JPH04136366A - Method for assembling framed scaffold and framed scaffold - Google Patents

Method for assembling framed scaffold and framed scaffold

Info

Publication number
JPH04136366A
JPH04136366A JP25528890A JP25528890A JPH04136366A JP H04136366 A JPH04136366 A JP H04136366A JP 25528890 A JP25528890 A JP 25528890A JP 25528890 A JP25528890 A JP 25528890A JP H04136366 A JPH04136366 A JP H04136366A
Authority
JP
Japan
Prior art keywords
support frame
scaffold
scaffold board
board support
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP25528890A
Other languages
Japanese (ja)
Other versions
JP2724909B2 (en
Inventor
Motomu Sakai
求 酒井
Fumio Sakaki
文夫 榊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Komuten Co Ltd
Original Assignee
Takenaka Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Komuten Co Ltd filed Critical Takenaka Komuten Co Ltd
Priority to JP25528890A priority Critical patent/JP2724909B2/en
Publication of JPH04136366A publication Critical patent/JPH04136366A/en
Application granted granted Critical
Publication of JP2724909B2 publication Critical patent/JP2724909B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

PURPOSE:To facilitate the work of installing a framed scaffold by using a scaffold board support frame and a first scaffold board to form a temporary scaffold, and using. the temporary scaffold for the work of temporarily mounting a steel beam to the beam mounting portion of a steel pole, and using the temporary scaffold and a support frame hanging hook to provide a framed scaffold. CONSTITUTION:Part of the horizontal bar 4a of each of two scaffold board support frames 4 is freely detachably fixed to each of the two opposite faces 1C of a steel pole 1. A first scaffold board 6 is placed between the respective horizontal bars 4a of the two scaffold support frames 4 each of which bars projects from the end face of the steel pole 1 and a support bar 11 comprising an iron pipe is placed. The steel pole 1 is erected and fixed at its end portion to a lower construction body and the hanging member of a hanged scaffold board support frame 5 is freely detachably fixed to the welded support hanging hook 2a of a steel beam 2 and a second scaffold board 7 is placed. The work of installing a temporary scaffold is thereby facilitated.

Description

【発明の詳細な説明】 産業上の利用分野 この出願の発明は、梁取付作業等に使う枠足場、特に、
ボックス型鉄骨柱および鉄骨梁に固定した取付具、吊り
具等を使って組み立てる枠足場の組立法および枠足場に
関する。
[Detailed Description of the Invention] Industrial Application Field The invention of this application relates to a frame scaffolding used for beam installation work, etc.
This article relates to a method for assembling frame scaffolding using fixtures, hanging tools, etc. fixed to box-shaped steel columns and steel beams, and to frame scaffolding.

従来の技術 角形鋼管等のボックス型鉄骨柱を使って建物を建造する
際に、鉄骨柱に小さな梁取付用の支持片を溶接し、この
支持片に鉄骨梁を取付けてから、鉄骨梁の端部と鉄骨柱
とを溶接する場合がある。
Conventional technology When constructing a building using box-shaped steel columns such as square steel pipes, a small support piece for attaching the beam is welded to the steel column, the steel beam is attached to this support piece, and then the end of the steel beam is There are cases where the steel column and the steel column are welded together.

この場合には一般にコラムステージを使って鉄骨柱への
鉄骨梁の取付作業等を行っている。
In this case, a column stage is generally used to attach the steel beam to the steel column.

発明が解決しようとする課題 しかし、コラムステージは、嵩張るため、狭い作業空間
では置場所に困り、しかも、その使用料は高く、その整
備費も嵩む欠点がある。
Problems to be Solved by the Invention However, since the column stage is bulky, it is difficult to place it in a narrow working space, and furthermore, the column stage has drawbacks such as high usage fees and high maintenance costs.

この出願の発明の解決しようとする課題は、上記欠点の
ない梁取付作業等に使う枠足場を提供すること、換言す
ると、鉄骨柱および鉄骨梁への取付けが容易で、その解
体も容易な枠足場の組立法および枠足場を提供すること
にある。
The problem to be solved by the invention of this application is to provide a frame scaffold for use in beam installation work etc. that does not have the above-mentioned drawbacks, in other words, a frame that can be easily attached to steel columns and steel beams and can be easily dismantled. The purpose of the present invention is to provide a method for assembling a scaffold and a frame scaffold.

課題を解決するための手段 この出願の発明は、前記課題を解決するための手段とし
て、次ぎの構成を採用する。
Means for Solving the Problems The invention of this application employs the following configuration as a means for solving the problems described above.

