JPH0364039B2 - - Google Patents

Info

Publication number
JPH0364039B2
JPH0364039B2 JP60261893A JP26189385A JPH0364039B2 JP H0364039 B2 JPH0364039 B2 JP H0364039B2 JP 60261893 A JP60261893 A JP 60261893A JP 26189385 A JP26189385 A JP 26189385A JP H0364039 B2 JPH0364039 B2 JP H0364039B2
Authority
JP
Japan
Prior art keywords
concrete
shield excavator
end stop
formwork
outer shell
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP60261893A
Other languages
Japanese (ja)
Other versions
JPS62121300A (en
Inventor
Masato Honda
Haruo Kaneko
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsui Construction Co Ltd
Original Assignee
Mitsui Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsui Construction Co Ltd filed Critical Mitsui Construction Co Ltd
Priority to JP60261893A priority Critical patent/JPS62121300A/en
Publication of JPS62121300A publication Critical patent/JPS62121300A/en
Publication of JPH0364039B2 publication Critical patent/JPH0364039B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Description

【発明の詳細な説明】 (a) 産業上の利用分野 本発明はシールド掘削機により掘削されたトン
ネルの覆工を現場打ちコンクリートで打設形成す
る際に用いられる、トンネル覆工の構築方法に関
する。
[Detailed Description of the Invention] (a) Field of Industrial Application The present invention relates to a method for constructing a tunnel lining, which is used when forming the lining of a tunnel excavated by a shield excavator using cast-in-place concrete. .

(b) 従来の技術 最近、シールド掘削機により掘削されたトンネ
ルの覆工を現場打ちコンクリートで打設形成し
て、繁雑で時間の掛かるセグメントの組立作業を
行わないようにする提案がなされている。
(b) Prior Art Recently, a proposal has been made to form the lining of a tunnel excavated by a shield excavator using cast-in-place concrete to avoid the complicated and time-consuming assembly work of segments. .

この場合、シールド掘削機を掘進させる方法と
して、打設されたコンクリートの硬化後に掘進さ
せる方法と、コンクリートが硬化していない状態
で掘進させる方法とが有る。
In this case, there are two methods for making the shield excavator dig: one is to make the excavation proceed after the placed concrete has hardened, and the other is to make the shield excavator dig after the concrete has not yet hardened.

(c) 発明が解決しようとする問題点 前者の場合、打設されたコンクリートが硬化す
るまで掘削機は掘進できないので、掘進速度が低
下する欠点が有り、また掘削機が掘進した後に生
じるテールボイドを充填する必要が生じる。
(c) Problems to be solved by the invention In the former case, the excavator cannot dig until the concrete that has been placed has hardened, so there is a drawback that the excavation speed decreases. It will be necessary to fill it.

また、後者の場合は、コンクリートが硬化して
しまわないうちに掘削機を掘進させることが出
来、それだけ掘進速度を早めることが出来る反
面、掘削機の掘進に伴つて妻止めが移動してしま
わないように、妻止めを常時ジヤツキで押圧して
おく必要が有り、そのために新たに構築すべき覆
工に関する鉄筋等の補強材設置に際して当該ジヤ
ツキが邪魔になつてしまう不都合が生じる。
In the latter case, the excavator can dig before the concrete hardens, increasing the excavation speed, but the stopper does not move as the excavator advances. As such, it is necessary to press the end stop with a jack at all times, and this causes the inconvenience that the jack gets in the way when installing reinforcing materials such as reinforcing bars for a newly constructed lining.

本発明は、前述の欠点を解消すべく、コンクリ
ートが硬化していない状態で掘進した場合でも、
新たに構築すべき覆工に関する鉄筋等の補強材の
設置を円滑に行うことの出来るトンネル覆工の構
築方法を提供することを目的とするものである。
In order to eliminate the above-mentioned drawbacks, the present invention has been developed to solve the above-mentioned drawbacks, even when excavation is carried out before the concrete has hardened.
It is an object of the present invention to provide a method for constructing a tunnel lining that can smoothly install reinforcing materials such as reinforcing bars for a newly constructed lining.

(d) 問題点を解決するための手段 即ち、本発明は、シールド掘削機1が所定距離
L1だけ掘進したところで、妻止めを型枠12に
対して固定し、その状態でコンクリートの加圧手
段を解除して、新たにコンクリート打設空間17
を形成するようにして構成される。
(d) Means for solving the problem That is, in the present invention, after the shield excavator 1 has excavated a predetermined distance L1, the end stop is fixed to the formwork 12, and in this state, the concrete pressurizing means is is released and a new concrete placement space 17 is created.
It is configured so as to form a

なお、括弧内の番号等は、図面における対応す
る要素を示す、便宜的なものであり、従つて、本
記述は図面上の記載に限定拘束されるものではな
い。以下の「(e)作用」の欄についても同様であ
る。
Note that the numbers in parentheses are for convenience and indicate corresponding elements in the drawings, and therefore, this description is not limited to the descriptions on the drawings. The same applies to the column "(e) Effect" below.

(e) 作用 上記した構成により、本発明は、シールド掘削
機1が所定距離L1だけ掘進したところで、妻止
めを型枠12に固定して加圧手段6による加圧動
作を解除し、その状態でコンクリート打設空間1
7を形成するように作用する。
(e) Effect With the above-described configuration, the present invention fixes the stopper to the formwork 12 and releases the pressurizing operation by the pressurizing means 6 when the shield excavator 1 has excavated a predetermined distance L1, and the pressurizing operation by the pressurizing means 6 is released. Concrete pouring space 1
7.

(f) 実施例 以下、本発明の実施例を図面に基づき説明す
る。
(f) Embodiments Hereinafter, embodiments of the present invention will be described based on the drawings.

第1図は本発明が適用されるシールド掘削機の
一例を示す断面図、 第2図及び第3図は本発明によるトンネル覆工
の構築方法の一実施例を示す工程図である。
FIG. 1 is a sectional view showing an example of a shield excavator to which the present invention is applied, and FIGS. 2 and 3 are process diagrams showing an example of the method for constructing a tunnel lining according to the present invention.

シールド掘削機1は、第1図に示すように、全
体が円筒形状に形成された外殻2を有しており、
外殻2の図中左方にはカツタ3が駆動モータ5に
より回転駆動自在に設けられている。外殻2の内
側には、複数のコンクリート加圧ジヤツキ6及び
推進ジヤツキ7が、外殻2の周囲に沿つた形で同
心円状に2重に設けられており、各ジヤツキ6,
7にはラム6a,7aが、矢印A,B方向に突出
後退自在に設けられている。
As shown in FIG. 1, the shield excavator 1 has an outer shell 2 that is entirely cylindrical.
A cutter 3 is provided on the left side of the outer shell 2 in the figure and is rotatably driven by a drive motor 5. Inside the outer shell 2, a plurality of concrete pressure jacks 6 and propulsion jacks 7 are provided concentrically in double layers along the periphery of the outer shell 2, and each jack 6,
7 is provided with rams 6a and 7a that can protrude and retract in the directions of arrows A and B.

シールド掘削機1は、以上のような構成を有す
るので、シールド掘削機1によりトンネル9を掘
削する場合には、駆動モータ5によりカツタ3を
回転駆動させると共に、推進ジヤツキ7のラム7
aを矢印B方向に突出させて、型枠12を足場に
する形で、外殻2をA方向に押圧する。A方向に
外殻2が押圧されると、カツタ3は切羽13方向
に所定の掘削圧力で押され、切羽部分の土砂は掘
削される。切羽13部分の土砂が掘削されると、
外殻2は切羽13が掘削された分だけ推進ジヤツ
キ7の押圧力でA方向に推進し、トンネル9が形
成される。推進ジヤツキ7は、外殻2が所定距離
L1だけA方向に進む間、外殻2の移動速度に合
わせた形でラム7aをB方向に突出駆動させ、カ
ツタ3に常に所定の掘削圧力が作用するようにす
る。
Since the shield excavator 1 has the above configuration, when the shield excavator 1 excavates the tunnel 9, the cutter 3 is rotationally driven by the drive motor 5, and the ram 7 of the propulsion jack 7 is rotated.
A is made to protrude in the direction of arrow B, and the outer shell 2 is pressed in the direction of A using the formwork 12 as a foothold. When the outer shell 2 is pressed in the direction A, the cutter 3 is pushed in the direction of the face 13 with a predetermined excavation pressure, and the earth and sand in the face part is excavated. When the earth and sand in the 13th part of the face is excavated,
The outer shell 2 is propelled in the direction A by the pushing force of the propulsion jack 7 by the amount that the face 13 is excavated, and the tunnel 9 is formed. The propulsion jack 7 drives the ram 7a to protrude in the B direction in accordance with the moving speed of the outer shell 2 while the outer shell 2 moves a predetermined distance L1 in the A direction, so that a predetermined digging pressure is always applied to the cutter 3. I'll do what I do.

こうして、所定距離L1だけトンネル10がA
方向に掘削されたところで、第2図に示すよう
に、ラム6aをA方向に後退させ、その状態で、
第3図に示すように、鉄筋や鉄板等の補強部材1
0及び妻止めリング15Bを覆工11を打設構築
すべき位置に設置する。妻止めリング15は、全
体が円環状に形成されており、また、補強部材1
0は既にコンクリートが打設された状態の、図中
右側の妻止めリング15Aと新たに設置された図
中左側の妻止めリング15Bとの間に設置する。
妻止めリング15には、補強部材10を設置する
ための公知のガイド手段(ガイド穴、ガイド溝
等)が設けられており、補強部材10の設置は円
滑に行うことが出来る。
In this way, the tunnel 10 is A for a predetermined distance L1.
When the excavation is completed in the direction A, the ram 6a is moved back in the A direction as shown in FIG. 2, and in this state,
As shown in Figure 3, reinforcing members 1 such as reinforcing bars and iron plates
0 and the end stop ring 15B are installed at the position where the lining 11 is to be cast and constructed. The end stop ring 15 has an annular shape as a whole, and the reinforcing member 1
0 is installed between the end stop ring 15 A on the right side in the figure, where concrete has already been placed, and the end stop ring 15 B on the left side in the figure, which has been newly installed.
The end stop ring 15 is provided with known guide means (guide holes, guide grooves, etc.) for installing the reinforcing member 10, so that the reinforcing member 10 can be installed smoothly.

また、第3図右方の妻止めリング15Aは、外
殻2及び型枠12に嵌入した形で設けられてお
り、しかも型枠12に対してはピン16により矢
印A,B方向の移動を拘束された形で設置されて
いるので、補強部材10を設置する際に、コンク
リート加圧ジヤツキ6のラム6aをA方向に後退
させても、妻止めリング15AがA方向に移動し
てしまうようなことが無く、従つて妻止めリング
15Aの図中右方のコンクリートがいまだ硬化し
ていなくとも、当該コンクリートは妻止めリング
15Aにより、コンクリート打設空間17中に確
実に保持され、良好なコンクリートの凝固が行わ
れる。
The end stop ring 15 A on the right side of FIG. 3 is fitted into the outer shell 2 and the formwork 12, and can be moved in the directions of arrows A and B with respect to the formwork 12 by pins 16. Since the reinforcing member 10 is installed in a restrained manner, even if the ram 6a of the concrete pressure jack 6 is moved back in the A direction, the end stop ring 15A will not move in the A direction. Therefore, even if the concrete on the right side of the end retaining ring 15A in the figure is not yet hardened, the concrete is securely held in the concrete placement space 17 by the end retaining ring 15A . , good concrete solidification takes place.

こうして、妻止めリング15及び補強部材10
が、第3図に示すように設置されたとことろで、
推進ジヤツキ7のラム7aをA方向に後退させ
て、図中右方の型枠12とラム7aの先端部との
間に型枠12を全体円筒状に設置し、第1図に示
すように、型枠12、妻止めリング15A,15B
及び外殻2間に筒状のコンクリート打設空間17
を形成する。その状態で、新たに形成されたコン
クリート打設空間17中にコンクリートを打設注
入し、コンクリート打設空間17をコンクリート
で満たす。コンクリート打設空間17がコンクリ
ートで満たされると、次に推進ジヤツキ7を駆動
してラム7aをB方向に突出させ、型枠12を足
場にする形で外殻2、従つてシールド掘削機1を
A方向に押圧し、カツタ3による掘進を開始す
る。
In this way, the end stop ring 15 and the reinforcing member 10
is installed as shown in Figure 3.
The ram 7a of the propulsion jack 7 is moved backward in the direction A, and the formwork 12 is installed in a cylindrical shape between the formwork 12 on the right side of the figure and the tip of the ram 7a, as shown in Fig. 1. , formwork 12, end stop ring 15 A , 15 B
and a cylindrical concrete placement space 17 between the two outer shells.
form. In this state, concrete is poured into the newly formed concrete placement space 17 to fill the concrete placement space 17 with concrete. When the concrete casting space 17 is filled with concrete, the propulsion jack 7 is then driven to project the ram 7a in the direction B, and the outer shell 2 and therefore the shield excavator 1 are moved using the formwork 12 as a foothold. Press in direction A and start digging with the cutter 3.

シールド掘削機1が、A方向に掘進するにつ
れ、コンクリート加圧ジヤツキ6のラム6aも、
ラム7aのB方向の移動に同期した形で突出さ
せ、外殻2がA方向に移動する際に、妻止めリン
グ15がつられてA方向に移動しないように保持
し、コンクリート打設空間17内のコンクリート
を所定の圧力で加圧する。シールド掘削機1がA
方向に移動すると、外殻2が通過した後にテール
ボイドが生じるが、当該テールボイドはコンクリ
ート加圧ジヤツキ6により加圧されたコンクリー
ト打設空間17内のコンクリートが直ちに流入し
て塞いでしまうので、覆工11は地山19と密着
した良好な状態で構築される。なお、この時点に
おけるコンクリート打設空間17内のコンクリー
トは、いまだ硬化していないので、テールボイド
へのコンクリートの充填は円滑に行われる。ま
た、妻止めリング15は、コンクリートの注入打
設時には、型枠12に対しては固定されておら
ず、従つて、型枠12と外殻2との間で、矢印
A,B方向に移動し得る状態となつているので、
コンクリート加圧ジヤツキ6によるコンクリート
打設空間17内のコンクリートに対する加圧動作
は円滑に行われる。
As the shield excavator 1 excavates in the direction A, the ram 6a of the concrete pressurizing jack 6 also
It is made to protrude in synchronization with the movement of the ram 7a in the B direction, and when the outer shell 2 moves in the A direction, the end retaining ring 15 is held so that it does not hang and move in the A direction. concrete at a specified pressure. Shield excavator 1 is A
When moving in the direction, a tail void occurs after the outer shell 2 passes, but the concrete in the concrete placement space 17 pressurized by the concrete pressurizing jack 6 immediately flows in and blocks the tail void, so the lining 11 is constructed in good condition in close contact with the ground 19. Note that since the concrete in the concrete placement space 17 at this point has not yet hardened, the tail void is filled with concrete smoothly. Furthermore, the stopper ring 15 is not fixed to the formwork 12 during pouring of concrete, and therefore moves in the directions of arrows A and B between the formwork 12 and the outer shell 2. Since it is possible to do so,
Pressurizing the concrete in the concrete placement space 17 by the concrete pressurizing jack 6 is performed smoothly.

なお、シールド掘削機1が、所定距離L1だけ
A方向に掘進すると、外殻2の後端部2aは、そ
れまでの妻止めリング15Aの、第1図右側面部
15aから、妻止めリング15Bの右側面部15
aにまで距離L1だけ移動するが、当該移動部分
は、コンクリート打設空間17に対応しているの
で、前記したテールボイドへのコンクリート打設
空間17からのコンクリートの充填動作は円滑に
行われる。
When the shield excavator 1 excavates in the A direction by a predetermined distance L1, the rear end 2a of the outer shell 2 moves from the right side surface 15a of the end stop ring 15A in FIG. Right side part 15 of B
Although the moving portion corresponds to the concrete placement space 17, the operation of filling the above-mentioned tail void with concrete from the concrete placement space 17 is performed smoothly.

シールド掘削機1が、距離L1だけ掘進する
と、妻止めリング15を型枠12に対してピン1
6を用いて固定し、その状態でコンクリート加圧
ジヤツキ6のラム6aをA方向に後退させ(第2
図参照)、既に述べた手順で、第3図に示すよう
に、新たに妻止めリング15及び補強部材10を
設置して、直前に打設した覆工11に連続する形
で、コンクリート打設空間17を形成し、同様な
手順で覆工11を構築してゆく。
When the shield excavator 1 excavates by a distance L1, the end stop ring 15 is attached to the pin 1 against the formwork 12.
6, and in that state, move the ram 6a of the concrete pressure jack 6 back in the direction A (second
As shown in Figure 3, following the steps already described, a new stopper ring 15 and reinforcing member 10 are installed, and concrete is poured in a manner that continues with the lining 11 that was just poured. A space 17 is formed, and the lining 11 is constructed in the same manner.

なお、上述の実施例は、コンクリート打設空間
17内に、補強部材10を設けた場合について述
べたが、本発明は補強部材10の設置の有無に無
関係に適用することが出来ることは勿論である。
In addition, although the above-mentioned Example described the case where the reinforcing member 10 was provided in the concrete placement space 17, it goes without saying that the present invention can be applied regardless of whether or not the reinforcing member 10 is installed. be.

(g) 発明の効果 以上、説明したように、本発明によれば、シー
ルド掘削機1が所定距離L1だけ掘進したところ
で、妻止めを型枠12に対して固定し、その状態
でコンクリートの加圧手段を解除して、新たにコ
ンクリート打設空間17を形成するようにしたの
で、掘削機1がコンクリートが硬化していない状
態で掘進しても、妻止めシールド掘削機1の所定
距離L1の掘進が終了した時点で、型枠12に対
して固定され、従つて型枠12に対して移動する
事態の発生が機械的に防止されるので、コンクリ
ートの加圧手段により常時妻止めを押圧する必要
が無くなり、コンクリート打設空間17内への補
強部材10の設置等の作業も円滑かつ容易に行う
ことが出来る。
(g) Effect of the Invention As explained above, according to the present invention, after the shield excavator 1 has excavated a predetermined distance L1, the end stop is fixed to the formwork 12, and concrete is added in this state. Since the pressure means is released and a new concrete placement space 17 is formed, even if the excavator 1 excavates with the concrete not hardened, the predetermined distance L1 of the end shield excavator 1 can be maintained. When the excavation is completed, it is fixed to the formwork 12, and therefore, movement relative to the formwork 12 is mechanically prevented, so the end stop is constantly pressed by the concrete pressurizing means. This eliminates the need for this, and work such as installing the reinforcing member 10 in the concrete placement space 17 can be performed smoothly and easily.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本発明が適用されるシールド掘削機の
一例を示す断面図、第2図及び第3図は本発明に
よるトンネル覆工の構築方法の一実施例を示す工
程図である。 1……シールド掘削機、6……加圧手段(コン
クリート加圧ジヤツキ)、12……足場(型枠)、
15……妻止め(妻止めリング)、17……コン
クリート打設空間、L1……距離。
FIG. 1 is a sectional view showing an example of a shield excavator to which the present invention is applied, and FIGS. 2 and 3 are process diagrams showing an example of a method for constructing a tunnel lining according to the present invention. 1... Shield excavator, 6... Pressurizing means (concrete pressurizing jack), 12... Scaffolding (formwork),
15... End stop (end stop ring), 17... Concrete placement space, L1... Distance.

Claims (1)

【特許請求の範囲】 1 妻止めを型枠に対してシールド掘削機の掘進
方向に移動し得るように設け、 該妻止めを介して前記コンクリート打設空間内
に注入されたコンクリートをコンクリートの加圧
手段を用いて加圧し、 その状態でシールド掘削機を足場を介して掘進
させ、その結果生じるテールボイドを、前記注入
された未硬化状態のコンクリートにより充填しつ
つ覆工を構築してゆく方法において、 前記シールド掘削機が所定距離だけ掘進したと
ころで、前記妻止めを型枠に対して固定し、 その状態で前記コンクリートの加圧手段を解除
して、新たにコンクリート打設空間を形成するよ
うにして構成したトンネル覆工の構築方法。
[Scope of Claims] 1. An end stop is provided so as to be movable in the excavation direction of a shield excavator with respect to the formwork, and concrete poured into the concrete placement space via the end stop is processed by concrete. A method in which a shield excavator is pressurized using a pressure means, excavates through the scaffolding in that state, and a lining is constructed while filling the resulting tail void with the injected uncured concrete. When the shield excavator has dug a predetermined distance, the end stop is fixed to the formwork, and in this state, the concrete pressurizing means is released to form a new concrete pouring space. A method of constructing a tunnel lining made up of
JP60261893A 1985-11-21 1985-11-21 Covering construction of tunnel Granted JPS62121300A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP60261893A JPS62121300A (en) 1985-11-21 1985-11-21 Covering construction of tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP60261893A JPS62121300A (en) 1985-11-21 1985-11-21 Covering construction of tunnel

Publications (2)

Publication Number Publication Date
JPS62121300A JPS62121300A (en) 1987-06-02
JPH0364039B2 true JPH0364039B2 (en) 1991-10-03

Family

ID=17368226

Family Applications (1)

Application Number Title Priority Date Filing Date
JP60261893A Granted JPS62121300A (en) 1985-11-21 1985-11-21 Covering construction of tunnel

Country Status (1)

Country Link
JP (1) JPS62121300A (en)

Also Published As

Publication number Publication date
JPS62121300A (en) 1987-06-02

Similar Documents

Publication Publication Date Title
JPS62194399A (en) Construction method for coating tunnel
JPS62121299A (en) Method for covering casting of tunnel and shield excavator used therein
JPS62121300A (en) Covering construction of tunnel
JPS6145037B2 (en)
JPS62206198A (en) Method of constructing tunnel lining
JPH0519000B2 (en)
JP2819224B2 (en) Reaction force support structure for shaft excavator
JP2634883B2 (en) Construction method of tunnel lining
JPH02132295A (en) Constructing method for tunnel lining work
JP2829679B2 (en) Construction method of large depth shaft using vertical shield machine
JPH055039B2 (en)
JPH0511200B2 (en)
JPH0367199B2 (en)
JP2951895B2 (en) Cast-in-place lining type shield method
JPH0361000B2 (en)
JP2676691B2 (en) Construction method of shield and lining using shield
JPS6221991A (en) Method of excavating tunnel and shielding excavator used forsaid method
JPH05118194A (en) Sealing method of lining in cast-in-place lining shield method
JPH0692719B2 (en) Lining construction method
JPH0332658B2 (en)
JPH01312199A (en) Construction of tunnel linining work
JPS63189598A (en) shield excavator
JPH0749760B2 (en) Shield for cast-in-place lining method
JPH0668237B2 (en) Concrete formwork equipment
JPH0493498A (en) Concrete placing device for covering tunnel