JPH0410268Y2 - - Google Patents

Info

Publication number
JPH0410268Y2
JPH0410268Y2 JP1986186325U JP18632586U JPH0410268Y2 JP H0410268 Y2 JPH0410268 Y2 JP H0410268Y2 JP 1986186325 U JP1986186325 U JP 1986186325U JP 18632586 U JP18632586 U JP 18632586U JP H0410268 Y2 JPH0410268 Y2 JP H0410268Y2
Authority
JP
Japan
Prior art keywords
lining plate
plate
tunnel
lining
waterway tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP1986186325U
Other languages
Japanese (ja)
Other versions
JPS6391527U (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP1986186325U priority Critical patent/JPH0410268Y2/ja
Publication of JPS6391527U publication Critical patent/JPS6391527U/ja
Application granted granted Critical
Publication of JPH0410268Y2 publication Critical patent/JPH0410268Y2/ja
Expired legal-status Critical Current

Links

Classifications

    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00—Energy generation through renewable energy sources
    • Y02E10/20—Hydro energy

Description

【考案の詳細な説明】 「産業上の利用分野」 本考案は、水力発電施設などにおける水路トン
ネルの補修に用いられて水路を覆行するライニン
グプレートの接合構造に関する。
[Detailed Description of the Invention] "Industrial Application Field" The present invention relates to a joining structure for lining plates that cover waterways and are used for repairing waterway tunnels in hydroelectric power generation facilities and the like.

「従来の技術」 河川の水を利用して発電機のタービンを回転さ
せ発電を行う水力発電は、火力発電や原子力発電
などに比較して燃料費が不要であつて公害発生の
おそれのないクリーンな発電方式であり、運転コ
ストも低廉であるなどの利点がある。
``Conventional technology'' Hydroelectric power generation, which uses river water to rotate a generator's turbine to generate electricity, requires no fuel costs and is clean and free from pollution compared to thermal or nuclear power generation. It is a powerful power generation method and has advantages such as low operating costs.

前記水力発電施設の中でも、水路トンネル(導
入水管)式水力発電施設は、立地条件上、ダム位
置と水圧管と発電機を離れた場所に建設する形式
の施設であつてダム直下型の施設より地形を有利
に活用できる利点がある。
Among the above-mentioned hydroelectric power generation facilities, water tunnel (introduced water pipe) type hydroelectric power generation facilities are facilities in which the dam location, penstock, and generator are constructed at a separate location due to location conditions, and are more expensive than facilities directly under the dam. It has the advantage of being able to take advantage of the terrain.

第8図は、この種の水路トンネル式水力発電施
設の一構造例を示すものである。この水力発電施
設は、ダム1で造られた貯水池2の水をダム1の
取水口3から水路トンネル4に導いてサージタン
ク5に貯水し、このサージタンク5から水圧管6
を通して水を落下させて発電機7のタービンを回
転させ、発電を行う施設である。
FIG. 8 shows an example of the structure of this type of water tunnel type hydroelectric power generation facility. In this hydroelectric power generation facility, water from a reservoir 2 created in a dam 1 is guided from a water intake 3 of the dam 1 to a waterway tunnel 4 and stored in a surge tank 5, and from this surge tank 5 to a penstock 6.
This is a facility that generates electricity by letting water fall through it to rotate the turbine of the generator 7.

ところで、近年、前記水路トンネル式水力発電
施設においては、水路トンネル4の浸食が大きな
問題となつてきている。この浸食は、水路トンネ
ル4の内部を水とともに砂や砂利等が流動するた
めに、水路トンネル4の底部などが経年的に削り
取られて生じる現象である。
Incidentally, in recent years, erosion of the waterway tunnel 4 has become a major problem in the waterway tunnel type hydroelectric power generation facility. This erosion is a phenomenon that occurs when the bottom of the waterway tunnel 4 is scraped away over time because sand, gravel, and the like flow together with water inside the waterway tunnel 4 .

そこで近年、前記水路トンネル式の水力発電施
設にあつては水路トンネルの内部補修工事を行う
必要に迫られてきている。この補修工事を行うに
あたつては、発電を休止し、トンネル内の水を排
除するので、その施工をトンネルの内側から簡単
かつ迅速に行う必要があることは勿論、トンネル
内部の強固な補強が要求されるが、現在のとこ
ろ、このような施工については、有効かつ適切な
ものが提供されていないのが実状である。
Therefore, in recent years, it has become necessary to perform internal repair work on the water tunnel type hydroelectric power generation facilities. In carrying out this repair work, power generation will be suspended and water in the tunnel will be removed, so it is necessary to carry out the work easily and quickly from inside the tunnel, as well as to ensure strong reinforcement of the inside of the tunnel. However, at present, there is no effective and appropriate method available for such construction.

そこで本考案者等は、このような要求に応える
べく水路トンネルの内部補修工事について、鋭意
研究を重ねた結果、第9図に示すように、水路ト
ンネルの内面に沿つて一定の曲率で湾曲形成され
た円弧板状の鋼製ライニングプレート8を用意
し、これらライニングプレート8を複数、筒状に
なるように接合して順次水路トンネルの軸方向
(トンネルの長さ方向)に組み付け、次いで前記
ライニングプレート8…と水路トンネルの内壁面
との間にモルタル等の充填材を注入固化するとい
つた補修方法を提案した。
In order to meet these demands, the inventors of the present invention have conducted extensive research on internal repair work for waterway tunnels, and as a result, as shown in Fig. A plurality of these lining plates 8 are joined to form a cylindrical shape and sequentially assembled in the axial direction of the waterway tunnel (tunnel length direction). A repair method was proposed in which filler such as mortar was injected and solidified between the plate 8 and the inner wall surface of the waterway tunnel.

「考案が解決しようとする問題点」 ところが、前記補修方法において問題となるの
は、水路トンネル内で行うライニングプレート8
の設置である。即ち、水路トンネルを補修するた
めには、水路トンネルの内部側から総てのライニ
ングプレート8を筒状になるように接合する必要
があるが、円弧板状のライニングプレート8をト
ンネル内壁面に沿わせ、トンネルの周方向に沿つ
て筒状になるように接合していつた場合、第9図
に示すように、最後に据え付けるべきライニング
プレート8′を既設のライニングプレート8,8
の間に嵌め込もうとしてもライニングプレート
8′の端部が他のライニングプレート8の端部に
接触するために嵌め込みができない問題を生じる
のである。なおここで、最後に設置するライニン
グプレート8′の大きさを隣接する他のライニン
グプレート8,8よりかなり小さく形成するなら
ば、ライニングプレート8′の嵌め込みが可能と
なるが、この場合はライニングプレート8,8′
間の継目部分が大きくなつて、継目部分の完全な
接合が困難となり、継目部分での強度低下や止水
性低下のおそれを生じる問題がある。
``Problem that the invention seeks to solve'' However, the problem with the above repair method is that the lining plate 8 is carried out inside the waterway tunnel.
This is the installation. That is, in order to repair a waterway tunnel, it is necessary to join all the lining plates 8 from the inside of the waterway tunnel so that they form a cylindrical shape. When the lining plate 8' to be installed last is connected to the existing lining plates 8, 8, as shown in FIG.
Even if an attempt is made to fit the two lining plates 8' in between, the end of the lining plate 8' comes into contact with the end of another lining plate 8, resulting in a problem that the fitting cannot be done. Here, if the size of the lining plate 8' to be installed last is formed to be considerably smaller than the other adjacent lining plates 8, 8, it becomes possible to fit the lining plate 8', but in this case, the lining plate 8'8,8'
There is a problem in that as the joint portion between the two becomes larger, it becomes difficult to completely join the joint portion, which may lead to a decrease in strength and water-stopping properties at the joint portion.

本考案は前記事情に鑑みてなされたもので、円
弧状のライニングプレートを水路トンネルの周方
向に接合して水路トンネルの内壁面を補修する場
合、ライニングプレートを水路トンネルの内部側
から接合することができるとともに、接合部分の
接合強度が十分高く、施工性に優れた補修用ライ
ニングプレートの接合構造の提供を目的とする。
The present invention was developed in view of the above circumstances, and when repairing the inner wall surface of a waterway tunnel by joining arc-shaped lining plates in the circumferential direction of the waterway tunnel, it is necessary to join the lining plates from the inside of the waterway tunnel. The purpose of the present invention is to provide a joint structure for a repair lining plate which has a sufficiently high joint strength at the joint part and is excellent in workability.

「問題点を解決するための手段」 本考案は、前記背景に基いてなされたもので、
水路トンネルの内部で接合されるライニングプレ
ートの接合構造であつて、前記複数のライニング
プレートのうち、少なくとも1つのライニングプ
レートの端辺部外周側であつて、水路トンネルの
周方向に隣接する他のライニングプレートと接合
される端辺部に切欠部を形成し、この切欠部の先
端側とこの先端側に対向される他のライニングプ
レートの端片部に凹溝を形成し、前記凹溝を対向
させて水路トンネル内に設置されたライニングプ
レートどうしを、前記双方の凹溝にわたつて挿入
したキープレートにより接続してなるものであ
る。
"Means for solving problems" The present invention was made based on the above background,
A joining structure of lining plates joined inside a waterway tunnel, wherein the outer peripheral side of at least one lining plate among the plurality of lining plates is adjacent to the other lining plate in the circumferential direction of the waterway tunnel. A notch is formed in the end portion to be joined to the lining plate, a groove is formed in the tip side of this notch and the end piece of another lining plate opposite to this tip side, and the groove is placed opposite The lining plates installed in the waterway tunnel are connected to each other by a key plate inserted across both of the grooves.

「作用」 ライニングプレートの端辺部に形成した切欠部
がライニングプレートの装着時に他のライニング
プレートの端部との接触を回避させて水路トンネ
ル内部側からのライニングプレートの装着を可能
にする。また、対向するライニングプレートの凹
溝にわたつてキープレートを挿入することにより
ライニングプレートどうしを隙間なく接合するこ
とができる。
"Function" The notch formed at the end of the lining plate avoids contact with the end of another lining plate when the lining plate is installed, and allows the lining plate to be installed from inside the waterway tunnel. Further, by inserting the key plate across the grooves of the opposing lining plates, the lining plates can be joined without any gaps.

「実施例」 以下、本考案の一実施例の接合構造について、
ライニングプレートを用いた水路トンネルの補修
工事に従つて第1図ないし第7図を参照して説明
する。
“Example” Below, the joining structure of an example of the present invention will be described.
Repair work for waterway tunnels using lining plates will be explained with reference to FIGS. 1 to 7.

水路トンネルTに設置されるライニングプレー
トには、水路トンネルTの下半部に設置される下
部ライニングプレート20と、水路トンネルTの
上半部に設置され、本考案に係る上部ライニング
プレート30の2種類のライニングプレートがあ
る。
The lining plates installed in the waterway tunnel T include a lower lining plate 20 installed in the lower half of the waterway tunnel T, and an upper lining plate 30 installed in the upper half of the waterway tunnel T and according to the present invention. There are different types of lining plates.

まず、下部ライニングプレート20の基本構造
を説明すると、下部ライニングプレート20は、
第3図と第4図に示すように、長方形状の端板2
1と、円弧板状の側板22とを溶接して組み立て
た本体に、本体の内周側を覆うスキンプレート2
0aを溶接してなる基本構造となつており、全体
としてトンネル内面に沿つて一定の曲率で湾曲形
成された円弧板状をなしている。また、ライニン
グプレート20の側板22には、ライニングプレ
ート20を軸方向に連結する長ボルト23(第4
図参照)を通すための透孔24が各ライニングプ
レート20の上下両側に位置してそれぞれ形成さ
れる一方、下部ライニングプレート20のスキン
プレート20aには、この下部ライニングプレー
ト20を後述する台車D2を用いて吊り支持する
際に使用される袋ナツト29(第3図参照)が設
けられている。
First, to explain the basic structure of the lower lining plate 20, the lower lining plate 20 is as follows:
As shown in FIGS. 3 and 4, a rectangular end plate 2
A skin plate 2 that covers the inner circumferential side of the main body is attached to the main body assembled by welding 1 and an arc plate-shaped side plate 22.
The basic structure is made by welding 0a, and the overall shape is an arcuate plate that is curved at a constant curvature along the tunnel inner surface. Further, on the side plate 22 of the lining plate 20, a long bolt 23 (a fourth
Through-holes 24 (see figure) are formed at the upper and lower sides of each lining plate 20, respectively, and the skin plate 20a of the lower lining plate 20 is provided with a dolly D 2 (to be described later) of the lower lining plate 20. A cap nut 29 (see FIG. 3) is provided for use in suspending and supporting the device.

一方、本考案に係る上部ライニングプレート3
0の基本構造は前記下部ライニングプレート20
と同等の構造であり、側板32とスキンプレート
30aを具備して構成されている。なおここで、
上部ライニングプレート30の詳細構造を説明す
る前に、下部ライニングプレート20の据え付け
について説明する。
On the other hand, the upper lining plate 3 according to the present invention
The basic structure of 0 is the lower lining plate 20.
It has the same structure as the one shown in FIG. 1, and includes a side plate 32 and a skin plate 30a. Furthermore, here,
Before explaining the detailed structure of the upper lining plate 30, the installation of the lower lining plate 20 will be explained.

第2図は、前記構造のライニングプレート20
の据え付け設置手順を示す工程図であり、同図に
より、ライニングプレート20の設置要領を簡単
に説明すると、まず、下部ライニングプレート2
0は、水路トンネルT内の作業現場まで、ライニ
ングプレート運搬用台車D1によつて運ばれ、次
いでエレクター装置付き台車D2によつて水路ト
ンネルTの下半部に据え付けられる。
FIG. 2 shows a lining plate 20 of the above structure.
2 is a process diagram showing the installation procedure of the lower lining plate 20. Using the figure, the installation procedure of the lining plate 20 will be briefly explained. First, the lower lining plate 2
0 is transported to the work site in the waterway tunnel T by a lining plate transporting trolley D 1 and then installed in the lower half of the waterway tunnel T by a trolley D 2 equipped with an erector device.

そしてエレクター装置付き台車D2によつて据
え付けられた下部ライニングプレート20は、水
路トンネルTの長さ方向に連結されながら、コン
クリートポンプPを介して前記下部ライニングプ
レート20と水路トンネルTの内壁面との間に充
填された充填材Gにより一体化され、これにより
水路トンネルTの下半部に強固に固定される。
The lower lining plate 20 installed by the cart D 2 with the erector device is connected in the length direction of the waterway tunnel T, and is connected to the lower lining plate 20 and the inner wall surface of the waterway tunnel T via the concrete pump P. They are integrated by the filler G filled between them, and are thereby firmly fixed to the lower half of the waterway tunnel T.

一方、充填材Gは、コンクリートバケツト台車
D3によつてコンクリートポンプPまで運ばれ、
コンクリートポンプPから注入パイプKを通して
送出される。
On the other hand, the filler G is a concrete bucket truck.
It is carried by D 3 to the concrete pump P,
It is delivered from the concrete pump P through the injection pipe K.

なお、前記各台車D1,D2,D3は、それぞれ水
路トンネルTに設置された下部ライニングプレー
ト20をレールとして走行し、台車に備え付けら
れた駆動モータ等によつて移動する。
Each of the bogies D 1 , D 2 , and D 3 runs on a lower lining plate 20 installed in the waterway tunnel T as a rail, and is moved by a drive motor or the like provided on the bogie.

ここで更に、下部ライニングプレート20の据
え付け作業について詳述する。
Here, the installation work of the lower lining plate 20 will be further explained in detail.

まず、下部ライニングプレート20を固定する
には、第3図などに示すように、トンネル内周壁
の底部および内周壁の左右側部にそれぞれ、削岩
機のビツト等によりドリル孔10を穿孔し、これ
らドリル孔10にアンカー金具11を定着する。
このアンカー金具11は、ねじ穴を有する筒体か
らなり、その取付位置および個数は、下部ライニ
ングプレート20の大きさにもよるが、例えば、
第3図に示すように水路トンネルTの底部と両側
部内面であつて、ライニングプレート20の幅方
向両側(トンネルTの長さ方向両側)の各々に位
置するように定着する、そして水路トンネルTの
底部のアンカー金具11にねじ軸を有する支持金
具12を、また、水路トンネルTの両側部側のア
ンカー金具11,11にライニングプレート20
を係止するためのクリツプ金具17を螺合する。
First, in order to fix the lower lining plate 20, as shown in FIG. 3, drill holes 10 are drilled at the bottom of the inner peripheral wall of the tunnel and on the left and right sides of the inner peripheral wall using a rock drill bit or the like. Anchor fittings 11 are fixed in these drill holes 10.
This anchor fitting 11 is made of a cylindrical body having a screw hole, and the mounting position and number of the anchor fittings 11 depend on the size of the lower lining plate 20, but for example,
As shown in FIG. 3, it is fixed at the bottom and inner surfaces of both sides of the waterway tunnel T, and is located on both sides of the lining plate 20 in the width direction (both sides in the length direction of the tunnel T). A support fitting 12 having a threaded shaft is attached to the anchor fitting 11 at the bottom of the waterway tunnel T, and a lining plate 20 is attached to the anchor fittings 11, 11 on both sides of the waterway tunnel T.
A clip fitting 17 for locking is screwed together.

次に、下部ライニングプレート20を前記水路
トンネル底部の支持金具12…に載置するととも
に、下部ライニングプレート20の側部を水路ト
ンネル両側部のクリツプ金具17に係止して下部
ライニングプレート20を水路トンネルTの下半
部に第3図に示すように固定する。なお、下部ラ
イニングプレート20の高さ調節は支持金具12
のアンカー金具11に対するねじ込み長さの調節
によつて行うことができ、横方向の位置調節は、
クリツプ金具17のアンカー金具11に対するね
じ込み長さを調節して行えば良い。従つて下部ラ
イニングプレート20を水路トンネルTの下半部
に精度良く固定することができる。
Next, the lower lining plate 20 is placed on the support fittings 12 at the bottom of the waterway tunnel, and the sides of the lower lining plate 20 are locked to the clip fittings 17 on both sides of the waterway tunnel to attach the lower lining plate 20 to the waterway tunnel. It is fixed to the lower half of the tunnel T as shown in FIG. The height of the lower lining plate 20 can be adjusted using the support fittings 12.
This can be done by adjusting the length of the screw into the anchor fitting 11, and the lateral position adjustment is as follows:
This can be done by adjusting the screwing length of the clip fitting 17 into the anchor fitting 11. Therefore, the lower lining plate 20 can be fixed to the lower half of the waterway tunnel T with high precision.

続いて先に固定した下部ライニングプレート2
0の側方に同様の手順によつて他の下部ライニン
グプレート20を設置し、隣接する下部ライニン
グプレート20,20どうしを第4図に示すよう
に接合する。
Next, lower lining plate 2 fixed earlier
Another lower lining plate 20 is installed on the side of 0 by the same procedure, and the adjacent lower lining plates 20, 20 are joined as shown in FIG.

なお、下部ライニングプレート20の据え付け
作業は、チエーンブロツク等の吊り上げ装置を用
いても良いが、後述するエレクター装置40付き
台車D2により行えば、作業能率を向上すること
ができる。
Although the lower lining plate 20 may be installed using a lifting device such as a chain block, the work efficiency can be improved by using a cart D2 equipped with an erector device 40, which will be described later.

前記エレクター装置40付き台車D2は、第5
図と第6図に示すように、水路トンネルTの下半
部に設置されたライニングプレート20の上縁部
をレールとして走行する台車Dと、この台車Dに
設置された基台41に横回動自在に支持されたタ
ーンテーブル42と、このターンテーブル42に
縦回動自在に支持されたブーム43と、このブー
ム43を上下に回動させる駆動手段44と、前記
ブーム43の先端に設けられてライニングプレー
トを保持する保持手段45とを主体として構成さ
れ、ブーム43の先端に設けられたスイツチ46
によつて駆動手段44を作動できるようになつて
いる。
The trolley D 2 with the erector device 40 is the fifth
As shown in the figure and FIG. 6, there is a bogie D that runs on the upper edge of the lining plate 20 installed in the lower half of the waterway tunnel T as a rail, and a base 41 installed on this bogie D that runs horizontally. A turntable 42 is movably supported, a boom 43 is vertically rotatably supported by the turntable 42, a driving means 44 is provided for vertically rotating the boom 43, and a drive means 44 is provided at the tip of the boom 43. a switch 46 provided at the tip of the boom 43;
The drive means 44 can be actuated by.

また、前記駆動手段44は、ターンテーブル4
2に立設されたアーム47の巻掛けプーリ48を
介してブーム43の先端のブラケツト49に留め
られた懸垂ワイヤ50と、この懸垂ワイヤ50を
巻き取る巻取ドラム51と、この巻取ドラム51
を回転駆動する駆動モータ52とから構成されて
いる。
Further, the driving means 44 includes the turntable 4
2, a suspension wire 50 fastened to a bracket 49 at the tip of the boom 43 via a winding pulley 48 of an arm 47 installed upright; a winding drum 51 for winding the suspension wire 50;
and a drive motor 52 that rotationally drives the.

前記ライニングプレート20を保持する保持手
段45は、第6図に示すように、ブーム43の先
端に回転軸53を介して回転自在に支持された回
転ブラケツト54と、この回転ブラケツト54の
間にヒンジピン55を介して回動自在に設けられ
た筒体56と、この筒体56に挿入されてライニ
ングプレートの袋ナツト29に螺合される固定ボ
ルト57とから構成されている。
As shown in FIG. 6, the holding means 45 for holding the lining plate 20 includes a rotating bracket 54 rotatably supported at the tip of the boom 43 via a rotating shaft 53, and a hinge pin between the rotating bracket 54. 55, and a fixing bolt 57 which is inserted into the cylinder 56 and screwed into the cap nut 29 of the lining plate.

しかして前記構成のエレクター装置40は、下
部ライニングプレート20の袋ナツト29にブー
ム43の先端の固定ボルト57を螺合して下部ラ
イニングプレート20を吊り支持するとともに、
ブーム43の先端のスイツチ操作によりブーム4
3を回動操作して下部ライニングプレート20を
3次元方向に移動することによりその位置決めを
行う。
Thus, the erector device 40 configured as described above suspends and supports the lower lining plate 20 by screwing the fixing bolt 57 at the tip of the boom 43 into the cap nut 29 of the lower lining plate 20.
Boom 4 is activated by operating the switch at the tip of boom 43.
3 to move the lower lining plate 20 in three-dimensional directions to position it.

ここで、下部ライニングプレート20を水路ト
ンネルTの長さ方向に連結するには、予め第4図
に示すようにライニングプレート連結用の長ボル
ト23を上部ライニングプレート20の透孔24
に挿通し、ライニングプレート20を水路トンネ
ルTの長さ方向に連結可能な状態としておき、ラ
イニングプレート20を据え付けた後に、長ボル
ト23を透孔24に挿通し、その後長ナツト28
をねじ込んでおく。そして長ボルト23に長ナツ
ト28を締め付ければ良い。なお、水路トンネル
Tの長さ方向に沿う下部ライニングプレート2
0,20の接合構造は、下部ライニングプレート
20を水路トンネルTの長さ方向に接合できる構
造であれば、前記例に限るものではなくその他の
構造を用いても良い。
Here, in order to connect the lower lining plate 20 in the length direction of the waterway tunnel T, as shown in FIG.
After the lining plate 20 is installed, the long bolt 23 is inserted into the through hole 24, and then the long nut 28 is inserted into the through hole 24.
Screw it in. Then, simply tighten the long nut 28 onto the long bolt 23. In addition, the lower lining plate 2 along the length direction of the waterway tunnel T
The joining structure of Nos. 0 and 20 is not limited to the above example, and other structures may be used as long as the lower lining plate 20 can be joined in the length direction of the waterway tunnel T.

次いで、前記下部ライニングプレート20…を
固定した後に、これらのライニングプレート20
と水路トンネルTの内周壁との間にこれらを一体
化するコンクリート等の充填材Gを注入充填す
る。この充填作業は、コンクリートポンプPのコ
ンクリート吐出管Kを下部ライニングプレート2
0とトンネル内周壁との隙間に差し込み、コンク
リートポンプPを作動させることによつて行う。
Next, after fixing the lower lining plates 20..., these lining plates 20
A filler G such as concrete is injected between the inner peripheral wall of the waterway tunnel T and the inner peripheral wall of the waterway tunnel T to integrate them. In this filling operation, the concrete discharge pipe K of the concrete pump P is connected to the lower lining plate 2.
This is done by inserting it into the gap between the concrete pump P and the inner peripheral wall of the tunnel and activating the concrete pump P.

そして、下部ライニングプレート20の固定作
業と充填材Gの充填作業を連続して行いながら、
覆工部分を前進させ、水路トンネルTの内周壁の
下半部を補修してゆく。この際、補修に伴つて前
進する補修箇所への資材運搬は、下部ライニング
プレート20をトンネルの長さ方向に連結する毎
に構築される半円筒状の構築物の上端縁をレール
として利用し、このレールにより台車D2,D1,
D3を走行させることによつて行う。
Then, while continuously performing the fixing work of the lower lining plate 20 and the filling work with the filler G,
The lining section will be moved forward and the lower half of the inner peripheral wall of the waterway tunnel T will be repaired. At this time, materials are transported to the repaired area as the repair progresses by using the upper edge of the semi-cylindrical structure constructed each time the lower lining plate 20 is connected in the length direction of the tunnel as a rail. Trucks D 2 , D 1 ,
This is done by running D 3 .

このようにして水路トンネルTの下半部の補修
が終了したならば、次に、エレクター装置付き台
車D3を後退させながら水路トンネルTの上半部
を上部ライニングプレート30で補修する作業を
行う。
Once the lower half of the waterway tunnel T has been repaired in this way, the upper half of the waterway tunnel T is repaired using the upper lining plate 30 while moving the erector-equipped cart D 3 backward. .

この上部ライニングプレート30は本考案に係
るものであつて、その基本構造は前述した如く下
部ライニングプレート20と同等であるが、以下
にその詳細構造について説明する。
This upper lining plate 30 is according to the present invention, and its basic structure is the same as that of the lower lining plate 20 as described above, but its detailed structure will be explained below.

上部ライニングプレート30は、2枚でもつて
水路トンネルTの内周面上半部を水路トンネルT
の所定長さにわたつて覆うことができる大きさの
円弧板状に形成されるとともに、その下端部は、
第1図の実線に示すように上部ライニングプレー
ト30を水路トンネルTの内周壁に沿わせた状態
において、その下端部30aを水平にするように
形成され、この下端部30aを既設の下部ライニ
ングプレート20の上端面に面接合できるように
形成されている。また、第1図に示す上部ライニ
ングプレート30の上端部であつて、水路トンネ
ルTの内壁面側(外周側)には切欠部32aが形
成されている。この切欠部32aは上部ライニン
グプレート30の上端部の側板32を斜めに切り
欠いて形成されたものである。なお、切欠部32
aは、下部ライニングプレート20の上端部20
aに第1図の2点鎖線に示すように上部ライニン
グプレート30の下端部を当接させた状態から上
部ライニングプレート30を水路トンネルTの内
壁面に接近させるべく上方に回動させた際に、他
の上部ライニングプレート30の端部との接触を
避ける目的で形成されている。従つて本実施例に
おいては切欠部32aを斜面状に形成している
が、段部状であつても、曲面状であつても良い。
更に、上部ライニングプレート30の上端部であ
つて、水路トンネルTの中央側(内周部側)に
は、隣接する他の上部ライニングプレート30に
向く凹溝32bがスキンプレート30aと側面L
字状の補強材32cに囲まれて形成されている。
また前記上部ライニングプレート30の上部には
充填材Gを充填するための注入孔32dを形成す
る筒体32eが固定されている。
Two upper lining plates 30 cover the upper half of the inner peripheral surface of the waterway tunnel T.
It is formed into an arcuate plate shape large enough to cover a predetermined length of the area, and its lower end is
As shown by the solid line in FIG. 1, when the upper lining plate 30 is placed along the inner circumferential wall of the waterway tunnel T, its lower end 30a is made horizontal, and this lower end 30a is connected to the existing lower lining plate. It is formed so that it can be surface-joined to the upper end surface of 20. Further, a notch 32a is formed at the upper end of the upper lining plate 30 shown in FIG. 1 on the inner wall surface side (outer circumferential side) of the waterway tunnel T. This notch 32a is formed by obliquely cutting out the side plate 32 at the upper end of the upper lining plate 30. Note that the notch 32
a is the upper end 20 of the lower lining plate 20;
When the upper lining plate 30 is rotated upward to approach the inner wall surface of the waterway tunnel T from the state in which the lower end of the upper lining plate 30 is brought into contact with the lower end of the upper lining plate 30 as shown in FIG. , are formed for the purpose of avoiding contact with the ends of other upper lining plates 30. Therefore, in this embodiment, the notch 32a is formed in the shape of a slope, but it may be in the shape of a step or a curved surface.
Further, at the upper end of the upper lining plate 30 and on the center side (inner peripheral side) of the waterway tunnel T, a groove 32b facing the other adjacent upper lining plate 30 is formed between the skin plate 30a and the side surface L.
It is surrounded by a character-shaped reinforcing member 32c.
Furthermore, a cylinder 32e forming an injection hole 32d for filling the filler G is fixed to the upper part of the upper lining plate 30.

前記上部ライニングプレート30で水路トンネ
ルTの上半部の補修を行うには、水路トンネルT
の下半部の補修を行つたエレクター装置付き台車
D2を後退させ、エレクター装置で各上部ライニ
ングプレート30を吊り支持して行う。
In order to repair the upper half of the waterway tunnel T using the upper lining plate 30, the waterway tunnel T
A trolley with an erector device was repaired on the lower half of the
This is done by retracting D 2 and suspending and supporting each upper lining plate 30 using an erector device.

前記上部ライニングプレート30の設置手順
は、まず、上部ライニングプレート30の下端部
を下部ライニングプレート20の上端部20aに
第1図の2点鎖線に示すように突き合わせ、この
突き合わせ部分を支点として上部ライニングプレ
ート30を上方に回動させて行う。ここで、1枚
目の上部ライニングプレート30を設置し、2枚
目の上部ライニングプレート30をその側部側に
設置する場合、1枚目の上部ライニングプレート
30の端部に2枚目の上部ライニングプレート3
0が接触するおそれがあるが、上部ライニングプ
レート30の上端部に切欠部32aがあるため
に、上部ライニングプレート30,30の端部ど
うしを接触させることなくこれらを水路トンネル
の内壁面に沿わせることができる。なお、上部ラ
イニングプレート30の下端面30aを下部ライ
ニングプレート20の上端面に突き合わせたなら
ば、この端面に設けた嵌合孔76に位置決めピン
77を嵌め込んでおく。また、上部ライニングプ
レート30の軸方向の連結は下部ライニングプレ
ート20の場合と同様に長ボルト23と長ナツト
28を用いて行う。
The installation procedure for the upper lining plate 30 is as follows: First, the lower end of the upper lining plate 30 is butted against the upper end 20a of the lower lining plate 20 as shown by the two-dot chain line in FIG. This is done by rotating the plate 30 upward. Here, when installing the first upper lining plate 30 and installing the second upper lining plate 30 on the side thereof, the second upper lining plate 30 is installed at the end of the first upper lining plate 30. Lining plate 3
However, since there is a notch 32a at the upper end of the upper lining plate 30, it is possible to align the ends of the upper lining plates 30 and 30 along the inner wall surface of the waterway tunnel without making them contact each other. be able to. Note that once the lower end surface 30a of the upper lining plate 30 is butted against the upper end surface of the lower lining plate 20, the positioning pin 77 is fitted into the fitting hole 76 provided in this end surface. Further, the upper lining plate 30 is connected in the axial direction using long bolts 23 and long nuts 28, as in the case of the lower lining plate 20.

以上の操作によつて第1図の実線に示すように
上部ライニングプレート30,30を設置したな
らば、板状のキープレート33を上部ライニング
プレート30,30の側方から凹溝32bに挿入
して上部ライニングプレート30,30の継目部
分を覆つておく。このキープレート33は、上部
ライニングプレート30の幅(水路トンネルTの
長さ方向に沿う幅)と同一であつても良く、ま
た、上部ライニングプレート30の幅の数分の一
であつても良い。即ち、上部ライニングプレート
30の幅より短い複数のキープレート33を凹溝
32bに挿入して上部ライニングプレート30,
30を接合しても良く、また、上部ライニングプ
レート30の幅より長いキープレート33を用い
ることより水路トンネルTの長さ方向に設置した
複数の上部ライニングプレート30を一括して接
合するようにしても良い。
After the upper lining plates 30, 30 are installed as shown by the solid line in FIG. 1 through the above operations, insert the plate-shaped key plate 33 into the groove 32b from the side of the upper lining plates 30, 30. to cover the joint portion of the upper lining plates 30, 30. This key plate 33 may be the same width as the upper lining plate 30 (width along the length direction of the waterway tunnel T), or may be a fraction of the width of the upper lining plate 30. . That is, by inserting a plurality of key plates 33 shorter than the width of the upper lining plate 30 into the groove 32b, the upper lining plate 30,
Alternatively, by using a key plate 33 that is longer than the width of the upper lining plate 30, a plurality of upper lining plates 30 installed in the length direction of the waterway tunnel T can be joined at once. Also good.

このようにして所定区間の水路トンネルTの上
半部に上部ライニングプレート30…を設置した
ならば、上部ライニングプレート30…と水路ト
ンネルTの内壁面との間の間隙に、上部ライニン
グプレートTの注入孔32dからコンクリートポ
ンプPを用いて充填材を注入固化する。なおここ
で前記充填材注入時にキープレート33に作用す
る力はアーチアクシヨンによる圧縮力のみとなる
のでキープレート33を設けた継手構造が有効に
作用する。そして、前記充填材の固化によつて上
部ライニングプレート30と水路トンネルTの内
周壁とが一体化され、各上部ライニングプレート
30が強固に固定される。
Once the upper lining plate 30 is installed in the upper half of the waterway tunnel T in a predetermined section in this way, the upper lining plate T is installed in the gap between the upper lining plate 30 and the inner wall surface of the waterway tunnel T. The filler is injected and solidified using the concrete pump P through the injection hole 32d. Here, the force acting on the key plate 33 when injecting the filler is only the compressive force due to the arch action, so the joint structure provided with the key plate 33 acts effectively. Then, by solidifying the filler, the upper lining plate 30 and the inner circumferential wall of the waterway tunnel T are integrated, and each upper lining plate 30 is firmly fixed.

以上の作業によつて水路トンネルTの全内面を
補修することができる。なお、補修後において水
路トンネルTに水を流した場合、キープレート3
3には水圧が作用するが、キープレート33の背
後側には固化した充填材Gがあるために、キープ
レート33を用いて接合した継目部分が十分高い
強度と止水性を発揮する。
Through the above work, the entire inner surface of the waterway tunnel T can be repaired. In addition, if water is poured into the waterway tunnel T after repair, the key plate 3
Although water pressure acts on 3, since there is solidified filler G behind the key plate 33, the joint portion joined using the key plate 33 exhibits sufficiently high strength and water-stopping properties.

ところで本実施例にあつては、上部ライニング
プレート30の総てに切欠部32aを形成した
が、水路トンネルTの周方向に隣接する一対の上
部ライニングプレート30,30のうち、一方の
みに切欠部32aを設けるようにしても差し支え
ない。また本実施例においては、水路トンネルT
の周方向に4つのライニングプレート20,2
0,30,30を設けて水路トンネルTの内面を
覆う構成としたが、5つ以上あるいは2つか3つ
のライニングプレートで水路トンネルを覆う構成
にすることもできる。
Incidentally, in this embodiment, the notches 32a are formed in all of the upper lining plates 30, but the notches are formed in only one of the pair of upper lining plates 30, 30 adjacent in the circumferential direction of the waterway tunnel T. 32a may be provided. In addition, in this embodiment, the waterway tunnel T
Four lining plates 20, 2 in the circumferential direction of
0, 30, and 30 are provided to cover the inner surface of the waterway tunnel T, but it is also possible to have a structure in which the waterway tunnel is covered with five or more lining plates, or two or three lining plates.

「考案の効果」 以上説明したように本考案の構造は、水路トン
ネル補修用のライニングプレートの接続におい
て、水路トンネルTの内壁面に対する設置状態で
他のライニングプレートと隣接するライニングプ
レートの端片部外側に切欠部を設けた構成のため
に、ライニングプレートを水路トンネルの内側か
ら水路トンネルの内壁面に沿わせる場合に、他の
ライニングプレートと接触させることなく沿わせ
ることができる。従つて水路トンネルの内壁面全
周に、その内部側からライニングプレートを据え
付けることが可能になり、水路トンネルの全内周
補修工事を水路トンネルの内側から効率良く実施
できる効果がある。
"Effects of the Invention" As explained above, the structure of the present invention is such that when connecting lining plates for waterway tunnel repair, the end piece of the lining plate adjacent to another lining plate when installed on the inner wall surface of the waterway tunnel T. Because of the configuration in which the notch is provided on the outside, when the lining plate is placed along the inner wall surface of the waterway tunnel from inside the waterway tunnel, it can be placed along the inner wall surface of the waterway tunnel without coming into contact with other lining plates. Therefore, it becomes possible to install the lining plate all around the inner wall surface of the waterway tunnel from the inside side, and there is an effect that the repair work on the entire inner circumference of the waterway tunnel can be carried out efficiently from the inside of the waterway tunnel.

また、ライニングプレートの端辺部内側に形成
した凹溝にライニングプレートの側方からキープ
レートを挿入することによつて隣接するライニン
グプレートの継目部分を隙間なく容易に接続する
ことができる。
Further, by inserting the key plate from the side of the lining plate into the groove formed inside the end side of the lining plate, the joint portions of adjacent lining plates can be easily connected without any gaps.