この出願の第1の発明の構成は、横杆の両端に縦杆を固
定して足場板支持枠が形成され、横杆の両端に縦杆を固
定し、且つ前記横杆の中途に吊り部材を取付けて吊り足
場板支持枠が形成され、鉄骨柱を建てる前に、梁取付部
の下方の鉄骨柱の対向する二つの面にそれぞれ固定した
対の支持枠取付具を使って、鉄骨柱の対向する二つの面
に足場板支持枠の横杆の中途を着脱自在に取付け、且つ
一方の足場板支持枠の横杆と他方の足場板支持枠の横杆
との間に第1の足場板を架渡して取付けて仮足場を形成
し、次いで鉄骨柱を建ててその下部を下部躯体に固定し
、前記仮足場を使って、鉄骨柱の梁取付部への鉄骨梁の
仮取付作業を行ってから、鉄骨梁に予め固定しておいた
支持枠吊り具に吊り足場板支持枠の横杆の吊り部材を着
脱自在に取付け、足場板支持枠の横杆と吊り足場板支持
枠の横杆と間に第2の足場板を架渡して取付け、且つ足
場板支持枠の縦杆と吊り足場板支持枠の縦杆と間に手摺
杆を架渡して手摺杆を各縦杆に着脱自在に固定して本枠
足場を形成することを特徴とする枠足場の組立法にある
The structure of the first invention of this application is that a scaffold board support frame is formed by fixing vertical bars to both ends of the horizontal bars, the vertical bars are fixed to both ends of the horizontal bars, and a hanging member is provided in the middle of the horizontal bars. The suspension scaffold plate support frame is formed by attaching the support frame, and before the steel column is erected, the steel column is attached using a pair of support frame fixtures fixed respectively to two opposite sides of the steel column below the beam attachment part. The middle part of the horizontal rod of the scaffold board support frame is detachably attached to two opposing surfaces, and the first scaffold board is installed between the horizontal rod of one scaffold board support frame and the horizontal rod of the other scaffold board support frame. to form a temporary scaffold, then erect a steel column and fix its lower part to the lower structure, and use the temporary scaffold to temporarily attach the steel beam to the beam attachment part of the steel column. Then, detachably attach the suspension members of the horizontal rods of the suspended scaffold board support frame to the support frame suspension fixtures that have been fixed in advance to the steel beams, and then attach the horizontal rods of the scaffold board support frame and the horizontal rods of the suspended scaffold board support frame. A second scaffold board is installed by spanning between the vertical bars of the scaffold board support frame and the vertical bars of the hanging scaffold board support frame, and a handrail bar is spanned between the vertical bars of the scaffold board support frame and the vertical bars of the hanging scaffold board support frame, so that the handrail bars can be attached to and detached from each vertical bar. A method for assembling a frame scaffold, which is characterized in that it is fixed to form a main frame scaffold.

また、この出願の第2の発明の構成は、横杆の両端に縦
杆を固定して足場板支持枠が形成され、横杆の両端に縦
杆を固定し、且つ前記横杆の中途に吊り部材を取付けて
吊り足場板支持枠が形成され、梁取付部の下方の鉄骨柱
の対向する二つの面にそれぞれ固定した支持枠取付具を
使って、鉄骨柱の対向する二つの面に足場板支持枠の横
杆の中途を着脱自在に取付け、且つ一方の足場板支持枠
の横杆と他方の足場板支持枠の横杆との間に第1の足場
板を架渡して取付け、鉄骨柱の梁取付部に取付けた鉄骨
梁に固定した支持枠吊り具に吊り足場板支持枠の横杆の
吊り部材を着脱自在に取付け、足場板支持枠の横杆と吊
り足場板支持枠の横杆と間に第2の足場板を架渡して取
付け、且つ足場板支持枠の縦杆と吊り足場板支持枠の縦
杆と間に手摺杆を架渡して手摺杆を各縦杆に着脱自在に
固定したことを特徴とする枠足場にある。
Further, in the configuration of the second invention of this application, the scaffold board support frame is formed by fixing vertical bars to both ends of the horizontal bars, the vertical bars are fixed to both ends of the horizontal bars, and the vertical bars are fixed to both ends of the horizontal bars, and the vertical bars are fixed to both ends of the horizontal bars. A hanging scaffold board support frame is formed by attaching the hanging members, and the scaffolding is attached to the two opposing sides of the steel column using the support frame fixtures fixed to the two opposing sides of the steel column below the beam attachment part. The middle of the horizontal rod of the board support frame is removably attached, and the first scaffolding board is installed by spanning between the horizontal rod of one scaffold board support frame and the horizontal rod of the other scaffold board support frame, and the steel frame is installed. The suspension members of the horizontal rods of the suspended scaffold board support frame are removably attached to the support frame suspension fixtures fixed to the steel beams attached to the beam attachment parts of the columns, and the horizontal rods of the scaffold board support frame and the sides of the suspended scaffold board support frame are attached. A second scaffolding board is installed by spanning between the rods, and a handrail rod is installed between the vertical rods of the scaffold board support frame and the vertical rods of the hanging scaffold board support frame, so that the handrail rods can be freely attached to and detached from each vertical rod. The frame is characterized by being fixed to the scaffold.

好適な実施形態にあっては、鉄骨柱としてボックス型鉄
骨を使い、鉄骨柱に固定する支持枠取付具は、支持片と
該支持片に取付けたクランプとで構成し、その支持片を
溶接等により鉄骨柱に固定する。作業者が枠足場にのる
のに使う梯子は、その下部を鉄骨柱に固定した梯子支持
片に着脱自在に固定し、その上部を足場板支持枠の横杆
に固定した梯子支え杆に着脱自在に固爺する。
In a preferred embodiment, a box-type steel frame is used as the steel column, and the support frame fixture for fixing to the steel column is composed of a support piece and a clamp attached to the support piece, and the support piece is welded, etc. It is fixed to the steel column by. The ladder used by workers to climb onto the scaffolding frame has its lower part removably fixed to a ladder support piece fixed to a steel column, and its upper part removably attached to a ladder support rod fixed to the horizontal beam of the scaffold board support frame. Freely hold fast.

