JPH0344821Y2 - - Google Patents

Info

Publication number
JPH0344821Y2
JPH0344821Y2 JP1985078863U JP7886385U JPH0344821Y2 JP H0344821 Y2 JPH0344821 Y2 JP H0344821Y2 JP 1985078863 U JP1985078863 U JP 1985078863U JP 7886385 U JP7886385 U JP 7886385U JP H0344821 Y2 JPH0344821 Y2 JP H0344821Y2
Authority
JP
Japan
Prior art keywords
water
water seal
tunnel
underground
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP1985078863U
Other languages
Japanese (ja)
Other versions
JPS61193155U (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP1985078863U priority Critical patent/JPH0344821Y2/ja
Publication of JPS61193155U publication Critical patent/JPS61193155U/ja
Application granted granted Critical
Publication of JPH0344821Y2 publication Critical patent/JPH0344821Y2/ja
Expired legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Description

【考案の詳細な説明】 産業上の利用分野 地下洞の上部に形成した配管トンネル(サービ
ストンネル)の下部に水封室を設けその上にコン
クリート舗装床を形成し、配管トンネルと水封ト
ンネルを同一のトンネルとし建設コストを下げる
ようにした地下洞における配管トンネルに係るも
のである。
[Detailed description of the invention] Industrial application field A water seal chamber is provided at the bottom of a piping tunnel (service tunnel) formed in the upper part of an underground cavern, and a concrete paved floor is formed on top of the water seal chamber, thereby forming a piping tunnel and a water seal tunnel. This relates to a pipe tunnel in an underground cave that is made into the same tunnel to reduce construction costs.

従来の技術 一般に岩盤内水封タンク(貯油槽)では自然地
下水位が低下し、水封機能が保持できない場合、
水封タンクと払出しシヤフトで連結した配管トン
ネルとは別に地下水供給用の水封トンネル及び水
封ボーリングを設けるのが普通であつて、この場
合、水供給用の水封トンネル及び水封ボーリング
を施工する費用が増大し費用コスト全体が高くつ
く等の欠点を有していたものである。
Conventional technology In general, when the natural groundwater level in an in-rock water seal tank (oil storage tank) decreases and the water seal function cannot be maintained,
It is normal to install a water seal tunnel and water seal boring for underground water supply separately from the water seal tank and the piping tunnel connected by the delivery shaft.In this case, the water seal tunnel and water seal boring for water supply are constructed. However, this method has disadvantages such as an increase in the costs involved, making the overall cost high.

前記欠点に鑑み改良した技術が実公昭60−3155
号として知られ、その技術とは地下洞の上部に形
成した配管トンネルの下部に砂利を敷き透水性層
を形成し、層の上部にコンクリート床を形成する
と共に、コンクリート床と配管トンネルの壁面と
の連接部において壁面の周囲の一部又は全面に沿
つて水層部を形成したものであるが、これでは水
封ボーリング孔及び水封トンネルに圧力水を送水
することはできないものである。
The technology improved in view of the above drawbacks was published in 1983-3155.
The technique is to lay gravel at the bottom of a pipe tunnel formed at the top of an underground cavern to form a permeable layer, form a concrete floor on top of the layer, and connect the concrete floor to the wall of the pipe tunnel. A water layer is formed along a part or the entire surface of the wall at the connecting part of the wall, but this makes it impossible to send pressurized water to the water-seal borehole and water-seal tunnel.

考案が解決しようとする問題点 水供給用の水封トンネル及び水封ボーリングを
施工する費用の節約、水封ボーリング孔より地下
洞周囲の岩盤内に確実に水を圧入して供給してや
ることにより水封を保たせる問題点を解決しよう
とするものである。
Problems that the invention aims to solve: Saving the cost of constructing water seal tunnels and water seal borings for water supply, and supplying water by reliably injecting water into the rock around underground caves through water seal boreholes. This is an attempt to solve the problem of maintaining the seal.

問題点を解決するための手段 地下洞の上部に形成した配管トンネルの下部に
おいて、底面より一定高さを保たせて鉄筋入りコ
ンクリート舗装床を形成して水封室を形成し、底
面とコンクリート舗装床間で壁部に水平又は斜め
の水封ボーリング孔を複数本設け、底面とコンク
リート舗装床で形成する水封室に圧力水を供給
し、それと連通する水封ボーリング孔に圧力水を
圧送し、地下洞周囲の岩盤内に水を圧入して供給
してやることにより水封を保つことができ、自然
地下水位が高くなつたとき底面と舗装床間の水を
ポンプで外部に送り出してやればよいものであ
る。
Measures to solve the problem At the bottom of the piping tunnel formed at the top of the underground cave, a reinforced concrete pavement floor is formed at a constant height from the bottom to form a water seal chamber, and the bottom and concrete pavement are Multiple horizontal or diagonal water seal boreholes are provided in the wall between the floors, and pressurized water is supplied to the water seal chamber formed by the bottom and concrete paved floor, and the pressure water is pumped to the water seal boreholes communicating with the water seal chamber. A water seal can be maintained by pressurizing and supplying water into the rock around the underground cave, and when the natural groundwater level rises, the water between the bottom and the paved floor can be pumped outside. It is something.

実施例 地下洞1の上部に形成した配管トンネル2の下
部において、底面3より一定高さhを保たせて、
例えば水封ボーリング孔4が十分に開口できる高
さを保たせて鉄筋5入りコンクリート舗装床6を
形成して水封室11を形成し、底面3とコンクリ
ート舗装床6間で壁部7に水平又は斜めの水封ボ
ーリング孔4を複数本設けるものである。
Example At the lower part of the piping tunnel 2 formed in the upper part of the underground cave 1, a constant height h is maintained from the bottom surface 3,
For example, a water seal chamber 11 is formed by forming a concrete paved floor 6 with reinforcing bars 5 at a height that allows the water seal borehole 4 to open sufficiently, and the water seal chamber 11 is formed between the bottom surface 3 and the concrete paved floor 6 horizontally to the wall portion 7. Alternatively, a plurality of diagonal water seal boring holes 4 are provided.

8はコンクリート舗装床6の補強用の支持部材
で床面3とコンクリート舗装床6間に立脚させて
あり複数箇所に通水孔9を設けてある。
Reference numeral 8 denotes a support member for reinforcing the concrete paved floor 6, which is erected between the floor surface 3 and the concrete paved floor 6, and is provided with water holes 9 at a plurality of locations.

10はロツクアンカーでコンクリート舗装床6
及び支持部材8に一体に連結し、コンクリート舗
装床6のずれ等を防止させるようにしたものであ
る。
10 is a concrete paved floor 6 with a lock anchor
and is integrally connected to the support member 8 to prevent the concrete paved floor 6 from shifting.

作 用 自然地下水位が低下して地下洞1の周囲の水封
機能が保持できないとき、水封室11に圧力水を
ポンプ(図示せず)で圧送し水封ボーリング孔4
より地下洞1周囲の岩盤内に水を圧入して供給し
てやることにより水封を保つことができ、自然地
下水位が高くなつたとき水封室11の水をポンプ
で外部に送り出してやればよいものである。
Function When the natural groundwater level drops and the water seal function around the underground cave 1 cannot be maintained, pressurized water is pumped into the water seal chamber 11 with a pump (not shown) and the water seal borehole 4 is pumped into the water seal chamber 11.
A water seal can be maintained by pressurizing and supplying water into the bedrock surrounding the underground cave 1, and when the natural groundwater level rises, the water in the water seal chamber 11 can be pumped outside. It is something.

考案の効果 水封室に連結開口する水封ボーリング孔が形成
してあるので確実に圧力水を水封ボーリング孔及
び水封室を介して地下洞周囲の岩盤内に水を圧入
供給して水封を保つことができるものである。
Effects of the invention Since a water seal borehole is formed that connects to the water seal chamber, it is possible to reliably supply pressurized water into the rock surrounding the underground cave through the water seal borehole and the water seal chamber. It is something that can be kept sealed.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図及び第2図は全体の縦断面図及び横断面
図、第3図は配管トンネルの拡大断面図である。
1 and 2 are a longitudinal sectional view and a cross sectional view of the entire structure, and FIG. 3 is an enlarged sectional view of the piping tunnel.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 地下洞の上部に形成した配管トンネルの下部に
おいて、底面より一定高さを保たせて鉄筋入りコ
ンクリート舗装床を形成して水封室を形成して、
底面とコンクリート舗装床間で壁部に水平又は斜
めの水封ボーリング孔を複数本設けて成る地下洞
における配管トンネル。
At the bottom of the piping tunnel formed at the top of the underground cave, a reinforced concrete paved floor is formed at a constant height from the bottom to form a water seal chamber.
A piping tunnel in an underground cavern consisting of multiple horizontal or diagonal water-sealed boreholes in the wall between the bottom and the concrete paved floor.
JP1985078863U 1985-05-27 1985-05-27 Expired JPH0344821Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1985078863U JPH0344821Y2 (en) 1985-05-27 1985-05-27

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1985078863U JPH0344821Y2 (en) 1985-05-27 1985-05-27

Publications (2)

Publication Number Publication Date
JPS61193155U JPS61193155U (en) 1986-12-01
JPH0344821Y2 true JPH0344821Y2 (en) 1991-09-20

Family

ID=30623237

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1985078863U Expired JPH0344821Y2 (en) 1985-05-27 1985-05-27

Country Status (1)

Country Link
JP (1) JPH0344821Y2 (en)

Also Published As

Publication number Publication date
JPS61193155U (en) 1986-12-01

Similar Documents

Publication Publication Date Title
CN100464055C (en) Construction method of shallow buried underground excavating tunnel super large section using PBA method
CN103775110A (en) Underground excavation construction method for multilayer underground space of soft soil area
CN105840207A (en) Cross shallow buried bias pressure loose accumulation body large-span tunnel comprehensive entrance structure construction method
CN110331992A (en) A kind of hole daguanpeng construction method
CN101139839A (en) Setting structure of ultra-deep foundation pit in high confined water area
CN101205721A (en) Method for surrounding water by combination of steel cofferdam and heavy-pressure rotary-spraying pile in deep-water low-pile cap construction
CN109339029A (en) A kind of construction method of existing tunnel top excavation of foundation pit Resistant heave deformation
CN111535328A (en) Wellbore underground garage foundation pit support system and construction method in water-rich strata
CN112854245A (en) Classification design method for earth rock foundation pit support based on depth and medium-stroke fossil rock burial depth
CN105714834A (en) Construction process for grouting H-shaped steel pile after pre-forming hole in hard stratum
CN206928305U (en) A kind of rigid passive area buttress type supporting construction
CN105133641A (en) Thin-wall continuous-wall-type foundation reinforcing structure and method
CN1657711A (en) Rotary spray anchoring pile construction process
CN108867673A (en) A kind of underwater prevention method in the foundation pit based on the curtain that draws water
JPH0344821Y2 (en)
CN206721875U (en) A kind of pressure-bearing type boulder and cobble soil layer enlarging anchor rod
CN104763431A (en) Novel shaft construction method
CN202064960U (en) Traversing tunnel type dissolved cavity stabilizing system
JPH0344822Y2 (en)
CN1361333A (en) Tracing compensation and grouting process to control formation displacement
CN111877358A (en) Supporting structure, building and construction method of soft rock foundation pit at lower part of upper soil layer
CN114075994A (en) Artificial retaining dam for coal mine underground reservoir
CN115217146B (en) An anti-floating underground building structure
CN215669484U (en) Pressure type anchor rod
CN1333139C (en) Column supported underground continuous wall