JPH0349323B2 - - Google Patents

Info

Publication number
JPH0349323B2
JPH0349323B2 JP15614585A JP15614585A JPH0349323B2 JP H0349323 B2 JPH0349323 B2 JP H0349323B2 JP 15614585 A JP15614585 A JP 15614585A JP 15614585 A JP15614585 A JP 15614585A JP H0349323 B2 JPH0349323 B2 JP H0349323B2
Authority
JP
Japan
Prior art keywords
sheet pile
stop
sheet
flexible water
piles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP15614585A
Other languages
Japanese (ja)
Other versions
JPS6217222A (en
Inventor
Soichiro Shimizu
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP15614585A priority Critical patent/JPS6217222A/en
Publication of JPS6217222A publication Critical patent/JPS6217222A/en
Publication of JPH0349323B2 publication Critical patent/JPH0349323B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は、埋立工事、護岸工事、堤防構築工
事等において構築される矢板壁に用いられる可撓
性止水矢板の打込施工法に関するものである。
[Detailed Description of the Invention] [Field of Industrial Application] This invention relates to a method for driving flexible water-stop sheet piles used for sheet pile walls constructed in land reclamation work, bank protection work, embankment construction work, etc. It is.

〔従来技術〕[Prior art]

従来、矢板壁に用いられる可撓性止水矢板とし
て、U型鋼矢板をウエブ中央に沿つて分割して構
成した分割矢板を、間隔をおいて平行に配置し、
各分割矢板をゴム製帯状止水材を介して連結した
構造のものが提案されている。
Conventionally, as flexible water-stop sheet piles used for sheet pile walls, split sheet piles made by dividing U-shaped steel sheet piles along the center of the web are arranged in parallel at intervals,
A structure has been proposed in which each divided sheet pile is connected via a rubber belt-shaped waterproof material.

しかるに、この構造の可撓性止水矢板における
一方の分割矢板の継手を既に地中に打込まれた鋼
矢板の継手に噛み合わせて、可撓性止水矢板を地
中に打込む場合、地盤の抵抗や土圧等により、第
12図および第13図に示すように、前記一方の
分割矢板8に対し他方の分割矢板9が、矢板壁長
手方向に傾斜、傾斜重合または偏位したり、矢板
壁面直角方向に傾斜または偏位したりして、可撓
性止水矢板10における一対の分割矢板8,9
を、所定の位置関係を保つて地中に設置すること
ができず、また可撓性止水矢板10を比較的硬い
地盤に打込む場合は、ゴム製帯状止水材11が強
大な抵抗力を受けて損傷する恐れがある。
However, when driving the flexible water-stop sheet pile into the ground by meshing the joint of one split sheet pile with the joint of the steel sheet pile that has already been driven into the ground, Due to ground resistance, earth pressure, etc., as shown in FIGS. 12 and 13, the other divided sheet pile 9 may tilt, overlap, or deviate in the longitudinal direction of the sheet pile wall, as shown in FIGS. 12 and 13. , a pair of split sheet piles 8 and 9 in the flexible water-stop sheet pile 10 are tilted or deviated in the direction perpendicular to the sheet pile wall surface.
cannot be installed in the ground while maintaining a predetermined positional relationship, and when driving the flexible water-stop sheet pile 10 into relatively hard ground, the rubber band-shaped water-stop material 11 has a strong resistance. There is a risk of damage due to exposure.

〔発明の目的、構成〕[Purpose and structure of the invention]

この発明は前述の問題を有利に解決できる可撓
性止水矢板の打込施工法を提供することを目的と
するものであつて、この発明の要旨とするところ
は、可撓性止水矢板と同等以上の大きさの輪郭を
有する矢板挿入空間形成用剛性矢板1を介在させ
た矢板壁を打設し、次にその剛性矢板1を引抜い
たのち、間隔をおいて平行に配置された一対の分
割矢板2と各分割矢板2を連結するゴム製止水材
3とからなる可撓性止水矢板4を、矢板挿入空間
形成用剛性矢板1の引抜きにより生じた地中空間
5の両側にある矢板6,7に噛み合わせて地中に
挿入することを特徴とする可撓性止水矢板の打込
施工法にある。
The purpose of this invention is to provide a method for driving flexible water-stop sheet piles that can advantageously solve the above-mentioned problems. A sheet pile wall with a rigid sheet pile 1 for forming a sheet pile insertion space having an outline of a size equal to or larger than that is placed, and then the rigid sheet pile 1 is pulled out. Flexible water-stop sheet piles 4 made of split sheet piles 2 and rubber water-stop material 3 that connects each split sheet pile 2 are placed on both sides of the underground space 5 created by pulling out the rigid sheet pile 1 for forming the sheet pile insertion space. This method is for driving a flexible water-stop sheet pile, which is characterized by engaging certain sheet piles 6 and 7 and inserting the same into the ground.

次にこの発明を図示の例によつて詳細に説明す
る。
Next, the present invention will be explained in detail using illustrated examples.

第6図ないし第9図はこの発明において用いら
れる矢板挿入空間形成用剛性矢板(剛性間取り矢
板)1を示すものであつて、U型鋼矢板がウエブ
中央に沿つて分断されて一対の分割矢板13が構
成され、各分割矢板13のウエブ14は同一平面
上において間隔をおいて平行に配置され、かつ各
分割矢板13におけるウエブ14の外面にわたつ
て、分割矢板13のほぼ全長にわたつて延長する
帯状鋼板からなる連結板15の側部が重合されて
溶接により固着され、さらに各分割矢板13にお
けるウエブ14の内面にわたつて溝形断面の鋼製
空間形成兼連結部材16が配置され、その空間形
成兼連結部材16の開口縁部は各分割矢板13に
おけるウエブ14の内面に溶接により固着され、
前記連結板15の巾方向中間部と前記空間形成兼
連結部材16における溝定板の巾方向中間部との
間に帯状鋼板からなるスペーサ17が介在されて
溶接により固着され、また鋼製先端沓18は各分
割矢板13の先端部にわたつて配置されて溶接に
より固着され、その先端沓18により一対の分割
矢板13と連結板15と空間形成兼連結部材16
とにより形成された空間19の下端部が被覆され
ている。
6 to 9 show a rigid sheet pile (rigid floor plan sheet pile) 1 for forming a sheet pile insertion space used in the present invention, in which a U-shaped steel sheet pile is divided along the center of the web to form a pair of split sheet piles 13. The webs 14 of each divided sheet pile 13 are arranged in parallel at intervals on the same plane, and extend over almost the entire length of the divided sheet pile 13 over the outer surface of the web 14 in each divided sheet pile 13. The side portions of the connecting plates 15 made of band-shaped steel plates are overlapped and fixed by welding, and a steel space forming and connecting member 16 with a groove-shaped cross section is arranged over the inner surface of the web 14 in each split sheet pile 13, and the space is The opening edge of the forming and connecting member 16 is fixed to the inner surface of the web 14 in each split sheet pile 13 by welding,
A spacer 17 made of a band-shaped steel plate is interposed between the widthwise middle part of the connecting plate 15 and the widthwise middle part of the groove plate in the space forming/connecting member 16, and is fixed by welding. 18 is arranged across the tip of each split sheet pile 13 and fixed by welding, and the tip shoe 18 connects the pair of split sheet piles 13, the connecting plate 15, and the space forming/connecting member 16.
The lower end of the space 19 formed by the above is covered.

第10図および第11図はこの発明において用
いられる可撓性止水矢板4の一例を示すものであ
つて、U型鋼矢板がウエブ中央に沿つて分断され
て一対の分割矢板2が構成され、各分割矢板2の
ウエブ20は同一平面上において間隔をおいて平
行に配置され、円弧状溝形部分21とその両側に
連設された取付用フランジ22とからなるゴム製
帯状止水材3における各フランジ22は、各分割
矢板2におけるウエブ20の内面に重合され、か
つフランジ22の表面には帯状鋼板からなる押え
部材23が重合され、前記ウエブ20とフランジ
22と押え部材23とにわたつて挿通されたボル
ト24により、フランジ22がウエブ20に締付
結合されている。
10 and 11 show an example of the flexible water-stop sheet pile 4 used in the present invention, in which a U-shaped steel sheet pile is divided along the center of the web to form a pair of split sheet piles 2, The webs 20 of each split sheet pile 2 are arranged parallel to each other at intervals on the same plane, and are made of a rubber band-shaped water stop material 3 consisting of an arcuate groove-shaped portion 21 and mounting flanges 22 connected on both sides thereof. Each flange 22 is superimposed on the inner surface of the web 20 in each divided sheet pile 2, and a holding member 23 made of a band-shaped steel plate is superimposed on the surface of the flange 22, and the holding member 23 is overlapped with the web 20, the flange 22, and the holding member 23. The flange 22 is fastened to the web 20 by bolts 24 inserted therethrough.

前記矢板挿入空間形成用剛性矢板1の継手間隔
と可撓性止水矢板4の継手間隔とは同一に設定さ
れ、また可撓性止水矢板4におけるゴム製帯状止
水材3と押え部材23とボルト24とは、矢板挿
入空間形成用剛性矢板1における連結板15およ
び空間形成兼連結部材16の外面により囲まれた
部分に納まるように設定されている。
The joint spacing of the rigid sheet pile 1 for forming the sheet pile insertion space and the joint spacing of the flexible water-stop sheet pile 4 are set to be the same, and the rubber band-shaped water-stop material 3 and the pressing member 23 in the flexible water-stop sheet pile 4 are set to be the same. The bolts 24 and 24 are set to fit in a portion surrounded by the outer surfaces of the connecting plate 15 and the space forming/connecting member 16 in the rigid sheet pile 1 for forming the sheet pile insertion space.

次に前記矢板挿入空間形成用矢板1および前記
可撓性止水矢板4を使用したこの発明の実施例の
打込施工法について説明する。
Next, a driving method according to an embodiment of the present invention using the sheet pile 1 for forming a sheet pile insertion space and the flexible water-stop sheet pile 4 will be described.

まず第1図に示すように、通常のU型鋼矢板か
らなる適当本数の矢板6を相互に噛み合わせて順
次地盤25に打設し、次いで端部の矢板6の継手
に矢板挿入空間形成用剛性矢板1の一側部の継手
を噛み合わせて、その剛性矢板1を地盤25に打
設する。
First, as shown in Fig. 1, an appropriate number of sheet piles 6 made of ordinary U-shaped steel sheet piles are interlocked with each other and sequentially driven into the ground 25, and then rigidity is attached to the joints of the sheet piles 6 at the ends to form a space for sheet pile insertion. The joints on one side of the sheet pile 1 are engaged and the rigid sheet pile 1 is driven into the ground 25.

次に第2図に示すように、前記矢板挿入空間形
成用矢板1の他側部に配置される通常のU型鋼矢
板からなる適当本数の矢板7を相互に噛み合わせ
て地盤25に打設したのち、第3図に示すよう
に、矢板挿入空間形成用剛性矢板1を抜取り、隣
り合う矢板6,7の間に、可撓性止水矢板4を挿
入するための地中空間5を形成する。
Next, as shown in FIG. 2, an appropriate number of sheet piles 7 made of ordinary U-shaped steel sheet piles placed on the other side of the sheet pile 1 for forming the sheet pile insertion space were interlocked with each other and driven into the ground 25. Later, as shown in FIG. 3, the rigid sheet pile 1 for forming the sheet pile insertion space is removed, and an underground space 5 for inserting the flexible water-stop sheet pile 4 is formed between the adjacent sheet piles 6 and 7. .

次に第4図に示すように、前記地中空間5の両
側にある矢板6,7の継手に可撓性止水矢板4の
両側の継手を噛み合わせて、その可撓性止水矢板
4を地中に挿入する。可撓性止水矢板4を地中に
挿入する場合、自重だけでは挿入できないとき
は、押圧力または打撃力を加えて挿入すればよ
い。
Next, as shown in FIG. 4, the joints on both sides of the flexible water-stop sheet pile 4 are engaged with the joints of the sheet piles 6 and 7 on both sides of the underground space 5, and the flexible water-stop sheet pile 4 is Insert into the ground. When inserting the flexible water-stop sheet pile 4 into the ground, if it cannot be inserted by its own weight alone, it may be inserted by applying a pressing force or a striking force.

第5図は可撓性止水矢板4とその両側に噛み合
わされたU型鋼矢板からなる矢板5,6の一部と
を示している。
FIG. 5 shows a flexible water-stop sheet pile 4 and a portion of sheet piles 5 and 6 made of U-shaped steel sheet piles engaged on both sides thereof.

この発明を実施する場合、矢板6,7としては
U型鋼矢板以外の任意の矢板を使用してもよい。
When carrying out this invention, any sheet piles other than U-shaped steel sheet piles may be used as the sheet piles 6 and 7.

〔発明の効果〕〔Effect of the invention〕

この発明によれば、可撓性止水矢板と同等以上
の大きさの輪郭を有する矢板挿入空間形成用剛性
矢板1を介在させた矢板壁を打設し、次にその剛
性矢板1を引抜いたのち、間隔をおいて平行に配
置された一対の分割矢板2と各分割矢板2を連結
するゴム製止水材3とからなる可撓性止水矢板4
を、矢板挿入空間形成用剛性矢板1の引抜きによ
り生じた地中空間5の両側にある矢板6,7に噛
み合わせて地中に挿入するので、可撓性止水矢板
4における両側の分割矢板2をそれぞれ地中空間
5の両側の所定位置に設置された矢板6,7によ
りガイドして、可撓性止水矢板4を地中に挿入す
ることができ、そのため可撓性止水矢板4におけ
る一方の分割矢板2に対し、他方の分割矢板2
が、矢板壁長手方向あるいは矢板壁面直角方向に
偏位および傾斜しないようにして、かつゴム製止
水材3が地盤との摩擦抵抗により損傷しないよう
にして、前記可撓性止水矢板4を所定の垂直度お
よび所定の分割矢板間隔で容易にかつ正確に地中
に挿入設置することができ、さらに予め設けられ
た地中空間5内の可撓性止水矢板4を挿入するの
で、その可撓性止水矢板4をスムーズに挿入設置
することができる等の効果が得られる。
According to this invention, a sheet pile wall with a rigid sheet pile 1 for forming a sheet pile insertion space having an outline of a size equal to or larger than that of a flexible water-stop sheet pile is placed, and then the rigid sheet pile 1 is pulled out. Later, a flexible water-stop sheet pile 4 is constructed, which is made up of a pair of split sheet piles 2 arranged in parallel at intervals and a rubber water-stop material 3 that connects each split sheet pile 2.
are inserted into the ground by engaging the sheet piles 6 and 7 on both sides of the underground space 5 created by pulling out the rigid sheet pile 1 for forming the sheet pile insertion space, so that the split sheet piles on both sides of the flexible water-stop sheet pile 4 are inserted into the ground. 2 are guided by sheet piles 6 and 7 installed at predetermined positions on both sides of the underground space 5, and the flexible water-stop sheet pile 4 can be inserted into the ground. For one split sheet pile 2 in , the other split sheet pile 2
However, the flexible water-stop sheet piles 4 are made so that they do not deviate or incline in the longitudinal direction of the sheet pile wall or in the direction perpendicular to the sheet pile wall surface, and so that the rubber water-stop material 3 is not damaged due to frictional resistance with the ground. It can be easily and accurately inserted into the ground with a predetermined verticality and a predetermined interval between divided sheet piles, and furthermore, since the flexible water-stop sheet pile 4 is inserted into the underground space 5 that has been prepared in advance, Effects such as being able to smoothly insert and install the flexible water-stop sheet pile 4 can be obtained.

【図面の簡単な説明】[Brief explanation of drawings]

第1図ないし第4図はこの発明の実施例に係る
可撓性止水矢板の打込施工法の施工順序を示すも
のであつて、Aは正面図、Bは横断平面図であ
る。第5図は可撓性止水矢板とその両側に噛み合
わされた矢板の一部とを示す横断平面図である。
第6図ないし第9図はこの発明において用いられ
る矢板挿入空間形成用剛性矢板の一例を示すもの
であつて、第6図は正面図、第7図は縦断側面
図、第8図は拡大横断平面図、第9図は先端付近
の拡大縦断側面図である。第10図および第11
図はこの発明において用いられる可撓性止水矢板
の一例を示すものであつて、第10図は一部を示
す正面図、第11図は拡大横断平面図である。第
12図および第13図は従来の可撓性止水矢板の
打込施工法における分割矢板傾斜状態を示す正面
図である。 図において、1は矢板挿入空間形成用剛性矢
板、2は分割矢板、3はゴム製止水矢板、5は地
中空間、6および7は矢板、13は分割矢板、1
5は連結板、16は空間形成兼連結部材、18は
鋼製先端沓、21は円弧状溝形部分、22は取付
用フランジ、23は押え部材、24はボルト、2
5は地盤である。
1 to 4 show the construction order of the method for driving flexible water-stop sheet piles according to an embodiment of the present invention, in which A is a front view and B is a cross-sectional plan view. FIG. 5 is a cross-sectional plan view showing a flexible water-stop sheet pile and a portion of the sheet pile engaged with both sides thereof.
Figures 6 to 9 show an example of a rigid sheet pile for forming a sheet pile insertion space used in the present invention, in which Figure 6 is a front view, Figure 7 is a vertical side view, and Figure 8 is an enlarged cross-sectional view. The plan view and FIG. 9 are enlarged longitudinal sectional side views of the vicinity of the tip. Figures 10 and 11
The figures show an example of a flexible waterstop sheet pile used in the present invention, with FIG. 10 being a front view showing a portion thereof, and FIG. 11 being an enlarged cross-sectional plan view. FIGS. 12 and 13 are front views showing an inclined state of split sheet piles in the conventional driving construction method for flexible water-stop sheet piles. In the figure, 1 is a rigid sheet pile for forming a sheet pile insertion space, 2 is a split sheet pile, 3 is a rubber water-stop sheet pile, 5 is an underground space, 6 and 7 are sheet piles, 13 is a split sheet pile, 1
5 is a connecting plate, 16 is a space forming/connecting member, 18 is a steel tip shoe, 21 is an arcuate grooved portion, 22 is a mounting flange, 23 is a holding member, 24 is a bolt, 2
5 is the ground.

Claims (1)

【特許請求の範囲】[Claims] 1 可撓性止水矢板と同等以上の大きさの輪郭を
有する矢板挿入空間形成用剛性矢板1を介在させ
た矢板壁を打設し、次にその剛性矢板1を引抜い
たのち、間隔をおいて平行に配置された一対の分
割矢板2と各分割矢板2を連結するゴム製止水材
3とからなる可撓性止水矢板4を、矢板挿入空間
形成用剛性矢板1の引抜きにより生じた地中空間
5の両側にある矢板6,7に噛み合わせて地中に
挿入することを特徴とする可撓性止水矢板の打込
施工法。
1. A sheet pile wall with a rigid sheet pile 1 for forming a sheet pile insertion space having an outline of a size equal to or larger than that of the flexible water-stop sheet pile is placed, and then after the rigid sheet pile 1 is pulled out, the interval is A flexible water-stop sheet pile 4 consisting of a pair of split sheet piles 2 arranged in parallel and a rubber water-stop material 3 connecting each split sheet pile 2 was produced by pulling out the rigid sheet pile 1 for forming a sheet pile insertion space. A construction method for driving flexible water-stop sheet piles, which is characterized by inserting the flexible water-stop sheet piles into the ground while meshing with sheet piles 6 and 7 on both sides of an underground space 5.
JP15614585A 1985-07-17 1985-07-17 Placing construction for flexible cut-off sheet pile Granted JPS6217222A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP15614585A JPS6217222A (en) 1985-07-17 1985-07-17 Placing construction for flexible cut-off sheet pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP15614585A JPS6217222A (en) 1985-07-17 1985-07-17 Placing construction for flexible cut-off sheet pile

Publications (2)

Publication Number Publication Date
JPS6217222A JPS6217222A (en) 1987-01-26
JPH0349323B2 true JPH0349323B2 (en) 1991-07-29

Family

ID=15621312

Family Applications (1)

Application Number Title Priority Date Filing Date
JP15614585A Granted JPS6217222A (en) 1985-07-17 1985-07-17 Placing construction for flexible cut-off sheet pile

Country Status (1)

Country Link
JP (1) JPS6217222A (en)

Also Published As

Publication number Publication date
JPS6217222A (en) 1987-01-26

Similar Documents

Publication Publication Date Title
JP4856779B2 (en) Retaining wall device
JP2011084938A (en) Earth retaining wall and method of constructing the same
JP7454113B2 (en) Steel sheet pile connection structure and steel sheet pile connection method
JPH0349323B2 (en)
JP2631242B2 (en) Water stop fittings for steel pipe piles
US5399057A (en) Self-locking lagging strip
JP3116098B2 (en) Construction method for underground structures
JP2653993B2 (en) Road bridge expansion joint
JPS5918491B2 (en) Construction method for expanding portions of simple earth retaining
JPH02252892A (en) How to build underground structures
JP3010536B2 (en) Steel sheet pile wall
JPH07119142A (en) Steel sheet pile and steel wall
JPS645128B2 (en)
JPS5817791Y2 (en) Tip member of H-shaped pile
US3068656A (en) Underground sheeting methods
JPH0731934U (en) H-shaped steel sheet pile
JP3223364B2 (en) Construction sheet pile
JP7032737B2 (en) How to install FC plate fixing member and box structure
JPS644915Y2 (en)
JPS5938498A (en) tunnel construction method
JP3060937B2 (en) Steel panel for underground diaphragm wall method
JPS6311482B2 (en)
JPH0240191Y2 (en)
JP6636989B2 (en) Open shield method and concrete box used for it
JPS61130519A (en) Driving work of flexible, expandible cut-off sheet pile for sheet pile wall

Legal Events

Date Code Title Description
EXPY Cancellation because of completion of term