好適な実施形態にあっては、足場板支持枠を横杆の両端
に縦杆の下部を溶接し、縦杆の上部にクランプを固定し
て形成し、吊り足場板支持枠を横杆の両端に縦杆の下部
を溶接し、前記横管の中央に吊り部材の下部を溶接し、
縦管の上部に手摺杆を止める止め具を取付けて形成する
。なお、前記吊り部材は、一対の吊り杆と該吊り杆の上
部に取付けた取付片とで構成され、一対の吊り杆はその
上端が幅狭で下方に行くにしたがって幅広になるように
配置され、取付片には鉄骨梁に固定した支持枠吊り具に
あけた複数の孔に一致する複数の孔が穿ってあり、吊り
部材を介して吊り足場板支持枠を鉄骨梁の下部に揺動し
ないように着脱自在に固定できるようにする。
In a preferred embodiment, the scaffold board support frame is formed by welding the lower part of the vertical bar to both ends of the horizontal bar, and a clamp is fixed to the top of the vertical bar, and the suspended scaffold board support frame is formed by welding the lower part of the vertical bar to both ends of the horizontal bar. Welding the lower part of the vertical rod to the center of the horizontal pipe, welding the lower part of the hanging member to the center of the horizontal pipe,
Attach a stopper to the top of the vertical pipe to hold the handrail rod. The hanging member is composed of a pair of hanging rods and a mounting piece attached to the upper part of the hanging rod, and the pair of hanging rods are arranged so that the width thereof is narrow at the upper end and becomes wider as it goes downward. , the mounting piece has multiple holes drilled in it that match the multiple holes drilled in the support frame hanging tool fixed to the steel beam, so that the hanging scaffold board support frame does not swing to the bottom of the steel beam via the hanging member. It can be fixed in a removable manner.

手摺杆は、足場板支持枠および吊り足場板支持枠の縦杆
に取付けたクランプまたは止め具にて。
Handrail rods are secured with clamps or fasteners attached to the vertical rods of the scaffold board support frame and suspended scaffold board support frame.

それらの縦杆の上端(および必要に応じて縦杆の中途)
に着脱自在に固定する。クランプまたは止め具としては
、鋼管足場等の組立等に使う通常のものを使用するが1
手摺杆を足場板支持枠および吊り足場板支持枠の縦杆に
着脱自在に固定できるようなものならどのようなもので
もよい。なお、吊り足場板支持枠の縦杆間に架渡す手摺
杆は鉄骨梁の貫通孔に通す。
the tops of those stiles (and the middle of the stiles, if necessary)
It is removably fixed to the As a clamp or stopper, use a normal one used for assembling steel pipe scaffolding, etc.
Any type of material may be used as long as the handrail rod can be detachably fixed to the vertical rods of the scaffold board support frame and the suspended scaffold board support frame. In addition, the handrail rods spanning between the vertical rods of the suspended scaffold board support frame will pass through the through holes in the steel beams.

第1および第2の足場板としては、鋼製の布枠の両端に
係止突片を設けた通常のものを使い、前記係止突片を足
場板支持枠および吊り足場板支持枠の横杆に係合させて
、それらの横杆に取付ける。
As the first and second scaffolding boards, ordinary ones with locking protrusions provided at both ends of a steel cloth frame are used, and the locking protrusions are attached to the sides of the scaffold board support frame and the hanging scaffold board support frame. Engage with the rods and attach to their horizontal rods.

この発明の枠足場は、主に鉄骨柱への梁取付作業に使う
が、その他の作業にも使うことができる。
The frame scaffold of this invention is mainly used for attaching beams to steel columns, but it can also be used for other tasks.

実施例 この発明の実施例を第1図ないし第8図を使って説明す
る。
Embodiment An embodiment of the present invention will be described with reference to FIGS. 1 to 8.

先ず、使用する主な部品を説明する。First, we will explain the main parts used.

第1図ないし第3図に示すように、角形鋼管からなる鉄
骨柱1の仕口部の梁取付部に対応する位置に梁取付片1
aを固定し、鉄骨柱1の下部およびその仕口部の上方の
部分に梯子支持片1bを固定する。鉄骨柱1の仕口部の
下方の対向する二つの面1cの同一水平面上にある部分
に、支持枠取付具3をそれぞれ一対ずつ溶接する。支持
枠取付具3は、好ましい実施形態にあっては、第4図に
示すように、短い鋼板からなる支持片3aの端部3a1
にクランプ3bの基盤3b工を溶接して形成するが、支
持片3aにクランプ3bを着脱自在に取付けるようにし
てもよい。
As shown in Figures 1 to 3, a beam attachment piece 1 is placed at a position corresponding to the beam attachment part of the joint part of a steel frame column 1 made of a square steel pipe.
A is fixed, and a ladder support piece 1b is fixed to the lower part of the steel column 1 and the upper part of the joint part thereof. A pair of support frame fixtures 3 are each welded to portions of the two opposing surfaces 1c below the joint portion of the steel frame column 1 that are on the same horizontal plane. In a preferred embodiment, the support frame fixture 3 is attached to an end portion 3a1 of a support piece 3a made of a short steel plate, as shown in FIG.
Although the base 3b of the clamp 3b is welded to the support piece 3a, the clamp 3b may be detachably attached to the support piece 3a.

