JPH03217556A - Timbering construction for reinforced concrete placing mold, and separator fixture to be used for its construction - Google Patents
Timbering construction for reinforced concrete placing mold, and separator fixture to be used for its constructionInfo
- Publication number
- JPH03217556A JPH03217556A JP1087590A JP1087590A JPH03217556A JP H03217556 A JPH03217556 A JP H03217556A JP 1087590 A JP1087590 A JP 1087590A JP 1087590 A JP1087590 A JP 1087590A JP H03217556 A JPH03217556 A JP H03217556A
- Authority
- JP
- Japan
- Prior art keywords
- separator
- formwork
- construction
- pair
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims description 30
- 239000011150 reinforced concrete Substances 0.000 title claims description 10
- 238000009415 formwork Methods 0.000 claims description 42
- 230000003014 reinforcing effect Effects 0.000 claims description 25
- 238000000034 method Methods 0.000 claims description 11
- 230000002787 reinforcement Effects 0.000 abstract 2
- 239000004567 concrete Substances 0.000 description 4
- 238000005266 casting Methods 0.000 description 3
- 229910052751 metal Inorganic materials 0.000 description 3
- 239000002184 metal Substances 0.000 description 3
- 238000005452 bending Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000002023 wood Substances 0.000 description 2
- 101000685083 Centruroides infamatus Beta-toxin Cii1 Proteins 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 229910052782 aluminium Inorganic materials 0.000 description 1
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Description
【発明の詳細な説明】
[発明の目的]
(産業上の利用分野)
本発明は、例えは、鉄筋コンクリート建物の柱や壁等と
打設する型枠の支保工に於いて、型枠板を所定箇所に位
置決めし固定する作業を簡便に行える様にした、鉄筋コ
ンクリーI一打設用型枠の支保工法及び該工法に用いる
セパレータ固定見に間する.
(1ノ゛亡十の技術)
第5図は、鉄筋コンクリ−1〜建物の壁(又は柱)部分
を打iQする型枠を、従来工法によって支保した有様を
示している。[Detailed Description of the Invention] [Objective of the Invention] (Industrial Application Field) The present invention is applicable to formwork plates used in supporting formwork, for example, to be installed with columns and walls of reinforced concrete buildings. This article describes a shoring method for reinforced concrete I single pouring formwork that facilitates the work of positioning and fixing it in a predetermined location, and the separator fixing method used in this method. (1 No. 10 Lost Techniques) Fig. 5 shows how the formwork for pouring reinforced concrete 1 to the wall (or column) part of the building is supported by the conventional construction method.
壁50を打設する型枠は、施工床面51上の所定箇所に
1組の型枠板52.52は所定間隔を隔て対向状に立設
し、この立設状態をその支保用資材により支持して横築
されている。The formwork for constructing the wall 50 consists of a set of formwork plates 52 and 52 erected at a predetermined location on the construction floor 51 in a facing manner with a predetermined interval apart, and this erected state is maintained by supporting materials. It is supported and built horizontally.
53は鉄筋て、この場き、壁50の厚さ方向に所定間隔
を隔てて2本が、施工床面51の所定箇所に埋設状態で
予め立設されている。Reference numeral 53 denotes reinforcing bars, and here, two reinforcing bars are installed in advance in a buried state at a predetermined location on the construction floor surface 51 at a predetermined distance apart from each other in the thickness direction of the wall 50 .
そして、1組の型枠板52.52を、図示の様に鉄筋5
3を挟んてその両側の所定位置に立設するには、先ず、
施工床面51の所定位置に墨線を引き、この墨線に沿っ
て桟木54を図に示した様に床面に釘打固定し、この桟
木54に型枠板52の下端を沿わせてその固定位置を決
める。Then, one set of formwork plates 52 and 52 are attached to the reinforcing bars 5
To install it in a predetermined position on both sides of 3, first,
Draw an ink line at a predetermined position on the construction floor surface 51, nail the crosspiece 54 to the floor surface along this ink line as shown in the figure, and place the lower end of the form board 52 along the crosspiece 54 and fix it. Decide on position.
然る後、此等両型枠板52.52間に、その対向間隔保
持用のセパレータ55の両端を貫通させた状態て取着ず
る,,56はセパレータ55の両端近くに夫々挿着され
て、この対向間隔を保たせる没割を果たすキャンプであ
る。Thereafter, the two formwork plates 52 and 52 are installed with both ends of the separator 55 for maintaining the opposing distance passed through, and 56 are inserted near both ends of the separator 55, respectively. , it is a camp that fulfills the mission of maintaining this opposing distance.
そして、セパレータ55の両端に螺着したホムタイ57
を型枠板52に向けて締結すれば、両型枠板52.52
は所定位置に所定の対向間隔を保って立設固定される。Home ties 57 are screwed onto both ends of the separator 55.
If it is fastened toward the formwork plate 52, both formwork plates 52 and 52
are erected and fixed at a predetermined position with a predetermined spacing between them.
58は型枠をコンクリートの注入圧に耐えて支える支保
用の桟木て、型枠板52の背面に宛てがい、図示の様に
ホームタイ57の楔孔に打ち込まれた楔59によって、
型枠板52への当接状態を固定される。図の右側の型枠
板52も、上記と同様にして固定される。58 is a supporting crosspiece that supports the formwork by withstanding the injection pressure of concrete, and is attached to the back side of the formwork board 52, and as shown in the figure, by means of wedges 59 driven into the wedge holes of the home ties 57,
The state of contact with the formwork plate 52 is fixed. The formwork plate 52 on the right side of the figure is also fixed in the same manner as described above.
(発明か解決しようとする課題)
此の様な従来の支保工法ては、型枠板52の立設位置を
決める為に、施工床而51に予め墨線を引き、この墨線
に沿って床面に型枠板52の立設位置決め用の桟木54
を釘打ち固定させ、然も用済み後の桟木54は釘を抜い
て撤去すると言った、頗る繁雑なうえに、桟木の消耗も
伴う非能率な一運の(1二業f!−金品なくされていた
。(Problem to be solved by the invention) In such a conventional shoring method, in order to determine the position of the form board 52, a black line is drawn on the construction floor 51 in advance, and the floor surface is placed along this black line. A crosspiece 54 for erecting and positioning the formwork board 52
However, after it has been used, the crosspiece 54 has to be removed by pulling out the nails. It had been.
そこで、本発明の目的は、上記従来の型枠板の立設位置
決め固定用の桟木の取着作業を不要『ヒさせ得る、鉄筋
コンクリ−1〜打設用型枠の支保工法及ひこの工法に用
いるセパレータ固定具を提洪するにある。SUMMARY OF THE INVENTION Therefore, the object of the present invention is to eliminate the need for the above-mentioned conventional work of attaching crosspieces for erecting and positioning formwork plates. There is a separator fixing device used for this purpose.
[発明の横成]
(課題を解決するための手段)
上記の目的を達成する為の、本発明による鉄筋コンクリ
ート打設用型枠の支保工法は、1組の型枠板5.5を所
定間隔に保持させるセパレータ7を、施工床面C上に予
め立設されて前記1組の型枠板5.5間に配置される鉄
筋6の所要位置に、ねじ正式、楔止式等のセパレータ固
定具、へ,Alを用いて固定し、
この固定されたセパレータ7の両端に所定間沼を隔てて
夫17挿着された1組のキャノブ8.8及び前記セパレ
ータ7の両端に夫々螺着したホームタイ9により、前記
1組の型枠板5,5の対向間隔の固定と、前記立設位置
決めとを同時に行う様にした。[Yokohama of the invention] (Means for solving the problem) In order to achieve the above-mentioned object, the method for supporting formwork for reinforced concrete casting according to the present invention is such that a set of formwork plates 5.5 are arranged at predetermined intervals. The separator 7 to be held is fixed to the required position of the reinforcing bars 6 which are erected in advance on the construction floor surface C and placed between the pair of formwork plates 5.5 using screws, wedges, etc. A pair of cannobs 8 and 8 were fixed using aluminum, and a pair of cannobs 8 and 8 were inserted into each end of the fixed separator 7 with a predetermined gap between them, and screwed into both ends of the separator 7, respectively. The home ties 9 are used to simultaneously fix the opposing distance between the pair of formwork plates 5, 5 and determine the standing position.
