JPH04155010A - Construction method for retaining - Google Patents
Construction method for retainingInfo
- Publication number
- JPH04155010A JPH04155010A JP27941790A JP27941790A JPH04155010A JP H04155010 A JPH04155010 A JP H04155010A JP 27941790 A JP27941790 A JP 27941790A JP 27941790 A JP27941790 A JP 27941790A JP H04155010 A JPH04155010 A JP H04155010A
- Authority
- JP
- Japan
- Prior art keywords
- earth retaining
- retaining walls
- shoring
- earth
- struts
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
- Retaining Walls (AREA)
Abstract
(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.
Description
【発明の詳細な説明】 〈産業上の利用分野〉 本発明は施工麟に優れた土留工法に関する。[Detailed description of the invention] <Industrial application field> The present invention relates to an earth retaining method with excellent construction efficiency.
・ト1
〈従来の技術〉
仮締切や土留工事においては、支保工を設置するまでの
土庄や水圧の対抗手段が閉頭となる。・T1 <Conventional technology> In temporary cofferdam and earth retaining work, countermeasures against earth shoring and water pressure are closed until shoring is installed.
このようなことから、現在は土留壁の間の地盤を掘削・
排水する工程と、その後にドライ状態で土留壁の間に一
段ずつ支保工(切梁)を水平に架設する工程とを雄り返
しながら、所定の深度まで掘削する方法がとられている
。For this reason, the ground between the retaining walls is currently being excavated and
The method used is to excavate to a predetermined depth by repeating the process of draining water and then horizontally erecting supports (struts) step by step between the retaining walls in a dry state.
〈本発明が解決しようとする間穎点〉
前記した従来の土留技術にはつぎのような問題点がある
。<Disadvantages to be Solved by the Present Invention> The conventional earth retaining technology described above has the following problems.
〈イ〉 掘削作業、排水作業、支保工の架設作業を夫々
繰り返し行わなければならず、施工に多大の労力と時間
を要する。<B> Excavation work, drainage work, and support erection work must be performed repeatedly, requiring a great deal of labor and time.
〈口〉 軟弱地盤を山留する場合は、土留壁に大きな土
庄や水圧が作用する。<Exposure> When retaining soft ground, large soil pressure and water pressure act on the retaining wall.
そのため、地盤改良などの補助工法が必要となり、施工
コストが高(なる。Therefore, auxiliary construction methods such as ground improvement are required, resulting in high construction costs.
〈本発明の目的〉
本発明は以上の問題点を解決するために成されたもので
、その目的とするところは施工性に優れた土留工法を提
供することにある。<Object of the present invention> The present invention was made to solve the above-mentioned problems, and its purpose is to provide an earth retaining method with excellent workability.
〈問題点を解決するための手段〉
すなわち本発明は相対向して土留壁を構築し、泥水を満
たしながら前記土留壁間を掘削し、多段的に配置した複
数の切梁間を縦柱で井桁状に連結した支保工装置を水没
して土留壁間に架設し、支保工装置で土留壁を支持した
状態で土留壁間の泥水を排水して行う、土留工法である
。<Means for solving the problem> That is, the present invention constructs earth retaining walls facing each other, excavates between the earth retaining walls while filling with muddy water, and connects a plurality of struts arranged in multiple stages with vertical pillars. This is an earth retention construction method in which shoring equipment connected in a shape is submerged in water and erected between earth retaining walls, and muddy water between the earth retaining walls is drained while the earth retaining walls are supported by the shoring equipment.
〈本発明の説明〉 以下、図面を参照しながら本発明について説明する。<Description of the present invention> The present invention will be described below with reference to the drawings.
〈イ〉支保工装置 第1図に本発明で使用する支保工装置1を示す。<A> Shoring device FIG. 1 shows a shoring device 1 used in the present invention.
支保工装置1は水平方向に向は多段的に配置した伸縮機
能付きの複数の切梁2と、各切梁2間を縦方向に連結し
た縦柱3と、隣り合う各切梁2の端部間を水平に連結し
た腹起し4との一体構造体で構成される。The shoring device 1 includes a plurality of struts 2 with a telescopic function arranged horizontally in multiple stages, a vertical column 3 connecting each strut 2 in the vertical direction, and an end of each adjacent strut 2. It is composed of an integral structure with a belly riser 4 whose parts are horizontally connected.
〈口〉切梁
切梁2は鋼材からなり、その一部に油圧シリンダやねじ
機構により遠隔がらその全長を伸縮制御できるように構
成しである。<Exposure> The strut 2 is made of steel, and a part thereof is configured so that its entire length can be controlled to expand or contract remotely using a hydraulic cylinder or a screw mechanism.
〈ハ〉縦柱
縦柱3は切梁2間を縦方向に連結する機能の他に、切梁
2の全長が長くなった場合に切梁2を補強する機能を有
する剛性材で構成される。<C> Vertical column The vertical column 3 is made of a rigid material that not only functions to connect the struts 2 in the vertical direction, but also has the function of reinforcing the struts 2 when the overall length of the struts 2 becomes longer. .
〈ハ〉腹起し
腹起し4はH鋼などで構成され、一定間隔をおいた切梁
2の端部間に溶接などにより固定しである。<C> Stand-up The stand-up 4 is made of H steel or the like, and is fixed by welding or the like between the ends of the struts 2 spaced apart at regular intervals.
〈作用〉 つぎに施工方法について説明する。<Effect> Next, the construction method will be explained.
〈イ〉土留壁の構築(第1図) 相対向して土留壁5.6を構築する。<B> Construction of earth retaining wall (Fig. 1) Construct earth retaining walls 5.6 facing each other.
土留壁5.6はシートパイルやコンクリート製壁体や柱
列杭なと公知の工法により構築する。The earth retaining wall 5.6 is constructed using a known construction method such as sheet pile, concrete wall, or column pile.
〈口〉掘削(第1図) つぎに土留壁5.6間の地盤を掘削する。<Exit> Excavation (Fig. 1) Next, excavate the ground between retaining walls 5 and 6.
ドライ状態で掘削すると土留壁5.6に土圧や水圧が作
用して土留壁5.6が内側に変形する危険がある。If excavation is carried out in a dry state, there is a risk that earth pressure or water pressure will act on the retaining wall 5.6, causing the retaining wall 5.6 to deform inward.
そこで土留壁5.6の変形を抑止する目的でベントナイ
ト液などの泥水7を満たしなから土留壁5.6間の地盤
を所定の深度まで掘削する。Therefore, in order to suppress the deformation of the earth retaining walls 5.6, the ground between the earth retaining walls 5.6 is excavated to a predetermined depth before being filled with muddy water 7 such as bentonite liquid.
〈ハ〉支保工の水没(第1図)
掘削作業が完了したら立体的に組み立てた支保工装置1
を泥水7中へ水没させる。<C> Submergence of shoring (Fig. 1) Shoring equipment 1 assembled three-dimensionally after excavation work is completed
Submerge it in muddy water 7.
このとき各切梁2は土留壁5.6に衝突しないように収
縮させておく。At this time, each strut 2 is contracted so as not to collide with the retaining wall 5.6.
〈二〉切梁の伸長・排水(第2図)
つぎに各切梁2群を一斉に伸長して土留壁5.6に両端
を接地する。<2> Extension and drainage of struts (Fig. 2) Next, extend each group of struts at the same time and ground both ends to the retaining wall 5.6.
これにより、土留壁5、間に複数の切梁2群が一度に架
設されたことになる。As a result, a plurality of two groups of struts are erected at once between the earth retaining walls 5 and between them.
支保工装置1で土留壁5.6を支持した状態で土留壁5
.6間の泥水7を排水して作業を完了する。The earth retaining wall 5 is supported by the shoring device 1.
.. Drain the muddy water 7 between 6 and complete the work.
〈その他の実施例1〉
腹起し4を省略し、複数の切梁2と縦柱3とを井桁状に
組み立て構成する支保工装置1を使用してもよい。<Other Embodiments 1> It is also possible to use a shoring device 1 in which the uprights 4 are omitted and a plurality of struts 2 and vertical columns 3 are assembled in a cross-shaped structure.
また伸縮機能を持たない切梁2を使用してもよい。Alternatively, a strut 2 without a telescopic function may be used.
〈その他の実施例2〉 第3図は水中での締切工事に適用した実施例を示す。<Other Example 2> Figure 3 shows an example of application to underwater cofferdam construction.
本実施例の施工法は既述した実施例と同様である。The construction method of this embodiment is the same as that of the previously described embodiments.
〈本発明の効果〉
本発明は以上説明したようになるから次の効果が得られ
る。<Effects of the Present Invention> Since the present invention is as described above, the following effects can be obtained.
〈イ〉 従来は掘削作業と支保工の設置作業を交lに繰
り返していたが、本発明では掘削作業ズ完了した後に複
数の切梁を僅えた支保工装aを一度に架設することがで
きる。<B> Conventionally, excavation work and shoring installation work were repeated alternately, but in the present invention, after the excavation work is completed, it is possible to erect the shoring system a with a plurality of struts at once.
そのため、工期を著しく短縮することがズきる。Therefore, the construction period can be significantly shortened.
〈口〉 土留壁に作用する土庄や水圧を、掘削作】中は
泥水で支持し、ドライ状態下では支保]装置で支持でき
る。〈口〉 The soil and water pressure acting on the earth retaining wall can be supported by muddy water during excavation operations, and by shoring equipment in dry conditions.
したがって、従来のように周辺地盤を車重に補強する補
助工法が不要となり、工費の伊減が図れる。Therefore, the conventional auxiliary method of reinforcing the surrounding ground with the weight of the vehicle becomes unnecessary, and construction costs can be reduced.
〈ハ〉 既設構造物に接近して施工することができる。<C> Can be constructed close to existing structures.
〈二〉 陸上や水上の何れでも施工できる。(2) Can be constructed either on land or on water.
〈ホ〉 鋼管矢板基礎の仮締切時における支保工に好適
である。<E> Suitable for shoring during temporary coffering of steel pipe sheet pile foundations.
第1図:本発明の説明図で土留壁の横断面図i 第2
図:作業終了時における土留壁の横断面図j1 第
3図:水上での施工に適用した他の実施例の説【
明図
[
第2図
第3図Figure 1: Cross-sectional view of the earth retaining wall in an explanatory diagram of the present invention.
Figure: Cross-sectional view of the retaining wall at the end of the work j1 Figure 3: Description of another example applied to construction on water [
Light diagram [Figure 2 Figure 3
Claims (1)
た支保工装置を水没して土留壁間に架設し、 支保工装置で土留壁を支持した状態で土留壁間の泥水を
排水して行う、 土留工法。(1) Construct earth retaining walls facing each other, excavate between the earth retaining walls while filling them with muddy water, and submerge in water a shoring device in which multiple struts arranged in multiple stages are connected in a well-shaped manner with vertical columns. An earth retention method in which muddy water is drained between the earth retaining walls while the earth retaining walls are supported by shoring equipment.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP27941790A JPH04155010A (en) | 1990-10-19 | 1990-10-19 | Construction method for retaining |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP27941790A JPH04155010A (en) | 1990-10-19 | 1990-10-19 | Construction method for retaining |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH04155010A true JPH04155010A (en) | 1992-05-28 |
Family
ID=17610800
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP27941790A Pending JPH04155010A (en) | 1990-10-19 | 1990-10-19 | Construction method for retaining |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH04155010A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109752238A (en) * | 2019-01-03 | 2019-05-14 | 同济大学 | Model Test Device for Local Instability of Grooved Underground Diaphragm Wall Considering Confined Water |
| CN111851468A (en) * | 2020-07-28 | 2020-10-30 | 上海市基础工程集团有限公司 | Underground water soil steel wall continuous inserting verticality control construction method |
-
1990
- 1990-10-19 JP JP27941790A patent/JPH04155010A/en active Pending
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109752238A (en) * | 2019-01-03 | 2019-05-14 | 同济大学 | Model Test Device for Local Instability of Grooved Underground Diaphragm Wall Considering Confined Water |
| CN111851468A (en) * | 2020-07-28 | 2020-10-30 | 上海市基础工程集团有限公司 | Underground water soil steel wall continuous inserting verticality control construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN113718796B (en) | Underground structure system with foundation pit supporting function and construction method | |
| JPH04155010A (en) | Construction method for retaining | |
| CN111535333A (en) | Complicated reconstruction foundation pit engineering pile foundation structure and construction method | |
| CN115387344B (en) | A rapid construction method for double foundation pits and double working conditions | |
| JPS62288269A (en) | Method for extending underground stair of building | |
| JPH0684622B2 (en) | Parent-side Yokoyaita method | |
| CN210887250U (en) | Foundation pit supporting structure for controlling deformation of existing building | |
| JP2000355941A (en) | Building and its construction method | |
| JP3109038B2 (en) | Underground skeleton structure and construction method | |
| JPS638249B2 (en) | ||
| JPH02311620A (en) | Underground structure construction method | |
| CN215888268U (en) | Utilize slant steel of steel stand biography power to trade and prop system | |
| CN112962614A (en) | Foundation pit support and construction method thereof | |
| CN218148236U (en) | Cofferdam and drilling platform integrated system | |
| JPS6322916A (en) | Construction of continuous underground wall in artificial islet | |
| CN215105364U (en) | Cast-in-place pile and steel purlin combined deep foundation pit supporting system | |
| JPH0572481B2 (en) | ||
| JPS5844802B2 (en) | Ganpekino hokiyoukohou | |
| JP3082053B2 (en) | Large-scale, deep steel continuous basement wall and method of constructing the same | |
| JPS62202125A (en) | Underwater foundation work using steel plate shell | |
| JP2002088777A (en) | Method for connecting jacket structure to pile, and pipe expanding apparatus for use in the method | |
| RU2123558C1 (en) | Method for erection of wall in ground | |
| JPH0759813B2 (en) | Underground construction method | |
| CN116180750A (en) | A construction method of open excavation and suspension of foundation pit | |
| CN118087553A (en) | Double-row miniature pile foundation pit supporting structure and construction method |