更に、ライニングプレートどうしの継目部分を
キープレートで隙間なく接続できるために、止水
性の高い接合が可能であり、継目部分の強度も十
分高い構造を得ることができる効果がある。
Furthermore, since the joint portions of the lining plates can be connected without any gaps with the key plate, it is possible to achieve a highly watertight joint, and it is possible to obtain a structure with sufficiently high strength at the joint portions.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本考案の一実施例の断面図、第2図な
いし第7図はライニングプレートを用いて行う水
路トンネルの補修方法を説明するためのもので、
第2図は補修中の水路トンネルを示す縦断面図、
第3図は水路トンネルの底部側に設置された下部
ライニングプレートを示す断面図、第4図は水路
トンネルの長さ方向に沿うライニングプレートの
接合状態を示す側面図、第5図はライニングプレ
ートの搬送用台車を示す側面図、第6図は搬送用
台車のアームの先端部を示す側面図、第7図は水
路トンネル上部のライニングプレートの設置状態
を示す断面図、第8図は水路トンネル式発電施設
の構成図、第9図はライニングプレートの配置状
態を説明するための構成図である。 T……水路トンネル、20……下部ライニング
プレート、30……上部ライニングプレート、3
0a……スキンプレート、32……側板、32a
……切欠部、33……キープレート。
Fig. 1 is a sectional view of an embodiment of the present invention, and Figs. 2 to 7 are for explaining a method of repairing a waterway tunnel using a lining plate.
Figure 2 is a vertical cross-sectional view showing the waterway tunnel under repair.
Figure 3 is a cross-sectional view showing the lower lining plate installed on the bottom side of the waterway tunnel, Figure 4 is a side view showing the joint state of the lining plate along the length direction of the waterway tunnel, and Figure 5 is a cross-sectional view of the lower lining plate installed on the bottom side of the waterway tunnel. Fig. 6 is a side view showing the tip of the arm of the transport cart, Fig. 7 is a sectional view showing the installation state of the lining plate on the upper part of the waterway tunnel, and Fig. 8 is the waterway tunnel type. FIG. 9 is a block diagram of the power generation facility for explaining the arrangement of the lining plates. T... Channel tunnel, 20... Lower lining plate, 30... Upper lining plate, 3
0a...Skin plate, 32...Side plate, 32a
...Notch, 33...Key plate.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 端辺部どうしを接合して水路トンネルの内壁面
に沿つて筒状になるように接合され、水路トンネ
ルの内壁面を覆うために用いられる円弧板状のラ
イニングプレートの接合構造において、水路トン
ネルの周方向に接合されるライニングプレートの
うち、少なくとも1つのライニングプレートの端
辺部の外周部分に切欠部が形成され、ライニング
プレートの端辺部の内周部分には、隣接する他の
ライニングプレートの端辺部に対向する凹溝が形
成される一方、前記凹溝を対向させて水路トンネ
ル内に設置されたライニングプレートどうしが、
前記対向する凹溝にわたつて挿入されたキープレ
ートにより接続されてなることを特徴とする水路
トンネル補修用ライニングプレートの接合構造。
In the joining structure of arc plate-shaped lining plates that are joined at their edges to form a cylindrical shape along the inner wall surface of the waterway tunnel and used to cover the inner wall surface of the waterway tunnel, Among the lining plates to be joined in the circumferential direction, at least one of the lining plates has a notch formed in the outer peripheral part of the end part, and a notch part is formed in the inner peripheral part of the end part of the lining plate. Concave grooves facing each other are formed on the edge portions, and lining plates installed in the waterway tunnel with the grooves facing each other,
A joining structure of lining plates for repairing waterway tunnels, characterized in that they are connected by a key plate inserted across the opposing grooves.
JP1986186325U 1986-12-03 1986-12-03 Expired JPH0410268Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1986186325U JPH0410268Y2 (en) 1986-12-03 1986-12-03

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1986186325U JPH0410268Y2 (en) 1986-12-03 1986-12-03

Publications (2)

Publication Number Publication Date
JPS6391527U JPS6391527U (en) 1988-06-14
JPH0410268Y2 true JPH0410268Y2 (en) 1992-03-13

Family

ID=31135778

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1986186325U Expired JPH0410268Y2 (en) 1986-12-03 1986-12-03

Country Status (1)

Country Link
JP (1) JPH0410268Y2 (en)

Also Published As

Publication number Publication date
JPS6391527U (en) 1988-06-14

Similar Documents

Publication Publication Date Title
CN110924961A (en) Construction method for starting shield tunneling machine to pass through existing station
CN114645721B (en) A highway tunnel combined assembly process and its inverted arch structure and assembly device
CN109137739B (en) Tower anchor-pier anchor combined rapid construction method of self-anchored suspension bridge
CN110748349A (en) A double-split originating method for a small clear distance double-track tunnel shield
CN114922085B (en) A prefabricated tunnel anchor system and construction method
CN119553723A (en) A combined protection device and method for offshore wind power pile foundation
JP2004183273A (en) Tunnel structure
CN213571580U (en) A new type of concrete box girder bridging through-hole equipment
CN210977512U (en) Tunnel secondary lining anticreep is empty vertically to move back tubular area mould slip casting rotary device
JPH0410269Y2 (en)
CN118911069A (en) Construction method of prefabricated wave wall
CN217270196U (en) Quick pressure building device for mud shield starting stage
JPS63118412A (en) Repairing of waterway tunnel
CN114396288A (en) A rapid pressure building device in the initial stage of mud-water shield
CN116290071A (en) An anti-frost heave pile foundation and construction method for photovoltaic support installation in permafrost regions
CN115749811A (en) Novel shield reaction frame structure and construction method thereof
CN118375085A (en) A connection structure and construction method of a new box culvert and an existing road box culvert
CN223549270U (en) Tunnel dissolves chamber shutoff structure
CN111088951B (en) A construction method for foundation structure of a gently sloped inclined well reverse drilling rig
JPS63142196A (en) Method of installing lining plate in repair construction in water channel tunnel
JPH0410267Y2 (en)
CN110159191A (en) The device of wired pipe is excavated under a kind of road surface
CN223657302U (en) A grouting device for treating leakage in underground engineering projects
CN217811173U (en) Prefabricated pin-connected panel piping lane of dry-type connection
CN215804584U (en) Vacuum pouring concrete template for repairing damaged shield structure and damaged duct piece