前記セパレータ固定具Aは、
例えは、セパレータ7をこの両腕部1a、1a間に橋絡
状に掛止させる掛止部2を設け、前記連結部1l)に螺
孔3を設けた固定具本体1と、前記螺孔3に螺着されて
、前記掛止部2に掛止させた前記セパレータ7を前記鉄
筋6に向けて締結する螺杆4とから成る構成とすると良
い。The separator fixing tool A is, for example, a fixing tool that has a hooking part 2 for hooking the separator 7 between both arm parts 1a, 1a in a bridging manner, and a screw hole 3 in the connecting part 1l). It is preferable to have a structure consisting of a main body 1 and a screw rod 4 that is screwed into the screw hole 3 and fastens the separator 7, which is hooked to the hook portion 2, toward the reinforcing bar 6.
(作 用)
例えば、鉄筋コンクリー1〜建物の壁体を打設する為に
、施工床面上の所定位置に1組の型枠板5,5を所定間
隔を曜でて立設し、此等を支保するには、
先ず、施工床面C上の所定箇所に埋設状態で立設されて
、前記壁体を補強する鉄筋6の下部の所要箇所に、セパ
レータ7をねじ止式、模止式等のセパレータ固定具A,
Alを用いて固定させる。(Function) For example, in order to pour reinforced concrete 1 to the wall of a building, a set of formwork plates 5, 5 are erected at predetermined positions on the construction floor surface with a predetermined spacing between them. In order to support the walls, etc., first, separators 7 are screwed or simulated to the required locations under the reinforcing bars 6 that are buried and erected at predetermined locations on the construction floor surface C to reinforce the wall. Separator fixture A, such as formula
It is fixed using Al.
次いて、この固定されたセパレータ7の両端に対応した
位置に夫々トリル孔を穿った1組の型枠板5.5を鉄筋
6の両側に配置し、セパレータ7の両端を1−記l・リ
ル孔に挿通させたうえ、この[1j端に大々ホーl、タ
イ9を螺着すれば良11,又、セバし一夕7をセバトー
タ固定具Aを川l−)で鉄筋6の所望箇所に固定させる
には、そJ)両腕部1a、1a間に鉄筋6を挿し込んだ
状態で、両腕部1a、1aに設けた各掛止部2,2間に
セノ{レータ7を橋絡状に掛止させたうえ、連結部1b
の螺孔3に螺着した螺杆4を螺し込めば、七ノ{レータ
7は鉄筋5に締結固定される。Next, a pair of formwork plates 5.5 with drill holes drilled at positions corresponding to both ends of the fixed separator 7 are placed on both sides of the reinforcing bars 6, and both ends of the separator 7 are marked 1-1. Insert the reinforcing bar 6 into the rill hole, and then screw the tie 9 into the large hole 1 at the end 1j. To fix it in place, J) With the reinforcing bar 6 inserted between both arm parts 1a, 1a, insert the senorator 7 between each hook part 2, 2 provided on both arm parts 1a, 1a. In addition to being hung like a bridge, the connecting portion 1b
When the screw rod 4 screwed into the screw hole 3 is screwed in, the seven lever 7 is fastened and fixed to the reinforcing bar 5.
(実 施 例)
以下に、第1図乃至第3図を参照し乍ら本発明の一実施
例を説明する。(Embodiment) An embodiment of the present invention will be described below with reference to FIGS. 1 to 3.
先ず、セパレータ固定具Aを示した第1.2図に於いて
、1は固定具本木て、この場合は帯状金属板を略U字形
に屈曲させた形態を備え、その両腕部l a,l aの
各先端側上面には掛止部2を設けている。この掛止部2
は腕部1aの先端側に向けてアンダーカット状をなして
いる。又、両腕部1a、1aの基端側を互に連結させる
連結部1bの真ん中には螺孔3を設けている。First, in Fig. 1.2 showing the separator fixing device A, 1 is the main body of the fixing device, in this case, it has a form in which a band-shaped metal plate is bent into a substantially U-shape, and its both arms l a , la is provided with a hooking portion 2 on the top surface of each tip end side. This hook part 2
has an undercut shape toward the distal end side of the arm portion 1a. Further, a screw hole 3 is provided in the middle of a connecting portion 1b that connects the proximal ends of both arm portions 1a, 1a to each other.
4は螺孔3に螺6される螺杆で、この螺杆4の一端側は
I一字形に折曲して、回動用の折曲部4aを設けている
。A screw rod 4 is screwed into the screw hole 3, and one end of the screw rod 4 is bent into an I-shape to provide a bent portion 4a for rotation.
第3図は、鉄筋コンクリート建↑勿の壁(又は柱)Bを
その施工床面C上に打設する型枠を、本発明方法によっ
て支保した状態を示す縦断面図である。FIG. 3 is a longitudinal cross-sectional view showing a state in which a formwork for casting a reinforced concrete wall (or column) B on its construction floor surface C is supported by the method of the present invention.
壁Bの両側面を形成させる型枠板5.5は、厚手のき板
やサントイッチパネル等から成り、壁Bの厚さに対応し
た所定間隔を隔てて、以下に説明する方法によって施工
床面C上に立設される。The formwork plates 5.5 that form both sides of the wall B are made of thick wood boards, Santoitch panels, etc., and are spaced at predetermined intervals corresponding to the thickness of the wall B, and are used to form the construction floor by the method described below. It is erected on surface C.
6は壁Bを補強するリブ付きの縦鉄筋で、壁Bの厚さ方
向には、所定間隔を隔てて2本配置され、その下端は施
工床面Cをコンクリート打ちする際に、この床面にその
下端部を埋設した状態で立殺される。Reference numeral 6 denotes vertical reinforcing bars with ribs that reinforce the wall B. Two of them are placed at a predetermined interval in the thickness direction of the wall B, and the lower ends of the bars are placed on the floor surface C when pouring concrete. He was killed standing up with the lower end buried in the ground.
7は1組の型枠板5.5を所定間隔に保持させるセパレ
ー夕で、その両端近くには、1組の型枠板5.5を所定
間隔に保持させるキャップ8,8が夫々挿着されている
。Reference numeral 7 denotes a separator for holding a set of formwork plates 5.5 at a predetermined interval, and caps 8, 8 for holding a set of formwork plates 5.5 at a predetermined interval are inserted near both ends of the separator, respectively. has been done.
そして、セパレータ7の両端は夫々型枠板5,5に設け
たドリル孔を貫いて型枠力外側に突出さき、この突出端
にホー1、タイ9を螺着すること(こよって、1組の型
枠板5,5か施工床面C上の所定位置に於いて、所定の
対向間隔′:!:保って固定される様になっている。Then, both ends of the separator 7 pass through the drill holes provided in the formwork plates 5, 5, respectively, and protrude outward from the formwork, and the hoes 1 and ties 9 are screwed onto these protruding ends (thus, one set of The formwork plates 5, 5 are fixed at a predetermined position on the construction floor surface C while maintaining a predetermined facing interval':!:.
次に、本発明の作用を、第3図を撃照し乍ら説明する。Next, the operation of the present invention will be explained with reference to FIG.
先ず、施工床面C上に壁Bの厚さ方向に並立された2本
の鉄筋6.6の夫々に、この実施例ては施工床面Cから
凡そ8CII1位の高さ位置に於いて、螺杆4の締付を
緩めたセパレータ固定具Aの両腕部1a、1a間を挟み
込ませたうえ、セパレータ73両鉄筋6.6間に水平に
跨がらせ、且つ両掛止部2,2間に跨がらせる様に載せ
掛け、この状態で夫々の螺杆4を螺し込めば、セパレー
タ1は2本の縮鉄筋6、6間に架け渡した状態て強固に
固定される。First, in this embodiment, each of the two reinforcing bars 6.6 placed side by side in the thickness direction of the wall B on the construction floor surface C is placed at a height of approximately 8 CII 1 from the construction floor surface C. After loosening the tightening of the screw rod 4, insert the separator fixture A between both arms 1a, 1a, and then horizontally straddle the separator 73 between both reinforcing bars 6 and 6, and between both the hook parts 2, 2. If the separator 1 is placed so as to straddle the separator 1 and screwed in with each screw rod 4 in this state, the separator 1 is firmly fixed in a state spanning between the two contracted reinforcing bars 6, 6.
この様にしてセパレータ7を固定させる際に、その長さ
方向の中心を、構築すべき壁Bの厚さ方法によー)で型
枠板5,5に予め穿一)たドリル孔をセパし一夕7の両
端に大・J挿崩させたうえ、この両端に人・Jポーノ、
タf9を螺首させhば、1組の型枠板5,5は、施工床
面C上の所定位置に所定間隔を保って立設 固定される
。When fixing the separator 7 in this way, separate the longitudinal center of the separator 7 with a drill hole pre-drilled in the formwork plates 5 (depending on the thickness of the wall B to be constructed). In addition to inserting a large J at both ends of Ichiyo 7, there are also people and J porno at both ends.
By screwing the tab f9, the pair of formwork plates 5, 5 are erected and fixed at a predetermined position on the construction floor surface C with a predetermined interval maintained.
従って、従来の様に、施工床面に型枠板の立設位置決用
の墨線を引くき、この墨線に沿って型枠板の立設位置決
め用の桟木を床面に釘打着け、その上、コンクリート打
設後は、この桟木を撤去しなければならい等の、頗る繁
雑て労力、時間、副資材の浪費を余儀なくされる作業を
完全に不要化することが出来る。Therefore, as in the past, draw a black line on the construction floor to determine the position of the formwork board, and nail the crosspieces for positioning the formwork board to the floor along this black line. Moreover, it is possible to completely eliminate the need for extremely complicated work such as having to remove the crosspieces after concrete is poured, which is a waste of labor, time, and auxiliary materials.
第4図は、本発明の池の実施例のセパレータ固定具A]
を示すもので、上記のセパレータ固定具Aとの相異点は
、セパレータ7を縦鉄筋6に締結させる手段として、螺
杆4に代えて、楔10を用いたことと、固定具本体1を
、金属板てはなくて金属線材を屈曲加工して形成させた
処にある。FIG. 4 shows a separator fixing device A of an embodiment of the pond of the present invention]
The difference from the separator fixture A described above is that a wedge 10 is used instead of the screw rod 4 as a means for fastening the separator 7 to the vertical reinforcing bar 6, and the fixture main body 1 is It is not a metal plate but is formed by bending a metal wire.
この楔10は、図示の様に両腕部1a,ia間をータ7
を掛止させた状態で、連結部1bと縦鉄筋6との間隙部
に図示の様に打ち込めば、セパレータ1は縮鉄筋6に強
固に固定される。This wedge 10 connects the arm portions 1a and ia with a distance of 7 as shown in the figure.
If the separator 1 is driven into the gap between the connecting portion 1b and the vertical reinforcing bar 6 as shown in the figure in a state where it is hooked, the separator 1 is firmly fixed to the contracted reinforcing bar 6.
[発明の効果]
以上の説明によって明らかな様に、本発明のコンクリー
ト打設用型枠の支保工法によれは、この工法の為に特別
にfYられなセパレータ固定具を用いることによって、
従来工法の様に、施工床面に型枠板の立設位置決め用の
墨線を引き、この墨線に治って型枠板の位置決用桟木を
床面に打ちfすけ、その上、用済みの桟木を取り外す等
の、一連の極めて繁雑な準備及ひ後片付け作業は一切不
要化する。[Effects of the Invention] As is clear from the above explanation, the concrete casting formwork shoring method of the present invention uses a special separator fixing device for this method.
As in the conventional construction method, draw ink lines on the construction floor to determine the position of the formwork boards, and then use the ink lines to mark the positioning of the formwork boards on the floor. A series of extremely complicated preparation and cleanup operations such as removing the crosspieces are completely eliminated.
そして、此等の従来作業に替えて、施工床面の所定箇所
に予め立設されている鉄筋の下部に、セパレータ固定具
を使ってセパレー夕を固定させると言う、簡単迅速に完
了する作業を行うだけて足りる様になる。Instead of this conventional work, we now have a simple and quick work that involves fixing the separator to the bottom of the reinforcing bars that have been erected in advance at a predetermined location on the construction floor using a separator fixture. Just doing it will be enough.
従って、本発明の工法及びこの工法の為に開発された用
具によれば、非熟練(Y業者でも確実な作業を行え、又
、貴重な天然資源となりつつある木材を使わなくて済む
ことも寄与して、従来工法に比べて施工経費を目立って
低減出来ると言う優れた効果を奏する。Therefore, according to the construction method of the present invention and the tools developed for this construction method, even unskilled workers (Y workers) can perform the work reliably, and it also contributes to the fact that it does not require the use of wood, which is becoming a valuable natural resource. This has the excellent effect of significantly reducing construction costs compared to conventional construction methods.
【図面の簡単な説明】
第II2I乃至第3図は、本発明の一実施例を示すもの
で、第1図はセパレータ固定具の斜視図、第2図はこの
セパレータ固定具を使って、セパレータを鉄筋に固定さ
せた状態の側面図、第3図は本発明工法によって鉄筋コ
ンクリート建物の壁体打設用型枠を構築した状態を示す
縦断面図である。
第4図は、セパレータ固定具の別の実施例を示す第2図
相当図である。
第5図は、従来例を示す第3図相当図である。
符
1 固定具本体
1b 連結部
3 螺孔
4a 折曲部
号 表
1a 腕部
2 掛止部
4 螺杆
5 型枠板
縮鉄筋(鉄筋) 7
キャップ 9
模
A1 セパし一夕固定具
壁 C
セパし一タ
ポームタイ
施工床面
50
52
54
56
58
壁
型枠板
桟木
キャ7ブ
桟木
51
53
55
57
59
施工床面
鉄筋
セパレータ
ポームタイ
楔[BRIEF DESCRIPTION OF THE DRAWINGS] FIGS. II2I to 3 show an embodiment of the present invention. FIG. 1 is a perspective view of a separator fixture, and FIG. FIG. 3 is a side view showing a state in which the steel sheet is fixed to reinforcing bars, and FIG. 3 is a longitudinal cross-sectional view showing a state in which a formwork for pouring a wall of a reinforced concrete building is constructed by the construction method of the present invention. FIG. 4 is a view corresponding to FIG. 2 showing another embodiment of the separator fixture. FIG. 5 is a diagram corresponding to FIG. 3 showing a conventional example. Symbol 1 Fixture main body 1b Connecting part 3 Screw hole 4a Bending part number Table 1a Arm part 2 Hanging part 4 Screw rod 5 Form plate shrink reinforcing bar (reinforcing bar) 7 Cap 9 Model A1 Separated overnight fixture wall C Separated 1 Tapom tie construction floor surface 50 52 54 56 58 Wall type frame board crosspiece cab 7 crosspiece 51 53 55 57 59 Construction floor surface reinforcing bar separator Pom tie wedge
Claims (2)
位置に対向状に立設される1組の型枠板5、5を、所定
間隔を隔てて所定位置に固定させる工法であって、 前記1組の型枠板5、5を所定間隔に保持させるセパレ
ータ7を、前記施工床面C上に予め立設されて前記1組
の型枠板5、5間に配置される鉄筋6の所望位置に、ね
じ止式、楔止式等のセパレータ固定具A、A1を用いて
固定し、 この固定されたセパレータ7の両端に所定間隔を隔てて
夫々挿着された1組のキャップ8、8及〔登録商標〕 び前記セパレータ1の両端に螺着されるホームタイ9、
9により、前記1組の型枠板5、5の対向間隔の固定と
、前記立設位置決めとを同時に行うことを特徴とする鉄
筋コンクリート打設用型枠の支保工法。(1) A construction method in which a pair of formwork plates 5, 5, which are erected to face each other at a predetermined position on a construction floor surface C on which reinforced concrete is to be poured, are fixed at a predetermined position at a predetermined interval, A separator 7 for holding the pair of formwork plates 5, 5 at a predetermined interval is set up in advance on the construction floor surface C, and a separator 7 is installed between the reinforcing bars 6 arranged between the pair of formwork plates 5, 5. A pair of caps 8 are fixed at a desired position using separator fixtures A, A1 such as screw type or wedge type, and are inserted into both ends of the fixed separator 7 at a predetermined interval, respectively. 8 and [registered trademark] and home ties 9 screwed to both ends of the separator 1,
9, a method for shoring a formwork for pouring reinforced concrete, characterized in that fixing the opposing interval of the pair of formwork plates 5, 5 and determining the erecting position are performed at the same time.
基端側を連結部1bにより互いに連結させた形態を備え
、前記両腕部1a、1aの先端側に、前記セパレータ7
をこの両腕部1a、1a間に橋絡状に掛止させる掛止部
2を設け、前記連結部1bに螺孔3を設けた固定具本体
1と、 前記螺孔3に螺着されて、前記掛止部2に掛止させた前
記セパレータ7を前記鉄筋6に向けて締結する螺杆4と
から成ることを特徴とする請求項1項記載のセパレータ
固定具。(2) The separator fixture A has a configuration in which the proximal ends of both arm parts 1a, 1a which sandwich the reinforcing bar 6 from the sides are connected to each other by a connecting part 1b, The separator 7 is placed on the tip side.
A fixing device main body 1 is provided with a hooking portion 2 that is hooked in a bridging manner between both arm portions 1a, 1a, and a screw hole 3 is provided in the connecting portion 1b; , and a screw rod (4) for fastening the separator (7) hooked to the hooking portion (2) toward the reinforcing bar (6).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP1087590A JP2867280B2 (en) | 1990-01-19 | 1990-01-19 | Method for supporting reinforced concrete casting formwork and separator fixing tool used in the method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP1087590A JP2867280B2 (en) | 1990-01-19 | 1990-01-19 | Method for supporting reinforced concrete casting formwork and separator fixing tool used in the method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH03217556A true JPH03217556A (en) | 1991-09-25 |
| JP2867280B2 JP2867280B2 (en) | 1999-03-08 |
Family
ID=11762509
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP1087590A Expired - Fee Related JP2867280B2 (en) | 1990-01-19 | 1990-01-19 | Method for supporting reinforced concrete casting formwork and separator fixing tool used in the method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2867280B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2015229841A (en) * | 2014-06-04 | 2015-12-21 | 譲二 山下 | Fixture and method for fixing rod to be fixed on columnar support post |
-
1990
- 1990-01-19 JP JP1087590A patent/JP2867280B2/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2015229841A (en) * | 2014-06-04 | 2015-12-21 | 譲二 山下 | Fixture and method for fixing rod to be fixed on columnar support post |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2867280B2 (en) | 1999-03-08 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US4052031A (en) | Adjustable concrete form apparatus | |
| US3979868A (en) | Composite concrete and steel floor construction | |
| US3945168A (en) | Reusable spanner bar | |
| US8844224B2 (en) | Utility dowel bracket | |
| US3841597A (en) | Floor form with connected truss supports | |
| US3819143A (en) | Formwork for concrete walls | |
| US2916245A (en) | Adjustable scaffold bracket | |
| JPH07317188A (en) | Constructing method of reinforced concrete structure | |
| JPH03217556A (en) | Timbering construction for reinforced concrete placing mold, and separator fixture to be used for its construction | |
| CN214402669U (en) | Repeatedly usable's I-steel's of encorbelmenting joint fixed establishment | |
| US6415578B1 (en) | Method and apparatus for bricklaying | |
| JP3019766B2 (en) | Method of constructing formwork for concrete structures | |
| JP2012241473A (en) | Support material for temporary scaffold plate and method of installing temporary scaffold using the same | |
| JP3359145B2 (en) | How to install the water stop plate | |
| JP3081653U (en) | Baseboard panel fixture | |
| JPH0925636A (en) | Reinforcement suspension frame | |
| KR200141835Y1 (en) | Slab formwork for construction | |
| JP3098214U (en) | Large flutter | |
| JP7822565B2 (en) | Auxiliary equipment for slab formwork construction and method for constructing slab concrete using the same | |
| JP2939760B2 (en) | Separator fixture for reinforced concrete casting formwork | |
| JPH03217557A (en) | Sealant for gap between edges of form plates for placing concrete | |
| JPH0714556Y2 (en) | Scaffold connection strengthening hardware and scaffold connection device | |
| JPS638260B2 (en) | ||
| JPH0447300Y2 (en) | ||
| JPS6212028Y2 (en) |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |