JPH0421101B2 - - Google Patents

Info

Publication number
JPH0421101B2
JPH0421101B2 JP62275300A JP27530087A JPH0421101B2 JP H0421101 B2 JPH0421101 B2 JP H0421101B2 JP 62275300 A JP62275300 A JP 62275300A JP 27530087 A JP27530087 A JP 27530087A JP H0421101 B2 JPH0421101 B2 JP H0421101B2
Authority
JP
Japan
Prior art keywords
water
temperature
signal
water heater
detection means
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP62275300A
Other languages
Japanese (ja)
Other versions
JPH01118068A (en
Inventor
Takeshi Kato
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rinnai Corp
Original Assignee
Rinnai Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rinnai Corp filed Critical Rinnai Corp
Priority to JP62275300A priority Critical patent/JPH01118068A/en
Priority to KR1019880011562A priority patent/KR920009304B1/en
Publication of JPH01118068A publication Critical patent/JPH01118068A/en
Publication of JPH0421101B2 publication Critical patent/JPH0421101B2/ja
Granted legal-status Critical Current

Links

Classifications

    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23N—REGULATING OR CONTROLLING COMBUSTION
    • F23N1/00—Regulating fuel supply
    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24—HEATING; RANGES; VENTILATING
    • F24H—FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H1/00—Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters
    • F24H1/10—Continuous-flow heaters, i.e. heaters in which heat is generated only while the water is flowing, e.g. with direct contact of the water with the heating medium
    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24—HEATING; RANGES; VENTILATING
    • F24H—FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00—Details
    • F24H9/20—Arrangement or mounting of control or safety devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Control Of Combustion (AREA)
  • Instantaneous Water Boilers, Portable Hot-Water Supply Apparatuses, And Control Of Portable Hot-Water Supply Apparatuses (AREA)

Description

【発明の詳細な説明】 [産業上の利用分野] 本発明は、水を加熱して供給する給湯器に関
し、特に入水温度によつて燃焼量等の加熱量を制
御する制御装置を備えた給湯器に係る。
[Detailed Description of the Invention] [Industrial Application Field] The present invention relates to a water heater that heats and supplies water, and particularly to a water heater that is equipped with a control device that controls the amount of heating such as the amount of combustion depending on the temperature of water entering the water. Concerning vessels.

[従来の技術] ガス燃焼式給湯器のように、加熱量の調節を自
由に行うことができる給湯器では、設定温度にす
るために予め給湯器内に入水する水の温度を検出
し、その温度に応じて加熱量としての燃焼量を調
節するフイードフオワード制御が制御装置によつ
て行われ、設定温度の水を供給している。
[Prior Art] In water heaters such as gas-fired water heaters that can freely adjust the amount of heating, the temperature of the water entering the water heater is detected in advance in order to reach the set temperature. The control device performs feed forward control to adjust the amount of combustion as the amount of heating depending on the temperature, and supplies water at a set temperature.

[発明が解決しようとする問題点] しかし、給湯器が継続して使用され入水温度が
一定になつた定常時には、こうした入水温度に基
づいたフイードフオワード制御によつて設定温度
の水を給湯できるが、使用開始時には、給湯器内
に止どまつている水の温度は周囲の温度によつて
決まり、この温度はその後通水によつて給湯器内
に入水する水の温度とは異なつている場合があ
る。従つて、もし給湯器内の温度が高く入水する
水の温度が低い場合には、給湯器から供給される
水の温度は設定温度より低くなり、逆に給湯器内
の温度が低く入水する水の温度が高い場合には、
給湯器から供給される水の温度は高くなつてしま
い、場合によつては設定温度以上に過熱されて非
常に危険になるという問題点がある。
[Problems to be solved by the invention] However, in steady state when the water heater is used continuously and the inlet water temperature is constant, water at the set temperature cannot be supplied by feed forward control based on the inlet water temperature. However, at the beginning of use, the temperature of the water that remains in the water heater is determined by the ambient temperature, and this temperature will be different from the temperature of the water that enters the water heater after water flows through it. There may be cases. Therefore, if the temperature inside the water heater is high and the temperature of the incoming water is low, the temperature of the water supplied from the water heater will be lower than the set temperature, and conversely, if the temperature inside the water heater is low, the temperature of the incoming water will be lower. If the temperature of
There is a problem in that the temperature of the water supplied from the water heater becomes high, and in some cases, it becomes overheated to a temperature higher than the set temperature, which can be extremely dangerous.

本発明は、入水温度を検出するための入水温検
出手段を備え、この入水温検出手段によつて検出
される入水温度によつて加熱器の加熱量を制御す
る制御装置を備えた給湯器において、使用開始時
においても設定温度の水を供給でき過熱されるこ
とがない安全な給湯器を提供することを目的とす
る。
The present invention provides a water heater equipped with an inlet water temperature detection means for detecting the inlet water temperature, and a control device that controls the heating amount of the heater based on the inlet water temperature detected by the inlet water temperature detection means. The purpose of the present invention is to provide a safe water heater that can supply water at a set temperature even at the beginning of use and will not be overheated.

[問題点を解決するための手段] 本発明は、給湯器内に入水する水を検知して通
水信号を発生する通水検知手段と、前記給湯器内
に入水する水の量を検知するための流量検知手段
と、前記給湯器内に入水する水を加熱する加熱手
段と、該加熱手段によつて加熱される水の温度を
設定するための温度設定手段と、前記給湯器内に
入水する水の温度を検知し、検知した温度に応じ
た温度信号を発生する入水温検出手段と、前記流
量検知手段の検知流量、前記温度設定手段の設定
温度および前記入水温検出手段により検出された
温度信号に基づき前記加熱手段の加熱量を制御す
る制御手段とからなる給湯器において、前記制御
手段は、前記通水検知手段からの通水信号を受信
してから所定時間作動する計時手段を備え、該計
時手段の作動終了後に前記入水温検出手段の温度
信号の読み込みを開始し、読み込まれる温度信号
に基づいた前記加熱手段の制御を開始することを
技術的手段とする。
[Means for Solving the Problems] The present invention provides a water flow detection means that detects water entering a water heater and generates a water flow signal, and detects the amount of water entering the water heater. a heating means for heating the water entering the water heater; a temperature setting means for setting the temperature of the water heated by the heating means; an inlet water temperature detection means for detecting the temperature of the water to be detected and generating a temperature signal according to the detected temperature; a flow rate detected by the flow rate detection means; a set temperature of the temperature setting means; A water heater comprising a control means for controlling the heating amount of the heating means based on a temperature signal, wherein the control means includes a timer that operates for a predetermined period of time after receiving a water flow signal from the water flow detection means. The technical means is to start reading the temperature signal of the inlet water temperature detecting means after the operation of the timing means is completed, and to start controlling the heating means based on the read temperature signal.

[作用] 本発明の給湯器では、給湯器に入水する水は通
水検知手段によつて検知され、この通水検知手段
によつて通水信号が発生される。
[Function] In the water heater of the present invention, water entering the water heater is detected by the water flow detection means, and a water flow signal is generated by the water flow detection means.

また給湯器に入水する水の温度は、入水温検出
手段によつて検出され温度信号として発生され
る。
Further, the temperature of water entering the water heater is detected by an incoming water temperature detection means and generated as a temperature signal.

制御手段には、通水信号を受信すると所定時間
作動する計時手段が備えられ、制御手段は、計時
手段の作動が終了すると入水温検出手段により検
出された温度信号を読み込み、読み込まれた温度
信号に基づいて加熱手段の制御を開始する。
The control means is equipped with a timer that operates for a predetermined time upon receiving the water flow signal, and when the timer finishes operating, the control means reads the temperature signal detected by the inlet water temperature detection means, and reads the temperature signal that has been read. control of the heating means is started based on.

従つて、制御手段による加熱手段の制御は、所
定時間を経過してからの温度信号に基づいて開始
される。その後制御手段は、入水温検出手段から
の温度信号に基づいて加熱手段を制御する。
Therefore, control of the heating means by the control means is started based on a temperature signal after a predetermined time has elapsed. Thereafter, the control means controls the heating means based on the temperature signal from the incoming water temperature detection means.

[発明の効果] 本発明では、制御手段による加熱手段の制御
は、通水検知手段からの通水信号を受信してから
所定時間後に初めて行われる。このため、加熱手
段によつて加熱される水の温度は、給湯器内の水
の温度が安定してから行われることになるため、
設定温度より高すぎたり低すぎたりすることはな
い。従つて、安全に給湯器を使用することができ
る。
[Effects of the Invention] In the present invention, the heating means is controlled by the control means for the first time after a predetermined period of time has passed after receiving the water flow signal from the water flow detection means. For this reason, the temperature of the water heated by the heating means is adjusted only after the temperature of the water in the water heater has stabilized.
The temperature will never be too high or too low below the set temperature. Therefore, the water heater can be used safely.

[実施例] 次に本発明の給湯器を図面に示す実施例に基づ
き説明する。
[Example] Next, a water heater of the present invention will be described based on an example shown in the drawings.

第2図に示すガス燃焼式給湯器1の給湯器ケー
ス2内には燃焼器ケース10が設けられ、さらに
その内部にはガス供給管20により供給される燃
料ガスを燃焼させる2連式のバーナ11が設けら
れている。また、燃焼器ケース10には3相Y結
線のブラシレスDCモータを使用した燃焼用フア
ン12が備えられ、バーナ11はこの燃焼用フア
ン12によつて供給される燃焼用空気によつて燃
焼する強制送風式燃焼器となつており、燃焼排ガ
スは排気口3から外部へ排気される。
A combustor case 10 is provided in the water heater case 2 of the gas combustion type water heater 1 shown in FIG. 11 are provided. Further, the combustor case 10 is equipped with a combustion fan 12 using a three-phase Y-connected brushless DC motor, and the burner 11 is forced to burn by the combustion air supplied by the combustion fan 12. It is a blower type combustor, and combustion exhaust gas is exhausted to the outside from an exhaust port 3.

燃焼器ケース10内の上方には水供給管30と
接続された熱交換器13が設けられ、内部を通過
する水は本発明の加熱手段であるバーナ11によ
り発生する熱により加熱される。また燃焼器ケー
ス10内のバーナ11の近傍には、点火装置とし
てのスパーカ14と、炎検知手段としてのフレー
ムロツド15とが設けられている。
A heat exchanger 13 connected to a water supply pipe 30 is provided above the combustor case 10, and water passing through the interior is heated by heat generated by the burner 11, which is the heating means of the present invention. Further, in the vicinity of the burner 11 in the combustor case 10, a sparker 14 as an ignition device and a flame rod 15 as a flame detection means are provided.

ガス供給管20には、上流側より通電時に燃料
ガスを通過させる元電磁弁21、主電磁弁22、
燃料ガスの供給量を供給圧力を制御することによ
り調節するガバナ比例弁23、2連式バーナ11
の一方への燃料ガスを使用状態に応じて遮断する
切替用電磁弁24がそれぞれ設けられ、前述のバ
ーナ11へ燃料ガスを供給する。
The gas supply pipe 20 includes a source solenoid valve 21, a main solenoid valve 22, which allows fuel gas to pass through when energized from the upstream side.
A governor proportional valve 23 that adjusts the amount of fuel gas supplied by controlling the supply pressure, and a dual burner 11
A switching electromagnetic valve 24 is provided to cut off fuel gas to one of the burners 11 according to the usage state, and supplies fuel gas to the burner 11 described above.

水供給管30の最上流部には水フイルタ31を
備えた水抜き栓32が設けられ、その下流には熱
交換器13内への水の流入量を調整するギヤドモ
ータによる水量制御弁33が設けられ、この水量
制御弁33は開度検出のためのポテンシヨメータ
34を備えている。水量制御弁33で流入量が調
整された水は、すぐ下流に設けられた本発明の温
度検出手段である入水温サーミスタ35によつて
温度が検知され、さらにその下流に設けられた水
量センサ36により流入量が検出され、水供給管
30を通過して熱交換器13へ送られる。
A water drain valve 32 equipped with a water filter 31 is provided at the most upstream portion of the water supply pipe 30, and a water flow control valve 33 operated by a geared motor is provided downstream thereof to adjust the amount of water flowing into the heat exchanger 13. The water flow control valve 33 is equipped with a potentiometer 34 for detecting the opening degree. The temperature of the water whose inflow amount is adjusted by the water amount control valve 33 is detected by the inlet water temperature thermistor 35, which is the temperature detection means of the present invention, provided immediately downstream, and the water amount sensor 36 provided further downstream. The inflow amount is detected and sent to the heat exchanger 13 through the water supply pipe 30.

以上の構成からなるガス燃焼式給湯器1は、制
御装置50により制御される。
The gas combustion water heater 1 having the above configuration is controlled by a control device 50.

制御装置50は、第1図に示すとおり、屋内配
線のコンセントに接続される電源コード51に接
続された電源部53により作動し、制御装置50
にはガス燃焼式給湯器1を操作するためにメイン
コントローラ54とサブコントローラ54aとが
備えられている。
As shown in FIG. 1, the control device 50 is operated by a power supply section 53 connected to a power cord 51 connected to an outlet of indoor wiring.
is equipped with a main controller 54 and a sub-controller 54a to operate the gas combustion water heater 1.

制御回路60には、マイクロコンピユータ70
(以下CPU70とする)を中心として、スパーカ
回路61、フアン回路62、比例弁回路63、ギ
ヤドモータ回路64、位置検出回路65、水量検
出回路66があり、これらの回路はCPU70に
より所定の制御が行われる。
The control circuit 60 includes a microcomputer 70.
(hereinafter referred to as the CPU 70), there are a sparker circuit 61, a fan circuit 62, a proportional valve circuit 63, a geared motor circuit 64, a position detection circuit 65, and a water amount detection circuit 66, and these circuits are controlled in a prescribed manner by the CPU 70. be exposed.

フアン回路62は、燃焼用フアン12を設定水
温等の燃焼要求量に応じて回転させるとともに、
3相Y結線のブラシレスDCモータに備えられた
ホールICによりその回転数を検出して検出信号
をCPU70へ送るものである。
The fan circuit 62 rotates the combustion fan 12 according to the required combustion amount such as the set water temperature, and
A Hall IC provided in a three-phase Y-connected brushless DC motor detects its rotational speed and sends a detection signal to the CPU 70.

比例弁回路63は、バーナ11における燃焼が
所望の空燃比で行われるように燃料ガスの供給量
を調整するためにガバナ比例弁23への通電量を
制御する回路で、ガバナ比例弁23への通電量は
点火時を除いて燃焼用フアン12の回転数に基づ
いて制御される。
The proportional valve circuit 63 is a circuit that controls the amount of electricity supplied to the governor proportional valve 23 in order to adjust the amount of fuel gas supplied so that combustion in the burner 11 is performed at a desired air-fuel ratio. The amount of energization is controlled based on the rotation speed of the combustion fan 12 except during ignition.

ギヤドモータ回路64は、熱交換器13へ流入
する水量を調節するための水量制御弁33のギヤ
ドモータを駆動する回路で、水量制御弁33を制
御信号の応じた開度にするものである。
The geared motor circuit 64 is a circuit that drives a geared motor of the water flow control valve 33 for regulating the flow of water into the heat exchanger 13, and opens the water flow control valve 33 according to a control signal.

位置検出回路65は、水量制御弁33にその開
度を検出するために備えられたポテンシヨメータ
34からの信号を解析するための回路である。
The position detection circuit 65 is a circuit for analyzing a signal from the potentiometer 34 provided in the water flow control valve 33 to detect its opening degree.

水量検出回路66は、入水量に応じて発生する
水量センサ36からのパルス信号を電圧に変換
し、通水量を示す電圧として出力する。また水量
検出回路66は、所定電圧を出力した場合に通水
信号を発生する本発明の通水検知手段でもあり、
ガス燃焼式給湯器1は通水信号に基づいてCPU
70により所定のシーケンスで燃焼を開始する。
The water amount detection circuit 66 converts a pulse signal from the water amount sensor 36 generated in accordance with the amount of water inflow into a voltage, and outputs it as a voltage indicating the amount of water flowing. Further, the water amount detection circuit 66 is also a water flow detection means of the present invention that generates a water flow signal when a predetermined voltage is output.
The gas combustion type water heater 1 uses the CPU based on the water flow signal.
70, combustion is started in a predetermined sequence.

CPU70は、本発明の制御手段であり、使用
者が水を使用して水量センサ36に基づく通水信
号が得られると、メインコントローラ54および
サブコントローラ54aによる設定状態および各
センサの出力信号に応じて燃焼量を制御する。
The CPU 70 is a control means of the present invention, and when the user uses water and obtains a water flow signal based on the water flow sensor 36, the CPU 70 responds to the settings by the main controller 54 and the sub-controller 54a and the output signals of each sensor. to control the amount of combustion.

この燃焼量の制御では、水供給管30に通水が
行われていないときの水温を読み込むと正しい入
水温度が得られないため、本実施例では入水温サ
ーミスタ35による水温の読み込みを水量検出回
路66からの通水信号を検知してから所定時間経
過後に行うために、CPU70は計時手段として
のタイマ71を備えている。
In this combustion amount control, if the water temperature is read when water is not flowing through the water supply pipe 30, the correct incoming water temperature cannot be obtained. Therefore, in this embodiment, the reading of the water temperature by the incoming water temperature thermistor 35 is carried out by the water amount detection circuit. The CPU 70 is equipped with a timer 71 as a timer so that the water flow signal is detected after a predetermined period of time has elapsed since the water flow signal from the water supply signal 66 is detected.

これは、ガス燃焼式給湯器1に入水される水の
温度と、周囲の温度とが大きく異なる場合に、通
水信号と同時に入水温度の読み込みを行うと、バ
ーナ11で加熱される水の温度が設定温度に対し
て低すぎたり高すぎたりすることがあり、特に高
い場合には非常に危険であるため、入水温度が安
定してから燃焼量の計算を行うようにするためで
ある。
This means that if the temperature of the water entering the gas combustion water heater 1 and the ambient temperature are significantly different, and the temperature of the water entering the water heater 1 is read at the same time as the water supply signal, the temperature of the water heated by the burner 11 will change. This is because the amount of combustion is calculated only after the inlet water temperature has stabilized, since the temperature may be too low or too high for the set temperature, and if it is particularly high, it is extremely dangerous.

本実施例では、第3図に示すとおり、タイマ7
1の作動はt(例えば0.1〜5)秒間であり、CPU
70はその作動終了後に入水温サーミスタ35に
よる入水温度の読み込みを行い、その時の水温を
温度信号としている。このとき、読み込みされた
入水温度が設定温度より高い場合には運転は行わ
れず、運転開始は設定温度が読み込み温度より例
えば2℃低くなつた場合に行われる。
In this embodiment, as shown in FIG.
The operation of 1 is for t (e.g. 0.1 to 5) seconds, and the CPU
70 reads the inlet water temperature by the inlet water temperature thermistor 35 after the operation is completed, and uses the water temperature at that time as a temperature signal. At this time, if the input water temperature read is higher than the set temperature, the operation is not performed, and the operation is started when the set temperature becomes lower than the read temperature by, for example, 2°C.

また、この読み込みによつて得られた入水温度
による運転停止、運転開始の制御も行われ、入水
温度が所定温度以上のときには運転が停止され、
所定温度以下のときには運転される。本実施例で
はこの所定温度はヒステリシス特性を持つて設定
され、入水温度が55℃以上のとき運転停止され、
50℃以下になると運転が開始される。
In addition, control is performed to stop and start operation based on the inlet water temperature obtained from this reading, and when the inlet water temperature is higher than a predetermined temperature, the operation is stopped.
It is operated when the temperature is below a predetermined temperature. In this embodiment, this predetermined temperature is set with a hysteresis characteristic, and the operation is stopped when the inlet water temperature is 55°C or higher.
Operation starts when the temperature drops below 50℃.

次に、以上の構成からなるガス燃焼式給湯器1
の作動を第3図および第4図に基づいて説明す
る。
Next, the gas combustion type water heater 1 having the above configuration will be described.
The operation will be explained based on FIGS. 3 and 4.

使用者が図示しない電源スイツチを閉じ、水温
を設定し通水を開始すると、水供給管30内に水
が流入し水量センサ36が作動し、その信号は水
量検出回路66へ送られる。
When the user closes a power switch (not shown), sets the water temperature, and starts water flow, water flows into the water supply pipe 30, the water amount sensor 36 is activated, and its signal is sent to the water amount detection circuit 66.

CPU70は、水量検出回路66の出力電圧に
より通水信号があるか否かを判別し(ステツプ
100)、通水信号がない場合(ステツプ100でNo)
には運転停止(ステツプ101)を選択し運転は行
われない。
The CPU 70 determines whether or not there is a water flow signal based on the output voltage of the water amount detection circuit 66 (step
100), if there is no water flow signal (No at step 100)
In this case, operation stop (step 101) is selected and operation is not performed.

通水信号がある場合(ステツプ100でYes)に
は、第3図に示すように同時にタイマ71を作動
する(ステツプ102)。タイマ71の作動時間は
0.5秒間で、その後入水温サーミスタ35からの
温度信号に基づき入水温度の読み込みし(ステツ
プ103)、燃焼量の計算が行われる(ステツプ
104)。
If there is a water flow signal (Yes at step 100), the timer 71 is activated at the same time as shown in FIG. 3 (step 102). The operating time of timer 71 is
After 0.5 seconds, the inlet water temperature is read based on the temperature signal from the inlet water temperature thermistor 35 (step 103), and the combustion amount is calculated (step 103).
104).

このとき読み込まれる入水温度は、通水信号が
受信されたからt秒経過してから検出された入水
温度であるため、水供給管30内に止どまつてい
た水の温度ではなく、新たに水供給管30に入水
された水の温度である。従つて、この入水温度に
基づいて燃焼量の計算を行うことにより、燃焼開
始後に給湯される水の温度を、設定温度にするこ
とができる。
The incoming water temperature read at this time is the incoming water temperature detected after t seconds have elapsed since the water flow signal was received, so it is not the temperature of the water that had been stagnant in the water supply pipe 30, but the temperature of the new water. This is the temperature of the water entering the supply pipe 30. Therefore, by calculating the amount of combustion based on this incoming water temperature, the temperature of the water supplied after the start of combustion can be set to the set temperature.

燃焼量の計算後にさらに通水信号がある場合
(ステツプ105でYes)には給湯器は運転され(ス
テツプ106)、燃焼用フアン12からは燃焼用空気
が、ガス供給管20からは燃料ガスが各電磁弁を
介してそれぞれ供給され、所定のシーケンスによ
つて燃焼を開始する。
If there is a water flow signal after calculating the combustion amount (Yes in step 105), the water heater is operated (step 106), and combustion air is supplied from the combustion fan 12 and fuel gas is supplied from the gas supply pipe 20. The fuel is supplied through each electromagnetic valve, and combustion starts according to a predetermined sequence.

その後は、逐次入水温度が読み込まれ(ステツ
プ103)、その入水温度によつて燃焼量が計算され
(ステツプ104)、通水信号がある間運転は継続さ
れる。
Thereafter, the inlet water temperature is sequentially read (step 103), the combustion amount is calculated based on the inlet water temperature (step 104), and operation continues as long as there is a water flow signal.

運転中に給湯が中止され、通水信号が停止した
場合(ステツプ105でNo)には、運転は停止され
る(ステツプ101)。
If hot water supply is stopped during operation and the water flow signal is stopped (No in step 105), the operation is stopped (step 101).

以上のとおり、本発明は、燃焼量を予め計算す
るために読み込む入水温度を、通水信号があつて
からt秒後に始めて読み込むため、運転開始時に
水供給管30内に残つている水の温度を検出する
ことはなく、新たに加熱される水の温度を検出す
ることができる。従つて、給湯される水の温度が
設定温度に対して、高すぎたり低かつたりするこ
とがなく、給湯器を安全に使用することができ
る。
As described above, in the present invention, since the inlet water temperature read in order to calculate the combustion amount in advance is read t seconds after the water flow signal is applied, the temperature of the water remaining in the water supply pipe 30 at the start of operation is The temperature of the newly heated water can be detected without detecting the temperature of the water. Therefore, the temperature of the water supplied will not be too high or too low relative to the set temperature, and the water heater can be used safely.

本実施例では、ガス燃焼式給湯器について説明
したが、石油等の他の燃料による給湯器や電気ヒ
ータによる給湯器であつても同様に制御すること
により設定温度の水を供給することができる。
In this example, a gas combustion type water heater was explained, but water heaters using other fuels such as oil or water heaters using electric heaters can be similarly controlled to supply water at a set temperature. .

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本実施例の制御装置を示すブロツク
図、、第2図は本実施例のガス燃焼式給湯器を示
す概略構成図、第3図は本実施例のマイクロコン
ピユータの作動説明のためのタイムチヤート、第
4図は本実施例のマイクロコンピユータの作動説
明のための流れ図である。 図中、11……バーナ(加熱手段)、35……
入水温サーミスタ(入水温検出手段)、66……
水量検出回路(通水検知手段)、70……マイク
ロコンピユータ(制御手段)、71……タイマ
(計時手段)。
Fig. 1 is a block diagram showing the control device of this embodiment, Fig. 2 is a schematic configuration diagram showing the gas combustion water heater of this embodiment, and Fig. 3 is for explaining the operation of the microcomputer of this embodiment. FIG. 4 is a flowchart for explaining the operation of the microcomputer of this embodiment. In the figure, 11... burner (heating means), 35...
Inlet water temperature thermistor (inlet water temperature detection means), 66...
Water amount detection circuit (water flow detection means), 70... microcomputer (control means), 71... timer (time measurement means).

Claims (1)

【特許請求の範囲】 1 給湯器内に入水する水を検知して通水信号を
発生する通水検知手段と、 前記給湯器内に入水する水の量を検知するため
の流量検知手段と、 前記給湯器内に入水する水を加熱する加熱手段
と、 該加熱手段によつて加熱される水の温度を設定
するための温度設定手段と、 前記給湯器内に入水する水の温度を検知し、検
知した温度に応じた温度信号を発生する入水温検
出手段と、 前記流量検知手段の検知流量、前記温度設定手
段の設定温度および前記入水検出手段により検出
された温度信号に基づき前記加熱手段の加熱量を
制御する制御手段と からなる給湯器において、 前記制御手段は、前記通水検知手段からの通水
信号を受信してから所定時間作動する計時手段を
備え、該計時手段の作動終了後に前記入水温検出
手段の温度信号の読み込みを開始し、読み込まれ
る温度信号に基づいた前記加熱手段の制御を開始
することを特徴とする給湯器。
[Scope of Claims] 1. Water flow detection means for detecting water entering the water heater and generating a water flow signal; flow rate detection means for detecting the amount of water entering the water heater; a heating means for heating water entering the water heater; a temperature setting means for setting the temperature of the water heated by the heating means; and a temperature setting means for detecting the temperature of the water entering the water heater. , an incoming water temperature detection means that generates a temperature signal according to the detected temperature; and a heating means based on the detected flow rate of the flow rate detection means, the set temperature of the temperature setting means, and the temperature signal detected by the water inflow detection means. A water heater comprising a control means for controlling the heating amount of the water heater, wherein the control means includes a timer that operates for a predetermined period of time after receiving a water flow signal from the water flow detection means, and when the timer ends its operation. The water heater is characterized in that reading of the temperature signal of the input water temperature detection means is subsequently started, and control of the heating means is started based on the read temperature signal.
JP62275300A 1987-10-30 1987-10-30 Hot water supplying device Granted JPH01118068A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP62275300A JPH01118068A (en) 1987-10-30 1987-10-30 Hot water supplying device
KR1019880011562A KR920009304B1 (en) 1987-10-30 1988-09-07 Water heater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP62275300A JPH01118068A (en) 1987-10-30 1987-10-30 Hot water supplying device

Publications (2)

Publication Number Publication Date
JPH01118068A JPH01118068A (en) 1989-05-10
JPH0421101B2 true JPH0421101B2 (en) 1992-04-08

Family

ID=17553511

Family Applications (1)

Application Number Title Priority Date Filing Date
JP62275300A Granted JPH01118068A (en) 1987-10-30 1987-10-30 Hot water supplying device

Country Status (2)

Country Link
JP (1) JPH01118068A (en)
KR (1) KR920009304B1 (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100426968B1 (en) * 2000-12-15 2004-04-13 정문화 Device for controlling heating boilers with hot water tank
CN105180452B (en) * 2015-09-21 2018-07-27 广东超人节能厨卫电器有限公司 Time sequence control method for quick start of forced-ventilated gas water heater
CN105222357B (en) * 2015-09-21 2018-06-01 广东超人节能厨卫电器有限公司 A quick start-up method of a forced-exhaust gas fast water heater
CN105241069B (en) * 2015-10-13 2018-07-24 广东超人节能厨卫电器有限公司 Time sequence control method for quick start of short-front cleaning forced-ventilated water heater
CN105674576A (en) * 2016-03-10 2016-06-15 广东超人节能厨卫电器有限公司 A control method for quick start-up of water heater through gas concentration detection
CN106016755A (en) * 2016-05-10 2016-10-12 广东超人节能厨卫电器有限公司 A sequential control method for rapid start-up of a direct current forced-pump gas water heater
CN105910290A (en) * 2016-05-10 2016-08-31 广东超人节能厨卫电器有限公司 A control method for rapid start-up of DC water heaters by gas concentration detection
CN105928213A (en) * 2016-05-10 2016-09-07 广东超人节能厨卫电器有限公司 A quick start-up method of a direct-current forced-pump gas fast water heater
CN105928212B (en) * 2016-05-10 2018-07-06 广东超人节能厨卫电器有限公司 Sequential control method for quick start of direct-current forced-pumping type gas water heater
CN110762851B (en) * 2019-11-01 2021-04-13 华帝股份有限公司 Quick ignition control method for secondary water consumption of gas water heater
CN111637628B (en) * 2020-05-22 2021-04-23 珠海格力电器股份有限公司 Overheating prevention structure, water heater and control method thereof, computer readable storage medium

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS604746A (en) * 1983-06-21 1985-01-11 Matsushita Electric Ind Co Ltd Hot water temperature control device of hot water supplier
JPS61175439A (en) * 1985-01-31 1986-08-07 Noritsu Co Ltd Control device for hot-water supplier
JPS63153359A (en) * 1986-12-17 1988-06-25 Matsushita Electric Ind Co Ltd Output hot-water temperature controller for hot-water supplier

Also Published As

Publication number Publication date
KR920009304B1 (en) 1992-10-15
KR890007025A (en) 1989-06-17
JPH01118068A (en) 1989-05-10

Similar Documents

Publication Publication Date Title
KR920009304B1 (en) Water heater
JPS60245947A (en) hot water control device
JPH11211228A (en) Combined water heater
JPH01302063A (en) Water quantity controller for hot water supplying apparatus
JP3274626B2 (en) Combustion equipment
JPH01277113A (en) Forced air blasting type burning device
JPH0668682B2 (en) Control device having a plurality of operating devices
JPH0248811B2 (en)
JPH0421104B2 (en)
JP2615152B2 (en) Bypass mixing water heater
KR930002800B1 (en) Control device of electric water control valve
KR940004181B1 (en) Combustion control method of hot water supplying device
JP2968100B2 (en) Combustion equipment
KR940004177B1 (en) Heating controller
JPH049969B2 (en)
JPH057607B2 (en)
JPH0637971B2 (en) Control equipment for combustion equipment
JPH06103123B2 (en) Hot air heater
JPH0261414A (en) Controller for burner
JPH0676861B2 (en) Control device for hot air heater
JPH0297820A (en) Control device for forced draft type combustion device
JPH0442573B2 (en)
JPH0346707B2 (en)
JPH0718593B2 (en) Control device for hot air heater
JPH01310225A (en) Forced blast type combustion device

Legal Events

Date Code Title Description
EXPY Cancellation because of completion of term
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080408

Year of fee payment: 16