JPH0424228Y2 - - Google Patents

Info

Publication number
JPH0424228Y2
JPH0424228Y2 JP1986066304U JP6630486U JPH0424228Y2 JP H0424228 Y2 JPH0424228 Y2 JP H0424228Y2 JP 1986066304 U JP1986066304 U JP 1986066304U JP 6630486 U JP6630486 U JP 6630486U JP H0424228 Y2 JPH0424228 Y2 JP H0424228Y2
Authority
JP
Japan
Prior art keywords
pipe
frame
tube
truck
wheel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP1986066304U
Other languages
Japanese (ja)
Other versions
JPS62177979U (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP1986066304U priority Critical patent/JPH0424228Y2/ja
Publication of JPS62177979U publication Critical patent/JPS62177979U/ja
Application granted granted Critical
Publication of JPH0424228Y2 publication Critical patent/JPH0424228Y2/ja
Expired legal-status Critical Current

Links

Landscapes

  • Handcart (AREA)

Description

【考案の詳細な説明】 産業上の利用分野 本考案は管の搬送具に関する。[Detailed explanation of the idea] Industrial applications The present invention relates to a tube conveyor.

従来の技術 既設管やシールドなどの敷設通路内に下水用な
どの管を敷設する場合には、所定敷設位置までこ
の管を搬送しなければならない。このため従来は
敷設通路内に管搬送レールを設置し、この管搬送
レール上で管をすべらせて、この管を所定敷設位
置まで搬送するのが一般的となつている。
BACKGROUND TECHNOLOGY When a sewage pipe or the like is to be laid in a passage for installing an existing pipe or shield, the pipe must be transported to a predetermined installation position. For this reason, it has conventionally been common practice to install a pipe transport rail in the installation path, and to slide the pipe on this pipe transport rail to transport the pipe to a predetermined installation position.

考案が解決しようとする問題点 ところが、このような従来のものでは、管搬送
レールの設置に手間を要するうえに、管はこの管
搬送レールからすべり抵抗を受けるため大きな搬
送動力を要するという問題点がある。
Problems that the invention aims to solve However, with this conventional method, the problem is that it takes time and effort to install the pipe transport rail, and the pipe receives sliding resistance from the pipe transport rail, requiring a large amount of transport power. There is.

そこで本考案はこのような問題点を解決し、搬
送作業が容易で、しかも大きな搬送動力を必要と
しない管の搬送具を提供することを目的とする。
SUMMARY OF THE INVENTION An object of the present invention is to solve these problems and provide a pipe conveying tool that is easy to carry and does not require large conveying power.

問題点を解決するための手段 上記問題点を解決するため本考案は、水平方向
の管の内部に挿通されるフレームを有した台車
と、 この台車の前部および後部に対応したフレーム
部分にそれぞれ設けられた一対のジヤツキと、 両ジヤツキの昇降部材間にわたつて配置される
とともに前記管の内部に挿通されてこの管の上部
内面を支持するビームと、 前記フレームの前部においてこのフレームに対
し昇降可能に構成された前記台車の先輪と、 前記フレームの後部に設けられた前記台車の後
輪と、 前記先輪よりもさらに前方における前記フレー
ムの前端部に取付けられて、この前端部が既に敷
設された水平方向の他の管の内部に挿入されたと
きにこの管の内面底部を走行可能なガイド輪と、 を有する構成としたものである。
Means for Solving the Problems In order to solve the above problems, the present invention provides a truck having a frame that is inserted into a horizontal pipe, and frame parts corresponding to the front and rear parts of the truck. a pair of jacks provided; a beam placed between the elevating members of both jacks and inserted into the tube to support the upper inner surface of the tube; A front wheel of the truck configured to be able to rise and fall; a rear wheel of the truck provided at the rear of the frame; and a front end of the frame further forward than the front wheel; A guide ring that can run on the bottom of the inner surface of another pipe that has already been installed in the horizontal direction when inserted into the inside of this pipe.

作 用 このような構成において、管を搬送する場合に
は、台車のフレームをビームとともに水平方向の
管の内部に通し、両ジヤツキによりビームを上昇
させて管の上部内面を支持する。これにより管が
持上げられるため、先輪と後輪とによつて台車を
走行させれば、所定敷設位置に向けて管を搬送で
きる。所定敷設位置では、既に敷設されている水
平方向の他の管内にフレームの前端部を挿入し、
ガイド輪をこの管内で走行させる。すると、台車
の前部の荷重をこのガイド輪で受けることが可能
となるため、先輪をフレームに向け上昇させるこ
とにより、この先端を搬送路から浮かせることが
できる。したがつて、管を台車に支持したままの
状態で、先輪が邪魔になることなしに、この管と
既設の他の管とを接続することができる。
Operation In such a configuration, when transporting a pipe, the frame of the truck is passed horizontally into the pipe together with the beam, and both jacks raise the beam to support the upper inner surface of the pipe. Since the pipe is thereby lifted, the pipe can be transported to a predetermined installation position by driving the truck using the front wheels and rear wheels. In the predetermined laying position, insert the front end of the frame into another horizontal pipe that has already been laid,
A guide wheel is run within this pipe. Then, the load on the front part of the truck can be received by this guide wheel, and by raising the front wheel toward the frame, the leading end can be lifted off the conveyance path. Therefore, it is possible to connect this pipe to another existing pipe while the pipe remains supported on the cart without the front wheel getting in the way.

実施例 第1図〜第3図において、1は敷設通路であ
り、この通路1内に新しい管2を敷設する。管2
はFRP材などにて形成され、一端に受口3を有
するとともに他端に挿口4を有している。5は他
の管で、すでに通路1内に敷設されている。
Embodiment In FIGS. 1 to 3, reference numeral 1 indicates a laying passage, and a new pipe 2 is laid within this passage 1. tube 2
is made of FRP material or the like, and has a socket 3 at one end and a socket 4 at the other end. 5 is another pipe, which has already been laid in the passage 1.

6は本考案にもとづく搬送具である。ここで7
は台車で、水平方向の管2の内部に挿通されると
ともにその前後両端部が管2から突出するフレー
ム8と、フレーム8の前部に設けられた先輪9
と、フレーム8の後端に設けられた後輪10とを
有している。先輪9はキヤスタ構造とされ、フレ
ーム8の中心位置に1輪のみが設けられている。
後輪10は、フレーム8の両側部に一対設けられ
ている。先輪9よりもさらに前方におけるフレー
ム8の前端部には、先輪9と同様の構成のガイド
輪11が設けられている。これら先輪9およびガ
イド輪11は、おねじ構造の支軸12がフレーム
8の受け部13にねじ込まれた構成となつてお
り、この支軸12を回転させることによりフレー
ム8に対し昇降し得るようにされている。
6 is a conveyor based on the present invention. here 7
1 is a truck, which includes a frame 8 that is inserted into a horizontal pipe 2 and whose front and rear ends protrude from the pipe 2, and a front wheel 9 provided at the front of the frame 8.
and a rear wheel 10 provided at the rear end of the frame 8. The front wheel 9 has a caster structure, and only one wheel is provided at the center of the frame 8.
A pair of rear wheels 10 are provided on both sides of the frame 8. A guide wheel 11 having the same configuration as the front wheel 9 is provided at the front end of the frame 8 further forward than the front wheel 9 . These front wheels 9 and guide wheels 11 have a male-threaded support shaft 12 screwed into a receiving portion 13 of the frame 8, and can be moved up and down relative to the frame 8 by rotating this support shaft 12. It's like that.

フレーム8上には、台車7の前部および後部に
対応した位置に、一対のジヤツキ14,14がそ
れぞれ設けられている。15はその操作ハンド
ル、16はその昇降部材である。両ジヤツキ1
4,14の昇降部材16,16間には、水平方向
のビーム17がわたされ、このビーム17もフレ
ーム8と同様に管2の内部に挿通されている。こ
のビーム17は、ジヤツキ14,14を上昇させ
ることにより、管2の上部内面に当たつてこの管
2を持上げ、これにより管2を支持可能とされて
いる。ビーム17の長さ方向適当間隔おきの位置
には、管2の内周適当範囲内面に縁部が接触する
振止め板18が取付けられており、管2がビーム
17まわりに揺動するのを防止している。また、
フレーム8の後端部には、入力により台車7を走
行させるための取手19が設けられている。
A pair of jacks 14, 14 are provided on the frame 8 at positions corresponding to the front and rear parts of the truck 7, respectively. 15 is its operating handle, and 16 is its elevating member. both jacks 1
A horizontal beam 17 is passed between the elevating members 16, 16 of 4 and 14, and this beam 17 is also inserted into the inside of the tube 2 like the frame 8. By raising the jacks 14, 14, the beam 17 can come into contact with the upper inner surface of the tube 2 and lift the tube 2, thereby supporting the tube 2. Steady prevention plates 18 whose edges are in contact with the inner circumference of the tube 2 at appropriate intervals are installed at appropriate intervals in the length direction of the beam 17 to prevent the tube 2 from swinging around the beam 17. It is prevented. Also,
A handle 19 is provided at the rear end of the frame 8 to allow the trolley 7 to travel in response to an input.

このような構成において、敷設通路1内におけ
る所定敷設位置に向けて管2を搬送する際には、
まず水平方向に置かれた管2の内部に台車7を通
し、その先輪9と後輪10とを管2の両端開口か
ら突出させる。次にジヤツキ14,14を操作し
てビーム17を上昇させ、このビーム17を管2
の上部内面に当ててこの管2を持上げる。これに
より、管2はビーム17を介して台車7に支持さ
れることになる。なお、管2の挿口4を台車7の
前部側とするとともに、その受口3を後部側とし
て支持を行なう。
In such a configuration, when transporting the pipe 2 toward a predetermined installation position in the installation passage 1,
First, the truck 7 is passed through the interior of the tube 2 placed in the horizontal direction, and its front wheels 9 and rear wheels 10 are made to protrude from the openings at both ends of the tube 2. Next, operate the jacks 14, 14 to raise the beam 17, and move this beam 17 to the tube 2.
Lift this tube 2 by placing it on the upper inner surface of the tube. Thereby, the tube 2 is supported by the truck 7 via the beam 17. Note that the tube 2 is supported with the insertion port 4 on the front side of the truck 7 and the socket 3 on the rear side.

次に、取手19を押し、敷設通路1内において
台車7を所定敷設位置に向け走行させる。所定敷
設位置では、まず、フレーム8の先端部を既設の
管5の受口3内に挿入する。するとガイド輪11
がこの管5の内面底部に沿つて走行し、台車7の
前部の荷重をこのガイド輪11で受けることが可
能となる。なお、ガイド輪11の高さ位置は、予
め管2の内面底部の位置に設定しておく。
Next, the handle 19 is pushed to move the trolley 7 toward a predetermined laying position within the laying passage 1. At the predetermined installation position, first, the tip of the frame 8 is inserted into the socket 3 of the existing pipe 5. Then the guide wheel 11
The guide wheel 11 runs along the bottom of the inner surface of the tube 5, and the load of the front part of the truck 7 can be received by the guide wheel 11. Note that the height position of the guide ring 11 is set in advance to the position of the inner bottom of the tube 2.

次に、先輪9の支軸12を回転させることによ
りこの先輪9を上昇させ、この先輪9をフレーム
8に近づける。これにより、台車7を走行させて
も管5の受口3と先輪9とが当たらないため、管
2の挿口4を管5の受口3内に挿入して、両管
2,5を互いに接合する。なお、管2の受口3に
フツク20を引掛けて管5側に引張るようにすれ
ば、挿口4の受口3内への挿入を容易に行なえ
る。また、管2の中心高さ位置が管5のそれと一
致するよう、予めジヤツキ14,14を操作して
おく。
Next, by rotating the support shaft 12 of the front wheel 9, the front wheel 9 is raised and brought closer to the frame 8. As a result, the socket 3 of the pipe 5 and the front wheel 9 do not come into contact with each other even when the trolley 7 is running, so the socket 4 of the pipe 2 is inserted into the socket 3 of the pipe 5, and both pipes 2, 5 are joined together. Incidentally, by hooking the hook 20 onto the socket 3 of the tube 2 and pulling it toward the tube 5, the socket 4 can be easily inserted into the socket 3. Further, the jacks 14, 14 are operated in advance so that the center height position of the tube 2 matches that of the tube 5.

管2,5どうしの接合が完了したなら、ジヤツ
キ14,14を動作させ、ビーム17を降下させ
て管2の内面から離し、台車7を引張つて管2か
ら取り出す。
When the joining of the tubes 2 and 5 is completed, the jacks 14 and 14 are operated, the beam 17 is lowered and separated from the inner surface of the tube 2, and the carriage 7 is pulled and taken out from the tube 2.

考案の効果 以上述べたように本考案によると、敷設通路に
従来のような搬送レールを設置することなしに、
台車を走行させるだけで容易にかつ大きな搬送動
力を必要とすることなく管を搬送することがで
き、しかもガイド輪を既設の管の内部で走行させ
るとともに、前輪を敷設通路から浮かせること
で、管を台車に支持したままでこの管を既設の管
と接合することができる。
Effects of the invention As mentioned above, according to the invention, there is no need to install conventional conveyor rails on the laying path.
The pipe can be easily transported by simply running the trolley without requiring large transport power.Moreover, by running the guide wheels inside the existing pipe and lifting the front wheel from the installation path, the pipe can be easily transported without requiring large transport power. This pipe can be joined to the existing pipe while it is supported on the trolley.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本考案の一実施例の正面図、第2図は
その左側面図、第3図はその右側面図である。 2……管、5……管、7……台車、8……フレ
ーム、9……先輪、11……ガイド輪、14……
ジヤツキ、16……昇降部材、17……ビーム。
FIG. 1 is a front view of an embodiment of the present invention, FIG. 2 is a left side view thereof, and FIG. 3 is a right side view thereof. 2...tube, 5...tube, 7...bogie, 8...frame, 9...front wheel, 11...guide wheel, 14...
Jacket, 16... Lifting member, 17... Beam.

Claims (1)

【実用新案登録請求の範囲】 所定敷設位置に向けて管を搬送するための搬送
具であつて、 水平方向の管の内部に挿通されるフレームを有
した台車と、 この台車の前部および後部に対応したフレーム
部分にそれぞれ設けられた一対のジヤツキと、 両ジヤツキの昇降部材間にわたつて配置される
ととも前記管の内部に挿通されてこの管の上部内
面を支持するビームと、 前記フレームの前部においてこのフレームに対
し昇降可能に構成された前記台車の先輪と、 前記フレームの後部に設けられた前記台車の後
輪と、 前記先輪よりもさらに前方における前記フレー
ムの前端部に取付けられて、この前端部が既に敷
設された水平方向の他の管の内部に挿入されたと
きにこの管の内面底部を走行可能なガイド輪と、 を有することを特徴とする管の搬送具。
[Scope of Claim for Utility Model Registration] A carrier for transporting pipes to a predetermined installation position, which has a frame that is inserted into the interior of the pipe in a horizontal direction, and the front and rear parts of this trolley. a pair of jacks each provided on a frame portion corresponding to the frame; a beam disposed between the elevating members of both jacks and inserted into the tube to support the upper inner surface of the tube; and the frame. a front wheel of the truck that is configured to be able to rise and fall with respect to the frame at the front of the truck; a rear wheel of the truck that is provided at the rear of the frame; and a front end of the frame that is further forward than the front wheel. a guide wheel attached to the pipe so that the front end can run along the bottom of the inner surface of the pipe when the front end is inserted into the interior of another pipe in the horizontal direction; .
JP1986066304U 1986-04-30 1986-04-30 Expired JPH0424228Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1986066304U JPH0424228Y2 (en) 1986-04-30 1986-04-30

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1986066304U JPH0424228Y2 (en) 1986-04-30 1986-04-30

Publications (2)

Publication Number Publication Date
JPS62177979U JPS62177979U (en) 1987-11-12
JPH0424228Y2 true JPH0424228Y2 (en) 1992-06-08

Family

ID=30904186

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1986066304U Expired JPH0424228Y2 (en) 1986-04-30 1986-04-30

Country Status (1)

Country Link
JP (1) JPH0424228Y2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013194747A (en) * 2012-03-15 2013-09-30 Taisei Corp Casting method of stream tunnel and carrying device of stream tunnel pipe

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2506496Y2 (en) * 1989-11-15 1996-08-07 株式会社間組 Hume pipe installation device
JP7128033B2 (en) * 2018-06-04 2022-08-30 積水化学工業株式会社 Jigs, tubes with jigs, how to use jigs and how to transport tubes

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH049510Y2 (en) * 1985-07-15 1992-03-10

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013194747A (en) * 2012-03-15 2013-09-30 Taisei Corp Casting method of stream tunnel and carrying device of stream tunnel pipe

Also Published As

Publication number Publication date
JPS62177979U (en) 1987-11-12

Similar Documents

Publication Publication Date Title
CN212556365U (en) Multi-functional transport trolley of utility tunnel
JPH0424228Y2 (en)
CN212406759U (en) Shield machine and tunnel tunneling material transportation system thereof
CN110318789B (en) Shield segment conveying device and conveying method
JP3800740B2 (en) Segment transport device
JPH10316365A (en) Installation structure for heavy object conveying crane in pit
CN113213027A (en) Automatic conveying system for garbage can
CN222121528U (en) A kind of auxiliary trolley for bottom arch segment construction
CN221025908U (en) Pipeline lifting device in underground pipe gallery
JPS625116Y2 (en)
JPS5968401A (en) Construction of pc beam
JPH0420808Y2 (en)
JPS5836942Y2 (en) Pipe transport device in buried pipes
JPH0582734U (en) Moving carriage of overhead traveling vehicle
JPS6434895A (en) Truck crane
JPH057102Y2 (en)
JP3320885B2 (en) Segment loading device
JPH0721448Y2 (en) Carrier
JP3261643B2 (en) Truck suspended transfer device
JPH0743278Y2 (en) Segment carrier
JPS627498U (en)
JPH0428620A (en) Self-propelled carriage type conveying device
JPS6039323Y2 (en) Conveyance device
JP3009385B2 (en) Transport trolley
JPS6244844Y2 (en)