第3図に示すように、H形鋼からなる鉄骨梁2の仕口部
よりの下面の長平方向の略中夫に複数のボルト通し孔を
穿った短い鋼板からなる支持枠吊り具2aを溶接し、且
つこの吊り具2aの上方の鉄骨梁のウェブに貫通孔2b
を穿っておく。
As shown in Fig. 3, a support frame hanger 2a made of a short steel plate with a plurality of bolt holes bored is welded to the lower surface of the steel beam 2 made of H-beam steel in the longitudinal direction. and a through hole 2b is formed in the web of the steel beam above the hanging device 2a.
wear it.

足場板支持枠4は、第5図に示すように、横杆4aの両
端に縦杆4bの下部を溶接し、縦杆4bの上部にクラン
プ4cを取付け、その中途部に止め具4dを取付けて形
成する。吊り足場板支持枠5は、第6図に示すように、
横杆5aの両端に縦杆5bの下部を溶接し、前記横杆5
aの中央に吊り部材5cの下部を溶接し、縦管5bの上
部および中途部に止め具5d□、5d、を取付けて形成
する。なお、前記吊り部材5cは、それらの間隔がそれ
らの上端で幅狭で下方に行くにしたがって幅広になるよ
うに配置した一対の杆5c工と、この一対の杆5cmの
上端に溶接した短い山形鋼からなる取付片5c、とで構
成され、取付片5c、には、鉄骨梁2に取付けた支持枠
吊り具2aにあけた複数の孔に一致する複数の孔が穿っ
てあり、吊り部材5Cを介して吊り足場板支持枠5を鉄
骨梁の下部に揺動しないように固定できるようにしであ
る。
As shown in Fig. 5, the scaffold board support frame 4 is constructed by welding the lower part of the vertical rod 4b to both ends of the horizontal rod 4a, attaching a clamp 4c to the upper part of the vertical rod 4b, and attaching a stopper 4d to the middle part. form. As shown in FIG. 6, the hanging scaffold board support frame 5 is
The lower part of the vertical rod 5b is welded to both ends of the horizontal rod 5a, and the horizontal rod 5
The lower part of the hanging member 5c is welded to the center of the vertical pipe 5b, and the stoppers 5d□, 5d are attached to the upper part and the middle part of the vertical pipe 5b. The hanging member 5c includes a pair of rods 5c arranged such that the distance between them is narrow at their upper ends and becomes wider toward the bottom, and a short chevron welded to the upper ends of the pair of rods 5cm. The mounting piece 5c is made of steel, and the mounting piece 5c has a plurality of holes that match the plurality of holes drilled in the support frame hanger 2a attached to the steel beam 2, and the hanging member 5C is made of steel. The hanging scaffold board support frame 5 can be fixed to the lower part of the steel beam so that it does not swing.

次に、枠足場の組立法を説明する。Next, the method of assembling the frame scaffold will be explained.

第7図に示すように、鉄骨柱1を横たえた状態にして、
鉄骨柱1の対向する二つの面1− cに一対ずつ溶接し
た支持枠取付具3のクランプ3bを使って、二つの足場
板支持枠4の横杆4aの中途部を着脱自在に鉄骨柱1に
固定する。
As shown in Fig. 7, the steel column 1 is laid down,
Using the clamps 3b of the support frame fixtures 3, which are welded in pairs to the two opposing surfaces 1-c of the steel column 1, the middle parts of the horizontal rods 4a of the two scaffold board support frames 4 can be detachably attached to the steel column 1. Fixed to.

二つの足場板支持枠4の鉄骨柱の端面から突出している
横杆4aの部分間に第1の足場板6を架渡し、その両端
の係止部6aにて、足場板支持枠4の横杆4aに取付け
る。また、第2図および第7図に示すように、足場板支
持枠4の各横杆4aの端部分間に鉄管よりなる支え杆1
1を架渡し、支え杆11をクランプを使って各横杆4a
に固定する。梯子12の下部を前記梯子支持片1bに着
脱自在に固定し、梯子12の上部をクランプ等を使って
支え杆11に着脱自在に固定する。
The first scaffolding board 6 is spanned between the parts of the horizontal rods 4a that protrude from the end faces of the steel columns of the two scaffolding board support frames 4, and the first scaffolding board 6 is strung between the parts of the horizontal rods 4a that protrude from the end faces of the steel columns of the two scaffolding board support frames 4, and the locking parts 6a at both ends of the first scaffolding board 6 are attached to the sides of the scaffolding board support frame 4. Attach to rod 4a. Further, as shown in FIGS. 2 and 7, a support rod 1 made of iron pipe is installed between the end portions of each horizontal rod 4a of the scaffold board support frame 4.
1, and using the support rods 11 and clamps, attach each horizontal rod 4a.
Fixed to. The lower part of the ladder 12 is removably fixed to the ladder support piece 1b, and the upper part of the ladder 12 is removably fixed to the support rod 11 using a clamp or the like.

次に、鉄骨柱1を建てて、その下部を下部躯体の所定に
固定する。作業員は、梯子12を使って第1の足場板6
上にのり、第1の足場板6と鉄骨柱1に取付けた命綱を
使って、鉄骨柱1の梁取付片1aに鉄骨梁2の端部をボ
ルトおよびナツトにて固定する。それから、鉄骨梁2の
下面に溶接した支持枠吊り具2aに、吊り足場板支持枠
5の吊り部材5cの取付片5c、を、それらに穿ったボ
ルト通し孔にボルトを通して着脱自在に固定する。
Next, the steel column 1 is erected, and its lower part is fixed to a predetermined position on the lower frame. The worker uses the ladder 12 to reach the first scaffolding board 6.
Using the first scaffold board 6 and the lifeline attached to the steel column 1, the end of the steel beam 2 is fixed to the beam attachment piece 1a of the steel column 1 with bolts and nuts. Then, the mounting pieces 5c of the hanging members 5c of the suspended scaffold board support frame 5 are removably fixed to the support frame hanger 2a welded to the lower surface of the steel beam 2 by passing bolts through the bolt holes bored therein.

足場板支持枠4の横杆4aと吊り足場板支持枠5の横杆
5aと間に第2の足場板7を架渡し、その両端の係止片
7aを横杆4a、5aに係合させて、足場板7を足場板
支持枠4および吊り足場板支持枠5に取付ける。また、
足場板支持枠4の縦杆4bと吊り足場板支持枠5の縦杆
5bと間に手摺杆8.9を架渡して、手摺杆8の外端を
吊り足場板支持枠4の縦杆4bの上端に止め具5d工に
て着脱自在に固定し、手摺杆8の内端を足場板支持枠4
の縦杆4bの上端にクランプ4cにて着脱自在に固定す
る。手摺杆9の内端を足場板支持枠4の縦杆4bの中途
に止め具4dにて着脱自在に固定し、手摺杆9の外端を
吊り足場板支持枠5の縦杆5bの中途に止め具5d、に
て着脱自在に固定し、且つ手摺杆10を鉄骨梁2の貫通
孔2bに通して、吊り足場板支持枠5の縦杆5b間に架
渡して、その両端部を縦杆5bの上部にその止め具5d
□にて着脱自在に固定し、枠足場を完成する。
A second scaffold board 7 is bridged between the horizontal rod 4a of the scaffold board support frame 4 and the horizontal rod 5a of the suspended scaffold board support frame 5, and the locking pieces 7a at both ends of the second scaffold board 7 are engaged with the horizontal rods 4a and 5a. Then, the scaffold board 7 is attached to the scaffold board support frame 4 and the suspended scaffold board support frame 5. Also,
A handrail rod 8.9 is spanned between the vertical rod 4b of the scaffold board support frame 4 and the vertical rod 5b of the suspended scaffold board support frame 5, and the outer end of the handrail rod 8 is suspended from the vertical rod 4b of the scaffold board support frame 4. It is removably fixed to the upper end with a stopper 5d, and the inner end of the handrail rod 8 is attached to the scaffold board support frame 4.
It is removably fixed to the upper end of the vertical rod 4b with a clamp 4c. The inner end of the handrail rod 9 is removably fixed to the middle of the vertical rod 4b of the scaffold board support frame 4 with a stopper 4d, and the outer end of the handrail rod 9 is fixed to the middle of the vertical rod 5b of the suspended scaffold board support frame 5. It is removably fixed with a stopper 5d, and the handrail rod 10 is passed through the through hole 2b of the steel beam 2, and is spanned between the vertical rods 5b of the hanging scaffold board support frame 5, and both ends of the handrail rod 10 are connected to the vertical rods. The stopper 5d is on the top of 5b.
Fix it removably with □ to complete the frame scaffold.

そして、作業者が枠足場のとに載って、溶接による鉄骨
柱への鉄骨梁の取付作業等を行い、鉄骨梁を鉄骨柱に固
定する。その後、鉄骨梁に波形鉄板を敷設する作業等を
行う、枠足場が不要になったら、手摺杆8ないし10、
第2の足場板7、吊り足場板支持枠5、第1の足場板6
、足場板支持枠4等を順次外し、最後に、必要に応じて
、支持枠取付具3、梯子支持片1bおよび支持枠吊り具
2aをそれらの基部から溶断し、枠足場の解体を完了す
る。
Then, a worker stands on the frame scaffold and performs work such as attaching the steel beam to the steel column by welding, thereby fixing the steel beam to the steel column. After that, when the frame scaffolding is no longer needed for work such as laying corrugated iron plates on steel beams, handrail rods 8 to 10,
Second scaffold board 7, hanging scaffold board support frame 5, first scaffold board 6
, remove the scaffold board support frame 4, etc. one after another, and finally, if necessary, cut the support frame fixture 3, ladder support piece 1b, and support frame hanger 2a from their bases to complete the dismantling of the frame scaffold. .

なお、足場板支持枠4としては既成の通路用支持枠が使
用でき、吊り足場板支持枠5としては既成の鉄骨梁等か
ら吊り下げる支持枠が使用できる。
Note that as the scaffold board support frame 4, an existing passage support frame can be used, and as the hanging scaffold board support frame 5, a support frame suspended from an existing steel beam or the like can be used.

発明の作用効果 この出願の枠足場の組立方法の発明は、枠足場の組立の
中途における足場板支持枠と第1の足場板で仮足場を形
成し、この仮足場を使って鉄骨柱の梁取付部への鉄骨梁
の仮取付作業を行い、また前記仮足場と鉄骨梁に固定し
た支持枠吊り具を使って以後の枠足場の組立作業を行う
から、足場の組立作業を容易に且つ安全に行うことがで
き、鉄骨柱の梁取付部への鉄骨梁の仮取付作業も容易に
なる。
Effects of the Invention The invention of the method for assembling a frame scaffold of this application forms a temporary scaffold with the scaffold plate support frame and the first scaffold plate in the middle of assembling the frame scaffold, and uses this temporary scaffold to assemble the beam of the steel column. The temporary installation of the steel beams to the attachment part is performed, and the subsequent assembly of the frame scaffold is performed using the temporary scaffolding and the support frame hangers fixed to the steel beams, making the scaffold assembly work easy and safe. This makes it easier to temporarily attach the steel beam to the beam attachment part of the steel column.

また、この出願の枠足場の発明は、鉄骨柱に支持枠取付
具を固定し、鉄骨梁に支持枠吊り具を固定し、前記支持
枠取付具および支持枠吊り具を使って、既成の足場板支
持枠および吊り足場板支持枠、既成の第1および第2の
足場板、および既成の手摺杆を着脱自在に組み立てるだ
けで枠足場を形成するものであるから、簡単な構成の部
品だけを使って枠足場を形成することができ、その組立
も容易で、枠足場を安価に提供することができる。
In addition, the invention of the frame scaffold of this application fixes a support frame fixture to a steel column, fixes a support frame hanger to a steel beam, and uses the support frame fixture and support frame hanger to create a ready-made scaffold. The frame scaffold is formed simply by removably assembling the board support frame, suspended scaffold board support frame, ready-made first and second scaffold boards, and ready-made handrail rods, so only parts with a simple configuration are required. It can be used to form a frame scaffold, its assembly is easy, and the frame scaffold can be provided at low cost.

支持枠取付具を支持片と該支持片に取付けたクランプと
で構成すると、鉄骨柱への足場板支持枠の取付作業が容
易になる。
When the support frame attachment tool is composed of a support piece and a clamp attached to the support piece, the work of attaching the scaffold board support frame to the steel column becomes easy.

手摺杆を鉄骨梁に穿った貫通孔に通して、吊り足場板支
持枠の縦杆間に架渡し、この手摺杆の両端部を前記縦杆
の上部に着脱自在に固定するようにすると、枠足場の周
囲の殆どの部分を手摺杆で囲むことができ、枠足場上で
行う作業σ安全性を高めることができる。
When the handrail rod is passed through a through hole drilled in the steel beam and spanned between the vertical rods of the suspension scaffold board support frame, and both ends of the handrail rod are removably fixed to the upper part of the vertical rod, the frame Most of the periphery of the scaffold can be surrounded by handrails, increasing the safety of work performed on the frame scaffold.

【図面の簡単な説明】[Brief explanation of drawings]

第1図ないし第8図は、この発明の詳細な説明するため
のもので、第1図は枠足場の平面図、第2図は枠足場の
側面図、第3図の枠足場を斜め下方からみた斜視図、第
4図は鉄骨柱に固定した支持具の側面図、第5図は足場
板支持枠の正面図、第6図は吊り足場板支持枠の正面図
、第7図は鉄骨柱に足場板支持枠および第1の足場板を
取付けた状態を示す斜視図、第8UiAは鉄骨柱を建て
た状態を示す斜視図である。 図中、1は鉄骨柱、1aは梁取付片、1bは梯子支持片
、2は鉄骨梁、2aは支持枠吊り具、2bは貫通孔、3
は支持枠取付具、3aは支持片、3bはクランプ、4は
足場板支持枠、5は吊り足場板支持枠、4aおよび5a
は横杆、4bおよび5bは縦杆、4cはクランプ、4d
、5d工および5d、は止め具、5cは吊り部材、6は
第1の足場板、7は第2の足場板、8.9および10は
手摺杆、11は支え杆、12は梯子である。 特許 出願人 株式会社 竹中工務店
Figures 1 to 8 are for explaining the present invention in detail. Figure 1 is a plan view of the frame scaffold, Figure 2 is a side view of the frame scaffold, and Figure 3 is a diagonally downward view of the frame scaffold. Figure 4 is a side view of the support fixed to the steel column, Figure 5 is a front view of the scaffold board support frame, Figure 6 is a front view of the suspended scaffold board support frame, and Figure 7 is the steel frame. FIG. 8 is a perspective view showing a state in which a scaffold board support frame and a first scaffold board are attached to a column, and 8th UiA is a perspective view showing a state in which a steel frame column is erected. In the figure, 1 is a steel column, 1a is a beam attachment piece, 1b is a ladder support piece, 2 is a steel beam, 2a is a support frame hanger, 2b is a through hole, 3
3 is a support frame fixture, 3a is a support piece, 3b is a clamp, 4 is a scaffold board support frame, 5 is a hanging scaffold board support frame, 4a and 5a
is the horizontal rod, 4b and 5b are the vertical rods, 4c is the clamp, 4d
, 5d and 5d are fasteners, 5c is a hanging member, 6 is a first scaffolding board, 7 is a second scaffolding board, 8.9 and 10 are handrail rods, 11 is a support rod, and 12 is a ladder. . Patent applicant: Takenaka Corporation

