JPH0416475A - Installation method for elevator - Google Patents

Installation method for elevator

Info

Publication number
JPH0416475A
JPH0416475A JP12093290A JP12093290A JPH0416475A JP H0416475 A JPH0416475 A JP H0416475A JP 12093290 A JP12093290 A JP 12093290A JP 12093290 A JP12093290 A JP 12093290A JP H0416475 A JPH0416475 A JP H0416475A
Authority
JP
Japan
Prior art keywords
template
machine room
room unit
hoistway
centering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP12093290A
Other languages
Japanese (ja)
Inventor
Shinichi Iwata
岩田 新一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP12093290A priority Critical patent/JPH0416475A/en
Publication of JPH0416475A publication Critical patent/JPH0416475A/en
Pending legal-status Critical Current

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

PURPOSE:To install device in an extension elevation passage above a unit during temporary operation of a cage in the elevation passage below the unit by mounting a template for a centering work on the upper edge part of a machine room unit and stretching piano wires for a centering work below and above the unit through the template. CONSTITUTION:A template 10 for a centering work is secured to an upper beam 4c of a machine room unit 4. The template 10 comprises a template 10a for a floor platform, a template 10b for a cage rail, and a template 10c for a balance weight. A piano wire 9 for centering is stretched from each of the templates 10a-10c, and a piano wire 11 for centering is extended to above and stretched between the template and a fixing body at the topmost end of an elevation passage 2. A unit 4 is temporarily installed, a device is installed in a underlaying elevation passage 2 through the piano wire 9 and temporarily operated. When the elevation passage 2 is extended upward, a device is installed in an extension elevation passage 2 through the piano wire 11 in a state to continue temporary operation. This method increases the efficiency of a device installing work.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は、建物建設の進捗に合せて仮設された機械室
ユニットを次第に上昇させて据付作業を行なうエレベー
タの据付工法に関するものである。
[Detailed Description of the Invention] [Industrial Application Field] The present invention relates to an elevator installation method in which a temporarily installed machine room unit is gradually raised to perform the installation work as building construction progresses.

〔従来の技術〕[Conventional technology]

第3図及び第4図は1例えば特開昭48−63451号
公報に示された従来のエレベータの据付工法を示す図で
あり9図中、(1)は建設中の建物。
3 and 4 are diagrams showing a conventional elevator installation method disclosed in, for example, Japanese Unexamined Patent Publication No. 48-63451, and in FIG. 9, (1) shows a building under construction.

(2)は建物(1)の中に構築されて次第に上方へ延長
される昇降路、(3)は昇降路(2)の上端部りに仮設
された受は梁、(4)は受は梁(3)に支持された機械
室ユニットで次のように構成される。すなわち、床梁(
4a)、横梁(4b)、上梁(4C〕からなる枠体(4
d)か設けられ、床梁(4a)の上に巻上様(4e)が
設けられ、また横梁(4b)の上に制御盤(4f)が設
けられる。(5)は巻上機(4e)に巻き掛けられ主索
(6)に吊持されたかご、(7)は昇降路(2)の機械
室ユニット(4〕の下方に立設されたレール、(8)は
芯出し作業用の形板で、床梁(4a)上に固定され、(
8a)は乗場周形板、 (8b)はかごレール周形板、
 (8c)はつり合おもりレール周形板である。(9)
は形板(8a)〜(8c)からそれぞれ吊下された芯出
し用のピアノ線である。
(2) is a hoistway that is built inside building (1) and gradually extends upward; (3) is a beam that is temporarily installed at the top of the hoistway (2); (4) is a hoistway that is The machine room unit is supported by a beam (3) and is configured as follows. In other words, the floor beam (
4a), a cross beam (4b), and a top beam (4C).
d), a hoisting member (4e) is provided on the floor beam (4a), and a control panel (4f) is provided on the cross beam (4b). (5) is a car wrapped around the hoisting machine (4e) and suspended from the main rope (6), and (7) is a rail installed below the machine room unit (4) of the hoistway (2). , (8) is a shape board for centering work, fixed on the floor beam (4a), (
8a) is the landing board circumferential plate, (8b) is the car rail circumferential plate,
(8c) is a counterweight rail peripheral plate. (9)
are centering piano wires suspended from the shape plates (8a) to (8c), respectively.

従来のエレベータの据付は上記のように部材が配置され
、構築中の昇降路(2)中に、タワークレ−ン(図示し
ない)によってかご(5)が搬入されまた機械室ユニッ
ト(4)が搬入されて昇降路(2)の上端寄りに仮設さ
れる。そして、形板(8)から吊下されたピアノ線(9
)を介してレール(4)等の昇降路(2)内機器が据付
けられる。ついで機械室ユニット(4)によりかご(5
)が建設工事用として仮運転される。また、建物の建設
が進捗して機械室ユニット(4)よりも上方に昇降路(
2)が延長されると7機械室ユニット(4)が上方へ移
動されて。
In conventional elevator installation, the components are arranged as described above, and the car (5) is carried by a tower crane (not shown) and the machine room unit (4) is carried into the hoistway (2) under construction. It will be temporarily installed near the upper end of the hoistway (2). Then, the piano wire (9) suspended from the shape board (8)
) The equipment in the hoistway (2) such as the rail (4) is installed. Next, the machine room unit (4) moves the car (5
) will be put into temporary operation for construction work. In addition, as the construction of the building progresses, a hoistway (
When 2) is extended, the 7 machine room unit (4) is moved upward.

延長分の昇降路(2)内機器の据付けが行なわれ。Equipment in the extended hoistway (2) was installed.

かご(5)の延長分を含めた仮運転が行なわれる。A temporary operation including the extension of the car (5) will be carried out.

〔発明が解決しようとする課題〕[Problem to be solved by the invention]

上記のような従来のエレベータの据付工法では。 In the conventional elevator installation method as described above.

機械室ユニット(4)の床梁(4a)の形板(8)から
ピアノ線(9)が張設されるため1機械室ユニット(4
)よりも上方に逐次構築された延長分の昇降路(2)に
対する芯出し用のピアノ線の張設が困難である。
Since the piano wire (9) is stretched from the shape plate (8) of the floor beam (4a) of the machine room unit (4), one machine room unit (4)
) It is difficult to tension the centering piano wire for the extension of the hoistway (2) constructed successively above the hoistway (2).

したがって、延長分の昇降路(2)に対応して機械室ユ
ニット(4)を上昇させた後、ピアノ線(9)を張設し
て昇降路(2)内機器を据付けることになる。
Therefore, after raising the machine room unit (4) to correspond to the extended hoistway (2), the piano wire (9) is stretched and the equipment in the hoistway (2) is installed.

このため、かご(5)の仮運転中断期間が長くなるとい
う問題点があった。
For this reason, there was a problem in that the temporary operation suspension period of the car (5) becomes long.

この発明は、かかる問題点を解決するためになされたも
のであり1機械室ユニットよりも上方の延長分昇降路に
対して昇降路内機器が据付は可能なエレベータの据付工
法を得ることを目的としている。
This invention was made in order to solve such problems, and the object is to obtain an elevator installation method that allows equipment in the hoistway to be installed in the hoistway for an extension above one machine room unit. It is said that

〔課題を解決するための手段〕[Means to solve the problem]

この発明にかかわるエレベータの据付工法においては1
機械室ユニットの上縁部に芯出し作業用の形板が装着さ
れ、この形板を介して機械室ユニットの下方、及び上方
の芯出し作業用のピアノ線が張設される。
In the elevator installation method related to this invention, 1
A shape plate for centering work is attached to the upper edge of the machine room unit, and piano wires for centering work are stretched below and above the machine room unit via this shape plate.

〔作用〕[Effect]

上記のようなエレベータの据付工法では1機械室ユニッ
トよりも下方のかごの仮運転中に9機械室ユニットより
も上方の延長分昇降路の昇降路内機器の据付けが可能と
なる。
In the elevator installation method described above, it is possible to install equipment in the hoistway extending above the 9th machine room unit during temporary operation of the car below the 1st machine room unit.

