JPH0434108A - Bank body structure - Google Patents
Bank body structureInfo
- Publication number
- JPH0434108A JPH0434108A JP13931890A JP13931890A JPH0434108A JP H0434108 A JPH0434108 A JP H0434108A JP 13931890 A JP13931890 A JP 13931890A JP 13931890 A JP13931890 A JP 13931890A JP H0434108 A JPH0434108 A JP H0434108A
- Authority
- JP
- Japan
- Prior art keywords
- construction
- earth
- sand
- embankment
- soil
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Revetment (AREA)
Abstract
Description
【発明の詳細な説明】 (産業上の利用分野) 本発明は、防波堤や突堤等に好適な堤体構造に関する。[Detailed description of the invention] (Industrial application field) The present invention relates to an embankment body structure suitable for breakwaters, jetties, and the like.
(従来の技術)
この種の堤体には、例えば防波堤、防潮堤、導流堤、水
門、護岸、堤防、突堤等があり、船舶の停泊や荷役の安
全と、各種の港湾施設や付帯施設等の安全を図るために
設置される。(Prior Art) This type of embankment body includes, for example, a breakwater, a seawall, a dike, a water gate, a seawall, an embankment, a jetty, etc., and is used to ensure the safety of ship berthing and cargo handling, as well as various port facilities and ancillary facilities. It is installed to ensure safety.
堤体構造としては、各堤体の具体的機能等に応じて形状
、機能、材料など多種多様な形式のものが考えられてい
る。第5図は従来の傾斜堤の代表的な構造例を示してい
る。A wide variety of levee structures have been considered, including shapes, functions, and materials, depending on the specific functions of each levee body. FIG. 5 shows a typical structural example of a conventional slope embankment.
同図の傾斜堤aは、地盤の基礎部すに捨石材Cを積載す
るとともに、捨石材Cの表面を被覆材dにて覆ったもの
であり、使用材料によって捨石式、捨ブロック式、両者
を組み合わせた混合式等に大別できる。このように、捨
石材を主体とした堤体構造にあっては、海底地盤の凹凸
状態にあまり影響されることなく施工できること、施工
工程が比較的単純なこと等から特に水深の浅いところに
多用されている。The sloping embankment a in the figure is constructed by loading rubble stones C on the foundation of the ground and covering the surface of the rubble stones C with a covering material d. It can be roughly divided into mixed types, etc. In this way, embankment structures mainly made of rubble are often used particularly in shallow water areas because they can be constructed without being affected by the irregularities of the seabed ground and the construction process is relatively simple. has been done.
(発明が解決しようとする問題点)
しかしながら、最近では捨石材自体が次第に欠乏しつつ
あり、現場近域で入手することは困難なことが多い。ま
た、捨石材は大きさや形状が千差万別となっていること
に加え、数十から百kg以上の重さのものまで混在する
ため積降しや運搬車類および施工機械類が大型化となり
、しかも所定の堤形状に形成し難いので、経済性および
施工性が悪く、急速施工に対処できない等の問題がある
。(Problems to be Solved by the Invention) Recently, however, rubble stone itself has become increasingly scarce, and it is often difficult to obtain it near the site. In addition, rubble materials come in a wide variety of sizes and shapes, and they range in weight from several dozen to over 100 kg, making loading and unloading, transport vehicles, and construction machinery larger. Moreover, since it is difficult to form a bank into a predetermined shape, there are problems such as poor economic efficiency and workability, and the inability to handle rapid construction.
本発明は、以上の不具合を解決するもので、工期および
工費ともに低減できる堤体構造を場供することにある。The present invention solves the above-mentioned problems and aims to provide an embankment structure that can reduce both construction period and construction cost.
(課題を解決するための手段)
上記目的を達成するために、本発明の堤体構造は、土砂
に固結材を混合処理した自立可能な安定処理土を地盤の
基礎部に盛立てるとともに、前記安定処理土の表面に被
覆部材を設けてなることを特徴としている。(Means for Solving the Problems) In order to achieve the above object, the embankment structure of the present invention embanks self-sustainable stabilized soil, which is prepared by mixing soil and sand with a consolidation material, on the foundation of the ground, and It is characterized in that a covering member is provided on the surface of the stabilized soil.
(作 用)
以上の構成によれば、土砂に固結材を混合処理した自立
可能な安定処理土を主材料としているので、捨石材に対
して運搬、施工性等の点で有利となり、また迅速施工も
容易となる。(Function) According to the above structure, since the main material is stabilized soil that can stand on its own, which is made by mixing soil and compaction material, it is advantageous in terms of transportability, ease of construction, etc. compared to rubble stone, and It also facilitates quick construction.
なお、本発明は、土砂に固結材を混合処理した自立可能
な安定処理土を要件としている。Note that the present invention requires stably treated soil that can be self-supporting and is prepared by mixing soil and sand with a consolidating material.
(実施例) 以下、本発明の実施例について図面を参照し説明する。(Example) Embodiments of the present invention will be described below with reference to the drawings.
第1図は本発明の堤体構造を適用した傾斜間を示す模式
断面図である。同図の傾斜間1は、防波を目的として数
メートルという水深海域に設けられたもので、海底に捨
石2により基礎部3が形成され、基礎部3の上に安定処
理土4を盛立てるとともに、安定処理±4の表面に被覆
部材5を設置した構造物となっている。FIG. 1 is a schematic cross-sectional view showing a slope to which the embankment structure of the present invention is applied. The slope 1 in the figure was built in a water depth of several meters for the purpose of wave prevention. A foundation 3 is formed on the seabed with rubble 2, and stabilized soil 4 is heaped on top of the foundation 3. In addition, the structure has a coating member 5 installed on the surface of the stabilization treatment ±4.
ここで、本発明の要部をなす安定処理材4は、土砂に固
結材を混合処理したものにより構成されている。具体的
には、現地の土砂と固結材とを混合処理したもので、特
に自立強度(約4〜6kg/口り有し、単位重量、透水
性、経済性等を設計諸条件を充足するよう調整され、ま
た固結材としてはセメント等を用いることができる。Here, the stabilizing material 4, which is the main part of the present invention, is made of earth and sand mixed with a consolidation material. Specifically, it is a mixture of local earth and sand and compaction material, which has a particularly high self-supporting strength (approximately 4 to 6 kg/mouth), and satisfies design conditions such as unit weight, water permeability, and economic efficiency. In addition, cement or the like can be used as the solidifying material.
混合処理条件としては、セメント量として50〜70
kg / m3、水量として自然湿潤状態、締固め度と
して圧縮率15〜25%を目安とすることが好ましい。As for the mixing treatment conditions, the amount of cement is 50 to 70.
It is preferable to use kg/m3 as a guideline, water amount in a naturally moist state, and compaction degree as a compression ratio of 15 to 25%.
次ぎに、前記傾斜間1の施工例を第2図および第3図を
参照しながら概説する。なお、第2図および第3図は前
記傾斜間の構築過程に示す模式断面図である。また、基
礎部3については、従来同様な海上施工により盛立てる
ことで構築されている。Next, an example of construction of the slope 1 will be outlined with reference to FIGS. 2 and 3. Note that FIGS. 2 and 3 are schematic cross-sectional views showing the construction process of the slope. Furthermore, the foundation part 3 is constructed by heaping it up using conventional offshore construction.
第2図は第1段目を設ける工程を示している。FIG. 2 shows the step of providing the first stage.
ここでは、基礎部3が施工されており、基礎部3上の所
定の箇所に型枠6を設置し、型枠6内に安定処理土4を
入れて第1段目4aを形成する。施工に際しては、先行
部分を作業足場として施工することを前場として、段数
やブロックの大きさ等が施工サイクルとともに設計され
るとともに、各段数の安定処理土4の使用量が決定され
る。Here, the foundation part 3 is being constructed, a formwork 6 is installed at a predetermined location on the foundation part 3, and stabilized treated soil 4 is put into the formwork 6 to form the first stage 4a. During construction, the number of stages, block size, etc. are designed together with the construction cycle, with the preceding part being used as a work scaffold, and the amount of stabilized soil 4 to be used for each number of stages is determined.
型枠6は木製の簡易なものが用いられ、基礎部3上に所
定の大きさに組付は設置される。そして、実施工では現
場土砂をふるい分けしたものをバックホーでミキサー車
に投入して、混合処理したものをトラッククレーンで型
枠6内に盛立てる。A simple formwork made of wood is used as the formwork 6, and is assembled and installed on the foundation part 3 to a predetermined size. In the actual construction, the soil at the site is sifted and thrown into a mixer truck using a backhoe, and the mixed material is piled into the formwork 6 using a truck crane.
第3図は第2段目4bの施工を示し、1段目4aの外側
に対応する被覆石5を積載した後、被覆石5の上に外枠
6を設置し、安定処理±4を盛立てた状態である。この
場合、第2段目からの施工では、前の段を足場として利
用可能なので作業効率がよい。Figure 3 shows the construction of the second stage 4b. After loading the corresponding covering stone 5 on the outside of the first stage 4a, an outer frame 6 is installed on the covering stone 5, and a stabilizing treatment ±4 is applied. It is in an upright position. In this case, when constructing from the second stage, the previous stage can be used as a scaffold, which improves work efficiency.
また、第2段目4bの上にさらに複数段を順時に繰り返
して施工することにより、第1図の傾斜間1が得られる
。なお、被覆石5は、各段4a。Further, by sequentially and repeatedly constructing a plurality of stages on top of the second stage 4b, the slope 1 shown in FIG. 1 can be obtained. Incidentally, the covering stone 5 is provided at each stage 4a.
4b・・・を施工した後に積載するようにしてもよい。4b... may be loaded after construction.
第4図は本発明の第2実施例を示したもので、水深が浅
い場合に全て安定処理土を用いたときの例である。FIG. 4 shows a second embodiment of the present invention, in which stably treated soil is used for all cases where the water depth is shallow.
つまり、同図の傾斜間10は、防波を目的として、水深
tが1m程度以内の浅海域に設けられたもので、軽備な
仮締切を用い、海底地盤上に直接安定処理±40を陸上
施工機により盛立て構築するものである。なお、符号5
0は被覆部材を示している。In other words, the slope 10 in the figure was built in shallow waters with a water depth t of approximately 1 m or less for the purpose of wave prevention, and stabilization treatment ±40 was applied directly to the seabed using a light temporary cofferdam. The construction will be carried out in heaps using land-based construction equipment. In addition, code 5
0 indicates a covering member.
以上の堤体構造では、従来の捨石材に代えて土砂に固結
材を混合処理した安定処理土4,40を用いているので
、主材料の入手が容易となるとともに、形状出しも容易
となる。In the above-mentioned embankment structure, stably treated soil 4,40, which is a mixture of soil and compaction material, is used instead of conventional rubble, making it easy to obtain the main material and also to shape it. Become.
本発明は、以上の実施例に限られず、その要旨の範囲内
で種々変形あるいは発展することができるるのである。The present invention is not limited to the above-described embodiments, but can be variously modified or developed within the scope of its gist.
(効果)
以上説明したように、本発明の堤体構造にあっては、土
砂に固結材を混合処理した自立可能な安定処理土を主材
料として用いるので、捨石材に対して施工性がよいこと
から工期短縮を図ることができ、また運搬等の経費が低
減されることから工費を低減できる。特に、構成材料で
ある土砂は枯枯渇するということがなく、しかも現地で
容易に入手可能なので迅速施工に対処できる。(Effects) As explained above, the embankment structure of the present invention uses as the main material stably treated soil, which is a mixture of earth and sand with a consolidating material, so it is easier to construct than rubble stone. Since this is a good thing, it is possible to shorten the construction period, and it is also possible to reduce construction costs because transportation costs are reduced. In particular, the construction material, earth and sand, does not run out and is readily available locally, allowing for quick construction.
第1図は本発明の実施例を示す傾斜堤の模式断面図、第
2図および第3図は前記傾斜堤の構築過程を示す模式断
面図、第4図は前記傾斜堤の他の例を示す模式断面図、
第5図は従来例としての傾斜堤を示す模式断面図である
。
1.10・・・・・傾斜堤
3・・・・・・・・基礎部
5.50・・・・・被覆部材
4.40・・・・・安定処理土
・型枠FIG. 1 is a schematic cross-sectional view of a slope embankment showing an embodiment of the present invention, FIGS. 2 and 3 are schematic cross-sectional views showing the construction process of the slope bank, and FIG. 4 is a schematic cross-sectional view showing another example of the slope bank. A schematic cross-sectional view showing
FIG. 5 is a schematic cross-sectional view showing a slope embankment as a conventional example. 1.10...Slope embankment 3...Foundation part 5.50...Covering member 4.40...Stabilized soil/formwork
Claims (1)
土を地盤の基礎部に盛立てるとともに、前記安定処理土
の表面に被覆部材を設けてなることを特徴とする堤体構
造。(1) An embankment body structure characterized in that self-supporting stably treated soil, which is prepared by mixing earth and sand with a consolidation material, is piled up on the foundation of the ground, and a covering member is provided on the surface of the stably treated soil.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP13931890A JP2802815B2 (en) | 1990-05-29 | 1990-05-29 | Embankment structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP13931890A JP2802815B2 (en) | 1990-05-29 | 1990-05-29 | Embankment structure |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH0434108A true JPH0434108A (en) | 1992-02-05 |
| JP2802815B2 JP2802815B2 (en) | 1998-09-24 |
Family
ID=15242519
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP13931890A Expired - Fee Related JP2802815B2 (en) | 1990-05-29 | 1990-05-29 | Embankment structure |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2802815B2 (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2017141543A (en) * | 2016-02-08 | 2017-08-17 | Jfeスチール株式会社 | Artificial shallow or tidal flat |
| JP2020153088A (en) * | 2019-03-18 | 2020-09-24 | Jfe建材株式会社 | Diversion bank |
-
1990
- 1990-05-29 JP JP13931890A patent/JP2802815B2/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2017141543A (en) * | 2016-02-08 | 2017-08-17 | Jfeスチール株式会社 | Artificial shallow or tidal flat |
| JP2020153088A (en) * | 2019-03-18 | 2020-09-24 | Jfe建材株式会社 | Diversion bank |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2802815B2 (en) | 1998-09-24 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3506680B2 (en) | Reinforcement method of earth structure dam body | |
| AU2019203298B2 (en) | A method and system for underwater scour prevention | |
| Heibaum | Coastal scour stabilisation using granular filter in geosynthetic nonwoven containers | |
| KR101487131B1 (en) | Fill gabion built in concrete block and on the concrete block of cap concrete | |
| RU2026122C1 (en) | Method of storing industrial waste | |
| JPH0434108A (en) | Bank body structure | |
| JP4491812B2 (en) | Embankment method using high water content specific viscosity soil | |
| KR20010016170A (en) | Anti-Scouring and Erosion Fabric Form | |
| Heibaum | Scour countermeasures using geosynthetics and partially grouted riprap | |
| JP3624461B2 (en) | Quay restoration method and quay structure | |
| JP2020169512A (en) | Fluidized soil slope protection structure | |
| JP7213140B2 (en) | Material using coal ash and landfill method | |
| JP6669543B2 (en) | Construction method of backing structure and mixed material | |
| JP2546110B2 (en) | Levee structure using excavated sludge and its construction method | |
| JP3510366B2 (en) | How to build underwater structures | |
| JP7525828B2 (en) | Quay or revetment structure | |
| US4072016A (en) | Method of reconstructing and reclamation of river channels | |
| JP2626427B2 (en) | Construction method of multi-layer bag and embankment for embankment using excavated sludge | |
| JPH038751A (en) | Method for discarding construction residual soil and soil concrete block | |
| JP2637571B2 (en) | Construction method of revetment | |
| RU2026452C1 (en) | Berthing facility | |
| KR20110014425A (en) | Festival and Reclamation Method using Solidification Method of Dredged Soil | |
| KR100947555B1 (en) | Mixed composition of reclaimed coal ash | |
| JPH0462221A (en) | Back-fill injection work | |
| JPH11152735A (en) | Modifying method for soft ground surface layer |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| S533 | Written request for registration of change of name |
Free format text: JAPANESE INTERMEDIATE CODE: R313533 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080717 Year of fee payment: 10 |
|
| LAPS | Cancellation because of no payment of annual fees |