Claims (1)

【特許請求の範囲】 1、横杆の両端に縦杆を固定して足場板支持枠が形成さ
れ、横杆の両端に縦杆を固定し、且つ前記横杆の中途に
吊り部材を取付けて吊り足場板支持枠が形成され、鉄骨
柱を建てる前に、梁取付部の下方の鉄骨柱の対向する二
つの面にそれぞれ固定した支持枠取付具を使って、鉄骨
柱の対向する二つの面に足場板支持枠の横杆の中途を着
脱自在に取付け、且つ一方の足場板支持枠の横杆と他方
の足場板支持枠の横杆との間に第1の足場板を架渡して
取付けて仮足場を形成し、次いで鉄骨柱を建ててその下
部を下部躯体に固定し、前記仮足場を使って、鉄骨柱の
梁取付部への鉄骨梁の仮取付作業を行ってから、鉄骨梁
に予め固定しておいた支持枠吊り具に吊り足場板支持枠
の横杆の吊り部材を着脱自在に取付け、足場板支持枠の
横杆と吊り足場板支持枠の横杆と間に第2の足場板を架
渡して取付け、且つ足場板支持枠の縦杆と吊り足場板支
持枠の縦杆と間に手摺杆を架渡して手摺杆を各縦杆に着
脱自在に固定して本枠足場を形成することを特徴とする
枠足場の組立法。 2、横杆の両端に縦杆を固定して足場板支持枠が形成さ
れ、横杆の両端に縦杆を固定し、且つ前記横杆の中途に
吊り部材を取付けて吊り足場板支持枠が形成され、梁取
付部の下方の鉄骨柱の対向する二つの面にそれぞれ固定
した支持枠取付具を使って、鉄骨柱の対向する二つの面
に足場板支持枠の横杆の中途を着脱自在に取付け、且つ
一方の足場板支持枠の横杆と他方の足場板支持枠の横杆
との間に第1の足場板を架渡して取付け、鉄骨柱の梁取
付部に取付けた鉄骨梁に固定した支持枠吊り具に吊り足
場板支持枠の横杆の吊り部材を着脱自在に取付け、足場
板支持枠の横杆と吊り足場板支持枠の横杆と間に第2の
足場板を架渡して取付け、且つ足場板支持枠の縦杆と吊
り足場板支持枠の縦杆と間に手摺杆を架渡して手摺杆を
各縦杆に着脱自在に固定したことを特徴とする枠足場。 3、支持枠取付具が支持片と該支持片に取付けたクラン
プとで構成されていることを特徴とする請求項2記載の
枠足場。 4、手摺杆を鉄骨梁に穿った貫通孔に通して、吊り足場
板支持枠の縦杆間に架渡し、手摺杆の両端部を前記縦杆
の上部に着脱自在に固定したことを特徴とする請求項2
または3記載の枠足場。 5、梯子支え杆を一方の足場板支持枠の横杆と他方の足
場板支持枠の横杆との間に架渡して着脱自在に各横杆に
固定し、鉄骨柱の仕口部間の下方の部分に固定した梯子
支持片に、昇降用梯子の下部を着脱自在に固定し、昇降
用梯子の上部を前記梯子支え杆に着脱自在に固定したこ
とを特徴とする請求項2ないし4のいずれ一つの項記載
の枠足場。
[Claims] 1. A scaffold board support frame is formed by fixing vertical bars to both ends of the horizontal bars, the vertical bars are fixed to both ends of the horizontal bars, and a hanging member is attached to the middle of the horizontal bars. When the suspended scaffold board support frame is formed and before the steel column is erected, the two opposite sides of the steel column are attached using the support frame fixtures fixed respectively to the two opposite sides of the steel column below the beam attachment part. The middle of the horizontal rod of the scaffold board support frame is removably attached to the frame, and the first scaffold board is installed by spanning between the horizontal rod of one scaffold board support frame and the horizontal rod of the other scaffold board support frame. to form a temporary scaffold, then erect a steel column and fix its lower part to the lower frame, use the temporary scaffold to temporarily attach the steel beam to the beam attachment part of the steel column, and then install the steel beam. The hanging member of the horizontal rod of the suspended scaffold board support frame is removably attached to the support frame hanging tool that has been fixed in advance to the support frame, and a second Scaffolding boards are straddled and installed, and handrail bars are spanned between the vertical bars of the scaffold board support frame and the vertical bars of the hanging scaffold board support frame, and the handrail bars are removably fixed to each vertical bar to form the main frame. A method for assembling a frame scaffold, characterized by forming a scaffold. 2. A scaffold board support frame is formed by fixing vertical bars to both ends of the horizontal bars, and a hanging scaffold board support frame is formed by fixing the vertical bars to both ends of the horizontal bars and attaching a hanging member to the middle of the horizontal bars. Using the support frame fixtures that are formed and fixed to the two opposing sides of the steel column below the beam attachment part, the middle of the horizontal beam of the scaffold board support frame can be attached and detached to the two opposing sides of the steel column. At the same time, the first scaffold board is installed by spanning between the horizontal beam of one scaffold plate support frame and the horizontal beam of the other scaffold plate support frame, and the steel beam is attached to the beam attachment part of the steel column. The suspension members of the horizontal bars of the suspended scaffold board support frame are detachably attached to the fixed support frame hanging tools, and a second scaffold board is installed between the horizontal bars of the scaffold board support frame and the horizontal bars of the suspended scaffold board support frame. A frame scaffold characterized in that the frame scaffold is installed by passing it across, and has a handrail rod spanned between the vertical rods of the scaffold board support frame and the vertical rods of the hanging scaffold board support frame, and the handrail rods are detachably fixed to each vertical rod. 3. The frame scaffold according to claim 2, wherein the support frame fixture is composed of a support piece and a clamp attached to the support piece. 4. A handrail rod is passed through a through hole drilled in a steel beam, and is spanned between vertical rods of a suspension scaffold board support frame, and both ends of the handrail rod are removably fixed to the upper part of the vertical rod. Claim 2
or the frame scaffold described in 3. 5. Ladder support rods are spanned between the horizontal rods of one scaffolding board support frame and the other scaffolding board support frame, and are removably fixed to each horizontal rod, and the ladder support rods are installed between the joints of the steel columns. Claims 2 to 4, characterized in that the lower part of the climbing ladder is detachably fixed to the ladder support piece fixed to the lower part, and the upper part of the climbing ladder is detachably fixed to the ladder support rod. Frame scaffolding as described in any one of the sections.
JP25528890A 1990-09-27 1990-09-27 Frame scaffold assembly method and frame scaffold Expired - Fee Related JP2724909B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP25528890A JP2724909B2 (en) 1990-09-27 1990-09-27 Frame scaffold assembly method and frame scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP25528890A JP2724909B2 (en) 1990-09-27 1990-09-27 Frame scaffold assembly method and frame scaffold

