotextile 2 is temporarily fixed on the ground G in a state where it is superimposed on the middle part of the geotextile 2 on the ground G by replacing the U pin 4 at the temporary fixing position of the U pin 4.

そして、このようにして該ジオテキスタイル2の途中部
および端部を重ね合わせた状態で該地盤G上の上記Uピ
ン4仮止め位置と同じ位置に固定した後、そのUビン4
固定位置に自硬性定着材I3を打設することによって、
該壁部Hと所定距離隔てた位置に沿って水平方向へ帯状
に延在する定着部を形成し、その定着部に、当該ジオテ
キスタイル2の途中部とその下の端部とを上記Uピン4
ごと埋設して定着する。
Then, after fixing the geotextile 2 at the same position as the temporary fixing position of the U pin 4 on the ground G with the middle part and end part of the geotextile 2 overlapped, the U pin 4 is
By placing the self-hardening fixing material I3 at a fixed position,
A fixing section is formed that extends horizontally in a strip shape along a position separated from the wall H by a predetermined distance, and the U pin 4 is attached to the middle part of the geotextile 2 and the lower end thereof to the fixing section.
Bury the whole thing and let it settle.

このようにした後、第7図に示すように、上記控盛土6
の背後に盛土材3を盛り、次いでその盛土材3を転圧す
ることにより、−層目の盛土層を形成する。そして、こ
の−層目の盛土層上の上記壁部Hから盛土内部側へ所定
距離隔てた位置に上記ジオテキスタイル2とは別のジオ
テキスタイル2の一方の端部を位置させ、かつその一方
の端部をUピン4により盛土層上に仮止めした状態で、
そのジオテキスタイル2を壁部H側に敷設してそのジオ
テキスタイル2を上記六層目の土嚢2o上のジオテキス
タイル2の上に一部重ね合わせた状態で、そのジオテキ
スタイル2の一方の端部を上記六層目の土嚢20の壁部
H外面側へ延出させておく。
After doing this, as shown in FIG.
By piling up the embankment material 3 behind and then rolling the embankment material 3, a -th embankment layer is formed. Then, one end of a geotextile 2 other than the geotextile 2 is located at a predetermined distance from the wall H on this −th embankment layer toward the inside of the embankment, and one end of the geotextile 2 is is temporarily fixed on the embankment layer with U pin 4,
The geotextile 2 is laid on the wall H side, and with the geotextile 2 partially overlapped on the geotextile 2 on the sixth layer sandbag 2o, one end of the geotextile 2 is placed on the sixth layer. The wall portion H of the sandbag 20 is made to extend toward the outer surface side.

そして、このようにした後、上記六層目の土嚢20上で
重ね合わされた二枚のジオテキスタイル2.2をその土
嚢20の上部に前記−層目のジオテキスタイル2を仮止
めしたUビン4を差し替えて固定しつつ、その土!12
0の上部中央に凹部を形成し、この凹部に自硬性定着材
13をジオテキスタイル2の上面が覆われる程度に充填
しながら、その土嚢20上に七層目の土嚢20を積み上
げて自硬性定着材13を各上下の土嚢20.20間に挟
設していく。
After doing this, the two geotextiles 2.2 superimposed on the sixth layer of sandbag 20 are replaced with the U-bin 4 in which the -th layer of geotextile 2 is temporarily fixed on top of the sandbag 20. While fixing the soil! 12
A recess is formed in the center of the top of the geotextile 0, and while filling this recess with the self-hardening fixing material 13 to the extent that the top surface of the geotextile 2 is covered, the seventh layer of sandbags 20 is stacked on top of the sandbag 20, and the self-hardening fixing material is filled. 13 is sandwiched between each upper and lower sandbag 20.20.

このようにして六層目の土嚢20上に七層目の土11f
20を複数並べて配設した後、第8図に示すように、そ
れら七層目の土嚢20の上に六層目の土嚢20および九
層目の土嚢20を千鳥に積み上げると共に、その九層目
までの土嚢20により形成された壁部Hの背後の地盤G
上の上記Uピン4仮止め位置よりも壁部H側に、該九層
目の土嚢20の高さまで盛土材3を盛り、必要に応じて
その盛土材3を転圧する。
In this way, the seventh layer of soil 11f is placed on the sixth layer of sandbags 20.
After arranging a plurality of sandbags 20 in a row, as shown in FIG. The ground G behind the wall H formed by the sandbags 20 up to
Embankment material 3 is piled up to the height of the ninth layer of sandbags 20 on the side of wall H from the temporary fixing position of the above U-pin 4, and the embankment material 3 is compacted as necessary.

このようにした後、上述の九層目の土嚢2oの上部中央
を壁部■4の延在方向に沿って溝状に凹ませて凹部を形
成し、その凹部内にアンカー5の基部5aを差し込んで
その下端部を取り付け、かつそのアンカー5の掛止部5
bを九層目の土嚢2゜の上端から壁面へ突出させた状態
で、七層目の土!I20の下から壁部H外面側へ延出し
ているジオテキスタイル2を持ち上げてその土嚢2oの
外面側下端面に沿って上方へ屈曲させることにより、該
壁部Hの壁面に沿ってぴったりと土嚢2oに接した状態
を保って張り付けた状態で立ち上げ、上記アンカー5の
掛止部5bに掛止させる。
After doing this, the center of the upper part of the ninth layer sandbag 2o mentioned above is recessed in the shape of a groove along the extending direction of the wall part 4 to form a recess, and the base 5a of the anchor 5 is inserted into the recess. Insert the lower end and attach the hook 5 of the anchor 5.
With b protruding 2 degrees from the top of the ninth layer of sandbag toward the wall, the seventh layer of soil! By lifting the geotextile 2 extending from below I20 toward the outer surface of the wall H and bending it upward along the lower end surface of the outer surface of the sandbag 2o, the sandbag 2o can be tightly fitted along the wall surface of the wall H. The anchor 5 is held in contact with the anchor 5 and then raised, and is hooked onto the hook portion 5b of the anchor 5.

そして、さらに上記九層目の土嚢20の凹部内に自硬性
定着材13を充填すると共に、その土嚢20上のアンカ
ー5の基部5aの上端部に十層目の土嚢20を差し込み
、かつその十層目の土!120の下面中央を溝状に凹ま
せてその凹部内が上述の自硬性定着材I3で満たされる
ようにした状態でその十層目の土嚢20を九層目の土嚢
20の上に積み重ねることによって、それらの各土嚢2
0.20を上記アンカー5および上記自硬性定着材13
により定着固定する。
Then, the self-hardening fixing material 13 is further filled into the recess of the ninth layer sandbag 20, and the tenth layer sandbag 20 is inserted into the upper end of the base 5a of the anchor 5 on the sandbag 20, and Layered soil! By stacking the tenth layer sandbag 20 on top of the ninth layer sandbag 20 with the center of the lower surface of the sandbag 120 made into a groove so that the inside of the recess is filled with the above-mentioned self-hardening fixing material I3. , each of those sandbags 2
0.20 for the anchor 5 and the self-hardening fixing material 13
Fix it by fixing it.

そして、このようにして、上述の工程と同様な工程を繰
り返すことに上り、−層目の盛土層上に、二層目、三層
目の盛土層およびその上層の盛土層を順次形成しつつ、
各盛土層の端部にそれぞれ六層づつの土嚢20を並行し
て積み上げていくことによって、第1図に示すような盛
土Mをその壁部Hと並行して造成していく。
In this way, the process similar to the above-mentioned process is repeated, and the second and third embankment layers and the upper embankment layer are sequentially formed on the -th embankment layer. ,
By stacking six layers of sandbags 20 in parallel at the end of each embankment layer, an embankment M as shown in FIG. 1 is created in parallel with the wall H thereof.

なお、この実施例の場合には、前記定着部において、下
側のジオテキスタイル2の方が盛土Mの後方へ長く敷設
されるようにして、上方側にジオテキスタイル2の端部
を重ねるようにしても良い。
In addition, in the case of this embodiment, the lower geotextile 2 may be laid longer toward the rear of the embankment M in the anchoring part, and the ends of the geotextile 2 may be overlapped on the upper side. good.

第9図は、この発明の第2実施例の急勾配盛土を示す図
であって、図では三層目の盛土層を造成この実施例の急
勾配盛土では、第1実施例の急勾配盛土と同様に、盛土
材3中に上下に間隔を隔ててそれぞれ略水平状態で敷設
されている各ジオテキスタイル2が、壁部Hにおいて下
から六層目ごとの土嚢20とその上の土!I20との間
に挾み込まれ、それらの各ジオテキスタイル2が、その
下方の六層の土嚢20をひとまとめにした状態で壁部H
の外面に沿って張り付けられている。
FIG. 9 is a diagram showing a steep slope embankment according to a second embodiment of the present invention, in which a third embankment layer is created. Similarly, each geotextile 2, which is laid substantially horizontally in the embankment material 3 at intervals above and below, is constructed of sandbags 20 in every sixth layer from the bottom on the wall H, and the soil above them! I20, each of these geotextiles 2 is placed in the wall H with the six layers of sandbags 20 below it being put together.
It is attached along the outer surface of the

しかし、この急勾配盛土では、第9図に示すように、上
述の六層ひとまとめの土嚢20のうち最下部の土嚢20
の下に挾み込まれて盛土M内部側へ延出しているジオテ
キスタイル2の一方の端部が、該壁部Hから盛土M後方
へ所定距離隔てた位置へ向かって斜め上方へ傾斜して敷
設され、その位置において当該ジオテキスタイル2の途
中部の下に重ね合わされた状態でUピン4により盛土材
3に仮固定され、かつそのUピン4ごと、当該ジオテキ
スタイル2の途中部およびその下の端部が、自硬性定着
材13からなる定着材に埋設されて定そして、このよう
な急勾配盛土を造成する場合には、例えば三層目の盛土
層を造成するところを第9図を参照して説明すると、予
め三層目の盛土層の高さまでの土嚢を積み上げて壁部H
を形成しておくと共に、その壁部Hの後方の二層目まで
の盛土層上に、該壁部H背後の控盛土6を形成すべき断
面三角形部分を除いて盛土材3を盛っておき、かつ、上
記壁部Hの外側から六層ひとまとめの土!120に張り
付けられているジオテキスタイル2の両側が盛土Mの盛
土作業の邪魔にならないように丸められた状態で、それ
ぞれUピン4、クリップ7等により土嚢20の内側など
にくくりつけておくと良い。
However, in this steeply sloped embankment, as shown in FIG.
One end of the geotextile 2, which is sandwiched under the embankment M and extends to the inside of the embankment M, is laid obliquely upward toward a position a predetermined distance away from the wall H to the rear of the embankment M. At that position, it is temporarily fixed to the embankment material 3 by the U pin 4 in a state that it is overlapped under the middle part of the geotextile 2, and the middle part of the geotextile 2 and the end below it are fixed together with the U pin 4. is buried in a fixing material made of the self-hardening fixing material 13, and when building such a steep slope embankment, for example, the construction of the third embankment layer is shown in FIG. 9. To explain, sandbags are stacked up to the height of the third embankment layer in advance and wall H is
At the same time, embankment materials 3 are piled up on the embankment layers up to the second layer behind the wall H, except for the triangular cross-sectional part where the backing embankment 6 is to be formed. , and six layers of soil from the outside of the wall H! It is preferable that both sides of the geotextile 2 attached to the earthen wall 120 are rolled up so as not to interfere with the embankment work of the embankment M, and each is tied to the inside of the sandbag 20 using U pins 4, clips 7, etc.

なお、この第2実施例においても、前記定着部において
、下側のジオテキスタイル2の方が盛土Mの後方へ長く
敷設されるようにして、上方側にジオテキスタイル2の
端部を重ねるようにしても良い。
In this second embodiment as well, the lower geotextile 2 may be laid longer toward the rear of the embankment M in the fixing section, and the ends of the geotextile 2 may be overlapped on the upper side. good.

第1O図は、この発明の第3実施例の急勾配盛土を示す
図である。
FIG. 1O is a diagram showing a steep slope embankment according to a third embodiment of the present invention.

この実施例の急勾配盛土は、第1実施例の急勾配盛土お
よび第2実施例の急勾配盛土と同様に、地盤G上および
その上の盛土材3中に複数のジオテキスタイル2が上下
に間隔を隔ててそれぞれ略水平状態で敷設され、各ジオ
テキスタイル2が、壁部Hにおいて下から六層目ごとの
各土嚢20とその上の土嚢20との間に挾み込まれ、か
つ各六層ひとまとめの土嚢20に壁部H外面に沿ってジ
オテキスタイル2が張り付けられている。
The steep slope embankment of this embodiment, like the steep slope embankment of the first embodiment and the steep slope embankment of the second embodiment, has a plurality of geotextiles 2 on the ground G and in the embankment material 3 thereon at vertical intervals. Each geotextile 2 is sandwiched between each sandbag 20 of every sixth layer from the bottom and the sandbag 20 above it on the wall H, and each of the six layers is laid together in a substantially horizontal state. A geotextile 2 is attached to the sandbag 20 along the outer surface of the wall H.

しかし、この急勾配盛土では、第10図に示すように、
壁部Hにおいて下から六層目ごとの土嚢20とその上の
土嚢20との間に挾み込まれた状態で該壁部Hの背後の
盛土材3中に略水平状態で敷設されているジオテキスタ
イル2と、その上方の六層ひとまとめの土嚢20の上部
から盛土M内部側へ斜め下方に傾斜状態で敷設されたジ
オテキスタイル2と、上記ジオテキスタイル2の下方の
六層ひとまとめの土嚢20の下部から盛土M内部側へ斜
め上方に傾斜状態で敷設されたジオテキスタイル2とが
、該壁部Hから所定圧離隔てた位置に沿って形成された
自硬性定着材13からなる定着部に定着されている。
However, in this steep embankment, as shown in Figure 10,
It is laid in a substantially horizontal state in the embankment material 3 behind the wall H in a state where it is sandwiched between the sandbags 20 of every sixth layer from the bottom and the sandbags 20 above it. The geotextile 2 and the geotextile 2 laid diagonally downward from the top of the six layers of sandbags 20 above it to the inside of the embankment M, and the embankment from the bottom of the six layers of sandbags 20 below the geotextile 2. A geotextile 2 laid obliquely upward toward the inside of the M is fixed to a fixing section made of a self-hardening fixing material 13 formed along a position spaced apart from the wall H by a predetermined pressure.

第11図は、この発明の第4実施例の急勾配盛土を示す
図である。
FIG. 11 is a diagram showing a steep slope embankment according to a fourth embodiment of the present invention.

この実施例の急勾配盛土は、第1実施例の急勾配盛土と
同様に、地盤G上およびその上の盛土材3中に複数のジ
オテキスタイル2が上下に間隔を隔ててそれぞれ略水平
状態で敷設され、各ジオテキスタイル2が、壁部Hにお
いて下から六層目ごとの各土嚢20とその上の土嚢20
との間に挟み込まれ、かつ各六層ひとまとめの土嚢20
に壁部H外面に沿ってジオテキスタイル2が張り付けら
れている。
The steep slope embankment of this embodiment is similar to the steep slope embankment of the first embodiment, in which a plurality of geotextiles 2 are laid on the ground G and in the embankment material 3 thereon in a substantially horizontal state at intervals vertically. Each geotextile 2 has a sandbag 20 on every sixth layer from the bottom and a sandbag 20 above it on the wall H.
20 sandbags sandwiched between the
A geotextile 2 is pasted along the outer surface of the wall H.

しかし、この急勾配盛土では、第11図に示すように、
下方の六層ひとまとめの土嚢20に巻き付けられてその
上の土嚢20,20間に挾み込まれたジオテキスタイル
2が、その上方の六層ひとまとめの土嚢20に巻き付け
られて上記土嚢20.20間に挾み込まれたジオテキス
タイル2の下側に沿って盛土M内部側へ所定距離略水平
状態で延在し、壁部Hから盛土M内部側へ所定圧離隔て
られた位置においてUピン4および自硬性定着材13に
より盛土材3中に定着固定され、かつその位置から盛土
M内部側へ斜め下方に傾斜状態で敷設されてその端部が
下方のジオテキスタイル2の上側に重ね合わされた状態
でUビン4および自硬性定着材13により定着固定され
ているため、壁部H背後において該ジオテキスタイル2
により上下から挾まれて形成されている控盛土6の断面
形状が三角形状ではなく、矩形状になっている。
However, in this steeply sloped embankment, as shown in Figure 11,
The geotextile 2, which is wrapped around the lower six layers of sandbags 20 and sandwiched between the upper sandbags 20, 20, is wrapped around the upper six layers of sandbags 20 and sandwiched between the above sandbags 20, 20. It extends approximately horizontally for a predetermined distance to the inside of the embankment M along the lower side of the inserted geotextile 2, and the U pin 4 and the self-support It is fixed and fixed in the embankment material 3 by the hard anchoring material 13, and is laid diagonally downward from that position to the inside of the embankment M, and the end thereof is overlaid on the upper side of the geotextile 2 below. 4 and the self-hardening fixing material 13, the geotextile 2 is fixed behind the wall H.
The cross-sectional shape of the retaining embankment 6 formed between the upper and lower sides is not triangular but rectangular.

なお、上述の第1、第2、第3、第4実施例の急勾配盛
土によれば、上下に複数個積み重ねられて壁部Hを構成
している各六層ひとまとめの土嚢20の背後にジオテキ
スタイル2で上下を囲まれた状態で該六層ひとまとめの
土嚢20と構造的に一体化された控盛土6が形成され、
この控盛土6がその後方の盛土材3中のジオテキスタイ
ル2に支持された巨大な土嚢として作用していると共に
、上下の各六層ひとまとめの土嚢20どうしが自硬性定
着材13により互いに定着固定されているので、上述の
控盛土6により形成された上下の巨大な土嚢どうしも一
体化されて巨大な土嚢構造として作用することとなり、
それによって、その巨大な土嚢構造が盛土M内部からの
土圧を壁部Hの内側で抑えて盛土Mの端部を極めて強固
に支持することとなる。
In addition, according to the steep slope embankments of the first, second, third, and fourth embodiments described above, behind each of the six layers of sandbags 20 that are stacked vertically to form the wall H, A retaining embankment 6 is formed which is structurally integrated with the six layers of sandbags 20 while being surrounded from above and below by the geotextile 2,
This backing embankment 6 acts as a huge sandbag supported by the geotextile 2 in the embankment material 3 behind it, and the upper and lower six layers of sandbags 20 are fixed and fixed to each other by the self-hardening anchoring material 13. Therefore, the upper and lower huge sandbags formed by the above-mentioned backing embankment 6 are integrated and act as a huge sandbag structure,
As a result, the huge sandbag structure suppresses the earth pressure from inside the embankment M on the inside of the wall H, and supports the end of the embankment M extremely firmly.

第12図は、この発明の第5実施例の急勾配盛土を示す
図であって、図では三層目の盛土層を造成しているとこ
ろを示している。
FIG. 12 is a diagram showing a steeply sloped embankment according to a fifth embodiment of the present invention, and the figure shows the construction of the third embankment layer.

この実施例の急勾配盛土では、上述の各実施例のように
土嚢20を用いずに、複数の壁面ユニット8を上下左右
の端部で連結し、かつその下部を基礎9に取り付けて壁
部Hが構成されている。
In the steep slope embankment of this embodiment, instead of using the sandbags 20 as in the above-mentioned embodiments, a plurality of wall units 8 are connected at the upper, lower, left and right ends, and the lower part is attached to the foundation 9 to form a wall. H is configured.

そして、この急勾配盛土では、上記基礎9および壁面ユ
ニット8の上部リブに取り付けられた定着継手金具IO
に、自硬性定着材13を介してジオテキスタイル2が該
壁部H背後の盛土材3中に略水平状態で敷設され、かつ
、各自硬性定着材13中のジオテキスタイル2の端部上
に別のジオテキスタイル2の一方の端部が重ね合わされ
た状態でUピン4で固定されて該自硬性定着材13中に
定着され、そのジオテキスタイル2が盛土M内部側へ斜
め上方に傾斜状態で敷設され、そのジオテキスタイル2
の他方の端部が、その上方に略水平状態で敷設されてい
るジオテキスタイル2の下側に重ね合わされた状態でU
ピン4および自硬性定着材13により定着固定されてお
り、これにより、上述の傾斜状態のジオテキスタイル2
の壁部H側に断面三角形状の控盛土6が形成されている
In this steep slope embankment, the anchoring joint metal fitting IO attached to the foundation 9 and the upper rib of the wall unit 8
, the geotextile 2 is laid in a substantially horizontal state in the embankment material 3 behind the wall H through the self-hardening fixing material 13, and another geotextile is placed on the end of the geotextile 2 in each self-hardening fixing material 13. The geotextile 2 is fixed in the self-hardening fixing material 13 with one end of the geotextile 2 overlapped with the U pin 4, and the geotextile 2 is laid diagonally upward toward the inside of the embankment M, and the geotextile 2 is 2
The other end of the U
It is fixed and fixed by the pin 4 and the self-hardening fixing material 13, and thereby the geotextile 2 in the above-mentioned inclined state
A retaining embankment 6 having a triangular cross section is formed on the side of the wall H.

そして、このような急勾配盛土を造成する場合には、例
えば三層目の盛土層を造成するところを第12図を参照
して説明すると、予め基礎9上に壁面ユニット8を組み
上げて壁部Hを形成しておくと共に、その壁部Hの後方
の二層目までの盛土層上に、該壁部H背後の控盛土6を
形成すべき断面三角形部分を除いて盛土材3を持ってお
き、かつ、二層目の盛土層上部に位置する壁部H内側の
定着継手金具10に自硬性定着材を介して定着固定され
ている控盛土6形成用のジオテキスタイル2がクリップ
7により丸められた状態で別のクリップ7により三層目
の盛土層上部に位置する壁部■4内側の定着継手金具I
Oにくくりつけられて盛土Mの施工の邪魔にならないよ
うにしている。
When constructing such a steeply sloped embankment, for example, the construction of the third embankment layer will be explained with reference to FIG. 12.The wall unit 8 is assembled on the foundation 9 in advance, H is formed, and the embankment material 3 is held on the embankment layer up to the second layer behind the wall H, excluding the triangular cross-sectional part where the backing embankment 6 is to be formed. The geotextile 2 for forming the backing embankment 6, which is fixed and fixed to the fixing joint fitting 10 inside the wall H located at the top of the second embankment layer via a self-hardening fixing material, is rolled up by the clip 7. In this state, use another clip 7 to attach the fixing joint metal fitting I on the inside of the wall part ■4 located at the top of the third embankment layer.
It is tied to O so that it does not interfere with the construction of embankment M.

第13図は、この発明の第6実施例の急勾配盛土を示す
図である。
FIG. 13 is a diagram showing a steeply sloped embankment according to a sixth embodiment of the present invention.

この実施例の急勾配盛土は、壁部Hが現場打ちコンクリ
ートにより形成されている。
In the steep slope embankment of this embodiment, the wall portion H is formed of cast-in-place concrete.

そして、この急勾配盛土では、壁部H内側に上下に等間
隔でそれぞれ定着継手金具lOが取り付けられ、それら
の各定着継手金具10に、自硬性定着材13を介してジ
オテキスタイル2が該壁部H背後の盛土材3中に略水平
状態で敷設されていると共に、下から一つおきの自硬性
定着材13には、上述の略水平なジオテキスタイル2の
端部の上下にそれぞれ別の二つのジオテキスタイル2.
2の一方の端部が重ね合わされた状態で埋め込まれてい
る。そして、上記二つのジオテキスタイル2のうち、上
側のジオテキスタイル2は、盛土M内部側へ斜め上方に
傾斜状態で敷設され、その他方の端部が、その上方の略
水平なジオテキスタイル2の下側に重ね合わされた状態
でUピン4および自硬性定着材13により定着固定され
ており、また、下側のジオテキスタイル2は、盛土M内
部側へ斜め下方に傾斜状態で敷設され、その他方の端部
が、その下方の略水平なジオテキスタイル2の上側に重
ね合わされた状態でUビン4および自硬性定着材13に
より定着固定されていることによって、上述の傾斜状態
の各ジオテキスタイル2′、2の壁部H側に断面三角形
状の控盛土6が形成されている。
In this steeply sloped embankment, fixing joint fittings 10 are attached to the inside of the wall H at equal intervals up and down, and the geotextile 2 is attached to each of these fixing fittings 10 via a self-hardening fixing material 13. The self-hardening anchoring materials 13 are laid in a substantially horizontal state in the embankment material 3 behind H, and two different self-hardening anchoring materials 13 are placed on the upper and lower ends of the above-mentioned substantially horizontal geotextile 2, respectively. Geotextile 2.
2 are embedded with one end thereof overlapped. Of the two geotextiles 2, the upper geotextile 2 is laid obliquely upward toward the inside of the embankment M, and the other end is overlapped with the lower side of the substantially horizontal geotextile 2 above it. The geotextile 2 on the lower side is laid in an inclined state diagonally downward to the inside of the embankment M, and the other end is By being fixed and fixed by the U-bin 4 and the self-hardening fixing material 13 in a superimposed state on the upper side of the substantially horizontal geotextile 2 below, the wall H side of each of the geotextiles 2', 2 in the above-mentioned inclined state An embankment 6 having a triangular cross section is formed in the area.

なお、上述の第5、第6実施例の急勾配盛土によれば、
プレキャストコンクリートまたは現場打ちコンクリート
により形成されている壁部Hの背後に、上下のジオテキ
スタイル2で囲まれた状態で壁部Hと構造的に一体化さ
れた控盛土6が互いに隣接状態で上下に複数形成され、
これらの控盛土6がその後方の盛土Its中のジオテキ
スタイル2に支持された巨大な土嚢として作用している
と共に、上記各控盛土6により形成された上下の巨大な
土嚢どうしも一体化されて巨大な土嚢構造として作用し
ているため、その巨大な土嚢構造が盛土M内部からの土
圧を壁部Hの内側で抑えて盛土Mの端部を極めて強固に
支持することとなる。
In addition, according to the steep slope embankments of the fifth and sixth embodiments described above,
Behind the wall H formed of precast concrete or cast-in-place concrete, there are a plurality of retaining embankments 6 that are structurally integrated with the wall H while being surrounded by upper and lower geotextiles 2 and adjacent to each other vertically. formed,
These retaining embankments 6 act as gigantic sandbags supported by the geotextile 2 in the embankment Its behind, and the upper and lower gigantic sandbags formed by the retaining embankments 6 are also integrated into a gigantic sandbag. Since the huge sandbag structure acts as a sandbag structure, the earth pressure from inside the embankment M is suppressed inside the wall H, and the end of the embankment M is extremely strongly supported.

「発明の効果」 この発明の急勾配盛土によれば、急勾配の壁部を有し、
その背後の地盤上に盛られた盛土材中にジオテキスタイ
ルが敷設され、そのジオテキスタイルが上記壁部に定着
されていると共に、該壁部の上下に間隔を隔てた各位置
に定着されている各ジオテキスタイル相互が該壁部の背
後の盛土材中の任意の位置において近接した状態で自硬
性定着材に埋め込まれて定着されているので、上記壁部
の背後に、上下のジオテキスタイルで囲まれた状態で壁
部と構造的に一体化された控盛土が形成され、この控盛
土がその後方の盛土材中のジオテキスタイルに支持され
た巨大な土嚢構造として作用することにより、その控盛
土が盛土内部からの土圧を壁部の内側で抑えて盛土の端
部を極めて強固に支持している。このため、この急勾配
盛土では、壁部の外壁面の経時変位が極めて小さくなっ
て、その安定性が非常に高くなると共に、盛土自体の安
定性も極めて高くなる。
"Effect of the invention" According to the steep slope embankment of this invention, it has a steep wall part,
A geotextile is laid in the embankment material piled up on the ground behind it, and the geotextile is fixed to the above-mentioned wall, and each geotextile is fixed at each position spaced apart above and below the wall. They are embedded and fixed in the self-hardening anchoring material in close proximity to each other at arbitrary positions in the embankment material behind the wall, so that they are surrounded by the upper and lower geotextiles behind the wall. A retaining embankment is formed that is structurally integrated with the wall, and this retaining embankment acts as a huge sandbag structure supported by the geotextile in the embankment material behind it, thereby preventing water from inside the embankment. The earth pressure is suppressed inside the wall and the edge of the embankment is extremely strongly supported. Therefore, in this steeply sloped embankment, the displacement over time of the outer wall surface of the wall portion becomes extremely small, and its stability becomes extremely high, and the stability of the embankment itself also becomes extremely high.

このため、この急勾配盛土では、従来の盛土において実
現不可能であった3分法(のり)以上の急勾配に壁部を
傾斜させても十分な安定性が確保されることとなる。
Therefore, with this steeply sloped embankment, sufficient stability is ensured even if the wall is sloped to a steeper slope than the three-division method (glue), which was impossible to achieve with conventional embankments.

また、この急勾配盛土では、壁部の安定性が高くなった
ことによって、盛土全体の剛性が高くなり、これにより
盛土の沈下量を軽減し、不同沈下による地表面の変形等
が有効に低減されて盛土の施工品質の向上に寄与すると
共に、盛土とジオテキスタイルと壁部とが一体的に作用
し得て荷重分散効果に優れている盛土構造となるので、
この面からも盛土の変形を有効に抑制して盛土の崩壊を
防ぎ、安全性と施工の信頼性および耐久性とに寄与する
In addition, with this steep slope embankment, the increased stability of the walls increases the rigidity of the entire embankment, which reduces the amount of embankment settlement and effectively reduces ground surface deformation due to uneven settlement. This contributes to improving the construction quality of the embankment, and creates an embankment structure with excellent load dispersion effects because the embankment, geotextile, and wall can work together as one.
From this point of view as well, deformation of the embankment is effectively suppressed to prevent collapse of the embankment, contributing to safety, construction reliability, and durability.

したがって、このような急勾配盛土を造成した場合には
、限られた敷地を効率的に活用して盛土造成地の有効利
用を図ることができると共に、その施工が簡略であるこ
とに加えて、盛土の高さに拘わらず長期に亙って優れた
施工品質と安定性および施工の信頼性とを確保すること
ができる故に建設産業において寄与するところが極めて
大きい。
Therefore, when creating such a steeply sloped embankment, it is possible to efficiently utilize the limited site and make effective use of the embankment area, and in addition to being simple in construction, Since it is possible to ensure excellent construction quality, stability, and reliability of construction over a long period of time regardless of the height of the embankment, it has an extremely large contribution to make in the construction industry.

【図面の簡単な説明】[Brief explanation of drawings]

第1図ないし第8図は、この発明の第1実施例を示す図
であって、第1図は急勾配盛土の端部の側断面図、第2
図は急勾配盛土で用いるアンカーの一例を示す斜視図、
第3図は他のアンカーの例を示す斜視図、第4図は壁部
の縦断面図、第5図は四層目までの土嚢を積み7上げた
ところを示す側断面図、第6図は六層目までの土嚢およ
びその背後の控盛土を形成したところ示す側断面図、第
7図は七層目までの土嚢および一層目の盛土層を形成し
たところを示す側断面図、第8図は十層目までの土嚢を
積み上げたところを示す側断面図である。第9図は、こ
の発明の第2実施例の急勾配盛土を示す図であって、三
層目の盛土層を造成しているところを示す側断面図であ
る。第10図は、この発明の第3実施例の急勾配盛土の
端部の側断面図である。第11図は、この発明の第4実
施例の急勾配盛土の端部の側断面図である。第12図は
、この発明の第5実施例の急勾配盛土を示す図であって
、三層目の盛土層を造成しているところを示す側断面図
である。第13図は、この発明の第6実施例の急勾配盛
土の端部の側断面図である。 第14図は、従来の盛土の端部の側断面図である。 3・・・・・・盛土材、 4・・・・・・Uピン、 5・・・・・・アンカー 6・・・・・・控盛土、 7・・・・・・クリップ、 8・・・・・・壁面ユニット、 9・・・・・・基礎、 ■0・・・・・・定着継手金具、 13・・・・・・自硬性定着材、 15・・・・・5ピン、 16・・・・・・ジオテキスタイル、 20・・・・・・土嚢、 G・・・・・・地盤、 M・・・・・・盛土、 H・・・・・・壁部。
1 to 8 are diagrams showing a first embodiment of the present invention, in which FIG. 1 is a side sectional view of the end of a steep slope embankment, and FIG.
The figure is a perspective view showing an example of an anchor used in a steep slope embankment.
Figure 3 is a perspective view showing another example of an anchor, Figure 4 is a vertical sectional view of the wall, Figure 5 is a side sectional view showing the fourth layer of sandbags stacked up, and Figure 6 is a perspective view showing another example of an anchor. Figure 7 is a side sectional view showing the formation of up to the sixth layer of sandbags and the backing embankment behind it, Figure 7 is a side sectional view showing the formation of the sandbags up to the seventh layer and the first embankment layer, and Figure 8. The figure is a side sectional view showing the tenth layer of sandbags stacked up. FIG. 9 is a diagram showing a steeply sloped embankment according to a second embodiment of the present invention, and is a side sectional view showing the construction of the third embankment layer. FIG. 10 is a side sectional view of the end of a steeply sloped embankment according to a third embodiment of the present invention. FIG. 11 is a side sectional view of the end of a steeply sloped embankment according to a fourth embodiment of the present invention. FIG. 12 is a diagram showing a steeply sloped embankment according to a fifth embodiment of the present invention, and is a side sectional view showing the construction of the third embankment layer. FIG. 13 is a side sectional view of the end of a steeply sloped embankment according to a sixth embodiment of the present invention. FIG. 14 is a side sectional view of the end of a conventional embankment. 3... Embankment material, 4... U pin, 5... Anchor 6... Retaining embankment, 7... Clip, 8... ... Wall unit, 9 ... Foundation, ■0 ... Fixing joint fittings, 13 ... Self-hardening fixing material, 15 ... 5 pin, 16 ... Geotextile, 20 ... Sandbag, G ... Ground, M ... Embankment, H ... Wall.

Claims (1)

【特許請求の範囲】[Claims] 急勾配の壁部を有し、その背後の地盤上に盛られた盛土
材中にジオテキスタイルが敷設され、そのジオテキスタ
イルが上記壁部に定着されている急勾配盛土であって、
該壁部の上下に間隔を隔てた各位置に定着されている各
ジオテキスタイル相互が該壁部の背後の盛土材中の任意
の位置において近接した状態で自硬性定着材に埋め込ま
れて定着されていることを特徴とする急勾配盛土。
A steeply sloped embankment having a steeply sloped wall, in which a geotextile is laid in an embankment material piled up on the ground behind the wall, and the geotextile is fixed to the wall,
The geotextiles fixed at respective positions spaced apart above and below the wall are embedded and fixed in a self-hardening material in close proximity to each other at arbitrary positions in the embankment material behind the wall. A steeply sloped embankment characterized by
JP32525589A 1989-12-15 1989-12-15 Steep embankment Expired - Lifetime JPH0765317B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP32525589A JPH0765317B2 (en) 1989-12-15 1989-12-15 Steep embankment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP32525589A JPH0765317B2 (en) 1989-12-15 1989-12-15 Steep embankment

Publications (2)

Publication Number Publication Date
JPH03187414A true JPH03187414A (en) 1991-08-15
JPH0765317B2 JPH0765317B2 (en) 1995-07-19

Family

ID=18174770

Family Applications (1)

Application Number Title Priority Date Filing Date
JP32525589A Expired - Lifetime JPH0765317B2 (en) 1989-12-15 1989-12-15 Steep embankment

Country Status (1)

Country Link
JP (1) JPH0765317B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100454740B1 (en) * 2002-01-16 2004-11-05 주식회사 화광건설 construction method for an incline plane

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100454740B1 (en) * 2002-01-16 2004-11-05 주식회사 화광건설 construction method for an incline plane

Also Published As

Publication number Publication date
JPH0765317B2 (en) 1995-07-19

Similar Documents

Publication Publication Date Title
JP5921857B2 (en) Slope protection structure in which honeycomb-shaped three-dimensional solid cell structures are stacked vertically
CN110306588B (en) Panel module unit for reinforced earth retaining wall and reinforced earth retaining wall
KR100468034B1 (en) Construction Method of Reinforced Earth Retaining-Wall for using Anchoring
JPH03180617A (en) Bank of sharp gradient
KR101149038B1 (en) Reinforcement construction method of poor subsoil by horizontal geogrid and vertical geogrid
JPH05171652A (en) Slope stability method
JP2597116B2 (en) Embankment foundation and its construction method
JPH03187414A (en) Steep slope banking
RU42547U1 (en) DEVICE FOR STRENGTHENING THE SOIL MILL
CN117265936A (en) Reinforced geogrid structure for filling interface and construction method thereof
KR20190142927A (en) Breast wall structure
KR100885909B1 (en) Self-supporting temporary retaining wall using geotextile network and its construction method
CN114687583A (en) Construction method and construction structure for preventing scattered water from sinking at outer wall of building coating
JP2963360B2 (en) Wall structure of reinforced soil structure
JP2750364B2 (en) Steep embankment
JPH0522009B2 (en)
JPH0765315B2 (en) Embankment structure
JPH0376926A (en) steep embankment
RU2783072C1 (en) Method for preparing the base of a cylindrical tank on soft soils
JPH02128016A (en) Stone masonry retaining wall
KR102632477B1 (en) Reinforced earth walls
JP2000328577A (en) Soil retaining cage frame and method of building steep grade banking using the cage frame
KR20090130904A (en) Reinforcement frame to improve compaction, Retaining wall with backfill reinforcement structure
JP5095355B2 (en) Wall block, reinforced earth wall structure, and method for constructing reinforced earth wall
JP3974753B2 (en) Retaining wall construction method