〔実施例〕〔Example〕

第1図及び第2図はこの発明の一実施例を示す図で1図
中、第3図及び第4図と同符号は相当部分を示し、 (
10)は芯出し作業用の形板で9機械室ユニット(4)
の上梁(4c)に固定され、 (10a)は乗場層形板
、 (10b)はかごレール層形板、 (10c)はつ
り合おもり周形板である。(9)はそれぞれ形板(10
)から下方が張設された芯出し用のピアノ線。
FIGS. 1 and 2 are diagrams showing an embodiment of the present invention. In FIG. 1, the same reference numerals as in FIGS. 3 and 4 indicate corresponding parts.
10) is a shape plate for centering work and has 9 machine room units (4)
It is fixed to the upper beam (4c), (10a) is the landing layer plate, (10b) is the car rail layer plate, and (10c) is the counterweight circumferential plate. (9) is the shape plate (10
) The piano wire for centering is stretched from below.

(11)はそれぞれ形板(10)から上方へ延長されて
(11) are each extended upwardly from the profile plate (10).

昇降路(2)最上端部の固定体(図示しない)との間に
張設された昇降路(2ン延長部の芯出し用の上部ピアノ
線である。
This is an upper piano wire for centering the hoistway (2-in extension) stretched between the hoistway (2) and a fixed body (not shown) at the top end.

上記のように構成されたエレベータの据付工法において
1機械室ユニット(4)が仮設され、ピアノ線(9)を
介して機械室ユニット(4)よりも下方の昇降路(2)
内機器が据付けられる。これにより。
In the elevator installation method configured as described above, one machine room unit (4) is temporarily installed, and the hoistway (2) below the machine room unit (4) is installed via the piano wire (9).
Internal equipment will be installed. Due to this.

機械室ユニント(4)よりも下方においてかご(5)か
仮運転される。そして1機械室ユニット(4)よりも上
方へ昇降路(2)が構築されて延長されると。
The car (5) is temporarily operated below the machine room unit (4). Then, a hoistway (2) is constructed and extended above the first machine room unit (4).

上部ピアノ線(11)が張設されてかご(5)の仮運転
が継続された状態で、延長昇降路(2)内機器の据付か
行なわれる。ついで延長昇降路(2)内の機器据付が終
了した段階で1機械室ユニット(4)が上方へ移動され
て延長昇降路(2)を含めたかご(5)の仮運転が再開
される。したがって、かご(5)の仮運転中断期間が短
縮できかご(5)を建設工事用として効率よく使用する
ことができる。また形板(10)は下方のピアノ線(9
)と上部ピアノ線(11)に兼用されるので、−回の位
置決めで済み、据付作業を能率化することができる。
With the upper piano wire (11) being stretched and the car (5) temporarily operating, equipment in the extended hoistway (2) is installed. Then, when the equipment installation in the extended hoistway (2) is completed, the first machine room unit (4) is moved upward, and the temporary operation of the car (5) including the extended hoistway (2) is resumed. Therefore, the temporary operation suspension period of the car (5) can be shortened, and the car (5) can be efficiently used for construction work. Also, the shape plate (10) is connected to the lower piano wire (9).
) and the upper piano wire (11), only -times of positioning is required, making the installation work more efficient.

〔発明の効果〕〔Effect of the invention〕

この発明は1以上説明したように構築中の昇降路の上端
寄りに仮設される機械室ユニットの上縁部に芯出し作業
用の形板を装着して機械室ユニットの下方及び上方の芯
出し作業用のピアノ線を張設するようにしたもので1機
械室ユニットよりも下方のかご仮運転中に機械室ユニッ
トよりも上方の延長昇降路内機器の据付けが可能となる
。このため、延長昇降路内機器据付終了後に機械室ユニ
ットを上方へ移動するようにして、かごの仮運転中断期
間を短縮することができ、かごの建設工事用使用を効率
化する効果がある。
As explained above, this invention involves attaching a shape plate for centering work to the upper edge of a machine room unit that is temporarily installed near the upper end of a hoistway that is being constructed, and aligning the lower and upper parts of the machine room unit. The work piano wire is stretched, making it possible to install equipment in the extended hoistway above the machine room unit during temporary operation of the car below the machine room unit. Therefore, by moving the machine room unit upward after the equipment installation in the extended hoistway is completed, it is possible to shorten the temporary operation interruption period of the car, which has the effect of streamlining the use of the car for construction work.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図はこの発明によるエレベータの据付工法の一実施
例を示す図で後述する第4図相当図、第2図は第1図の
H部拡大図、第3図は従来のエレヘータの据付工法を示
す図で建設中の建物の概念立面図、第4図は第3図の機
械室ユニット部分の拡大図である。 (2)−・・昇降路、(4)・・・機械室ユニッl”+
 (10)・・・形板。 なお1図中同一部分または相当部分は同一符号により示
す。
Fig. 1 is a diagram showing an embodiment of the elevator installation method according to the present invention, and is equivalent to Fig. 4, which will be described later. Fig. 2 is an enlarged view of the H section in Fig. 1, and Fig. 3 is a conventional elevator installation method. Figure 4 is an enlarged view of the machine room unit shown in Figure 3. (2)--Hoistway, (4)...Machine room unit l''+
(10)... shape plate. In addition, the same parts or corresponding parts in FIG. 1 are indicated by the same reference numerals.

Claims (1)

【特許請求の範囲】[Claims] 構築中の昇降路の上端部寄りに、構築進捗に従つて上昇
変位可能な機械室ユニットを仮設し、この機械室ユニッ
トよりも下方の上記昇降路内機器の少なくとも芯出し作
業を行なうエレベータの据付工法において、上記機械室
ユニットの上縁部に芯出し作業用の形板を固定し、この
形板により上記芯出し作業を行ない、かつ上記機械室ユ
ニットよりも上方に延長された昇降路内機器用の芯出し
作業を上記形板を介して行なうエレベータの据付工法。
A machine room unit that can be moved upward as the construction progresses is temporarily installed near the upper end of the hoistway under construction, and an elevator is installed to perform at least centering work of the equipment in the hoistway below this machine room unit. In the construction method, a shape plate for centering work is fixed to the upper edge of the machine room unit, the centering work is performed with this shape plate, and equipment in the hoistway extends upward from the machine room unit. An elevator installation method in which centering work is performed via the above-mentioned shape plate.
JP12093290A 1990-05-10 1990-05-10 Installation method for elevator Pending JPH0416475A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP12093290A JPH0416475A (en) 1990-05-10 1990-05-10 Installation method for elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP12093290A JPH0416475A (en) 1990-05-10 1990-05-10 Installation method for elevator

Publications (1)

Publication Number Publication Date
JPH0416475A true JPH0416475A (en) 1992-01-21

Family

ID=14798543

Family Applications (1)

Application Number Title Priority Date Filing Date
JP12093290A Pending JPH0416475A (en) 1990-05-10 1990-05-10 Installation method for elevator

Country Status (1)

Country Link
JP (1) JPH0416475A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001335255A (en) * 2000-05-24 2001-12-04 Toshiba Corp Elevator installation method and elevator installation unit

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001335255A (en) * 2000-05-24 2001-12-04 Toshiba Corp Elevator installation method and elevator installation unit

Similar Documents

Publication Publication Date Title
WO2002079067A1 (en) Method for installing hoist
JPH0416475A (en) Installation method for elevator
JP2939064B2 (en) Elevator installation template
JPH09165160A (en) Elevator installation method
JP2612258B2 (en) Elevator installation construction method
JP2877593B2 (en) Elevator installation method
JPH0747452B2 (en) Elevator installation method
JPS5912064A (en) Method of construction of installation of elevator
JP2564413B2 (en) How to remodel the elevator car
JPH021066B2 (en)
JPH02300081A (en) Installation work method for elevator
JP2549171B2 (en) Elevator installation method
JP2001163546A (en) Construction method for installation work for machine- roomless elevator
JPH05201648A (en) Installation of elevator
JPS63282083A (en) Method of isolation installation construction at every stair of elevator
JP3347968B2 (en) Hydraulic elevator installation method
JPH11209026A (en) Elevator installation method
JPH0791010B2 (en) Elevator guide rail assembly method
JPH05278966A (en) Temporary elevator device
JP2001097650A (en) Construction method for installing elevator without machine room
JPH0747453B2 (en) Elevator installation method
JPH04217578A (en) Centering method of guide rail for elevator balancing weight
JP2812590B2 (en) How to modify the elevator
JPH06156923A (en) Installation method of elevator
JPH05105359A (en) Elevator modifying method