Publications (2)

Publication Number Publication Date
JPH04136366A true JPH04136366A (en) 1992-05-11
JP2724909B2 JP2724909B2 (en) 1998-03-09

Family

ID=17276682

Family Applications (1)

Application Number Title Priority Date Filing Date
JP25528890A Expired - Fee Related JP2724909B2 (en) 1990-09-27 1990-09-27 Frame scaffold assembly method and frame scaffold

Country Status (1)

Country Link
JP (1) JP2724909B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH084278A (en) * 1994-06-16 1996-01-09 Hokuei Kizai Kk How to install a ladder and ladder

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5335379B2 (en) 2008-11-12 2013-11-06 学校法人東海大学 Organic semiconductor material and organic electronic device using the same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH084278A (en) * 1994-06-16 1996-01-09 Hokuei Kizai Kk How to install a ladder and ladder

Also Published As

Publication number Publication date
JP2724909B2 (en) 1998-03-09

Similar Documents

Publication Publication Date Title
US20050066609A1 (en) Preassembled roof and floor deck panel system
JP3027130B2 (en) Assembly structure of hanging scaffold
JPH04136366A (en) Method for assembling framed scaffold and framed scaffold
KR102583454B1 (en) Scaffolding system for construction works with improved safety
JP2001049623A (en) H-steel arm scaffolding and method for constructing the same
JPS6242049Y2 (en)
JPH11107218A (en) Suspended scaffold and method of assembly construction thereof
JP6928958B2 (en) Auxiliary pipe fixture and building construction
JPS6243080Y2 (en)
JPH082311Y2 (en) Scaffold used for beam installation work, etc.
KR200241823Y1 (en) A temporary working plate for steel construction
JPH08184179A (en) Side surface protecting wall assembling method for suspended scaffold and side surface protecting panel therefor
JP3047743B2 (en) Assembly type scaffold for construction
JPS6222607Y2 (en)
JP7696993B2 (en) Modular space frame support system, work platform system and method of erecting same
JPH0628089U (en) Jig for temporary passage
JPH0711236Y2 (en) Scaffolding equipment
JP2001323653A (en) Suspended scaffold for steel work
JP7264467B2 (en) Vertical strut for temporary scaffolding and temporary scaffolding system using the same
KR0116932Y1 (en) Prefabricated Scaffolding
JP2004019375A (en) Inserting connection pipe for assembling suspended scaffold
JPH0421408Y2 (en)
JPH0610499A (en) Lifting sling for scaffolding erection and method thereof
JPH0428990Y2 (en)
JPH0514392U (en) Work scaffolding for stairs

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees