JPH035512A - Freeze sampling method of sand soil sample - Google Patents
Freeze sampling method of sand soil sampleInfo
- Publication number
- JPH035512A JPH035512A JP13961189A JP13961189A JPH035512A JP H035512 A JPH035512 A JP H035512A JP 13961189 A JP13961189 A JP 13961189A JP 13961189 A JP13961189 A JP 13961189A JP H035512 A JPH035512 A JP H035512A
- Authority
- JP
- Japan
- Prior art keywords
- tube
- frozen
- sampling
- freezing
- core
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000002689 soil Substances 0.000 title claims abstract description 83
- 238000005070 sampling Methods 0.000 title claims abstract description 55
- 238000000034 method Methods 0.000 title claims abstract description 30
- 239000004576 sand Substances 0.000 title description 2
- 238000007710 freezing Methods 0.000 claims abstract description 39
- 230000008014 freezing Effects 0.000 claims abstract description 39
- 238000000605 extraction Methods 0.000 claims abstract description 8
- 238000009412 basement excavation Methods 0.000 claims description 18
- 238000011065 in-situ storage Methods 0.000 claims description 14
- 238000010276 construction Methods 0.000 abstract description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 4
- 239000003507 refrigerant Substances 0.000 abstract description 2
- 239000000523 sample Substances 0.000 description 11
- 238000001816 cooling Methods 0.000 description 4
- 239000012520 frozen sample Substances 0.000 description 4
- 238000011835 investigation Methods 0.000 description 4
- 238000005553 drilling Methods 0.000 description 3
- 238000003780 insertion Methods 0.000 description 3
- 230000037431 insertion Effects 0.000 description 3
- LFQSCWFLJHTTHZ-UHFFFAOYSA-N Ethanol Chemical compound CCO LFQSCWFLJHTTHZ-UHFFFAOYSA-N 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- CURLTUGMZLYLDI-UHFFFAOYSA-N Carbon dioxide Chemical compound O=C=O CURLTUGMZLYLDI-UHFFFAOYSA-N 0.000 description 1
- 235000011089 carbon dioxide Nutrition 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Sampling And Sample Adjustment (AREA)
Abstract
Description
【発明の詳細な説明】
産業上の利用分野
この発明は、砂質土地盤の物理特性、力学特性を調べる
ために、特に原位置地盤を凍結して実施される砂質土試
料の凍結サンプリング方法に関する。[Detailed Description of the Invention] Industrial Application Field This invention relates to a method for frozen sampling of sandy soil samples, which is carried out by freezing the ground in situ, in order to investigate the physical and mechanical properties of sandy soil. Regarding.
従来の技術
従来、原位置地盤を凍結して実施される砂質土試料の凍
結サンプリング方法には、大別して次の2通りがある。BACKGROUND OF THE INVENTION Conventionally, there are two types of frozen sampling methods for sandy soil samples, which are carried out by freezing the in-situ ground.
■ 第1の方法は、図面の第8図A、凱 Cに例示した
ように、原位置i+!!盤a中に設置した凍結管すによ
り同凍結管すを中心として直径f50cmぐらいの範囲
まで地盤の凍結を行ない(第8図A)、こうして凍結さ
れた凍結土Cに向かって口径が38cmぐらいもある大
きな凍結土掘削用のコアチューブdを挿入して凍結土C
のほぼ全体をコア抜きサンプリングする。そして、地上
において前記のようにコア抜きされた大径の凍結土サン
プルから、例えば直径が5c+m、長さが12e+mぐ
らいの大きざの砂質土試料を必要個数だけ切り出して形
成する。■ The first method is the original i+! ! The ground is frozen to an area of about 50 cm in diameter with the freezing pipe installed in Plate A (Fig. 8A), and the ground is frozen to a diameter of about 38 cm towards Frozen Soil C. Insert a core tube d for excavating frozen soil into frozen soil C.
Almost the entire area is sampled without core. Then, from the large-diameter frozen soil sample cored on the ground as described above, a required number of sandy soil samples having a diameter of, for example, 5 c+m and a length of about 12 e+m are cut out and formed.
■ 第2の方法は、例えば砂礫質試料用として開発され
、特開昭61−251742号公報に記載されているよ
うに、凍結管を中心として外径が1.2mにも達するほ
ど大きく凍結された凍結土に向かって地上からまず凍結
土の上端に達するガイド穴を掘削し、このガイド穴を通
じて口径が36鴎ぐらいの凍結土掘削用のコアチューブ
を挿入し、凍結土に於ける特に凍結管の近辺を除く部位
を凍結管とほぼ平行に掘削しコア抜きサンプリングを行
なう。■ The second method was developed for, for example, sand and gravel samples, and as described in Japanese Patent Application Laid-open No. 61-251742, the freezing tube is so large that the outer diameter reaches 1.2 m. First, a guide hole is drilled from the ground into the frozen soil that reaches the top of the frozen soil, and a core tube for frozen soil excavation with a diameter of about 36mm is inserted through this guide hole. Excavate the area excluding the vicinity of the cryotube almost parallel to the cryotube and perform core sampling.
本発明が解決しようとする課題
(+) 上記第1の方法のように、口径が36cmも
ある大きな凍結土開削用のコアチューブで凍結土の全体
を大きくコア抜きサンプリングする方法の場合は、大口
径の凍結土掘削用コアチューブが必要である。そのため
コアチューブの使用コストが割高になる。その上、この
ような大口径のコアチューブを使用して掘削するために
は、ポーリング機械も大形になり、同ポーリング機械を
据え付けるステージも大形になって美大な設備コストが
かかる。また、掘削にともなう冷却泥水の徽も多くなり
、冷却装置が大形化し、冷却に必要なコストも多くかか
る。さらに、両前した凍結土を地上に引き上げるために
大形のクレーンが必要であり、そのためのコストもかか
る。かくしてトータルコストは美大なものになるため、
その実施に当たっては建設総工費の中に地盤調査のため
に用意され得る予算との採算がとれず、必要性、有用性
は理解されても結局実施されないという問題点がある。Problems to be solved by the present invention (+) In the case of a method in which the entire frozen soil is cored and sampled using a large core tube with a diameter of 36 cm for excavating frozen soil, as in the first method, A core tube for frozen soil excavation of the same diameter is required. Therefore, the cost of using the core tube becomes relatively high. Furthermore, in order to excavate using such a large-diameter core tube, the polling machine must also be large, and the stage on which the polling machine is installed must also be large, resulting in considerable equipment costs. In addition, the amount of cooling mud water generated during excavation increases, the size of the cooling device increases, and the cost required for cooling increases. Furthermore, a large crane is required to lift the frozen soil to the ground, which is costly. In this way, the total cost becomes a huge amount, so
When implementing this, there is a problem that it cannot be made profitable with the budget that could be set aside for ground investigation in the total construction cost, and even if the necessity and usefulness are understood, it is not implemented in the end.
一方、一つのサンプリング地点で必要とされる砂質土試
料の個敞はわずかIO個程度でしかない。On the other hand, the number of individual sandy soil samples required at one sampling point is only about IO.
従って、コアチューブで地上に引き上げられた大きな凍
結土の大部分は投棄することになり、この点でも無駄な
手数がかかるから、これらの点が解決するべき課題とな
っている。Therefore, most of the large frozen soil that has been lifted to the ground by the core tube must be discarded, which is also a waste of time and effort, and these points are issues that need to be resolved.
([1) また、上記第2の方法の場合は、本来砂礫
質層であるため、凍結される地盤の外径はおよそ1.2
mもの大きさとされ、日数と経費が多くかかる。そして
、凍結土の掘削に使用されるコアチューブの口径は、や
はり36cmぐらいの大きなものとされるから、上記第
1の方法の場合と同様にコスト上の問題点が大きい。([1] In the case of the second method above, since the ground is originally a gravel layer, the outer diameter of the frozen ground is approximately 1.2
It is said to be as large as 1.5 m in size, and it takes a lot of time and money. Since the core tube used for excavating frozen soil has a large diameter of about 36 cm, this method poses a large cost problem as in the case of the first method.
([[I) 従フて、本発明の目的は、必要なだけの
量の砂質土試料を極めて安価にサンプリングすることが
できる凍結サンプリング方法を提供することにある。([[I) Therefore, it is an object of the present invention to provide a freezing sampling method that can sample a required amount of sandy soil sample at a very low cost.
!!題を解決するための手段
上記従来技術の!!題を解決するための手段として、こ
の発明に係る砂質土試料の凍結サンプリング方法は、図
面の′lI41図〜第4図に実施例を示した通り、
調査対象である砂質土の原位置地allを凍結し、その
凍結土2を凍結土掘削用のコアチューブ6によりサンプ
リングを行なう凍結サンプリング方法において、
コアチューブ6のガイド管4と凍結管3とは、凍結土2
の攪乱領域2aの半径相当の距firだけ離して平行に
設置し、原位置地9!11を凍結した後に、前記ガイド
管4を通じて砂質土試料の外径相当の口径(例えばφ7
0〜φ130mmぐらい)の凍結土掘削用のコアチュー
ブ5を挿入し凍結土2のコア抜きサンプリングを行なう
ことを特徴とする。! ! Means for solving the problem of the above prior art! ! As a means to solve the problem, the method of frozen sampling of sandy soil samples according to the present invention, as shown in the examples in Figures 41 to 4 of the drawings, is a method for freezing sandy soil samples according to the present invention. In a freezing sampling method in which all the ground is frozen and the frozen soil 2 is sampled using a core tube 6 for excavating frozen soil, the guide pipe 4 of the core tube 6 and the freezing tube 3 are used to collect frozen soil 2.
After freezing the original site 9!11, a tube with a diameter equivalent to the outer diameter of the sandy soil sample (for example, φ7
A core tube 5 for excavating frozen soil with a diameter of about 0 to 130 mm) is inserted to perform core extraction sampling of frozen soil 2.
また、上記砂質土試料の凍結サンプリング方法の実施に
あたり、図面の第5図〜第7図に実施例を示したように
、
サンプリング用外管10の内側に凍結管用ガイド管11
を一体的に設置し、同じサンプリング用外管lOの内側
であって前記凍結管用ガイド管11からは少なくとも凍
結土2の攪乱領域2aの半径相当の距離「だけ離れた位
置に前記凍結管用ガイド管1】と平行な配置でコアチュ
ーブのガイド管4を一体的に設置して成るサンプリング
用セット管12を調査対象の地盤1中に設置し、前記凍
結管用ガイド管11を通じて凍結管3を設置し、原位置
地盤lを凍結した後に、前記ガイド管4を通じて凍結土
掘削用のコアチューブ5を挿入しコア抜きサンプリング
を行なうことも特徴とする。In addition, in carrying out the above freezing sampling method for sandy soil samples, as shown in the examples in FIGS. 5 to 7 of the drawings, a freezing tube guide tube 11 is installed inside the outer sampling tube 10.
are integrally installed, and the frozen tube guide tube is installed inside the same outer sampling tube IO and at a distance from the frozen tube guide tube 11 by at least a distance equivalent to the radius of the disturbed area 2a of the frozen soil 2. A sampling set pipe 12 consisting of a core tube guide pipe 4 integrally installed in parallel with 1] is installed in the ground 1 to be investigated, and a frozen pipe 3 is installed through the frozen pipe guide pipe 11. Another feature is that after the in-situ ground l is frozen, a core tube 5 for excavating frozen soil is inserted through the guide pipe 4 to perform core extraction sampling.
さらに、上記砂質土試料の凍結サンプリング方法は、所
望長さの着脱自在な構成のモジュール管12A、12B
・・・を順次継ぎ足したサンプリング用セット管12を
、調査対象のiII!盤1中へ所望深さ位置まで設置す
ること、
あるいは凍結管3による原位置地盤lの凍結範囲は、ガ
イド管4を通じて挿入される凍結土掘削用のコアチュー
ブ5によるコア抜きサンプリングに必要最小限度の領域
までとすることも特徴とする。Furthermore, the frozen sampling method for sandy soil samples described above includes module tubes 12A and 12B having a desired length and a detachable structure.
The sampling set tube 12, which has been successively joined with ..., is used as the investigation target III! The freezing range of the in-situ ground l by the freezing tube 3 must be the minimum necessary for core extraction sampling with the core tube 5 for frozen soil excavation inserted through the guide tube 4. It is also characterized by the fact that it extends up to the area of .
作 用
砂質土試料の外径相当(およそφ50〜φ8〇−厘)の
口径をもつ凍結土掘削用のコアチューブ6でコア抜きサ
ンプリングが行なわれるから、必要以上の量の凍結土の
サンプリングは行なわれない。Since the core tube 6 for excavating frozen soil has a diameter equivalent to the outer diameter of the sandy soil sample (approximately φ50 to φ80 mm), sampling of frozen soil in an amount larger than necessary is avoided. Not done.
また、砂質土試料の外径相当(およそφ60〜φ801
)の云わば小口径(φ86〜φl OOan)の凍結土
掘削用のコアチューブ6によるコア抜きサンプリングが
行なわれるから、小形のポーリング機械による回前が出
来る。よって、ポーリング機械を据え付けるステージの
必要も篇い、[削泥水の使用量も大きく減らすことが出
来る。In addition, the outer diameter of the sandy soil sample (approximately φ60 to φ801
) Since the core tube 6 for excavating frozen soil is used for sampling with a small diameter (φ86 to φl OOan), sampling can be performed using a small poling machine. Therefore, there is no need for a stage to install the polling machine, and the amount of drilling water used can also be greatly reduced.
凍結土掘削用のコアチューブ6は、ガイド管4にきっち
り案内されて挿入されるため、その挿入及び回前の精度
が高い、従って、原位置地盤lの凍結範囲は必要最小限
度の大きさであってよく、それでも狙い通りの位置につ
いてコア抜きサンプリングが出来、凍結土2の攪乱領域
2aを切削したり、凍結管3を切断したり傷つける心配
もない。The core tube 6 for excavating frozen soil is inserted while being precisely guided by the guide tube 4, so the accuracy of its insertion and rotation is high.Therefore, the frozen area of the in-situ ground l is the minimum necessary size. Even so, core removal sampling can be performed at the targeted position, and there is no need to worry about cutting the disturbed area 2a of the frozen soil 2 or cutting or damaging the frozen pipe 3.
サンプリング用セット管12を使用すると、凍結管3の
挿入精度及びコアチューブ5の挿入精度は、それぞれサ
ンプリング用セット管12の工場加工に基く高い精度に
設置され、極めて精度の高いサンプリング作業が出来る
。When the sampling set tube 12 is used, the insertion accuracy of the cryotube 3 and the core tube 5 are set at high precision based on the factory processing of the sampling set tube 12, allowing extremely highly accurate sampling work.
実 施 例 次に、図示した本発明の詳細な説明する。Example The illustrated invention will now be described in detail.
まず第1図〜第4図は本発明の第1実施例を示したもの
で、第1図は調査対象である砂質土の原位置地盤l中に
所望深さまで凍結管3が設置された状態を示し、第21
!lは前記凍結管3から後述する凍結土2の攪乱領域2
aの半径相当の′ira離r(第41!l参照)だけ離
れた位置に凍結管3と平行にガイド管4が設置された状
態を示している。First, Figures 1 to 4 show a first embodiment of the present invention, and Figure 1 shows a frozen pipe 3 installed to a desired depth in the in-situ ground of sandy soil that is the subject of investigation. state, 21st
! l is a disturbed area 2 of the frozen soil 2 from the freezing pipe 3, which will be described later.
The guide tube 4 is installed in parallel with the freezing tube 3 at a distance `ira distance r corresponding to the radius of a (see No. 41!l).
凍結管3の特に外管の設置は、従来から行なわれている
ようにポーリング機械により穿孔した孔の中へ挿入する
方法で行なわれる。従って、前記穿孔の周囲の地盤は、
凍結管3を中心として例えば半径50mm位の範囲にわ
たって応力解放のゆるみ等が発生した攪乱領域2a(第
41!l)になっていると推定される。従って、ガイド
管4は、少なくとも前記攪乱領域2aの半径相当の距f
i(r=50 mm)ぐらい離れた位置に設置されてい
る。このガイド管4の長さ(深さ)は、第3図で明らか
なように、凍結管3を通じて原位置地盤1が凍結されて
出来る凍結土2の上端に到達する程度のものとされてい
る。ガイド管4の口径はφ100〜φ114+*aぐら
いである。ガイド管4は、つなぎ材6によって凍結管3
との相対位置が固定されている。The cryotube 3, particularly the outer tube, is installed by inserting it into a hole drilled by a poling machine, as has been conventionally done. Therefore, the ground around the perforation is
It is estimated that there is a disturbed region 2a (41st!l) in which loosening due to stress release has occurred, for example, over a radius of about 50 mm centered on the freezing tube 3. Therefore, the guide tube 4 has a distance f corresponding to at least the radius of the disturbed region 2a.
It is installed at a distance of about i (r=50 mm). As is clear from FIG. 3, the length (depth) of this guide pipe 4 is such that it can reach the upper end of the frozen soil 2 formed by freezing the in-situ ground 1 through the frozen pipe 3. . The diameter of the guide tube 4 is about φ100 to φ114+*a. The guide tube 4 is connected to the cryotube 3 by a connecting material 6.
The relative position is fixed.
次に、第3図は、凍結管3にエタノールとドライアイス
の混合液(−70℃)などの冷媒を循環させて地盤1を
所定の範囲で凍結させた後に、前記ガイド管4を通じて
凍結土掘削用のコアチューブ(ダブルコアチューブ)5
を挿入して凍結土2のコア抜きサンプリングが行なわれ
ている。コアチューブ5は、前記のようにして予め設置
されたガイド管4を通じて挿入されるから、第4図に示
したように、凍結管3を中心とする攪乱領域2aの外側
であって、しかも凍結土2の範囲内(不攪乱領域)へき
っちりと挿入され、不攪乱領域の凍結土2が正確にコア
抜きサンプリングされる。Next, in FIG. 3, a refrigerant such as a mixture of ethanol and dry ice (-70°C) is circulated through the freezing tube 3 to freeze the ground 1 within a predetermined range, and then the frozen soil is passed through the guide tube 4. Core tube for drilling (double core tube) 5
Core extraction sampling of frozen soil 2 is being carried out by inserting the Since the core tube 5 is inserted through the guide tube 4 installed in advance as described above, as shown in FIG. The frozen soil 2 in the undisturbed area is precisely inserted into the range of the soil 2 (undisturbed area), and the frozen soil 2 in the undisturbed area is accurately sampled.
第311には1個のガイド管4が設置された場合だけを
示しているが、この限りではない、必要があれば第4図
の凍結管4を中心として例えば直角4方向の位置にそれ
ぞれコアチューブ5を挿入して掘削することにより、l
塊の凍結土2から、位置の異なる4本の凍結試料をサン
プリングすることもできる。Although FIG. 311 shows only the case where one guide tube 4 is installed, this is not limited to this. If necessary, for example, cores may be installed at four positions at right angles to the freezing tube 4 in FIG. 4. By inserting and excavating the tube 5,
It is also possible to sample four frozen samples at different positions from the lump of frozen soil 2.
上記凍結土掘削用のコアチューブ5としては、砂質土試
料の外径(通常はφ50+w■)相当の小さな口径(φ
86s+s位)のものが使用されている。The core tube 5 for the above-mentioned frozen soil excavation has a small diameter (φ
86s+s) is used.
したがって、コア抜きサンプリングされた凍結試料は、
場合によっては人力だけで、あるいは小形のクレーンが
あれば一層たやすく地上へ引き上げることができる。こ
の凍w!試料はコアチューブ5から取出して単に必要な
長さに輪切りする程度の簡単な加工で直ちに砂質土試料
(外径がφ50−1長さ12cm)に形成することがで
きる。そして、必要量以上の凍結試料は採取しないので
、不要分を投棄する手間もほとんどかからない。また、
このような小口径のコアチューブ5による掘削は、小形
のポーリング機械で十分に行なえる。小形のポーリング
機械の場合は、これを据え付けるステージを絹む必要も
ない、その上、掘削に使用される泥水量を減らすことが
でき、泥水冷却装置の負荷を@減できるから、総合的に
大幅なコストダウンが達成される。Therefore, the core-sampled frozen specimen
In some cases, it may be easier to lift the object to the ground by hand or by using a small crane. This frost lol! The sample can be immediately formed into a sandy soil sample (outer diameter: φ50-1 length: 12 cm) by simply removing the sample from the core tube 5 and cutting it into rounds to the required length. Furthermore, since no more frozen sample than is required is collected, there is almost no need to dispose of unnecessary material. Also,
Excavation using such a small-diameter core tube 5 can be sufficiently performed with a small poling machine. In the case of a small poling machine, there is no need to prepare a stage to install it, and in addition, it is possible to reduce the amount of mud used for excavation, and the load on the mud water cooling system can be reduced, resulting in a significant overall improvement. cost reduction is achieved.
第2の実施例
次に、第6図〜第7図に示した本発明の第2実施例を説
明する。Second Embodiment Next, a second embodiment of the present invention shown in FIGS. 6 and 7 will be described.
まず第6図は、口径がm216、単位長さが2.5m〜
3mぐらいのサンプリング用外管10の内面に沿って凍
結管用ガイド管11及びコアチューブのガイド管4をそ
れぞれ一体的に設置して成る所望長さのモジュール管1
2A、12Bを継ぎ足して構成されたサンプリング用セ
ット管12が、調査対象の原位置地盤1中に所望深さま
で設置された段階を示している。First of all, in Figure 6, the diameter is m216 and the unit length is 2.5 m ~
A module tube 1 of a desired length is made by integrally installing a cryotube guide tube 11 and a core tube guide tube 4 along the inner surface of an outer sampling tube 10 of about 3 m.
This shows a stage in which the sampling set pipe 12, which is constructed by adding 2A and 12B, has been installed to a desired depth in the in-situ ground 1 to be investigated.
凍結管用ガイド管11は、これを通じて第6図のように
凍結管3を設置するために利用されるもので、凍結管3
の外径(約φ51 m11)より少し大きい内径(約φ
80.5mm)の鋼管が使用され、サンプリング用外管
10の内面に沿って溶接などの手段で一体的に設置され
ている。The cryotube guide tube 11 is used to install the cryotube 3 as shown in FIG.
The inner diameter (about φ51 m11) is slightly larger than the outer diameter (about φ51 m11).
A steel pipe (80.5 mm) is used, and is integrally installed along the inner surface of the sampling outer tube 10 by means such as welding.
また、ガイド管4は、凍結土掘削用のコアチューブδの
挿入及び両前を案内するためのもので、コアチューブ5
の外径(φ86−−)よりも少し大きい内径(φ92纜
−ぐらい)の鋼管が使用され、前記凍結管用ガイド管1
1の中心からおよそ凍結土2の攪乱領域2aの半径相当
の距1Ilrだけ離れた位置(第7図書wl)に、サン
プリング用外管lOの内面に沿って溶接などの手段で一
体的に設置されている。これらサンプリング用外管10
と凍結管用ガイド管11及びコアチューブのガイドw4
は、各々の軸線が平行な配置とされ、かつ同じ単位長さ
のものとされている。このようなモジュール管12A、
12B・・・は、工場において十分な品質管理のもとて
高精度に製作される。前記した単位長さのモジュール管
12は、各々の端部に接合用のフランジ13を有し、シ
ールゴム14を挟んでポル)15及びナツトにより強力
に接合して継ぎ足され、原位置地盤l中の所望深さ(例
えば地下10mぐらい)まで設置されている。In addition, the guide tube 4 is for inserting the core tube δ for frozen soil excavation and for guiding both front sides of the core tube δ.
A steel pipe with an inner diameter (about φ92 mm) slightly larger than the outer diameter (φ86 mm) of the freezing tube guide tube 1 is used.
1 is integrally installed by means such as welding along the inner surface of the outer sampling tube IO at a distance 1Ilr corresponding to the radius of the disturbed area 2a of the frozen soil 2 (see Figure 7). ing. These sampling outer tubes 10
and cryotube guide tube 11 and core tube guide w4
are arranged so that their respective axes are parallel and have the same unit length. Such a module pipe 12A,
12B... are manufactured with high precision in a factory under sufficient quality control. The unit length module pipe 12 described above has a joining flange 13 at each end, and is strongly joined with a bolt 15 and a nut with a seal rubber 14 in between, and the module pipe 12 is attached to the ground in the original position. It is installed to a desired depth (for example, about 10 meters underground).
第6図は、凍結管用ガイド管11を通じて凍結管3を挿
入し、原位置地盤1を凍結した後に、ガイド管4を通じ
て凍結土掘削用のコアチューブ5を挿入し、図示を省略
したポーリング機械による掘削で凍結土2の不攪乱領域
のコア抜きサンプリングを行なう段階を示している。サ
ンプリング用セット管12を設置すると、凍結管3は凍
結管用ガイド管11の中へ挿入することで高精度に設置
できる。凍結土掘削用のコアチューブ6は、ガイド管4
の中へ挿入して掘削する単純作業により、前記凍結管用
ガイド管11とガイド管4との相対位置として規定され
た位置、即ち、凍結±2の攪乱領域2aより外側の不攪
乱領域のコア抜きサンプリングを高精度に行なえる訳で
ある。FIG. 6 shows a method using a poling machine (not shown) in which a freezing tube 3 is inserted through a guide tube 11 for frozen tubes to freeze the in-situ ground 1, and then a core tube 5 for excavating frozen soil is inserted through the guide tube 4. This shows the stage of core sampling of the undisturbed area of frozen soil 2 by excavation. When the sampling set tube 12 is installed, the freezing tube 3 can be installed with high precision by being inserted into the freezing tube guide tube 11. The core tube 6 for frozen soil excavation is the guide tube 4
By the simple operation of inserting the tube into the core and digging it, the core is extracted from the undisturbed area outside the disturbed area 2a of freezing ±2, which is the position defined as the relative position of the frozen tube guide tube 11 and the guide tube 4. This allows for highly accurate sampling.
なお、サンプリング用セット管12を構成する各モジュ
ール管12A、12B同士を継ぎ足す接合の手段は、上
述したフランジ継手方式の限りではない0例えばねじ接
合方式その他を採用して実施することもできる。Note that the means of joining the module pipes 12A and 12B constituting the sampling set pipe 12 is not limited to the above-mentioned flange joint method, but may also be implemented by employing, for example, a screw joint method or the like.
なお、第6図と第81!Iに示した符号16はサンプリ
ング用セット管I2を原位置地盤l中へ設置するに際し
、その垂直精度を高め、又は垂直精度のrA整を可能な
らしめるためにガイド管4及び凍結管用ガイド管11の
上下のほぼ対称な位置に設置された傾斜計であり、これ
らは地上の図示を省略した計測装置に接続されてリアル
タイムに管理できるものとされている。In addition, Figure 6 and Figure 81! The reference numeral 16 shown in I is a guide tube 4 and a freezing tube guide tube 11 in order to increase the vertical accuracy or to make it possible to adjust rA of the vertical accuracy when installing the sampling set tube I2 into the ground at the original location. These are inclinometers installed at almost symmetrical positions above and below the ground, and these are said to be connected to measuring equipment on the ground (not shown) so that they can be managed in real time.
本発明が奏する効果
以上に実施例と併せて詳述したとおりであって、この発
明に係る砂質土試料の凍結サンプリング方法は、砂質土
試料の外径(例えばφ50)相当の比較的小さな口径の
凍結土掘削用のコアチューブ5で凍結土2の特に不攪乱
領域について高精度のコア抜きサンプリングが行なわれ
るので、小形のポーリング機械で十分に掘削ができる。As described in detail in conjunction with the examples above and beyond the effects of the present invention, the frozen sampling method for sandy soil samples according to the present invention has a relatively small size equivalent to the outer diameter (for example, φ50) of the sandy soil sample. Since the core tube 5 for frozen soil excavation with a large diameter performs highly accurate core sampling of the undisturbed region of the frozen soil 2, sufficient excavation can be performed using a small poling machine.
よって同ポーリング機械を据え付けるステージを組む必
要がなく、掘削泥水の量も大幅に減らすことができ、ク
レーンの必要もないから、従来の数分の一程度にまで大
幅なコストダウンを達成できる。したかって、経済的な
面での地盤調査の適用範囲を大きく広げることができる
。Therefore, there is no need to assemble a stage to install the polling machine, the amount of drilling mud can be significantly reduced, and there is no need for a crane, making it possible to achieve a significant cost reduction to a fraction of the conventional cost. Therefore, the scope of application of ground investigation can be greatly expanded from an economic point of view.
また、不必要な量の凍結試料を採取しないので、不要な
凍結試料の投棄に弔問がかかる不都合もない。Furthermore, since an unnecessary amount of frozen samples is not collected, there is no inconvenience caused by the need to dispose of unnecessary frozen samples.
その上、凍結土掘削用のコアチューブ5は、ガイド管4
を通じてきっちり挿入されるので、その挿入及び面前の
精度が高く、狙い通りの位置について不攪乱領域の凍結
土をコア抜きサンプリングできるから、品質の良い砂質
土試料を採取できる。Moreover, the core tube 5 for frozen soil excavation has a guide tube 4
Since it is inserted exactly through the core, the insertion and surface accuracy is high, and since the frozen soil in the undisturbed area can be cored and sampled at the targeted position, high-quality sandy soil samples can be collected.
勿論、誤ってコアチューブ6で凍結管3を切断したり傷
つける事故の心配もないのである。Of course, there is no fear of accidentally cutting or damaging the cryotube 3 with the core tube 6.
方法の施工過程を示した立面図である。It is an elevation view showing the construction process of the method.
1・・・原位置地盤 2・・・凍結土3・・・
凍結管 4・・・ガイド管2a・・・攪乱
領域 r・・・距離5・・・凍結土掘削用のコ
アチューブ
10・・・サンプリング用外管
11・・・凍結管用ガイド管
12・・・サンプリング用セット管
12A、B・・・モジュール管1... Ground in situ 2... Frozen soil 3...
Frozen tube 4... Guide tube 2a... Disturbed area r... Distance 5... Core tube for frozen soil excavation 10... Outer tube for sampling 11... Guide tube for frozen tube 12... Sampling set tube 12A, B...Module tube
第1図〜第3図はこの発明の第1実施例の枢要な施工過
程を示した立面図、第4図は第3図の4−4線矢視の断
面図、第5図と第6図は本発明の第2実施例の枢要な施
工過程を示した立面図、第7図は第5図のサンプリング
用セット管の平面図、第8図A、 B、 Cは従来
の凍結サンプリング第
1
図
第
図
第
図
第
図
第
図
第
図
第
図A
第
図B
第
図C
第
図1 to 3 are elevational views showing important construction processes of the first embodiment of the present invention, FIG. 4 is a sectional view taken along line 4-4 in FIG. 3, and FIGS. Figure 6 is an elevation view showing the important construction process of the second embodiment of the present invention, Figure 7 is a plan view of the sampling set tube in Figure 5, and Figures 8 A, B, and C are conventional freezing tubes. Sampling 1 Figure Figure Figure Figure Figure A Figure B Figure C Figure
Claims (1)
の凍結土を凍結土掘削用のコアチューブによりサンプリ
ングを行なう凍結サンプリング方法において、 コアチューブのガイド管と凍結管とは凍結土の攪乱領域
の半径相当の距離だけ離して平行に設置し、原位置地盤
を凍結した後に、前記ガイド管を通じて砂質土試料の外
径相当の口径の凍結土掘削用コアチューブを挿入し凍結
土のコア抜きサンプリングを行なうことを特徴とする砂
質土試料の凍結サンプリング方法。 【2】サンプリング用外管の内側に凍結管用ガイド管を
一体的に設置し、同じサンプリング用外管の内側であっ
て前記凍結管用ガイド管からは少なくとも凍結土の攪乱
領域の半径相当の距離だけ離れた位置に前記凍結管用ガ
イド管と平行な配置でコアチューブのガイド管を一体的
に設置して成るサンプリング用セット管を調査対象の地
盤中に設置し、前記凍結管用ガイド管を通じて凍結管を
設置し、原位置地盤を凍結した後に、前記ガイド管を通
じて凍結土掘削用のコアチューブを挿入しコア抜きサン
プリングを行なうことを特徴とする砂質土試料の凍結サ
ンプリング方法。 【3】サンプリング用セット管は、所望長さの着脱自在
なモジュール管を順次継ぎ足して調査対象の地盤中に所
望の深さ位置まで設置されることを特徴とする特許請求
の範囲第2項に記載した砂質土試料の凍結サンプリング
方法。 【4】凍結管による原位置地盤の凍結範囲は、ガイド管
を通じて挿入される凍結土掘削用のコアチューブによる
コア抜きサンプリングに必要最小限度の領域までとする
ことを特徴とする特許請求の範囲第1項又は第2項に記
載した砂質土試料の凍結サンプリング方法。[Scope of Claims] [1] In a freezing sampling method in which the in-situ ground of sandy soil to be investigated is frozen and the frozen soil is sampled using a core tube for excavating frozen soil, a guide tube of the core tube and A frozen soil excavation tube is installed in parallel at a distance equivalent to the radius of the disturbed area of frozen soil, and after freezing the ground in situ, a core for frozen soil excavation with a diameter equivalent to the outer diameter of the sandy soil sample is inserted through the guide tube. A frozen sampling method for sandy soil samples, which is characterized by inserting a tube and performing core extraction sampling of frozen soil. [2] A guide tube for freezing tubes is integrally installed inside the outer sampling tube, and the guide tube for freezing tubes is located inside the same outer sampling tube and is at least a distance equivalent to the radius of the disturbed area of frozen soil from the guide tube for freezing tubes. A sampling set tube consisting of a core tube guide tube integrally installed in parallel with the frozen tube guide tube is installed in the ground to be investigated, and the frozen tube is passed through the frozen tube guide tube. 1. A method for freezing sampling a sandy soil sample, which comprises: installing a core tube for frozen soil excavation through the guide tube to perform core extraction sampling after the in-situ ground is frozen. [3] The sampling set pipe is installed in the ground to be surveyed to a desired depth by sequentially adding removable module pipes of a desired length. Described freezing sampling method for sandy soil samples. [4] The frozen area of the in-situ ground by the freezing tube is limited to the minimum area necessary for core extraction sampling by the core tube for frozen soil excavation inserted through the guide tube. Frozen sampling method for sandy soil samples as described in Section 1 or Section 2.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP13961189A JP2764611B2 (en) | 1989-06-01 | 1989-06-01 | Freezing sampling method for sandy soil samples |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP13961189A JP2764611B2 (en) | 1989-06-01 | 1989-06-01 | Freezing sampling method for sandy soil samples |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH035512A true JPH035512A (en) | 1991-01-11 |
| JP2764611B2 JP2764611B2 (en) | 1998-06-11 |
Family
ID=15249323
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP13961189A Expired - Fee Related JP2764611B2 (en) | 1989-06-01 | 1989-06-01 | Freezing sampling method for sandy soil samples |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2764611B2 (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110514506A (en) * | 2019-08-13 | 2019-11-29 | 北京建筑大学 | Soil sample preparation device |
| JP7373108B1 (en) * | 2023-05-18 | 2023-11-02 | 国土防災技術株式会社 | Survey boring method |
-
1989
- 1989-06-01 JP JP13961189A patent/JP2764611B2/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110514506A (en) * | 2019-08-13 | 2019-11-29 | 北京建筑大学 | Soil sample preparation device |
| CN110514506B (en) * | 2019-08-13 | 2024-04-05 | 北京建筑大学 | Soil sample preparation device |
| JP7373108B1 (en) * | 2023-05-18 | 2023-11-02 | 国土防災技術株式会社 | Survey boring method |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2764611B2 (en) | 1998-06-11 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2009215763A (en) | Soil sampling method and soil sampling device | |
| CN101387202A (en) | Method for expanding and digging pipe shed working chamber in tunnel in section of soft surrounding rock with primary support | |
| CN106680033A (en) | Static cone penetration test type underground water sampling method | |
| CN111829816A (en) | Non-disturbed soil sampling device and sampling method for volatile organic compound contaminated sites | |
| CN111779516A (en) | A rock drilling manipulator suitable for rock bolt truck and its control method | |
| JP2764611B2 (en) | Freezing sampling method for sandy soil samples | |
| CN105957435A (en) | Test device and method for simulating plastic drainage plate cutting by soft soil shield tunneling | |
| Lin et al. | Optimizations for tunnel drainage water system based on locations of crystallizations | |
| CN119663914A (en) | A method for advanced and accurate diagnosis and treatment of leakage in foundation pit retaining structure | |
| CN217151834U (en) | A drilling device for geotechnical engineering investigation | |
| CN114088812B (en) | A method for evaluating the vibration of surrounding soil during shield tunnel construction | |
| CN117661557A (en) | A method for graded dry drilling of drilled piles and rotary drilling rigs to form holes and seal them | |
| JPH0452803B2 (en) | ||
| CN109695454A (en) | The construction method of preliminary bracing is carried out in the constructing tunnel of high earthquake zone fracture area | |
| JPH0821177A (en) | Ground soil investigation method and equipment under large structure | |
| CN121184156B (en) | TBM delayed collapse and water inrush handling methods | |
| CN111749246A (en) | Installation method of prestressed anchor cable of water-rich sand layer | |
| CN216411586U (en) | Device for detecting underground pipeline laying line | |
| CN112364519A (en) | Large-diameter drilling parameter determination method for extracting upper corner gas | |
| CN105926565B (en) | A kind of method visited shovel and its simply judged for traditional residence foundation soil | |
| JP2004100272A (en) | Geological survey method of micro tunnel excavation scheduled part | |
| CN214277846U (en) | Sampling device for soil corrosivity detection | |
| CN207794051U (en) | A kind of soil sampling equipment with augers | |
| CN221484827U (en) | Survey device for building design scheme design | |
| CN114993851B (en) | A soil shear strength in-situ testing device and testing method thereof |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090403 Year of fee payment: 11 |
|
| LAPS | Cancellation because of no payment of annual fees |