JPH03832A - Automatic apparatus for rib stitching in rope warper - Google Patents
Automatic apparatus for rib stitching in rope warperInfo
- Publication number
- JPH03832A JPH03832A JP13332889A JP13332889A JPH03832A JP H03832 A JPH03832 A JP H03832A JP 13332889 A JP13332889 A JP 13332889A JP 13332889 A JP13332889 A JP 13332889A JP H03832 A JPH03832 A JP H03832A
- Authority
- JP
- Japan
- Prior art keywords
- string
- rope
- warped
- yarn
- rods
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004519 manufacturing process Methods 0.000 abstract description 2
- 230000000630 rising effect Effects 0.000 abstract 2
- 238000004804 winding Methods 0.000 description 5
- 238000001125 extrusion Methods 0.000 description 3
- 238000004043 dyeing Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 229920000742 Cotton Polymers 0.000 description 1
- 241000283070 Equus zebra Species 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000835 fiber Substances 0.000 description 1
- 238000009958 sewing Methods 0.000 description 1
Landscapes
- Warping, Beaming, Or Leasing (AREA)
Abstract
Description
本発明はロープ整経機における新規な自動アゼ取り装置
に関するものである。The present invention relates to a new automatic grain removal device for a rope warper.
ロープ整経機は一般の織機用シート整経機とは異なり、
糸の染色の前工程として糸をロープ状に巻取るものであ
る。その場合、染色後に分繊し易いように、ロープ整経
の途中において所定間隔で整列糸を交互に1本宛縫うよ
うにして横方向にひも(紐)を通しておく、このひもを
アゼ糸(畦糸)と称する。本発明ではひもをアゼ糸と同
義語で使用する。
従来、このような操作を「アゼ取り」といい、すべて手
作業により行なっていたため、アゼ取り作業1回につき
2〜3分、1セツト平均約5500 mの整経について
20〜30分もの間は機械を停止する必要があり1人手
がかかるうえ、生産能率の悪いものであった。Rope warping machines differ from general loom sheet warping machines,
As a pre-process for dyeing the thread, the thread is wound into a rope shape. In that case, in order to make it easier to separate the fibers after dyeing, strings are passed through the strings in the horizontal direction by sewing the aligned threads alternately at predetermined intervals during the warping of the rope. Thread). In the present invention, string is used synonymously with adze thread. Traditionally, this kind of operation was called ``removal of warping,'' and it was all done by hand, so it took 2 to 3 minutes for each removal operation, and it took 20 to 30 minutes for one set of warping, which averaged about 5,500 m. It required one person to stop the machine, and the production efficiency was poor.
本発明は、このアゼ取り作業において、人手に頼らず、
連続的、自動的に実施する製麹の開発を目的に検討し、
完成したものである。
そのための解決手段の栗旨は1次のとおりである、すな
おち、多数の原糸リールから所定本数の糸を供給し、く
し状スクリーンで整経した糸の一本おき交互にアゼ糸を
通した状態でロープ状に引き揃えて巻取るロープ整経機
において、スリット長が長短の繰返しであり、全体が上
下動するくし状スクリーン(13)と、その移方整経糸
面の両脇に配置した走行レール(22)(23)に対し
てそれぞれ片方から整経糸面に対して出入する分け棒(
24)及びひも通し4iIl (25a) (25b)
と、このひも通し棒の移動終端に対してひも供結機(2
6a) (213b)とひも接t!i機(27a) (
27b)を設けてなることを特徴とするものである。
ここで、各部材の駆動源には、例えば、エアシリンダを
用い、動きの始端、終端をリミットスイッチで感知し、
エアバルブの開閉等は電気的自動制御回路で行なう従来
公知の駆動制御システムを応用する。The present invention does not rely on manual labor in this adze removal work,
We are considering the development of koji making that can be carried out continuously and automatically.
It is completed. The key points of the solution are as follows: A predetermined number of yarns are supplied from a large number of raw yarn reels, and every other yarn warped with a comb-like screen is passed through the adze yarn alternately. In the rope warping machine, the slits are lengthened and shortened repeatedly, and the comb-shaped screen (13) moves up and down as a whole, and its moving warp is placed on both sides of the warp surface. Separating rods (
24) and string loop 4iIl (25a) (25b)
Then, the string connecting machine (2
6a) (213b) and string contact t! i machine (27a) (
27b). Here, for example, an air cylinder is used as the drive source for each member, and the start and end of the movement is detected by a limit switch.
A conventionally known drive control system using an electric automatic control circuit is used to open and close the air valve.
【作用】
本装置によるアゼ取り作業は、次の順になされる。
まず最初に、<シ状スクリーン(13)を上に移動させ
、スリット長の長短により、1本おきの糸を上下面に分
けて開口する。
そこへ分け棒(24)をシリンダで押し出して入れ、走
行レールでひも通し棒(25a) (25b)の近くま
で移動させ、上下に分かれた系列の間へ一本のひも通し
捧(2Sa)をシリンダで押し出して入れ、ひも供結機
(26b)の位置まで走行レールで移動し、ひも通し穴
(31a)に通されたひもをシリンダの戻りと共に系列
中へ通す0次いで、くシ状スクリーン(13)を下へ移
動させて系列を上下逆に開口させて分け棒(24)を再
び挿入し、メツシュ(15)の位置へ移動させて、反対
側のひも通し捧(25b)をシリンダで押し出して入れ
、先のひも通し棒(25a)と同じ動作をして両ひも通
し捧(25a) (25b)の接近位置で上下に一本宛
互いに交差する系列の間に通された2本のひもを互いに
両端でひも供結機(26a)(26b)で切断し、ひも
接続機(27a) (27b)でひも相互を結んで輪差
状にすることによりアゼ糸となり、アゼ取り作業が完了
するのである。
(実施例]
以下図面によって本発明の実施例を詳細に説明する。
第1図は本発明の自動アゼ取り装置の作動説明平面図で
あり、第2図は本装置を装着したロープ整経機の全体平
面図である。第3図は同側面図であり、第4図は第3図
のA−A矢視図である。
第2〜4図から明らかなように、ロープ整経機は原糸供
給装置(1)、自動アゼ取り装置(2)及びロープ巻取
装a (3)の3装置からなる。原糸供給装置(L)は
多数の原糸リール(4)の架台(5)と各供給系の糸切
れ感知センサ(6)からなる従来の装置である。 また
、整経後のロープ巻取装a (3)もトラバーサ(7)
と 2本の平行駆動ロール(8)(9)上で太らせて巻
取る巻取りロール(10)の構成による従来の装置であ
る。
本発明の特徴は、アゼ取りの自動化にあり、この自動ア
ゼ取り装M(2)は、まず、原糸供給装置(1)からの
多数の糸を平面的に揃えるガイドロール(u)(12)
とくし状スクリーン(13)がある、<シ状スクリーン
(13)は糸−本宛通すスリットが長短の繰返しであり
、全体が上下動するよう南側のガイド溝で支持し、下方
にエアシリンダ(14)からなる上下移動装置を設けて
いる。
、次いで、糸を1本宛通すメツシュ(15)があり、水
平の移動間隔をおいて、引張ローラ(16) (17)
(18)を経てダンサローラ(19)、ガイドローラ(
2o)がほぼ平面的に配置され、ここから逆行して上部
位置に溝付ガイドローラ(21)が設けられて、平面的
な系列がロープ状に集合され、ロープ巻取装置(3)へ
送られる。
このような糸の流れに対して所定間隔でアゼ糸を通すア
ゼ取り作業がなされるが、本発明では自動的にアゼ取り
をするために1次に示す構造の装置とした。すなわち、
前記くし状スクリーン(13)と、その後方整経糸面の
両脇に配置した走行レール(22) (23)に対して
それぞれ片方がら整経糸面に対して出入する分は棒(2
4)及びひも通し棒(25a)(25b)と、 このひ
も通し棒の移動終端に対して、ひも供結機(26a)
(26b)とひも接続機(27a) (27b)を設け
てなることを特徴とする。
くし状スクリーン(13)の後方にメツシュ(15)が
あり、くし状スクリーン(13)とメツシュ(15)と
で系列が一平面上に整列されて進行する。そして、くし
状スクリーン(13)とメツシュ(15)との間を分け
棒(24)が糸面内へスライドシリンダ(29)により
出入し、かつ前後動するよう走行レール(23)に配置
され、同じくメツシュ(15)の前方で走行レール(2
3)により前後動し、かつスライドシリンダ(30a)
により糸面内へ出入りするひも通し棒(25a)が配置
されている。 このひも通し棒(25a)と糸面を挾ん
で対向する位置にもひも通し捧(25b)がスライドシ
リンダ(30b)に支持され、ひも通し棒(25a)と
同じ動きをするよう配置されているのである。
以上の構成の自動アゼ取り装置の作動を第1図により説
明する0作動順序は以下に示す■〜0であり、第1図中
に同一符号で示した。
■くし状スクリーン(13)の上下移動装置(14)を
作動させ、糸を上下に分ける。上下移動装置(14)の
シリンダ上移動。
0分け棒(24)を分は目に入れる。シリンダ(29)
による押出動作。
0分は棒(24)シリンダ(29)を走行レール(23
)上でメツシュ(15)前まで移動。
■ヒモ通し棒(25a)を分は目に入れる。シリンダ(
30a)による押出動作。
■ひも通し棒(25a)を走行レール(23)上でアゼ
取り位置まで移動。
0分は棒(24)を引き抜く。シリンダ(29)による
引抜動作。
0分は棒(24)シリンダ(29)を走行レール(23
)上で初期位置まで移動。
■くし状スクリーン(13)上下移動装置I!(14)
を作動させ、糸を上下に分ける。上下移動装置(14)
のシリンダ上移動。
■■と同じ。
0■と同じ。
■ひも通し捧(25b)を分は目に入れる。シリンダ(
30b)による押出動作。
■ひも通し棒(25b)を走行レール(22)上でアゼ
取り位置まで移動。
0■と同じ。
[株]■と同じ。
■くし状スクリーン(13)上下移動装置I(31)を
作動させ、中間位置に戻す。
[相]ひも通し捧(25a) (25b)先端のひも通
し穴(31a)(32a)にひも供結機(26o) (
26b)でアゼひもを通す。
■ひも通し捧(25g) (25b)を引き抜く、シリ
ンダ(30a) (30b)による引抜動作。
[株]ひも供結機(26a) (26b)によりひも通
し捧(25a)(25b)で引き出されたひもを切断す
る。
@l!!経機を作動させ、ひもをひも接続機(27a)
(27b)に送る。
[株]ひもをひも接続機(27a) (27b)で接続
する。
[相]ひも通し棒(25a) (25b)を走行レール
(22) (23)上で初期位置に戻す。[Operation] The adze removal work using this device is carried out in the following order. First, the screen (13) is moved upward, and every other thread is divided into upper and lower surfaces depending on the length of the slits. Push out the dividing rod (24) with a cylinder, move it to the vicinity of the string passing rods (25a) (25b) on the running rail, and insert one string passing rod (2Sa) between the vertically divided series. Push it out with a cylinder, move it on a running rail to the position of the string tying machine (26b), and pass the string passed through the string passing hole (31a) through the series as the cylinder returns.Next, the comb-shaped screen ( 13) downward to open the series upside down, insert the dividing rod (24) again, move it to the mesh (15) position, and push out the string threading rod (25b) on the opposite side with the cylinder. Then, do the same operation as the previous string threading rod (25a), and when the two string threading rods (25a) and (25b) approach each other, insert the two strings passed between the lines that intersect each other, one above the other. The strings are cut at both ends using string tying machines (26a) (26b), and the strings are tied to each other using string connecting machines (27a) (27b) to form a ring shape, thereby forming a zebra thread and completing the zeze removal work. It is. (Example) Examples of the present invention will be explained in detail with reference to the drawings below. Fig. 1 is a plan view illustrating the operation of the automatic adze removing device of the present invention, and Fig. 2 is a rope warping machine equipped with the device. FIG. 3 is a side view of the same, and FIG. 4 is a view taken along arrow A-A in FIG. 3. As is clear from FIGS. 2 to 4, the rope warping machine It consists of three devices: a yarn supply device (1), an automatic adze removal device (2), and a rope winding device a (3). ) and yarn breakage detection sensors (6) for each supply system.The rope winding device a (3) after warping also has a traverser (7).
This is a conventional device configured with a take-up roll (10) that is thickened and wound on two parallel drive rolls (8) and (9). The feature of the present invention lies in the automation of removal of adhesion, and this automatic adhesion removal device M (2) first consists of guide rolls (u) (12 )
There is a comb-shaped screen (13).The comb-shaped screen (13) has long and short slits that pass through the threads.The comb-shaped screen (13) is supported by a guide groove on the south side so that it can move up and down, and an air cylinder (14 ) is provided with a vertical movement device. Next, there is a mesh (15) through which one thread is passed, and at horizontal movement intervals, tension rollers (16) (17)
(18), dancer roller (19), guide roller (
2o) are arranged in a substantially planar manner, and a grooved guide roller (21) is provided at the upper position in the reverse direction from here, and the planar series are assembled into a rope shape and sent to the rope winding device (3). It will be done. The process of removing the lint by passing the lint thread through the yarn at predetermined intervals is performed in this manner, and in the present invention, in order to automatically remove the lint, a device having the structure shown below is used. That is,
With respect to the comb-shaped screen (13) and the running rails (22) and (23) arranged on both sides of the warp surface behind it, there are rods (2
4) and the string passing rods (25a) (25b), and the string connecting machine (26a) at the end of the movement of the string passing rods.
(26b) and string connectors (27a) (27b). There is a mesh (15) behind the comb-shaped screen (13), and the comb-shaped screen (13) and the mesh (15) align the series on one plane and advance. A dividing rod (24) between the comb-shaped screen (13) and the mesh (15) is arranged on the running rail (23) so as to move in and out of the yarn surface by a slide cylinder (29) and move back and forth. Also in front of Metush (15) is the running rail (2).
3) moves back and forth and slide cylinder (30a)
A string passing rod (25a) that goes in and out of the thread surface is arranged. A string threading rod (25b) is also supported by a slide cylinder (30b) at a position opposite to this string threading rod (25a) across the thread surface, and is arranged to move in the same way as the string threading rod (25a). It is. The operation of the automatic adhesion remover having the above structure will be explained with reference to FIG. 1. The operation order is shown below from 1 to 0, which are indicated by the same reference numerals in FIG. ■Activate the vertical moving device (14) of the comb-shaped screen (13) to separate the yarn into upper and lower parts. Cylinder upward movement of the vertical movement device (14). Place the 0 division stick (24) in your eye for minutes. Cylinder (29)
extrusion action. 0 minutes is when the rod (24) and cylinder (29) are running on the rail (23).
) and move to the front of Metush (15). ■Place the string rod (25a) in the eye. Cylinder(
Extrusion operation according to 30a). ■Move the string rod (25a) on the running rail (23) to the adze removal position. At 0 minutes, pull out the rod (24). Pulling operation by cylinder (29). 0 minutes is when the rod (24) and cylinder (29) are running on the rail (23).
) to move to the initial position. ■Comb-shaped screen (13) vertical movement device I! (14)
Activate to separate the thread into upper and lower parts. Vertical movement device (14)
Move up the cylinder. Same as ■■. Same as 0■. ■Place the cord-through offering (25b) in your eyes. Cylinder(
Extrusion operation according to 30b). ■Move the string rod (25b) on the running rail (22) to the adze removal position. Same as 0■. [Stock] Same as ■. (2) Operate the comb-shaped screen (13) vertical moving device I (31) to return it to the intermediate position. [Phase] String threading hole (25a) (25b) Attach the string connecting machine (26o) to the string passing hole (31a) (32a) at the tip (
Pass the adze string through 26b). ■Pull-out operation using cylinders (30a) (30b) to pull out string threader (25g) (25b). Cut the string pulled out by the string threaders (25a) and (25b) using the string connecting machines (26a and 26b). @l! ! Operate the warping machine and connect the string to the string (27a)
(27b). [Co., Ltd.] Connect the string with the string connecting machine (27a) (27b). [Phase] Return the string rods (25a) (25b) to their initial positions on the traveling rails (22) (23).
本発明のアゼ取り装置の構成によって、人手によること
なく、自動的にアゼ取り作業を実施することを可能にし
た。その結果、整経綿糸ロープ1セツト(平均約550
0 m )の巻取り時間が約90分から約70分に短縮
され、作業員は1台1名であったのが1名で3〜4台の
運転が可能となり、生産性向上に大きく貢献することに
なったのである。The structure of the adze removing device of the present invention makes it possible to automatically perform adze removal work without manual intervention. As a result, one set of warped cotton yarn rope (about 550 warps on average)
0 m) winding time has been shortened from about 90 minutes to about 70 minutes, and one worker can now operate 3 to 4 machines instead of one worker per machine, greatly contributing to improved productivity. That's what happened.
第1図は本発明の自動アゼ取り装置の作動説明平面図で
あり、第2rxIは本装置を装着したロープ整経機の全
体平面図である。第3図は同側面図であり、第4図は第
3図のA−A矢視図である。
(1) [糸供給装置 (2)自動アゼ取り装置(
3)ロープ巻取装置 (13)<L状スクリーン(1
5)メツシュ (22) (23)走行レール
(24)分は棒 (25a) (25b3ひも
通し棒(26a) (26b)ひも供給49 (27a
)(27b)ひも接続様以上FIG. 1 is a plan view illustrating the operation of the automatic grain removal device of the present invention, and 2rxI is an overall plan view of a rope warping machine equipped with the device. 3 is a side view of the same, and FIG. 4 is a view taken along the line A--A in FIG. 3. (1) [Yarn supply device (2) Automatic adhesion removing device (
3) Rope winding device (13) < L-shaped screen (1
5) Mesh (22) (23) Rod for running rail (24) (25a) (25b3 String passing rod (26a) (26b) String supply 49 (27a
) (27b) For string connection and above
Claims (1)
状スクリーンで整経した糸の一本おき交互にアゼ糸を通
した状態でロープ状に引き揃えて巻取るロープ整経機に
おいて、スリット長が長短の繰返しであり全体が上下動
するくし状スクリーン(13)と、その後方整経糸面の
両脇に配置した走行レール(22)(23)に対してそ
れぞれ片方から整経糸面に対して出入する分け棒(24
)及びひも通し棒(25a)(25b)と、該ひも通し
棒の移動終端に対してひも供結機(26a)(26b)
とひも接続機(27a)(27b)を設けてなることを
特徴とするロープ整経機における自動アゼ取り装置。1. In a rope warping machine, a predetermined number of threads are supplied from a large number of raw thread reels, and the warped threads are passed through a comb-like screen, and then the threads are alternately passed through every other thread, and then drawn and wound into a rope shape. The comb-shaped screen (13), whose slit length is repeated long and short, and which moves up and down as a whole, and the running rails (22) and (23) placed on both sides of the warp surface behind it, Dividing rod that goes in and out (24
) and string passing rods (25a) (25b), and string connecting machines (26a) (26b) for the moving ends of the string passing rods.
An automatic adze removal device for a rope warping machine, characterized in that it is provided with string connectors (27a) and (27b).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP13332889A JPH03832A (en) | 1989-05-27 | 1989-05-27 | Automatic apparatus for rib stitching in rope warper |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP13332889A JPH03832A (en) | 1989-05-27 | 1989-05-27 | Automatic apparatus for rib stitching in rope warper |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH03832A true JPH03832A (en) | 1991-01-07 |
Family
ID=15102146
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP13332889A Pending JPH03832A (en) | 1989-05-27 | 1989-05-27 | Automatic apparatus for rib stitching in rope warper |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH03832A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH06200441A (en) * | 1992-12-28 | 1994-07-19 | Sakamoto Denimu Kk | Automatic rib remover for warping |
| JP2010106426A (en) * | 2008-10-29 | 2010-05-13 | Karl Mayer Textil Mas Fab Gmbh | Apparatus for producing take-up body of yarn rope |
-
1989
- 1989-05-27 JP JP13332889A patent/JPH03832A/en active Pending
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH06200441A (en) * | 1992-12-28 | 1994-07-19 | Sakamoto Denimu Kk | Automatic rib remover for warping |
| JP2010106426A (en) * | 2008-10-29 | 2010-05-13 | Karl Mayer Textil Mas Fab Gmbh | Apparatus for producing take-up body of yarn rope |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US2890579A (en) | Textile material and manufacture | |
| US4581794A (en) | Automatic seaming machine for fabric belts | |
| EP0236601B1 (en) | Automatic seaming machine for fabric belts | |
| US3030786A (en) | Textile material and manufacture | |
| JPH03227434A (en) | Method and machine for automatic drawing | |
| US4118842A (en) | Weave-de-weave process | |
| ITFI990118A1 (en) | ELECTRONICALLY CONTROLLED SAMPLES ORDER | |
| CN114645359B (en) | Raw materials warping device for textile processing | |
| JP2744837B2 (en) | Partial warping machine and its operation method | |
| CN219930375U (en) | Warping machine for spinning | |
| US3161941A (en) | Method of uniting warps | |
| US5079811A (en) | Method and apparatus for feeding thread pneumatically in drawing-in | |
| US4098203A (en) | Advancing of a textile cloth on an embroidery machine | |
| CN212000063U (en) | Warp stop motion of sectional warper | |
| US2552680A (en) | Method and apparatus for producing twisted yarn-like structures | |
| US5421372A (en) | Method and apparatus for weaving articles on a loom in a plurality of widths | |
| US3407764A (en) | Sewing method and linear punching multi-needle machine therefor | |
| US4091512A (en) | Deweaving apparatus for textile tapes | |
| CN204265927U (en) | A kind of water jet looms waste selvage yarn bobbin cradle | |
| US2446544A (en) | Method of and apparatus for operating upon warps | |
| USRE25749E (en) | Textile material and manufacture | |
| CN218812425U (en) | Yarn rack for textile fabrics | |
| US2143230A (en) | Production of textile threads | |
| CN223660324U (en) | Knitting fabric warping machine pay-off frame | |
| CN110846814A (en) | Full-automatic dust-pushing film sewing machine |