JPH0336318A - Method of construction for stopping natural ground - Google Patents

Method of construction for stopping natural ground

Info

Publication number
JPH0336318A
JPH0336318A JP16916389A JP16916389A JPH0336318A JP H0336318 A JPH0336318 A JP H0336318A JP 16916389 A JP16916389 A JP 16916389A JP 16916389 A JP16916389 A JP 16916389A JP H0336318 A JPH0336318 A JP H0336318A
Authority
JP
Japan
Prior art keywords
natural ground
ground
anchor
excavated
retaining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP16916389A
Other languages
Japanese (ja)
Other versions
JPH0663234B2 (en
Inventor
Yasuhiro Yamada
泰弘 山田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kensetsu Kiso Engineering Co Ltd
Original Assignee
Kensetsu Kiso Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kensetsu Kiso Engineering Co Ltd filed Critical Kensetsu Kiso Engineering Co Ltd
Priority to JP16916389A priority Critical patent/JPH0663234B2/en
Publication of JPH0336318A publication Critical patent/JPH0336318A/en
Publication of JPH0663234B2 publication Critical patent/JPH0663234B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Retaining Walls (AREA)

Abstract

PURPOSE:To contrive safe and inexpensive execution by digging the natural ground divided into a plurality of steps, fixedly driving an anchor to raise a retaining structure, fixing it to the anchor and piling the structure. CONSTITUTION:The natural ground is excavated to be divided into a plurality of steps by each predetermined height from the upper. In each of this excavation, an anchor 2 is driven toward the natural ground from an excavated natural ground surface 1. Here, a nut 3 and a steel plate 4, which serve as a structure stopper tool, are left as inserted to a protruding part from the natural ground of the anchor 2. Next, an existing retaining panel 5, which serves as a retaining structure, is raised along the excavated natural ground surface 1 and fixed by a nut 6 or the like. Water from the natural ground is drained by packing broken stones 9 between the retaining panel 5 and the excavated natural ground surface. Further, by repeating similar work, the total surface of the excavated natural ground 1 is coated with the retaining panel 5.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は掘削した地山面の安定化を図る山留工法に関
するもので、特に長大な掘削地山の安定化を図るための
山留工法に関するものである。
[Detailed Description of the Invention] [Field of Industrial Application] This invention relates to a retaining method for stabilizing the surface of an excavated ground, and in particular, a retaining method for stabilizing a long excavated ground. It is related to.

〔従来技術及びその課題〕[Prior art and its issues]

高さが高く長大な地山の山留を行う場合、上方から下方
まで一気に掘削してしまい、その後山留構造物を掘削地
山面に沿って設置する方法が考えられる。
When retaining a long and high ground, one possible method is to excavate from the top to the bottom all at once, and then install retaining structures along the surface of the excavated ground.

しかし大きな掘削面を掘削した後、土留構造物の固定を
完了するまで掘削地山は不安定な状態であり、この地山
面の下で作業をするのは極めて大きな危険を伴っていた
However, after excavating a large excavation surface, the excavated ground remains unstable until the earth retaining structure is fixed, and it is extremely dangerous to work under this ground surface.

このため上方から下方まで段階的に掘削して、その掘削
ごとにアンカーを打設して土留パネルのような土留構造
物を設置して山留めをしておくことも考えられる。
For this reason, it may be possible to excavate in stages from the top to the bottom, drive anchors after each excavation, and install earth retaining structures such as earth retaining panels to hold the mountain in place.

しかし上方に土留構造物を設置した後、この下を掘削す
るのは極めて困難な作業であった。
However, after installing the earth retaining structure above, excavating beneath it was an extremely difficult task.

従って今だに山留工事において、上方から掘削して地山
を安定化させながら下方まで掘削し、その後土留構造物
を掘削地山に沿って配する方法は確立されていなかった
Therefore, in retaining earthworks, there is still no established method of excavating from above, stabilizing the earth, excavating downwards, and then placing earth retaining structures along the excavated earth.

この発明は以上のような課題を解決するためになされた
もので、安全な施工が可能であり、また安価に施工する
ことができる山留工法を提供することを目的とする。
This invention was made in order to solve the above-mentioned problems, and an object of the present invention is to provide a mountain retaining method that allows safe construction and can be constructed at low cost.

〔課題を解決するための手段〕[Means to solve the problem]

この発明にかかる山留工法は、地山を掘削するのに伴っ
て11M次仮留めするものである。
The mountain retaining method according to the present invention temporarily secures the 11M order while excavating the ground.

長大な掘削面を山留めする場合、上方から下方に向って
複数段階に分けて掘削する。つまり所定高さづつ順次掘
削していくもので、その掘削ごとに仮留めする。
When retaining a long excavated surface, the excavation is done in multiple stages from the top to the bottom. In other words, the tunnel is excavated one after another to a predetermined height, and temporary fixing is performed after each excavation.

この地山掘削面からアンカーを打設して固定する。アン
カーは比較的剛性の高いものを採用するもので、例えば
棒状体の異形鋼棒などを地山に打設して、グラウト材に
よって固定したものが採用できる。また大径の鋼より線
であれば後に述べる土留構造物の保持が可能な程の剛性
を有する。アンカーは比較的近い間隔を置いて打設し、
その間隔は1〜2 m、ごとである。このアンカーによ
って地山が補強され、崩壊の可能性が小さくなる。すな
わちアンカーは地山に生えた草木の根のように地山の中
に伸びて、地山の崩壊を防ぐものである。
Anchors are driven and fixed from this ground excavation surface. An anchor with relatively high rigidity is used; for example, a rod-shaped deformed steel rod can be driven into the ground and fixed with grout. In addition, a large diameter steel stranded wire has enough rigidity to hold an earth retaining structure, which will be described later. The anchors are set at relatively close intervals,
The spacing is every 1-2 m. These anchors strengthen the ground and reduce the possibility of collapse. In other words, anchors extend into the ground like the roots of plants growing in the ground and prevent the ground from collapsing.

このアンカーによる仮留めの状態で、順次下方へ掘削、
仮留めを繰り返して長大地山面を掘削する。
While temporarily secured with this anchor, excavate downward one by one.
Excavate a long ground surface by repeating temporary fixing.

掘削完了後、既設のコンクリートパネルなどの土留構造
物を掘削面に沿って起立する。アンカーの地山からの突
出部分には、ナツトやプレートの構造物止め具を取付け
ておいて、このアンカーの突出部分を挿通して土留構造
物を保持する。ナツトなどによってアンカーに土留構造
物を固定する。土留構造物としては平板状の土留パネル
やその他土留ブロック等様々なものが使用できる。土留
構造物と地山との間には隙間を設けておき、土砂や砕石
を詰めてもよい。
After excavation is complete, earth retaining structures such as existing concrete panels will be erected along the excavation surface. A structure stopper such as a nut or plate is attached to the protruding part of the anchor from the ground, and the earth retaining structure is held by inserting the protruding part of the anchor. Fix the earth retaining structure to the anchor using nuts, etc. Various earth retaining structures can be used, such as flat earth retaining panels and other earth retaining blocks. A gap may be provided between the earth retaining structure and the ground and filled with earth and sand or crushed stone.

〔実 施 例〕〔Example〕

以下、図に示す一実施例に基づき、この発明の詳細な説
明する。
Hereinafter, the present invention will be described in detail based on an embodiment shown in the drawings.

まず、地山を計画線に沿って上方から所定高さづつ複数
段階に分けて掘削する。この掘削ごとに掘削地山面1か
らアンカー2を地山に向って打設する。アンカー2は様
々な構成のものが採用できるが、実施例では外周にネジ
を有する異形鋼棒を使用し、孔内に注入したグラウト材
によって固定した。アンカー2は複数本を比較的短い間
隔づつ離して打設したもので、このアンカー2によって
地山の補強がなされ、大きな崩壊の可能性はなくなり、
仮留めの状態となる。
First, the ground is excavated from above along a planned line in multiple stages at predetermined heights. For each excavation, an anchor 2 is driven from the excavated ground surface 1 toward the ground. Although various configurations can be adopted for the anchor 2, in the example, a deformed steel rod having a screw on the outer periphery was used, and was fixed with grout material injected into the hole. Anchors 2 are multiple anchors placed at relatively short intervals, and these anchors 2 reinforce the ground, eliminating the possibility of major collapse.
It will be in a temporary state.

アンカー2の地山からの突出部分は充分長くとっておく
Leave the part of anchor 2 that protrudes from the ground sufficiently long.

(第1図) アンカー2の地山からの突出部分には構造物止め具であ
るナツト3と鋼製プレート4を挿通しておく。アンカー
2は総ネジの異形鋼棒を使用しているため、ナツト3を
回転して位置を微調整できる。ナツト3だけでも構造物
を支えることができれば、プレート4の必要はない。
(Fig. 1) A nut 3 and a steel plate 4, which are structural fasteners, are inserted into the part of the anchor 2 that protrudes from the ground. Since the anchor 2 uses a fully threaded deformed steel rod, the position can be finely adjusted by rotating the nut 3. If the nut 3 alone can support the structure, the plate 4 is not necessary.

このように上方の掘削地山面をアンカー2で仮留めして
崩壊を防ぎ、更に下方を掘削する。
In this way, the upper excavated ground surface is temporarily fixed with the anchors 2 to prevent collapse, and the lower part is excavated further.

(第3図)この掘削した地山も前記したと同様にアンカ
ー2にて仮留めする。(第4図〉その後掘削、仮留めを
繰り返して地山全面を計画通り掘削する。(第5,6図
) 掘削地山面lに沿って土留構造物である既製の土留めパ
ネル5を起立する。この土留めパネル5に前記したアン
カー2の地山がらの突出部分を通して、構造物止め具に
よって地山から所定間隔保持し、ナツト6等によって固
定する。
(Fig. 3) This excavated ground is also temporarily secured with anchors 2 in the same manner as described above. (Figure 4) After that, excavation and temporary fixing are repeated to excavate the entire surface of the ground as planned. (Figures 5 and 6) Ready-made earth retaining panels 5, which are earth retaining structures, are erected along the excavated earth surface l. The above-mentioned anchor 2 is passed through the earth retaining panel 5 through the protruding portion of the ground, held at a predetermined distance from the ground by a structural fastener, and fixed with a nut 6 or the like.

土留パネル5としては、実施例では円弧状のアーチ部7
と、この前面に棚状の補強部8を有する土留パネル5を
使用する。アンカー2は土留パネル5の両端に通して固
定する。
As the retaining panel 5, in the embodiment, an arcuate arch portion 7 is used.
A retaining panel 5 having a shelf-like reinforcing section 8 on the front surface thereof is used. The anchors 2 are passed through both ends of the retaining panel 5 and fixed.

土留パネル5と掘削地山面1との間に地山からの水を排
水するための砕石9を詰める。(第7図)土砂を詰める
場合は排水バイブ等を地山に埋めればよい。
Crushed stones 9 are packed between the earth retaining panel 5 and the excavated ground surface 1 for draining water from the ground. (Fig. 7) When filling with earth and sand, it is sufficient to bury a drainage vibrator etc. in the ground.

この土留パネル5上に順次土留パネル5を積み上げてア
ンカー2に固定し、砕石9を詰める。
The earth retaining panels 5 are sequentially stacked on top of the earth retaining panels 5, fixed to the anchors 2, and crushed stone 9 is filled.

(第8図) 以上のような作業を繰り返して掘削地山l全面を土留パ
ネル5によって覆う。
(Fig. 8) The above operations are repeated until the entire surface of the excavated ground l is covered with the retaining panel 5.

土留構造物としては上記のような形状の土留パネル5に
限らず、平板状のパネル等様々なものが使用できる。
The earth retaining structure is not limited to the earth retaining panel 5 having the shape described above, but various types such as flat panels can be used.

〔発明の効果〕〔Effect of the invention〕

この発明は以上のような構成によって以下の効果を得る
ことができる。
With the above configuration, the present invention can obtain the following effects.

■ 地山を上方から下方に向って複数段階に分けて掘削
し、この各段階ごとにアンカーによって掘削地山面の仮
留めをすることができ、施工中に地山の崩壊の危険が小
さく、安全な作業ができる。
■ The ground can be excavated in multiple stages from above to below, and the surface of the excavated ground can be temporarily secured with anchors at each stage, reducing the risk of the ground collapsing during construction. Able to work safely.

@ アンカーのみを使用して仮留めを行うため、従来の
山留めと比較して施工費は変わらず、安価に施工が可能
となる。
@ Since temporary fixing is performed using only anchors, the construction cost remains the same compared to conventional mountain fixing, making it possible to perform construction at a lower cost.

O以上のような効果により、従来極めて困難とされた鉛
直地山の山留めも極めて安全かつ容易に行えるようにな
る。
O Due to the above-mentioned effects, it becomes possible to secure vertical ground, which has been extremely difficult in the past, extremely safely and easily.

0 この工法により従来確立されていなかった長大な地
山を山留めする山留め工事で、上方から順に掘削して安
定化させながら下方まで掘削し、その後下方から順に土
留構造物を積み上げる逆打ち工法的な施工が可能となる
0 This construction method is used to retain a long ground that has not been previously established, and is similar to the reverse construction method in which earth retaining structures are excavated from the top, stabilized, and then excavated to the bottom, and then piled up earth retaining structures from the bottom. Construction is now possible.

【図面の簡単な説明】[Brief explanation of drawings]

第1図〜第8図はこの発明の一実施例の施工順序断面図
、第9図は山留め完了時の横断面図、第10図は施工状
態の斜視図である。 ■・・・掘削地山面、2・・・アンカー 3・・・ナツ
ト、4・・・鋼製プレート、5・・・土留めパネル、6
・・・ナツト、7・・・アーチ部、8・・・補強部、9
・・・砕石。
1 to 8 are sectional views in the construction sequence of an embodiment of the present invention, FIG. 9 is a cross sectional view when the heaping is completed, and FIG. 10 is a perspective view of the construction state. ■... Excavation ground surface, 2... Anchor 3... Nut, 4... Steel plate, 5... Earth retaining panel, 6
... Nut, 7... Arch part, 8... Reinforcement part, 9
...Crushed stone.

Claims (3)

【特許請求の範囲】[Claims] (1)地山を上方から下方に向って複数段階に分けて掘
削し、各段階ごとに地山掘削面から複数本のアンカーを
打設して固定し、下端まで掘削した後下方から順次土留
構造物を掘削面に沿って起立して前記アンカーに固定し
、掘削面に沿って土留構造物を積み上げてなる山留工法
(1) Excavate the ground in multiple stages from above to below, drive and secure multiple anchors from the ground excavation surface at each stage, and after excavating to the bottom end, earth retaining is carried out sequentially from below. A mountain retaining method in which a structure is erected along the excavated surface and fixed to the anchor, and earth retaining structures are piled up along the excavated surface.
(2)アンカーとして、剛性の高い棒状体をグラウト材
にて削孔内に固定した地山補強アンカーを採用したこと
を特徴とする請求項(1)記載の山留工法。
(2) The mountain retaining method according to claim (1), characterized in that the anchor is a ground reinforcement anchor in which a highly rigid rod-shaped body is fixed in the borehole with grout material.
(3)アンカーの地山からの突出部分に構造物止め具を
取付け、土留構造物の保持を行うことを特徴とする請求
項(1)記載の山留工法。
(3) The mountain retaining method according to claim 1, wherein a structure stopper is attached to a portion of the anchor protruding from the ground to hold the earth retaining structure.
JP16916389A 1989-06-30 1989-06-30 Yamadome method Expired - Fee Related JPH0663234B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16916389A JPH0663234B2 (en) 1989-06-30 1989-06-30 Yamadome method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16916389A JPH0663234B2 (en) 1989-06-30 1989-06-30 Yamadome method

Publications (2)

Publication Number Publication Date
JPH0336318A true JPH0336318A (en) 1991-02-18
JPH0663234B2 JPH0663234B2 (en) 1994-08-22

Family

ID=15881438

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16916389A Expired - Fee Related JPH0663234B2 (en) 1989-06-30 1989-06-30 Yamadome method

Country Status (1)

Country Link
JP (1) JPH0663234B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0790861A (en) * 1993-09-20 1995-04-04 Kyokado Eng Co Ltd Reinforcing earth slide protective retaining wall
KR100468035B1 (en) * 2002-06-19 2005-01-27 주식회사 도담이앤씨 A Precast Concrete Block for Retaining-Wall and Construction Method of Retaining-Wall for using Top-down Method
CN112681328A (en) * 2020-12-15 2021-04-20 陕西建工第六建设集团有限公司 Method for processing foundation of slope filling and digging combined part in loess region

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0790861A (en) * 1993-09-20 1995-04-04 Kyokado Eng Co Ltd Reinforcing earth slide protective retaining wall
KR100468035B1 (en) * 2002-06-19 2005-01-27 주식회사 도담이앤씨 A Precast Concrete Block for Retaining-Wall and Construction Method of Retaining-Wall for using Top-down Method
CN112681328A (en) * 2020-12-15 2021-04-20 陕西建工第六建设集团有限公司 Method for processing foundation of slope filling and digging combined part in loess region

Also Published As

Publication number Publication date
JPH0663234B2 (en) 1994-08-22

Similar Documents

Publication Publication Date Title
CN109440778A (en) Active two-way inclined pile foundation pit support method
US4911583A (en) Structure and method for shoring a face of an excavation
CN110777802A (en) Deep foundation pit high-low span supporting structure and construction method thereof
JPH0336318A (en) Method of construction for stopping natural ground
JPH10317371A (en) Method for erecting pile-column in building using pile as column, and pile-column support band for use therein
JP3244324B2 (en) Mountain retaining method
JPH0663233B2 (en) Yamadome method
JPS63280153A (en) Reverse construction method for underground framework
JPH1143960A (en) Shoring construction underground construction method
JPH0517955A (en) Execution method for direct foundation and form panel for direct foundation
JPH06102901B2 (en) Stabilized construction method that cuts off the slope
JP2881001B1 (en) Earth retaining wall construction method for cutting land mountain
JPH0813494A (en) Fixing method of earth retaining wall and timbering
JPS6018769B2 (en) Construction method of underground structure
JPS6043495B2 (en) How to build a retaining wall
JPS6290445A (en) Block for foundation and its manufacture
JPH04115024A (en) Sheathing method
JPH0663235B2 (en) Soil retaining method
JPS63277341A (en) Reverse execution of underground story
JP2768166B2 (en) Slope plate
GB2329914A (en) A method of combating soil movement in foundation trenches
JPH0197720A (en) Reinforcing work of banking
JPS6272817A (en) Construction of retaining wall concurrently serving as sheathing
JPH02200920A (en) Modification of grade of slope face
JPS5921831A (en) Reverse placement work

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees