JPH0333583A - How to lay underground pipes - Google Patents

How to lay underground pipes

Info

Publication number
JPH0333583A
JPH0333583A JP1168435A JP16843589A JPH0333583A JP H0333583 A JPH0333583 A JP H0333583A JP 1168435 A JP1168435 A JP 1168435A JP 16843589 A JP16843589 A JP 16843589A JP H0333583 A JPH0333583 A JP H0333583A
Authority
JP
Japan
Prior art keywords
buried pipe
refilled
ditch
earth
bulk material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP1168435A
Other languages
Japanese (ja)
Other versions
JPH0549873B2 (en
Inventor
Masaaki Watanabe
正明 渡辺
Takeshi Kitahara
武 北原
Nagayuki Ooba
大場 修幸
Akira Hagio
萩尾 彰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Engineering Corp
Original Assignee
NKK Corp
Nippon Kokan Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NKK Corp, Nippon Kokan Ltd filed Critical NKK Corp
Priority to JP1168435A priority Critical patent/JPH0333583A/en
Publication of JPH0333583A publication Critical patent/JPH0333583A/en
Publication of JPH0549873B2 publication Critical patent/JPH0549873B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Sewage (AREA)

Abstract

PURPOSE:To reduce the quantity of the earth to be refilled and lighten the tamping work of the refilled earth by laying a buried pipe in a drilled ditch through a spacer, filling foaming resin bulk material into the ditch and backfilling the upper part of the ditch with the earth to be refilled. CONSTITUTION:A ditch is drilled, and a buried pipe 3 is laid in the ditch through a spacer 2. Forming resin bulk material 4 is filled into the ditch 1, and the upper part of the ditch 1 is backfilled with the earth to be refilled 5. With the filling of the forming resin bulk material 4 around the buried pipe 3 laid in the ditch 1, the quantity of the earth to be refilled 5 can be reduced in large degree, and the tamping of the refilled earth is needed only for the refilled earth backfilled lastly. Moreover, as the foaming resin bulk material 4 has a cushioning characteristic and light weight, the strength of the buried pipe 3 can be reduced by that part. The bulk material 4 can be dug up easily at the time of digging up the refilled earth 5 for the repair of the buried pipe 3 and the like, so that the buried pipe 3 can be prevented from being damaged by a drilling machine and the like.

Description

【発明の詳細な説明】 [産業上の利用分野] この発明は、埋設管の敷設方法に関するものである。[Detailed description of the invention] [Industrial application field] The present invention relates to a method of laying a buried pipe.

[従来の技#i] 従来、水道管、ガス管等の埋設管を敷設するには、第2
図に示すように、先ず、)苺1を掘り、次いで、溝]、
の底部に埋戻土2Aを入れ、これを突き固める。次いで
、埋戻土2A上に埋設管3を敷設し、埋設管3の上部に
埋戻土2Bを入れ、これを突き固める。
[Conventional Technique #i] Conventionally, when laying underground pipes such as water pipes and gas pipes,
As shown in the figure, first dig a strawberry 1, then dig a trench],
Add 2A of backfill soil to the bottom of the tank and tamp it down. Next, the buried pipe 3 is laid on the backfilling soil 2A, and the backfilling soil 2B is put in the upper part of the buried pipe 3, and this is tamped.

[発明が解決しようとする課題] しかしながら、上述した従来の、埋設管の敷設方法は、
以下のような問題を有していた。
[Problems to be Solved by the Invention] However, the above-mentioned conventional method for laying underground pipes,
It had the following problems.

(1)溝1を掘削した後の土を、埋戻土2A、 2Bと
して使用せず、埋戻土2A、 2Bとしては通常、山砂
が使用されるが、この山砂の確保が近年、困難である。
(1) The soil after trench 1 is excavated is not used as backfill soil 2A, 2B, and mountain sand is normally used as backfill soil 2A, 2B, but in recent years, securing this mountain sand has become increasingly difficult. Have difficulty.

(2)埋戻土の突固め等に時間と手間がかかり、突固め
が均一でない場合には、埋設管3に地盤性下等によって
曲げ力が作用して、埋設管3が破損する虞れがある。
(2) It takes time and effort to compact backfill soil, and if the compaction is not uniform, there is a risk that bending force will be applied to the buried pipe 3 due to the ground quality, causing damage to the buried pipe 3. There is.

(3)埋設管3には直接、土荷重や車両荷重が作用する
ので、埋設管3として高強度のものを使用する必要があ
る。
(3) Since earth loads and vehicle loads directly act on the buried pipe 3, it is necessary to use a high-strength one as the buried pipe 3.

(4)埋設管3の補修時等において、埋戻土2Bを掘り
上げる場合に、誤って埋設管3を損傷することがある。
(4) When digging up the backfilling soil 2B during repair of the buried pipe 3, etc., the buried pipe 3 may be accidentally damaged.

従って、この発明の目的は、埋戻土が少量で済み、埋戻
土の突固め作業が軽微で済み、埋戻土を掘り上げる場合
に、誤って埋設管を損傷する虞れが少ない、埋設管の敷
設方法を提供することにある。
Therefore, an object of the present invention is to provide a buried pipe that requires only a small amount of backfill soil, requires only a small amount of compaction work for the backfill soil, and that reduces the risk of accidentally damaging buried pipes when digging up the backfill soil. The purpose of this invention is to provide a method for laying pipes.

[課題を解決するための手段] この発明は、溝を掘削し、次いで、前記溝内にスペーサ
ーを介して埋設管を敷設し、次いで、前記溝内に、発泡
樹脂粉粒体を充填し、そして、前記溝上部を埋戻土によ
って埋戻すことに特徴を有するものである。
[Means for Solving the Problems] This invention involves excavating a trench, then laying a buried pipe in the trench via a spacer, and then filling the trench with foamed resin powder, The present invention is characterized in that the upper part of the groove is backfilled with backfilling soil.

次に、この発明の、埋設管の敷設方法の一実施態様を、
図面を参照しながら説明する。
Next, an embodiment of the method for laying a buried pipe according to the present invention is as follows.
This will be explained with reference to the drawings.

第1図は、この発明の、埋設管の敷設方法の一実施態様
を示す断面図である。
FIG. 1 is a sectional view showing one embodiment of the buried pipe laying method of the present invention.

第1図に示すように、この発明は、先ず、溝1を掘削し
、次いで、溝工内にスペーサー2を介して埋設管3を敷
設し、次いで、溝1内に発泡樹脂粉粒体4を充填し、そ
して、最後に、溝l上部を3− 埋戻土5によって埋戻すことからなっている。
As shown in FIG. 1, this invention first excavates a groove 1, then lays a buried pipe 3 in the groove via a spacer 2, and then fills the groove 1 with foamed resin powder 4. 3. Then, finally, the upper part of the trench 1 is backfilled with backfilling soil 5.

)拷1内に敷設された埋設管3の周囲に発泡樹脂粉粒体
4を充填することによって、埋戻土の量が大幅に減少し
、埋戻土の突固めも最後に埋戻す埋戻土5だけで済み、
発泡樹脂粉粒体4が緩衝性を有し且つ軽量であるので、
その分、埋設管3の強度を低減でき、さらに、埋設管3
の補修時等において、埋戻土5を掘り上げる場合に、発
泡樹脂粉粒体4は容易に掘り上げることができるので、
埋設管4が掘削機等によって損傷を受ける虞れが少ない
。
) By filling the area around the buried pipe 3 laid in the pipe 1 with foamed resin powder 4, the amount of backfilling soil can be significantly reduced, and the tamping of the backfilling soil can be done at the end. Only 5 soils are required,
Since the foamed resin powder 4 has cushioning properties and is lightweight,
The strength of the buried pipe 3 can be reduced accordingly, and furthermore, the strength of the buried pipe 3 can be reduced.
When digging up the backfill soil 5 during repairs, etc., the foamed resin powder 4 can be easily dug up.
There is little risk that the buried pipe 4 will be damaged by an excavator or the like.

発泡樹脂粉粒体4の粒径は、0.5+nmから3.0m
の範囲内が好ましい。
The particle size of the foamed resin powder 4 is from 0.5+nm to 3.0m.
It is preferably within the range of .

[発明の効果1 以上説明したように、この発明によれば、埋戻土の一部
を発泡樹脂粉粒体に代えることによって。
[Effect of the Invention 1 As explained above, according to the present invention, part of the backfilling soil is replaced with foamed resin powder.

以下のような有用な効果ががもたらされる。The following useful effects are brought about:

(1)埋戻土の量が大幅に減少することで、押戻土用の
山砂の確保や突固め作業が軽減される。
(1) By significantly reducing the amount of backfilling soil, securing mountain sand for backfilling and compacting work will be reduced.

(2)埋設管にかかる前垂が減少するので、その分、埋
設管として強度の低いものを使用できる。
(2) Since the droop on the buried pipe is reduced, a lower-strength buried pipe can be used accordingly.

(3)埋設管の補修時等において、埋戻土を掘り上げる
場合に、埋設管を損傷させる虞れが少ない。
(3) There is less risk of damaging the buried pipe when backfilling soil is dug up when repairing the buried pipe.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は、この発明の、埋設管の敷設方法の−実施態様
を示す断面図、第2図は、従来の、埋設管の敷設方法を
示す断面図である。図面において、1・・・溝、   
   2・・・スペーサー3・・埋設管、   4・・
・発泡樹脂粉粒体、5・・・埋戻土。
FIG. 1 is a sectional view showing an embodiment of the buried pipe laying method of the present invention, and FIG. 2 is a sectional view showing a conventional buried pipe laying method. In the drawings, 1... groove;
2... Spacer 3... Buried pipe, 4...
- Foamed resin powder, 5... backfill soil.

Claims (1)

【特許請求の範囲】[Claims] 1 溝を掘削し、次いで、前記溝内にスペーサーを介し
て埋設管を敷設し、次いで、前記溝内に、発泡樹脂粉粒
体を充填し、そして、前記溝上部を埋戻土によって埋戻
すことを特徴とする、埋設管の敷設方法。
1. Excavating a trench, then laying a buried pipe in the trench via a spacer, filling the trench with foamed resin powder, and backfilling the upper part of the trench with backfilling soil. A method for laying underground pipes, characterized by the following.
JP1168435A 1989-06-30 1989-06-30 How to lay underground pipes Granted JPH0333583A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1168435A JPH0333583A (en) 1989-06-30 1989-06-30 How to lay underground pipes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1168435A JPH0333583A (en) 1989-06-30 1989-06-30 How to lay underground pipes

Publications (2)

Publication Number Publication Date
JPH0333583A true JPH0333583A (en) 1991-02-13
JPH0549873B2 JPH0549873B2 (en) 1993-07-27

Family

ID=15868064

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1168435A Granted JPH0333583A (en) 1989-06-30 1989-06-30 How to lay underground pipes

Country Status (1)

Country Link
JP (1) JPH0333583A (en)

Also Published As

Publication number Publication date
JPH0549873B2 (en) 1993-07-27

Similar Documents

Publication Publication Date Title
CN103882884B (en) A kind of anchor cable geo-grid retaining structure and construction method thereof
CN107503754A (en) A kind of construction method of VI grade of country rock rich water Shallow tunnel with large cross-section
CN106884427A (en) Immersed tube tunnel and immersed tube tunnel changeover portion soft soil foundation reinforcing method under water
CN115749833A (en) Ultra-small clear distance large jacking pipe jacking construction structure and method under complex conditions
CN110259490A (en) A construction method for subway underground excavation station
CN110344439A (en) Construction method of rear retaining wall drain hole
CN110273424A (en) A kind of construction method of yard piping
CN114016498B (en) Construction method for preventing filling pile from being in series holes in ultra-long hollow holes in sea-filling area
CN106948282A (en) The construction method of Integral Steel corrugated pipe forming culvert
CN107100100A (en) The corrugated steel pipe shaping culvert construction method of housing type joint connection
Webb et al. Field tests of buried pipe installation procedures
CN107700502A (en) A kind of Fill Reinforced With Geogrids slopes and its construction method
KR100333024B1 (en) Grouting Horizontal directional drilling method
CN109083122A (en) The construction method of deep peat soil area construction operation platform
JP2885199B2 (en) Underground burial method for pipelines
JP2554916Y2 (en) Compact shovel compaction device
JPH0333585A (en) How to lay underground pipes
JPH0549873B2 (en)
JP3101371B2 (en) Temporary backfill method
JPH01174729A (en) Method for burying pipe
JPH02300430A (en) Civil engineering method for embedding pipe
JP2920177B2 (en) Temporary backfill method and temporary backfill materials
JPH0333582A (en) How to lay underground pipes
JP2000154545A (en) Soil structure reinforcement method
JP2010121724A (en) Pipeline laying and burying method on steep slope