JPH0434280A - Method for removing underground buried object - Google Patents

Method for removing underground buried object

Info

Publication number
JPH0434280A
JPH0434280A JP2141963A JP14196390A JPH0434280A JP H0434280 A JPH0434280 A JP H0434280A JP 2141963 A JP2141963 A JP 2141963A JP 14196390 A JP14196390 A JP 14196390A JP H0434280 A JPH0434280 A JP H0434280A
Authority
JP
Japan
Prior art keywords
pipe
buried
shaft
propulsive
propulsion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2141963A
Other languages
Japanese (ja)
Other versions
JP2659607B2 (en
Inventor
Shinji Chino
千野 眞士
Yuji Kumano
熊野 裕治
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kumagai Gumi Co Ltd
Original Assignee
Kumagai Gumi Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kumagai Gumi Co Ltd filed Critical Kumagai Gumi Co Ltd
Priority to JP2141963A priority Critical patent/JP2659607B2/en
Publication of JPH0434280A publication Critical patent/JPH0434280A/en
Application granted granted Critical
Publication of JP2659607B2 publication Critical patent/JP2659607B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

PURPOSE:To eliminate a controversial point of correlation to superficies of the cut-and- cover method by constructing a shaft by enveloping a buried object, pressing in a lead pipe and a propulsive pipe equal to or larger than the buried object along it, destruction-removing the buried object in the vicinity of the lead pipe and thereafter drawing out the propulsive pipe and the lead pipe to a shaft side while filling solidifying agent. CONSTITUTION:A shaft 2 is constructed by enveloping a buried pipe 1 to remove it in the inside of the shaft 2, and next, a lead pipe 7 and a propulsive pipe 8 in size equal to or larger than the buried pipe 1 are concentrically set up with the buried pipe 1. The buried pipe 1 is destructed in the vicinity of the lead pipe 7, while pressing in the lead pipe 7 and the propulsive pipe 8 by a propulsive jack 9 along the buried pipe 1, and successively removed, and a partition 10 is mounted in the front part of the lead pipe 7 after completion of removal. The propulsive pipe 8 and the lead pipe 7 are drawn out to a side of the shaft 2 while injection charging a charge part 16, after the buried pipe is removed, with a solidifying agent by an injection pump 15 from an injection hole 13 provided in the partition 10. By the above method of construction, insufficiency of destructive strength by a rock auger and a controversial point to superficies of the cut-and-cover method are eliminated.

Description

【発明の詳細な説明】 (産業上の利用分野〉 本発明は、既に地中に埋設されている管渠等の埋設物を
トンネル工法により撤去した後、その後に周辺地山と同
等程度の強度を有する充填材を注入する地中埋設物ない
し障害物の撤去方法に関するものである。
[Detailed Description of the Invention] (Industrial Application Field) The present invention is a method of removing buried objects such as pipes that have already been buried underground using a tunnel construction method, and then creating a structure that has the same strength as the surrounding ground. The present invention relates to a method for removing underground objects or obstacles by injecting a filler having the following properties.

〈従来の技術〉 道路下に地下鉄等の大規模な地下構造物を新たに設置す
る場合、既設の構造物(埋設物、基礎杭等)が大きな障
害となるケースがある。
<Conventional Technology> When newly installing a large-scale underground structure such as a subway under a road, existing structures (buried objects, foundation piles, etc.) may become a major obstacle.

従来、このような場合の撤去方法としては次のような方
法がある。
Conventionally, there are the following methods of removal in such cases.

(I)ロックオーガーにより地中埋設物を破壊する方法
(I) A method of destroying underground objects using a rock auger.

この方法は杭打機に取付けたロックオーガーにより地上
から削孔し、オーガーヘッドで埋設物を破壊する。
In this method, a rock auger attached to a pile driver is used to drill a hole from the ground, and the auger head is used to destroy the buried material.

(n)開削工法によって埋設物を撤去する方法。(n) A method of removing buried objects using the open-cut method.

埋設物の両側に土留杭を打ち、上部から順次土留支保工
を設置しながら埋設物を露出、破壊し。
Drive earth retaining piles on both sides of the buried object, and expose and destroy the buried object while sequentially installing earth retaining shoring from the top.

撤去後良質土にて埋戻しを行い土留杭な引き抜く方法で
ある。
This method involves backfilling with high-quality soil after removal and pulling out the earth retaining piles.

〈発明が解決しようとする課題〉 従来の撤去方法において、前者の埋設物を破壊する方法
は簡単ではあるが、撤去方法は円形のもの、連続状のも
のではオーガーヘッドが有効に作用しないばかりでなく
、穿孔の乳白りが生じ、確実に破壊できない場合が生じ
る。
<Problem to be solved by the invention> In the conventional removal method, the former method of destroying buried objects is easy, but when the removal method is circular or continuous, the auger head does not work effectively. Otherwise, the perforation becomes milky and cannot be destroyed reliably.

又、コンクリートないし鉄筋コンクリートに対してはオ
ーガーヘッドの能力不足により破壊が困難となる問題が
ある。
Furthermore, there is a problem in that it is difficult to destroy concrete or reinforced concrete due to the insufficiency of the auger head.

一方、後者の開削工法も一般的な方法であるが、以下の
理由で近年採用が困難となっている。
On the other hand, the latter open-cut method is also a common method, but its adoption has become difficult in recent years for the following reasons.

(イ)シールド工法や推進工法によるものは上被が深い
(b) Those using the shield method or propulsion method have a deep top cover.

(ロ)交通量が多いところでは、交通渋滞を生じるので
好ましくない。
(b) It is undesirable in areas with heavy traffic as it will cause traffic congestion.

(ハ)河川や鉄道が横断している場合は採用できない。(c) Cannot be adopted if a river or railway crosses the area.

(ニ)用地境界線に接近して埋設物がある場合、借地が
必要か、あるいは開削工法に使用した土留杭が残留する
ときは地上権の買収が必要となる。
(iv) If there are buried objects close to the property line, it will be necessary to lease the land, or if the retaining piles used in the open-cut construction method remain, it will be necessary to purchase the surface rights.

(ホ)移設不能な重要埋設物がある場合は採用できない
(e) Cannot be adopted if there are important buried objects that cannot be relocated.

本発明は、このような従来工法の問題点を解消するため
になされたもので、地中の埋設物をトンネル工法で撤去
し、その後は地山間等に置換する新しい撤去方法を提供
することを目的とするものである。
The present invention has been made in order to solve the problems of the conventional construction method, and aims to provide a new removal method in which underground objects are removed using the tunnel construction method and then replaced between the ground and mountains. This is the purpose.

(課題を解決するための手段) 上記課題を解決するため、本発明に係る地中埋設物の撤
去方法は、地中埋設物を包するように立坑を構築し、同
埋設物と同等もしくはそれより大きな先導管及び推進管
を埋設物に沿って押込みながら先導管付近で埋設物を破
壊もしくは押出して埋設物を順次撤去した後、先導管の
前部または後部に隔壁を取付け、これに注入孔を設けて
注入管を接続し、注入ポンプを介して充填材を注入しな
がら推進管及び先導管を順次立坑側に引き抜き撤去する
ことを特徴とするものである。
(Means for Solving the Problems) In order to solve the above problems, the method for removing underground objects according to the present invention is to construct a vertical shaft so as to enclose the underground objects, and to construct a shaft that is equivalent to or similar to the underground objects. After pushing the larger leading pipe and propulsion pipe along the buried object and destroying or pushing out the buried object near the leading pipe and removing the buried object one by one, a bulkhead is attached to the front or rear of the leading pipe, and an injection hole is installed in this. The system is characterized in that the propulsion pipe and the leading pipe are sequentially pulled out toward the shaft side and removed while injecting the filler material through the injection pump.

(作用) 本発明においては、まず埋設物を包するように立坑を構
築し、この立坑内部の埋設物を撤去する。そして埋設物
と同等もしくはそれより大きな先導管及び推進管を埋設
物と同心状に設置し、立坑の側壁に設けた反力体を反力
に推進ジヤツキを用いて先導管及び推進管を埋設物に沿
って押込みながら先導管付近で埋設物を破壊もしくは押
出して順次撤去する。
(Operation) In the present invention, first, a vertical shaft is constructed to enclose a buried object, and the buried object inside this shaft is removed. Then, a leading pipe and a propulsion pipe that are equal to or larger than the buried object are installed concentrically with the buried object, and a propulsion jack is used to use the reaction force provided on the side wall of the shaft as a reaction force to move the leading pipe and propulsion pipe to the buried object. While pushing along the pipe, destroy or push out the buried objects near the lead pipe and remove them one by one.

このようにして埋設物を撤去した後、先導管の前部又は
後部に隔壁を取付け、これに注入孔を設けて注入管を接
続し、注入ポンプを介して固化剤等の充填材を注入し、
地山が崩壊しないよう注入圧、注入量、引き抜き量を調
節しながら推進管及び先導管を順次立坑側に引き抜き、
同時に埋設物が撤去された部分を充填材により埋戻す。
After removing the buried objects in this way, attach a bulkhead to the front or rear of the lead pipe, make an injection hole in it, connect the injection pipe, and inject a filler such as a solidifying agent through an injection pump. ,
While adjusting the injection pressure, injection amount, and withdrawal amount to prevent the ground from collapsing, the propulsion pipe and leading pipe are sequentially pulled out toward the shaft side.
At the same time, the area where the buried objects were removed is backfilled with filler material.

〈実施例) 以下に本発明の実施例を第1図乃至第5図を参照して説
明し、又他の実施例を第6図乃至第12図により説明す
る。
<Embodiments> Examples of the present invention will be described below with reference to FIGS. 1 to 5, and other embodiments will be described with reference to FIGS. 6 to 12.

まず、第1図に示すように地中に埋設されている既設の
埋設管lを包するように立坑2を構築し、その内部の埋
設管1を撤去し、さらに、立坑2の側壁にバックコンク
リート等反力体3を設ける。つぎに、第2図及び第5.
6図に示すように、埋設管1と同等もしくはこれより大
きい刃口4、スキンプレート5.補強リブ6より構成さ
れた先導管7及び推進管8を埋設管lと同心状に設置し
、上記反力体3を反力に推進ジヤツキ9により先導管7
及び推進管8を埋設實1に沿って第1図矢印方向に押込
みながら先導管7付近て埋設管lを破壊もしくは押出し
て順次撤去して行く。
First, as shown in Figure 1, a vertical shaft 2 is constructed so as to enclose the existing buried pipe 1 buried underground, the buried pipe 1 inside is removed, and a back wall is placed on the side wall of the vertical shaft 2. A reaction force body 3 such as concrete is provided. Next, FIGS. 2 and 5.
As shown in Fig. 6, a cutting edge 4 that is equal to or larger than the buried pipe 1, a skin plate 5. A leading pipe 7 and a propulsion pipe 8 composed of reinforcing ribs 6 are installed concentrically with the buried pipe 1, and the leading pipe 7 is moved by a propulsion jack 9 using the reaction force body 3 as a reaction force.
Then, while pushing the propulsion pipe 8 along the buried pipe 1 in the direction of the arrow in FIG. 1, the buried pipe 1 is destroyed or pushed out near the leading pipe 7 and removed one by one.

このようにして、不用かつ障害となった埋設管lの撤去
目的区間の推進を完了した後、第3図に示すように先導
管7の前部又は後部に隔壁10を取付ける。
In this way, after completing the removal target section of the buried pipe 1 which is unnecessary and has become an obstacle, a partition wall 10 is attached to the front or rear part of the leading pipe 7, as shown in FIG.

隔壁10は第5図に示すように鋼板11とH鋼材12と
からなるもので、適所に注入孔13を設けて構成される
As shown in FIG. 5, the partition wall 10 is made of a steel plate 11 and an H steel material 12, and is constructed with injection holes 13 provided at appropriate locations.

この隔壁10の注入孔13に注入管14を接続し、さら
に注入管14に注入ポンプ15を接続して固化剤、例え
ばポルトランドセメント、粘土、水、遅延剤よりなるa
液と、水ガラスよりなるb液とを混合したものを充填材
として埋設管撤去後の充填部16に注入充填する。
An injection pipe 14 is connected to the injection hole 13 of this partition wall 10, and an injection pump 15 is further connected to the injection pipe 14, and a solidifying agent, such as portland cement, clay, water, or a retarder, is added to the injection pipe 14.
A mixture of liquid and liquid b made of water glass is injected and filled as a filler into the filling portion 16 after the buried pipe is removed.

この充填材の注入充填は地山17が崩壊を起さぬよう注
入圧、注入量及び推進管8の引き抜き量を調節しつつ、
推進管8及び先導管7を順次立坑2側に引き抜きながら
行ない、推進管8及び先導管7の撤去とともに充填材に
よる撤去後の置換を行なう。
This filling material is injected while adjusting the injection pressure, injection amount, and withdrawal amount of the propulsion pipe 8 so as to prevent the ground 17 from collapsing.
The propulsion pipe 8 and the leading pipe 7 are sequentially pulled out toward the shaft 2 side, and the propulsion pipe 8 and the leading pipe 7 are removed and replaced with filler material after removal.

推進管8の引き抜きは、推進用に使用した推進ジヤツキ
、中間ジヤツキを使用する方法、ウィンチによる方法等
があるが、充填材の注入圧を適切にかけることにより引
き抜き力に作用させることができる。
The propulsion tube 8 can be pulled out using a propulsion jack used for propulsion, an intermediate jack, a winch, etc., but the pulling force can be applied by appropriately applying the filler injection pressure.

一方他の実施例としては、第7図に示すように、地中に
埋設されている既設の埋設管lを包するように複数の立
坑2.2′を構築し、その内部の埋設管lを撤去し、さ
らに立坑2の側壁に反力体3を設ける方法がある。すな
わち第2図及び第5.6図に示すように埋設管lと同等
もしくは、これより大きい刃口4.スキンプレート5.
補強リブ6より構成された先導管7、及び推進管8を埋
設管lと同心状に設置し、上記反力体3を反力に、推進
ジヤツキ9により先導管7、及び推進管8を埋設管1に
沿って第1図に示す矢印方向に押込みながら、先導管7
付近で埋設管1を破壊もしくは押出して順次立坑2′ま
て撤去・推進する。
On the other hand, as another example, as shown in FIG. There is a method of removing the reaction force body 3 and further installing a reaction force body 3 on the side wall of the shaft 2. That is, as shown in Fig. 2 and Fig. 5.6, the cutting edge 4. is equal to or larger than the buried pipe l. Skin plate 5.
A leading pipe 7 composed of reinforcing ribs 6 and a propulsion pipe 8 are installed concentrically with the buried pipe 1, and using the reaction force body 3 as a reaction force, the leading pipe 7 and the propulsion pipe 8 are buried using a propulsion jack 9. While pushing along the tube 1 in the direction of the arrow shown in FIG. 1, insert the leading tube 7.
Buried pipes 1 are destroyed or pushed out in the vicinity and vertical shafts 2' are sequentially removed and pushed forward.

このように埋設管1の撤去を完了した後、立坑2に第8
.第9図に示す隔壁18を設置し、最後尾の推進管8の
後部に隔壁10′を取付ける。隔壁10°は第5図にて
説明したものと同様に、鋼板11とH鋼材12とからな
るもので適所に注入孔13を設けて構成される。この隔
壁10°の注入孔13に注入管14を接続し、さらに注
入管14に注入ポンプ15を接続して固化剤例えばポル
トランドセメント、粘土、水、遅延剤よりなるa液と、
水ガラスよりなるb液とを混合したものを充填材として
埋設管撤去後の充填部16に注入充填する。この充填材
の注入充填は、地山17が崩壊を起さぬよう注入圧、注
入量、及び推進管8の引き抜き量を調整しつつ、推進管
8を順次立坑2°偏に引き抜きながら行ない、推進管8
の撤去とともに充填材による撤去後の置換を行う。
After completing the removal of buried pipe 1 in this way, the eighth
.. A bulkhead 18 shown in FIG. 9 is installed, and a bulkhead 10' is attached to the rear of the rearmost propulsion tube 8. The partition wall 10° is constructed of a steel plate 11 and an H steel material 12, with injection holes 13 provided at appropriate locations, similar to that explained with reference to FIG. An injection pipe 14 is connected to the injection hole 13 at 10° of this partition wall, and an injection pump 15 is further connected to the injection pipe 14, and a solidifying agent such as portland cement, clay, water, and a liquid consisting of a retarding agent is added.
A mixture of liquid B made of water glass is used as a filler and is injected into the filling portion 16 after the buried pipe is removed. This injection and filling of the filler material is carried out while adjusting the injection pressure, injection amount, and amount of withdrawal of the propulsion tube 8 so as not to cause collapse of the ground 17, while sequentially pulling out the propulsion tube 8 at a 2° angle from the shaft. Propulsion tube 8
At the same time as the removal, replacement with filler material will be carried out.

更に別の実施例としては、第11図に示す如く、障害物
l”があれば1発進用立坑2を構築し、反力体3を反力
に推進ジヤツキ9にてこの障害物1°に達するまで推進
する。障害物l”を撤去後は、先導管7の前部又は後部
に隔壁10を取付け、前記同様の充填材により充填部1
6に注入充填しつつ、推進管8を立坑2側に撤去させる
In yet another embodiment, as shown in FIG. 11, if there is an obstacle l'', a single launch shaft 2 is constructed, and a propulsion jack 9 is used to move the obstacle 1° using the reaction force 3. After removing the obstacle l'', attach the bulkhead 10 to the front or rear part of the leading pipe 7, and fill the filling part 1 with the same filling material as described above.
6 is injected and filled, the propulsion pipe 8 is removed to the shaft 2 side.

なお、本方法は事前に障害物が撤去できるので、密閉式
シールドの採用への道を拓くことにもなる。
Furthermore, since this method allows obstacles to be removed in advance, it will also pave the way for the adoption of sealed shields.

〈発明の効果〉 以上に説明したように1本発明によると以下のような多
大の効果を奏し得る。
<Effects of the Invention> As explained above, according to the present invention, the following great effects can be achieved.

■トンネル工法を用いて埋設物を撤去できるため、道路
交通等に支障を与えない。
■Since buried objects can be removed using the tunnel construction method, there will be no hindrance to road traffic, etc.

■また、トンネル工法であるため、用地境界線ぎりぎり
までの施工ができる。従って、借地あるいは地上権の問
題を生じないとともに、沿道住民感情を悪化させること
がない。
■Also, since it is a tunnel construction method, construction can be carried out right up to the property line. Therefore, there will be no problem of land lease or surface rights, and there will be no aggravation of feelings among roadside residents.

■推進工法を使用するため、埋設管ないし障害物を撤去
後推進管をも引き抜くことがてきる。
■Since the propulsion method is used, the propulsion pipe can be pulled out after removing the buried pipe or obstacles.

■充填材を注入しながら推進管を引き抜くため地山が崩
壊することがない。
■Since the propulsion tube is pulled out while injecting filler, the ground does not collapse.

■充填材の注入圧を推進管の引き扶きに利用することが
できるため推進管の引き抜きか容易である。
■The injection pressure of the filler can be used to pull the propulsion tube, making it easy to pull out the propulsion tube.

■推進管は発進立坑側にも到達立坑側にも自在に撤去で
きる。
■The propulsion pipe can be freely removed to either the starting shaft side or the destination shaft side.

■埋設管に限らず、基礎杭などの障害物の撤去も可能で
ある。
■In addition to buried pipes, it is also possible to remove obstacles such as foundation piles.

■障害物撤去後、推進管を作業坑に地盤改良工法、地下
水位低下工法などの補助工も施工できる。
■After removing obstacles, auxiliary works such as ground improvement methods and underground water level lowering methods can be performed using the propulsion pipe as a working pit.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は1本発明による地中埋設物の撤去方法を示す側
面図、 第2図は、第1図のA、 −A線矢視断面図、第3図は
、充填材を注入しながら推進管を引き抜く状況を示す側
面図、 第4図は、第3図のB−B線矢視断面図。 第5図は、先導管及び隔壁の構成を示す断面図、 第6図は、第5図のC−C線矢視断面図、第7図は、複
数立坑による地中埋設物の撤去方法を示す図、 第8図は、第7図の要部説明図、 第9図は、立坑の隔壁を説明する図、 第10図は、第9図のD−D線矢視断面図。 第11図は、他の障害物撤去方法を示す図。 第12図は、第11図の要部説明図である。 l・・・埋設管、2.2’−・・立坑。 3・・・反力体、 4・・・刃口。 5・・・スキンプレート、 6・・・補強リブ。 7・・・先導管、 8・・・推進管。 9・・・推進ジヤツキ、   10.10’・・・隔壁
。 11・・・鋼板、12・・・H鋼材、  13−・・注
入孔。 14・・・注入管、  15−・・注入ポンプ。 16・・・充填部、  17−・・地山、  18・・
・立坑隔壁。 19・・・立坑土留壁、  20−・・コーキング。
Fig. 1 is a side view showing the method for removing underground objects according to the present invention, Fig. 2 is a sectional view taken along the line A and -A in Fig. 1, and Fig. 3 is a side view showing the method for removing underground objects according to the present invention. A side view showing the state in which the propulsion tube is pulled out; FIG. 4 is a sectional view taken along the line B-B in FIG. 3; Figure 5 is a cross-sectional view showing the structure of the leading pipe and bulkhead, Figure 6 is a cross-sectional view taken along the line C--C in Figure 5, and Figure 7 is a method for removing underground objects using multiple vertical shafts. 8 is an explanatory diagram of the main part of FIG. 7, FIG. 9 is a diagram illustrating the partition of the shaft, and FIG. 10 is a sectional view taken along the line D-D in FIG. 9. FIG. 11 is a diagram showing another method of removing obstacles. FIG. 12 is an explanatory diagram of the main part of FIG. 11. l... Buried pipe, 2.2'-... Vertical shaft. 3...Reaction force body, 4...Blade mouth. 5...Skin plate, 6...Reinforcement rib. 7... Leading pipe, 8... Propulsion pipe. 9... Propulsion jack, 10.10'... Bulkhead. 11... Steel plate, 12... H steel material, 13-... Injection hole. 14--Infusion tube, 15--Infusion pump. 16... Filling part, 17-... Earth, 18...
・Shaft bulkhead. 19...Shaft earth retaining wall, 20-...Caulking.

Claims (1)

【特許請求の範囲】[Claims]  地中埋設物を包するように立坑を構築し、同埋設物と
同等もしくはそれより大きな先導管及び推進管を埋設物
に沿って押込みながら先導管付近で埋設物を破壊もしく
は押出して埋設物を順次撤去した後、先導管の前部また
は後部に隔壁を取付け、これに注入孔を設けて注入管を
接続し、注入ポンプを介して充填材を注入しながら推進
管及び先導管を順次立坑側に引き抜き撤去することを特
徴とする地中埋設物の撤去方法。
A vertical shaft is constructed to enclose the underground object, and a leading pipe and a propulsion pipe that are equal to or larger than the buried object are pushed along the buried object, and the buried object is destroyed or pushed out near the leading pipe to remove the buried object. After removing them one by one, attach a bulkhead to the front or rear of the leading pipe, make an injection hole in it, connect the injection pipe, and sequentially move the propulsion pipe and leading pipe to the shaft side while injecting filler through the injection pump. A method for removing underground objects characterized by pulling them out and removing them.
JP2141963A 1990-05-31 1990-05-31 How to remove underground objects Expired - Fee Related JP2659607B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2141963A JP2659607B2 (en) 1990-05-31 1990-05-31 How to remove underground objects

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2141963A JP2659607B2 (en) 1990-05-31 1990-05-31 How to remove underground objects

Publications (2)

Publication Number Publication Date
JPH0434280A true JPH0434280A (en) 1992-02-05
JP2659607B2 JP2659607B2 (en) 1997-09-30

Family

ID=15304201

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2141963A Expired - Fee Related JP2659607B2 (en) 1990-05-31 1990-05-31 How to remove underground objects

Country Status (1)

Country Link
JP (1) JP2659607B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009097296A (en) * 2007-10-19 2009-05-07 Sumitomo Mitsui Construction Co Ltd Removal tunnel backfilling device
JP2010112037A (en) * 2008-11-05 2010-05-20 Uemura Giken Kogyo Kk Method for removing and restoring underground installation
JP2016113874A (en) * 2014-12-18 2016-06-23 植村 誠 Shield machine recovery method in open shield method
CN109707926A (en) * 2018-12-28 2019-05-03 湖州师范学院 An automatic locking pipe connection mechanism

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009097296A (en) * 2007-10-19 2009-05-07 Sumitomo Mitsui Construction Co Ltd Removal tunnel backfilling device
JP2010112037A (en) * 2008-11-05 2010-05-20 Uemura Giken Kogyo Kk Method for removing and restoring underground installation
JP2016113874A (en) * 2014-12-18 2016-06-23 植村 誠 Shield machine recovery method in open shield method
CN109707926A (en) * 2018-12-28 2019-05-03 湖州师范学院 An automatic locking pipe connection mechanism

Also Published As

Publication number Publication date
JP2659607B2 (en) 1997-09-30

Similar Documents

Publication Publication Date Title
CN114562289A (en) Rapid treatment method for large-scale cavity collapse of soft broken surrounding rock tunnel vault
JP3834571B2 (en) Construction method for underground structures
JP2659607B2 (en) How to remove underground objects
JP4485006B2 (en) Construction method for underground structures
CN113958322A (en) Tunnel excavation method at lower layer of existing subway line
JP2963972B2 (en) Construction method for underground structures
JPH11152986A (en) Protection method for shielding excavation in section covered with thin soil layer
JP2594864B2 (en) Widening method of underground tunnel
JP2697762B2 (en) Tunnel structure and construction method
KR102243586B1 (en) Two-side semicircle arch type leading pipe and structure of non-excavation type tunnel using thereof and method of constructing thereof
KR102243585B1 (en) Structure of constructing non-excavation type tunnel using steel pipe loof and leading pipe
JP3710991B2 (en) Ground reinforcement method
JP4322796B2 (en) Reinforcement method of natural ground
CN208294522U (en) Waterproof of man in a kind of pilot tunnel of rich water sand-pebble layer
JP2849822B2 (en) Underground diaphragm wall excavation method and its equipment
CN207554050U (en) Box culvert relay jacking system with box culvert overlapping structure
JPH1162469A (en) Structure of earth retaining wall in shield shaft and method of starting and reaching shield machine
JPH09279985A (en) Freeze expansion pressure reducing structure and method for constructing the same
JP7597777B2 (en) Method of entering the vertical shaft of an open shield machine in the open shield construction method
JP4279818B2 (en) Open shield method
KR102243584B1 (en) Two-side semicircle arch type leading pipe and structure of underground tunnel using thereof and method of constructing thereof
JPH0366452B2 (en)
JPH08218770A (en) Underground curved member and its construction method
JPH0437916B2 (en)
JPH0536597B2 (en)

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees