JPH0327683B2 - - Google Patents
Info
- Publication number
- JPH0327683B2 JPH0327683B2 JP61255918A JP25591886A JPH0327683B2 JP H0327683 B2 JPH0327683 B2 JP H0327683B2 JP 61255918 A JP61255918 A JP 61255918A JP 25591886 A JP25591886 A JP 25591886A JP H0327683 B2 JPH0327683 B2 JP H0327683B2
- Authority
- JP
- Japan
- Prior art keywords
- pile
- girder
- piles
- guide device
- guide
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Description
【発明の詳細な説明】
[産業上の利用分野]
本発明は、既設杭の頭部に結構用の桁材を掛け
渡し、その桁材上に覆工板を架設して作業床を築
造し、順次前進して杭を打設する杭打工法に関す
る。[Detailed Description of the Invention] [Industrial Application Field] The present invention is a method for constructing a working floor by spanning a structural girder over the head of an existing pile and erecting a lining board on the girder. , relates to a pile driving method in which piles are driven sequentially forward.
[従来技術]
かかる杭打工法は、例えば荷揚桟橋の基礎杭等
の打設に従来から採られている。[Prior Art] Such a pile driving method has been conventionally used, for example, for driving foundation piles for unloading piers.
ところで、杭打ちの際に杭を案内する装置すな
わち、リーダーは、通常、作業床に固定されてい
るため、杭の打設後に作業床を既設杭まで築造前
進させる都度、取外して再度作業床に固定しなけ
ればならず、工事のスピード化、安全化上問題と
なつていた。 By the way, the device that guides the piles during pile driving, that is, the leader, is usually fixed to the work floor, so each time the work floor is advanced up to the existing pile after driving the piles, it must be removed and placed on the work floor again. It had to be fixed in place, which caused problems in terms of speeding up construction and making it safer.
例えば特公昭53−25401号公報には杭をガイド
するテンプレートを順次延長させて杭打ちを行う
工法が開示されている。しかしながら、かかる公
知技術ではテンプレートに円筒部を設けて杭を案
内するので、比較的に細い杭しか適用できず、そ
のために、強度上多数本の杭を打ち込まねばなら
ず、大型の作業台には不向きであつた。 For example, Japanese Patent Publication No. 53-25401 discloses a method of driving piles by sequentially extending a template that guides the piles. However, in this known technique, since a cylindrical portion is provided on the template to guide the pile, only relatively thin piles can be applied.For this reason, a large number of piles must be driven for strength, and a large workbench cannot be used. It was not suitable for me.
また、特公昭54−26803号工法には既設杭に打
設杭の案内装置を取付けて順次杭打ちを行うもの
であるから、案内装置の着脱作業が面倒であつ
た。 Furthermore, in the construction method of Japanese Patent Publication No. 54-26803, a guide device for driving piles is attached to the existing piles and the piles are driven one after another, so it is troublesome to attach and detach the guide device.
[解決しようとする課題]
したがつて本発明の目的は、比較的に大径の杭
を迅速かつ安全に打設でき、もつて荷揚桟橋等を
速やかに構築できる杭打工法を提供するにある。[Problems to be Solved] Therefore, an object of the present invention is to provide a pile driving method that allows relatively large diameter piles to be driven quickly and safely, and thereby allows for the prompt construction of a loading pier, etc. .
[課題を解決する手段]
本発明によれば、既設杭の頭部に結構用の桁材
を掛け渡し、その桁材上に覆工板を架設して作業
床を築造し、順次前進して杭を打設する杭打工法
において、桁材上に固定装置によつて固定でき、
そして桁材に沿つて移動自在な基台と、その基台
に連結部材を介して基台の下方に位置して桁材か
ら突出している梁部材と、その梁部材に沿つて移
動可能な足場と、その足場から張出し可能な案内
台とよりなる案内装置を準備し、既設杭に掛け渡
した桁材にガイドさせて該案内装置を前進させ、
固定手段で桁材に固定し、案内装置の案内台で杭
を抱えて杭打ちを行い、杭の案内台を解除して、
打設した杭まで桁材を掛け渡して作業床を形成
し、次いで固定装置を解除して案内装置を移動し
て、以後同様な作業を行い、順次杭を打設する。[Means for Solving the Problems] According to the present invention, a structural girder is spanned over the head of an existing pile, a lining board is erected on the girder to construct a working floor, and the work floor is sequentially advanced. In the pile driving method of driving piles, it can be fixed on the girder with a fixing device,
A base that is movable along the girder material, a beam member that is located below the base and protrudes from the girder material via a connecting member to the base, and a scaffold that is movable along the beam member. and a guide device consisting of a guide stand that can be extended from the scaffolding, and the guide device is advanced by being guided by a girder material that spans the existing pile,
Fix the pile to the girder with the fixing means, drive the pile by holding the pile with the guide stand of the guide device, release the guide stand of the pile,
A working floor is formed by extending girders up to the driven piles, then the fixing device is released and the guide device is moved, and the same operation is performed thereafter to drive the piles one after another.
[発明の作用効果の説明]
したがつて、案内装置は固定装置の締付け解除
で桁材に沿つて前進移動し固定できるので、その
前進移動および固定を簡単に行うことができる。
そして案内装置は作業床より低い位置で杭を抱え
るようになつているので、前進移動に際して杭が
邪魔にならず、かつ案内台は移動自在であり、こ
れらから打設する杭を好適に抱えることができ、
比較的に大径の杭に適し、その位置決めを容易に
行うことができる。[Description of Effects of the Invention] Therefore, the guide device can be moved forward along the girder and fixed by releasing the fastening device, so that the forward movement and fixation can be easily performed.
Since the guide device is designed to hold the piles at a position lower than the work floor, the piles do not get in the way when moving forward, and the guide table is movable, allowing it to hold the piles to be driven in a suitable manner. is possible,
Suitable for relatively large diameter piles and can be easily positioned.
それ故に作業の迅速化、安全化に大きく寄与す
ることができる。 Therefore, it can greatly contribute to speeding up and safety of work.
[実施例]
以下図面を参照して本発明の実施例を説明す
る。[Examples] Examples of the present invention will be described below with reference to the drawings.
第1図および第2図において、打設が終つた既
設杭1,1の頭部を切り揃え、頭部結構用の桁材
(H型鋼)2,2′……を掛け渡す。次いで、桁材
2,2′……上に全体をBで示す杭の案内装置を
据付ける部分を残して覆工板3を架けて作業床A
を築造する。 In FIGS. 1 and 2, the heads of the existing piles 1, 1 that have been driven are trimmed, and girder members (H-shaped steel) 2, 2' for the head structure are placed over them. Next, the lining board 3 is placed over the girder members 2, 2', leaving the part where the pile guide device is installed, which is indicated as B, and the work floor A is constructed.
Build.
案内装置Bは、桁材2上に据付けられる覆工板
3の厚さと等しい厚さを有し、桁材2上に固定装
置C,Cにより固定されて作業床Aの一部を形成
している。この固定装置C,Cは公知の任意のも
のでよく、図示の例ではねじ棒を回転させること
によつて、そのねじ棒に螺合するナツトが移動し
て桁材2のフランジと係合し固定するようになつ
ている。この案内装置Bは、桁材2に沿つて作業
床Aの長手方向(矢印X,Y方向)に移動自在な
基台4と、基台4に連結部材5,5を介して基台
4より下方に位置し、X方向に向つて突出された
一対の梁部材6,6と、その梁部材6,6に沿つ
て移動可能な足場台7a,7bと、その足場台7
a,7bに枢着され、折りたたみ(第1図の上方
に示す)、張り出し(第1図の下方に示す)が可
能な案内台8a,8bとから構成され、案内台8
a,8bには、それぞれ張り出した状態で打設し
ようとする杭1′の周囲を抱える半円状の凹部9
a,9bが形成されている。 The guide device B has a thickness equal to the thickness of the lining plate 3 installed on the girder 2, and is fixed on the girder 2 by fixing devices C, C, forming a part of the work floor A. There is. The fixing devices C, C may be any known fixing devices, and in the illustrated example, by rotating the threaded rod, the nut screwed into the threaded rod moves and engages with the flange of the beam member 2. It is supposed to be fixed. This guide device B includes a base 4 that is movable in the longitudinal direction (arrow X, Y direction) of the work floor A along the girder 2, and a base 4 that is connected to the base 4 via connecting members 5, 5. A pair of beam members 6, 6 located below and protruding toward the X direction, scaffolding platforms 7a, 7b movable along the beam members 6, 6, and the scaffolding platform 7.
a, 7b, and are configured with guide stands 8a, 8b that can be folded (shown in the upper part of FIG. 1) and extended (shown in the lower part of FIG. 1).
A and 8b each have a semicircular recess 9 that holds the circumference of the pile 1' to be driven in an overhanging state.
a, 9b are formed.
次に、杭打の手順を説明する。 Next, the pile driving procedure will be explained.
前作業が終了後、固定装置C,Cによる基台4
の桁材2への固定を解除し、図示されないクレー
ンで案内装置Bを吊り、基台4を既設杭1,1に
掛け渡した桁材2にガイドさせて案内装置Bを前
進させ、桁材2上に据付け、固定装置C,Cを操
作して固定する。その際に、次打設杭1′を案内
する凹部9a,9bの中心線を合せ基台4を桁材
2に位置決めする。次いで、杭間隔に応じてピン
部10のピンを差込み、足場台7a,7bを固定
するとともに、杭間隔の位置調整を行う。 After the previous work is completed, fix the base 4 using fixing devices C and C.
is released from the girder 2, the guide device B is lifted by a crane (not shown), the base 4 is guided by the girder 2 that spans the existing piles 1, 1, the guide device B is advanced, and the girder 2 and operate the fixing devices C and C to fix it. At this time, the center lines of the recesses 9a and 9b for guiding the next pile 1' to be driven are aligned, and the base 4 is positioned on the girder 2. Next, the pins of the pin portion 10 are inserted according to the distance between the piles to fix the scaffolding platforms 7a and 7b, and the position of the distance between the piles is adjusted.
次いで、新たに打設する杭1′をクレーンで吊
上げ、杭1′の建込みを行うが、片方の案内台8
bを折りたたみ、足場台7bを基台4側(矢印Y
方向)へ寄せておく。そして、足場台7bの方か
ら杭1′を他方の足場台7aの半円状凹部9aに
収めて杭の位置決めを行い、足場台7bを矢印X
方向に移動して案内台8bを張り出し、案内台8
aと協働して杭1′を抱える。この状態で杭1′を
下降させて杭打を行う。1本の杭の打込みが終つ
たら、足場台7a,7bと案内台8a,8bとを
利用して次の杭を建込み、下杭と上杭の溶接、溶
接部のX線検査を行う。杭打が完了したら、同様
に足場台と案内台とを利用して杭頭揃え等の頭部
処理工、桁材2aによる杭頭連結工の溶接作業等
を行う。 Next, the new pile 1' to be driven is lifted up by a crane and the pile 1' is erected.
b, and move the scaffolding platform 7b to the base 4 side (arrow Y
direction). Then, position the pile by placing the pile 1' from the scaffolding platform 7b into the semicircular recess 9a of the other scaffolding platform 7a, and move the scaffolding platform 7b along the arrow
direction and extend the guide platform 8b,
Hold the pile 1' in cooperation with a. In this state, the pile 1' is lowered to drive the pile. After driving one pile, use scaffolding platforms 7a, 7b and guide platforms 8a, 8b to erect the next pile, weld the lower pile and upper pile, and perform an X-ray inspection of the welded part. . Once the pile driving is completed, the scaffolding and guide tables are similarly used to perform head processing work such as aligning the pile heads, welding work for connecting the pile heads with the girder material 2a, etc.
次いで案内台8a,8bを折りたたんで杭1′
の案内を解除し、前記と同様にして案内装置Bを
桁材2aに沿つて前進させて据付ける。以下同様
の作業で杭打を行つて前進し、例えば荷揚桟橋を
築造する。 Next, fold up the guide tables 8a and 8b and attach the pile 1'.
The guide device B is moved forward along the girder 2a and installed in the same manner as described above. Thereafter, similar operations are performed to drive piles and move forward, for example, to build a loading pier.
なお、実施例では丸杭を扱つているが、H型杭
等の他の断面形状の杭にも本発明は実施でき、ま
た荷揚桟橋の築造に限らず他の用途のための杭打
にも本発明は実施できる。 Although round piles are used in the examples, the present invention can be applied to piles with other cross-sectional shapes such as H-shaped piles, and can also be applied to pile driving not only for the construction of loading docks but also for other purposes. The invention can be practiced.
[発明の効果]
以上の如く、本発明によれば、案内装置を既設
杭に掛け渡した桁材に沿つて前進させて固定し、
そして次打設する杭を案内台で抱えるようにする
ので、案内装置の案内台が桁材より下方にあつて
も既設杭がその前進の邪魔にならず、また杭を比
較的低い位置で抱えることができ、打設および位
置決めが容易である。したがつて、比較的大径の
杭打ち作業が迅速化でき、しかも極めて安全であ
る。[Effects of the Invention] As described above, according to the present invention, the guide device is moved forward and fixed along the girder material spanning the existing pile,
Since the next pile to be driven is held by the guide stand, even if the guide stand of the guide device is below the girder, the existing pile will not get in the way of its advancement, and the pile will be held at a relatively low position. Easy to place and position. Therefore, the work of driving relatively large diameter piles can be done quickly and is extremely safe.
図面は本発明を実施するのに用いる杭の案内装
置を示し、第1図は平面図、第2図は側面図であ
る。
A……作業床、B……杭の案内装置、C……固
定装置、1……既設杭、1′……新たに打込む杭、
2,2′,2a……桁材、3……覆工板、4……
基台、6……梁部材、7a,7b……足場台、8
a,8b……案内台、9a,9b……半円状の凹
部。
The drawings show a pile guiding device used to carry out the present invention, with FIG. 1 being a plan view and FIG. 2 being a side view. A...Working floor, B...Pile guide device, C...Fixing device, 1...Existing pile, 1'...Pile to be newly driven,
2, 2', 2a... Girder material, 3... Lining board, 4...
Base, 6... Beam member, 7a, 7b... Scaffolding stand, 8
a, 8b...Guide table, 9a, 9b...Semicircular recess.
Claims (1)
の桁材上に覆工板を架設して作業床を築造し、順
次前進して杭を打設する杭打工法において、桁材
上に固定装置によつて固定でき、そして桁材に沿
つて移動自在な基台と、その基台に連結部材を介
して基台の下方に位置して桁材から突出している
梁部材と、その梁部材に沿つて移動可能な足場
と、その足場から張出し可能な案内台とよりなる
案内装置を準備し、既設杭に掛け渡した桁材にガ
イドさせて該案内装置を前進させ、固定手段で桁
材に固定し、案内装置の案内台で杭を抱えて杭打
ちを行い、杭の案内台を解除して、打設した杭ま
で桁材を掛け渡して作業床を形成し、次いで固定
装置を解除して案内装置を移動して、以後同様な
作業を行い、順次杭を打設することを特徴とする
杭打工法。1 In the pile driving method, in which a structural girder is stretched over the head of an existing pile, a lining plate is erected on top of the girder, a working floor is built, and the piles are driven in sequence, the girder is a base that can be fixed to the top by a fixing device and is movable along the girder; a beam member that is located below the base and protrudes from the girder through a connecting member to the base; A guide device consisting of a scaffold that is movable along the beam member and a guide stand that can be extended from the scaffold is prepared, and the guide device is advanced by being guided by the girder material that spans the existing pile, and the fixing means Fix the pile to the girder material with A pile driving method characterized by releasing the device, moving the guide device, and performing the same operation thereafter to drive piles in sequence.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP25591886A JPS62260918A (en) | 1986-10-29 | 1986-10-29 | Pile driving method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP25591886A JPS62260918A (en) | 1986-10-29 | 1986-10-29 | Pile driving method |
Related Parent Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP11400780A Division JPS5740030A (en) | 1980-08-21 | 1980-08-21 | Pile driving work and guide material therefor |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS62260918A JPS62260918A (en) | 1987-11-13 |
| JPH0327683B2 true JPH0327683B2 (en) | 1991-04-16 |
Family
ID=17285375
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP25591886A Granted JPS62260918A (en) | 1986-10-29 | 1986-10-29 | Pile driving method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS62260918A (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH03137317A (en) * | 1989-10-24 | 1991-06-11 | Fujita Corp | Pier main pile driving method and pier main pile driving device used for it |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5837601B2 (en) * | 1976-08-23 | 1983-08-17 | ソニー株式会社 | Automatic lifting device for tone arm |
| JPS5426803A (en) * | 1977-08-02 | 1979-02-28 | Hitachi Ltd | Coking prevention and its device |
-
1986
- 1986-10-29 JP JP25591886A patent/JPS62260918A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS62260918A (en) | 1987-11-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN113463522B (en) | Auxiliary device and method for bent cap construction | |
| CN110616640B (en) | Positioning and lowering device for reinforcement cage and construction method thereof | |
| CN106193618A (en) | A kind of Long span aerial steel structure truss construction | |
| CN116479783A (en) | Device for splicing steel box arch segments and construction method | |
| JPH0455276A (en) | Apparatus installing method and device in elevator tower | |
| JPH0373697B2 (en) | ||
| JPS6334257B2 (en) | ||
| JPH0242969B2 (en) | ||
| JPS62260918A (en) | Pile driving method | |
| JPH0219248B2 (en) | ||
| US3568300A (en) | Method and apparatus for forming ship hulls | |
| JPS6041165B2 (en) | Equipment for cantilevering bridge structures made of reinforced concrete or prestressed concrete into sections. | |
| US4356948A (en) | Truss assembly unit | |
| JPH0762885A (en) | Steel post alignment jig device | |
| JPS5733620A (en) | Static loading type pile-driver | |
| JPS627120B2 (en) | ||
| US4156996A (en) | Scaffolding for working on contoured surfaces | |
| US20050199153A1 (en) | Railroad panel placement system | |
| CN214828436U (en) | An electric rail flat car crane track structure with fixing tools | |
| CN221038259U (en) | Welding test piece equipment | |
| LU508679B1 (en) | Cloud-based construction factory manipulator and construction method for concrete leveling operation | |
| CN223014871U (en) | Cage type tool for folding wall of stainless steel groove type bulkhead | |
| CN223907660U (en) | Girder steel convenient to location | |
| JPH0776489B2 (en) | Steel erection device and steel erection system | |
| DE943593C (en) | Device for lifting sunken bridges, ships or the like. |