JPH03215609A - Blast furnace residual pig iron amount prediction device - Google Patents

Blast furnace residual pig iron amount prediction device

Info

Publication number
JPH03215609A
JPH03215609A JP1089090A JP1089090A JPH03215609A JP H03215609 A JPH03215609 A JP H03215609A JP 1089090 A JP1089090 A JP 1089090A JP 1089090 A JP1089090 A JP 1089090A JP H03215609 A JPH03215609 A JP H03215609A
Authority
JP
Japan
Prior art keywords
iron
pig iron
amount
received
charging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP1089090A
Other languages
Japanese (ja)
Inventor
Ryuichi Nakajima
龍一 中島
Bungo Iino
文吾 飯野
Haruo Ito
伊藤 春男
Masayuki Shiobara
塩原 雅之
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Engineering Corp
Original Assignee
NKK Corp
Nippon Kokan Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NKK Corp, Nippon Kokan Ltd filed Critical NKK Corp
Priority to JP1089090A priority Critical patent/JPH03215609A/en
Publication of JPH03215609A publication Critical patent/JPH03215609A/en
Pending legal-status Critical Current

Links

Landscapes

  • Manufacture Of Iron (AREA)

Abstract

PURPOSE:To predict remaining iron quantity in a blast furnace with high accuracy by obtaining the remaining iron quantity in the blast furnace after tapping the iron with calculation of difference between the actual iron tapping quantity in the specific time and the molten iron production quantity calculated from raw material charged into the blast furnace and the operational condition during the above time. CONSTITUTION:The molten iron tapped from the blast furnace is received into a molten iron ladle and the actual iron tapping quantity measured with received iron quantity measuring means 1 through a load cell is inputted to a second computing element 3. On the other hand, the total charging quantity of main raw materials for the past fixed time in consideration of blasting quantity and fuel ratio obtd. with a first computing element 2, is inputted to the second computing element 3. In the second computing element 3, the molten iron quantity per one charging is calculated from the average number of charging of the main raw material per time for the past fixed time, each main raw material wt. per one time of charging, Fe content in iron ore and molten iron factor (ordinary 1.030), and the predicted iron tapping quantity per time calculated by multiplying the number of charging per time, is obtd. and the difference between the above quantity and the received iron quantity per time from the received iron quantity measuring means 1 is calculated and the remaining iron quantity in the furnace is predicted with high accuracy and displayed on a CRT display 4.

Description

【発明の詳細な説明】 [産業上の利用分野コ この発明は、一定時間の高炉の残銑量を予測、表示する
高炉の残銑量予測装置に関する。
DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] This invention relates to a blast furnace residual pig iron amount prediction device that predicts and displays the amount of residual pig iron in a blast furnace over a certain period of time.

[従来の技術] 一般に高炉において出銑後の炉内残銑、滓量は炉操業に
重大な影響を与えるものとして、従来より重要な管理指
標とされている.すなわち、残銑、滓量が増加すると、
羽口周辺でのガスの流れる有効体積が小さくなり、送風
圧力の上昇、装入物の降下が不規則となり、炉況の悪化
となるから従来、高炉の残銑量は制御室のオペレータが
、前回出銑時刻〜今回出銑時刻までに高炉に装入された
コークスおよび鉱石の装入回数を調べ、装入物の1回装
入当りの溶銑生成量を計算し、1回装入当りの溶銑生成
量に装入回数を乗じて今回の溶銑生成量を計算し、炉前
のオペレータに連絡する。
[Prior Art] In general, in blast furnaces, the amount of pig iron remaining in the furnace after tapping and the amount of slag have a significant impact on furnace operation, and have traditionally been considered important management indicators. In other words, when the amount of pig iron residue and slag increases,
The effective volume of gas flowing around the tuyeres becomes smaller, the blowing pressure increases, the charge falls irregularly, and the furnace condition worsens. Check the number of charging times of coke and ore charged into the blast furnace from the previous tapping time to the current tapping time, calculate the amount of hot metal produced per charging, and calculate the amount of hot metal produced per charging. Calculate the current amount of hot metal produced by multiplying the amount of hot metal produced by the number of times of charging, and notify the operator in front of the furnace.

一方、炉前のオペレータは溶銑鍋のロードセルおよび溶
銑レベル計により前回出銑時刻〜今回出銑時刻までの実
際の出銑量を求め、これらの差を今回の残銑量としてい
た。
On the other hand, the operator in front of the furnace determined the actual amount of tapped iron from the previous tapping time to the current tapping time using the load cell of the hot metal ladle and the hot metal level meter, and used the difference between these as the current amount of residual pig iron.

[発明が解決しようとする課題] 従来の残銑量の把握は20〜40分に一回の割合て゛あ
り、残銑量の変化を大まかにしか把握できず、溶銑の絞
り不足(出銑後の残銑量が多いこと)の把握に遅れを生
じ、ランブ出銑、滅風等のアクンヨン時期が遅れ、炉況
3悪化させるという問題点がある。
[Problems to be solved by the invention] Conventionally, the amount of residual pig iron was only measured once every 20 to 40 minutes, and changes in the amount of residual pig iron could only be grasped roughly. There is a problem in that there is a delay in understanding the amount of residual pig iron (the amount of residual pig iron in the furnace is large), which delays the timing of ramp taping, de-airing, etc., and worsens the condition of the furnace.

[課題を解決するための手段] 本発明は上記のような問題点を解決しようとするもので
、溶銑鍋の受銑重量と計測し、発信する受銑量計測手段
と、風量および燃料比を考慮した過去の一定時間の主原
料の合計装入回数を演算し、発信する第1の演算器と、
過去の一定時間の主原fJの時間当りの平均装入回数(
回/H).1装入当たりの各主原料の重量、各主原料の
Fe含有率および溶銑係数から1装入当りの溶銑量を算
出し、前記時間当りの装入回数(回/H)を乗じて、得
られる時間当たりの予定出銑量(T/H)と受銑量計測
手段からの受銑量の過去の一定時間の合計受銑量から求
めた時間当たりの受銑量(T/H)との差を演算する第
2の演算器と、第2の演算器の演算結果を表示するCR
Tデスプレーとからなる高炉の残銑量予測装置である。
[Means for Solving the Problems] The present invention is intended to solve the above-mentioned problems, and includes a means for measuring the amount of received pig iron that measures and transmits the weight of the received pig iron in a hot metal ladle, and a means for measuring the amount of received pig iron that measures and transmits the weight of the received pig iron in a hot metal ladle, as well as an air volume and a fuel ratio. a first computing unit that computes and transmits the total number of times the main raw material was charged during a certain period of time in the past;
Average number of times of charging of main material fJ per hour for a certain period of time in the past (
times/H). Calculate the amount of hot metal per charge from the weight of each main raw material per charge, the Fe content of each main raw material, and the hot metal coefficient, and multiply it by the number of times of charging per hour (times/H). The expected amount of pig iron to be tapped per hour (T/H) and the amount of pig iron received per hour (T/H) calculated from the total amount of pig iron received for a certain period of time in the past of the amount of pig iron received from the pig iron amount measuring means. A second arithmetic unit that calculates the difference, and a CR that displays the calculation results of the second arithmetic unit.
This is a blast furnace residual pig iron amount prediction device consisting of a T-display.

また、前記の残銑量予測装置において、第1の演算器と
第2の演算器を一つの演算器としてもよい。
Further, in the above-mentioned residual iron amount prediction device, the first arithmetic unit and the second arithmetic unit may be one arithmetic unit.

[作用] 受銑量計測手段から送信されてぐる受銑量(出銑量)の
累積変化と、風量および燃料比の変化を考慮した過去の
一定時間の主原料の平均装入回数の変化と、主原料のF
e含有率等から、所定時間毎に演算され、そのときの残
銑量がCRTデスプレーに表示されるので、炉前のオペ
レーターはCRTデスプレーに表示された残銑量を見て
、従来法に比し極めて早くラップ出銑または減風等の操
業アクションを取ることができる.従って、従来法にお
けるように、操業アクションの遅れによる炉況の悪化を
防止することができる。
[Function] Cumulative changes in the amount of pig iron received (tapping amount) transmitted from the pig iron amount measuring means, and changes in the average number of times of charging of the main raw material over a certain period of time in the past, taking into account changes in air volume and fuel ratio. , main raw material F
Calculations are made at predetermined intervals based on the e-content rate, etc., and the amount of residual pig iron at that time is displayed on the CRT display. Therefore, operational actions such as lap tapping or wind reduction can be taken extremely quickly. Therefore, it is possible to prevent the furnace condition from deteriorating due to a delay in operational action as in the conventional method.

[実施例] 本発明の実施例を以下に詳細に説明する.第1[Aは本
発明装宣のブロック図である。1は溶銑鍋の受銑重量の
時間的変化を計測する受銑量計測手段で、具体的にはロ
ードセルが使用される。2は第1の演算器で、高炉設備
の各種計測器から送信されてくる測定値等の情報をを受
信し、種々の演算加工を施し、その結果表示、プリント
アウトする。3は第2の演算器で、次の演算を行う。
[Example] Examples of the present invention will be described in detail below. 1. [A] is a block diagram of the present invention. Reference numeral 1 denotes a received pig iron amount measuring means for measuring temporal changes in the received pig iron weight in a hot metal ladle, and specifically, a load cell is used. Reference numeral 2 denotes a first computing unit that receives information such as measured values transmitted from various measuring instruments of the blast furnace equipment, performs various calculation processing, and displays and prints out the results. 3 is a second arithmetic unit that performs the following arithmetic operation.

(1)  風量、燃料比に変化が無い場合・過去10時
間の平均装入回数(回/■4)。
(1) When there is no change in air volume or fuel ratio - Average number of charging times in the past 10 hours (times/■4).

(2)  風量、燃料比に変化がある場合 過去10時
間の平均装入回数X (V2 /’Vl)X (F+ 
/F2),ここに、V,−前回の送風風量( N m 
’ /win), V 2  今回の送ffQq量(N
m’/min)、F1 一前回の燃料比(kg/′T)
.F2 今回の燃料比(kg/T). (3)1回装入当りの溶銑量一装入1回当りの主原料の
重量×主原料のFe含有率×溶銑係数。ここに、溶銑係
数は通常は1.030である。
(2) When there is a change in air volume or fuel ratio Average number of charging times in the past 10 hours X (V2 /'Vl)X (F+
/F2), here, V, - previous air volume (N m
'/win), V 2 Current feed ffQq amount (N
m'/min), F1 previous fuel ratio (kg/'T)
.. F2 Current fuel ratio (kg/T). (3) Amount of hot metal per charging: Weight of main raw material per charging x Fe content of main raw material x hot metal coefficient. Here, the hot metal coefficient is usually 1.030.

(イ) (1)または(2lで求めた装入回数×1回装
入当りの溶銑量一予定出銑量(溶銑生成量>(T/H)
.四 予定出銑量(T/H)一実績出銑量(T/H)−
1時闇当りの予想残銑量。
(B) (1) or (Number of charging calculated using 2l x amount of hot metal per charging - planned amount of pig iron tapping (amount of hot metal produced > (T/H)
.. 4. Planned pig iron tap amount (T/H) - Actual pig iron tap amount (T/H) -
Expected amount of residual pig iron at 1 o'clock darkness.

ここに、実績出銑量( T / H )は、ロードセル
から送信されてくる1分毎の測定情報から求められる。
Here, the actual pig iron extraction amount (T/H) is obtained from the measurement information every minute transmitted from the load cell.

4はCRTデスプレーで、1時間当りの予想残銑量やそ
の他の演算結果が表示される。すなわち、本発明装置は
、第2演算器3は、受銑量計測手段1の情報から実績出
銑量(T/H)を、第1演算器の風量、燃料比および装
入情報から予想装入回数と1回装入当りの溶銑量から予
定出銑量(T,/H)を求め、予定出銑量(T/H )
から実績出銑量(T/H)を減じて1時閏当り残銑量を
求め、その結果をCRTデスプレ−4に表示するもので
ある.過去10時間の平均装入回数は移動平均を用い、
残銑量の演算回数は、5分間隔で実施される。なお、第
1演算器2の容量が十分に大きい場合は、第1演算器に
第2演算器の演算を実施させることができる. 第3図は従来方法による残銑管理の場合の操業アクショ
ンの時間的経過を示すグラフ、第2図は本発明装置によ
る残銑管理の場合の操業アクションの時間的経過を示す
グラフである。なお、この例では炉内の残銑量の管理値
を2 0 0 T/Hだけ越えたときに、ラップ出銑を
開始するようになっている。従来方法による炉内の残銑
量が、20〜40分間隔でしか把握できないため、本発
明装1による場合に比してラップ出銑の開始時期が20
〜60分遅れ、安全のためにラップ出銑に先立ち、滅風
を行わねばならなかった.本発明装置を使用すると、5
分毎に残銑量の把握ができ、タイミングよくランプ出銑
を行うことができ、滅風しなくともよくなった。そして
、減風による減産を防ぐことができ、炉況が悪化するこ
ともなくなった. [発明の効果] 本発明の装置は以上のように構成されているから、炉内
の残銑量をきめこまかく(高頻度に)把握することがで
きるから、従来のように減風することもなく、また溶銑
レベルを上昇させて、炉況を悪化させることもない.
4 is a CRT display that displays the expected amount of residual pig iron per hour and other calculation results. That is, in the device of the present invention, the second computing unit 3 calculates the actual iron output amount (T/H) from the information of the received pig iron amount measuring means 1, and the expected iron output amount (T/H) from the air volume, fuel ratio, and charging information of the first computing unit. Calculate the planned tapping amount (T,/H) from the number of charging times and the amount of hot metal per charging, and calculate the planned tapping amount (T/H).
The actual pig iron extraction amount (T/H) is subtracted from the actual pig iron extraction amount (T/H) to obtain the residual pig iron amount per hour leap, and the result is displayed on the CRT display-4. The average number of charging times in the past 10 hours is calculated using a moving average.
The number of calculations of the residual pig iron amount is performed at 5 minute intervals. Note that if the capacity of the first arithmetic unit 2 is sufficiently large, the first arithmetic unit 2 can perform the calculations of the second arithmetic unit. FIG. 3 is a graph showing the time course of operational actions when the residual pig iron is managed by the conventional method, and FIG. 2 is a graph showing the time course of the operational actions when the residual pig iron is managed by the apparatus of the present invention. In this example, lap tapping is started when the amount of residual pig iron in the furnace exceeds the control value by 200 T/H. Since the amount of residual pig iron in the furnace using the conventional method can only be determined at intervals of 20 to 40 minutes, the start time of lap tapping is 20 minutes compared to the case using the device 1 of the present invention.
There was a delay of ~60 minutes, and for safety reasons, it was necessary to sterilize the air before tapping the lap iron. When using the device of the present invention, 5
The amount of residual pig iron can be ascertained minute by minute, and lamp tapping can be performed in a timely manner, eliminating the need for wind blowing. In addition, we were able to prevent a reduction in production due to reduced wind, and the condition of the furnace no longer deteriorated. [Effects of the Invention] Since the apparatus of the present invention is configured as described above, the amount of residual pig iron in the furnace can be determined in detail (and frequently), so there is no need to reduce the air flow as in the case of the conventional method. Also, it does not increase the hot metal level and worsen the furnace condition.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本発明装置のブロック図、第2図は本発明装置
による残銑管理の場合の操業アクションの時間的経過を
示すグラフ図、第3図は従来方法による残銑管埋の場合
の操業アクションの時間的経過を示すグラフ図である。
Fig. 1 is a block diagram of the apparatus of the present invention, Fig. 2 is a graph showing the time course of operational actions in the case of residual pig iron management by the apparatus of the present invention, and Fig. 3 is a diagram of the case of residual pig iron burying by the conventional method. FIG. 3 is a graph diagram showing the time course of operational actions.

Claims (2)

【特許請求の範囲】[Claims] (1)溶銑鍋の受銑重量を計測し、発信する受銑量計測
手段と、風量および燃料比の変化を考慮した過去の一定
時間の主原料の合計装入回数を演算し、発信する第1の
演算器と、過去の一定時間の主原料の時間当りの平均装
入回数(回/H)、1装入当たりの各主原料の重量、各
主原料のFe含有率および溶銑係数から1装入当りの溶
銑量を算出し、前記時間当りの装入回数(回/H)を乗
じて、得られる時間当たりの予定出銑量(T/H)と受
銑量計測手段からの受銑量の過去の一定時間の合計受銑
量から求めた時間当たりの受銑量(T/H)との差を演
算する第2の演算器と、第2の演算器の演算結果を表示
するCRTデスプレーとからなる高炉の残銑量予測装置
。
(1) A received pig iron amount measuring means that measures and transmits the weight of received pig iron in a hot metal ladle, and a means that calculates and transmits the total number of times the main raw material has been charged over a certain period of time, taking into account changes in air volume and fuel ratio. 1 from the calculation unit 1, the average number of times of charging of main raw materials per hour (times/H) over a certain period of time in the past, the weight of each main raw material per charge, the Fe content of each main raw material, and the hot metal coefficient. Calculate the amount of hot metal per charging, multiply by the number of times of charging per hour (times/H), and calculate the planned iron extraction amount per hour (T/H) and the received pig iron from the received pig iron amount measuring means. a second calculator that calculates the difference between the amount of iron received per hour (T/H) calculated from the total amount of pig iron received over a certain period of time in the past; and a CRT that displays the calculation results of the second calculator. A blast furnace residual pig iron amount prediction device consisting of a display.
(2)第1の演算器と第2の演算器とを一つの演算器と
した請求項1記載の高炉の残銑量予測装置。
(2) The blast furnace residual pig iron amount prediction device according to claim 1, wherein the first computing unit and the second computing unit are one computing unit.
JP1089090A 1990-01-19 1990-01-19 Blast furnace residual pig iron amount prediction device Pending JPH03215609A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1089090A JPH03215609A (en) 1990-01-19 1990-01-19 Blast furnace residual pig iron amount prediction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1089090A JPH03215609A (en) 1990-01-19 1990-01-19 Blast furnace residual pig iron amount prediction device

Publications (1)

Publication Number Publication Date
JPH03215609A true JPH03215609A (en) 1991-09-20

Family

ID=11762919

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1089090A Pending JPH03215609A (en) 1990-01-19 1990-01-19 Blast furnace residual pig iron amount prediction device

Country Status (1)

Country Link
JP (1) JPH03215609A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005281813A (en) * 2004-03-30 2005-10-13 Jfe Steel Kk Blast furnace output control method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005281813A (en) * 2004-03-30 2005-10-13 Jfe Steel Kk Blast furnace output control method

Similar Documents

Publication Publication Date Title
KR102356773B1 (en) Method of refining molten iron
CN202401090U (en) System for controlling finishing point of converter steelmaking
AU4229797A (en) Silicon refining process
JPH03223409A (en) Blast furnace residue amount prediction device
JP3146907B2 (en) Converter end point control method for converter
RU2180923C1 (en) Method of control of melting process in electric furnace
JP2002302709A (en) Blast furnace operation method
JPH05156331A (en) Blast furnace tap and slag monitoring device
RU2180951C1 (en) Method for controlling metallurgical melting process
EP3956481B1 (en) Method for monitoring a steelmaking process and associated computer program
JP7319538B2 (en) Converter blowing control device, converter blowing control method and program
JP4421314B2 (en) Determination of slag amount in hot metal refining
JPH055121A (en) Control method of tapping temperature
CN109609724B (en) Adding system and method for alloy-containing cold steel
JP3228083B2 (en) Blast furnace interior interior tracking method
EP4632081A1 (en) Silicon concentration prediction method, operation guidance method, silicon concentration prediction device, operation guidance device, operation guidance system, and terminal device
SU737467A1 (en) Device for steel smelting control in convertor
JPS56217A (en) Continuous desilicification for molten pig iron
JPH08157923A (en) How to determine the converter main raw material charge
JP2020002390A (en) Blowing calculation method, blowing calculation program
KR100579374B1 (en) Vacuum refining apparatus for chromium-containing molten steel and process for refining using the same
RU2037347C1 (en) Device for control of fusion level in blast furnace horn
KR100616137B1 (en) Converter weight measuring device and converter refining method using the same
JPH11269530A (en) Operation of converter
TW201734214A (en) Molten pig iron pre-treatment method and molten pig iron pre-treatment control device