JPH0442418Y2 JP1122586U JP1122586U JPH0442418Y2 JP H0442418 Y2 JPH0442418 Y2 JP H0442418Y2 JP 1122586 U JP1122586 U JP 1122586U JP 1122586 U JP1122586 U JP 1122586U JP H0442418 Y2 JPH0442418 Y2 JP H0442418Y2
Authority
JP
Japan
Prior art keywords
web
steel beam
stiffeners
steel
stiffener
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP1122586U
Other languages
Japanese (ja)
Other versions
JPS62124119U (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP1122586U priority Critical patent/JPH0442418Y2/ja
Publication of JPS62124119U publication Critical patent/JPS62124119U/ja
Application granted granted Critical
Publication of JPH0442418Y2 publication Critical patent/JPH0442418Y2/ja
Expired legal-status Critical Current

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Description

【考案の詳細な説明】 (産業上の利用分野) この考案は鉄骨梁をコンクリート製のスチフナ
ーで補強した構造の補強鉄骨梁構造に関するもの
である。
[Detailed description of the invention] (Field of industrial application) This invention relates to a reinforced steel beam structure in which a steel beam is reinforced with concrete stiffeners.

(考案が解決しようとする問題点) 鉄骨梁を補強するスチフナーにはこれまでは鋼
板が使用されているが、この構造は鋼板の端面を
溶接するものであるため必然的に施工に時間を要
し、工期が長びくことに加え、コスト高である等
の難点を抱えている。
(Problem that the invention aims to solve) Until now, steel plates have been used for stiffeners that reinforce steel beams, but since this structure involves welding the ends of the steel plates, it inevitably takes time to construct. However, in addition to the long construction period, there are also disadvantages such as high costs.

この考案はこうした鉄骨梁の補強に伴う難点を
軽減する目的からなされたもので、コンクリート
製のスチフナーを使用することによりこれを解決
しようとするものである。
This idea was made to alleviate the difficulties associated with reinforcing steel beams, and attempts to solve this problem by using concrete stiffeners.

(問題点を解決するための手段) 本考案ではスチフナーをプレキヤストコンクリ
ートで製作し、これを鉄骨梁のウエブにボルトで
接合することにより使用鋼材量の低減、施工の簡
略化を図る。
(Means for solving the problem) In this invention, the stiffener is made of precast concrete and is connected to the web of the steel beam with bolts, thereby reducing the amount of steel used and simplifying the construction.

スチフナーはフルウエブ型の鉄骨梁の上下フラ
ンジ間に嵌合する形状であり、これを複数個間隔
をおいて鉄骨梁のウエブを挟むようにこの両面に
突き合わせる。そしてウエブを介して対向したス
チフナーにボルトを挿通してこれをウエブに接合
する。
The stiffeners are shaped to fit between the upper and lower flanges of a full-web type steel beam, and a plurality of stiffeners are placed at intervals and abutted against both sides of the steel beam so as to sandwich the web of the steel beam. Then, bolts are inserted into the stiffeners facing each other via the web to join them to the web.

(実施例) 以下本考案を実施例を示す図面に基づいて説明
する。
(Example) The present invention will be described below based on drawings showing examples.

この考案はフルウエブ型の鉄骨梁1のウエブ1
aにプレキヤストコンクリート製のスチフナー2
をボルト3で接合し、鉄骨梁1のウエブ1aを補
強した構造としたものである。
This idea is based on the web 1 of a full web type steel beam 1.
Stiffener 2 made of precast concrete in a
are joined with bolts 3, and the web 1a of the steel beam 1 is reinforced.

スチフナー2は第1図−のようにウエブ1a
の両面に対向してボルト3により接合され、の
ように間隔をおいて複数個取り付けられる。この
ためウエブ1a及びスチフナー2には予めボルト
挿通孔が設けられる。
The stiffener 2 is attached to the web 1a as shown in Figure 1.
They are joined by bolts 3 facing each other on both sides, and a plurality of them are attached at intervals as shown in FIG. For this purpose, bolt insertion holes are provided in advance in the web 1a and the stiffener 2.

第2図に示す実施例はスチフナー2に埋設した鉄
筋4をスラブ5に埋め込んで鉄骨梁1を拘束し、
この横座屈を防止する構造としたものである。
In the embodiment shown in FIG. 2, reinforcing bars 4 embedded in the stiffener 2 are embedded in the slab 5 to restrain the steel beam 1,
The structure is designed to prevent this lateral buckling.

第3図に示す実施例はスチフナー2に突起2a
を形成してこれを小梁受として利用し、この突起
2a上に小梁6を載置した場合である。
The embodiment shown in FIG. 3 has a projection 2a on the stiffener 2.
This is a case where a small beam 6 is placed on this protrusion 2a by forming a small beam and using this as a small beam support.

なおスチフナー2は鉄筋コンクリートの他にフア
イバーコンクリート、グラスフアイバーコンクリ
ートで製作してもよい。
Note that the stiffener 2 may be made of fiber concrete or glass fiber concrete in addition to reinforced concrete.

(考案の効果) この考案は以上の通りスチフナーを鋼材に代え
てコンクリートで製作し、ウエブへの接合をボル
トで行う構造であるため鋼材量及びその溶接量が
低減され、その結果経費の節減、工期の短縮化を
図ることができる。
(Effects of the invention) As described above, this invention has a structure in which the stiffener is made of concrete instead of steel and is connected to the web with bolts, so the amount of steel and welding is reduced, resulting in cost savings. It is possible to shorten the construction period.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本考案の実施例を示したものでは断
面図、は側面図である。第2図、第3図は他の
実施例を示した断面図である。 1……鉄骨梁、1a……ウエブ、2……スチフ
ナー、2a……突起、3……ボルト、4……鉄
筋、5……スラブ、6……小梁。
FIG. 1 is a sectional view and a side view of an embodiment of the present invention. FIGS. 2 and 3 are sectional views showing other embodiments. 1... Steel beam, 1a... Web, 2... Stiffener, 2a... Projection, 3... Bolt, 4... Rebar, 5... Slab, 6... Small beam.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] フルウエブ型の鉄骨梁の上下フランジ間に嵌合
する形状に形成された板状のプレキヤストコンク
リート製のスチフナーを複数個間隔をおいて鉄骨
梁のウエブ両面に垂直に突き合わせ、各対向した
両スチフナーにボルトを挿通してウエブに接合し
てなる補強鉄骨梁構造。
A plurality of plate-shaped precast concrete stiffeners shaped to fit between the upper and lower flanges of a full-web type steel beam are butted perpendicularly to both sides of the steel beam's web at intervals, and each of the two opposing stiffeners is Reinforced steel beam structure made by inserting bolts and joining to the web.
JP1122586U 1986-01-29 1986-01-29 Expired JPH0442418Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1122586U JPH0442418Y2 (en) 1986-01-29 1986-01-29

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1122586U JPH0442418Y2 (en) 1986-01-29 1986-01-29

Publications (2)

Publication Number Publication Date
JPS62124119U JPS62124119U (en) 1987-08-06
JPH0442418Y2 true JPH0442418Y2 (en) 1992-10-07

Family

ID=30798244

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1122586U Expired JPH0442418Y2 (en) 1986-01-29 1986-01-29

Country Status (1)

Country Link
JP (1) JPH0442418Y2 (en)

Also Published As

Publication number Publication date
JPS62124119U (en) 1987-08-06

Similar Documents

Publication Publication Date Title
JPH09221717A (en) Steel-concrete composite slab bridge and its construction method
JP2522714B2 (en) Construction method of building frame
JPH0442418Y2 (en)
JP3571913B2 (en) Column and beam joint structure, beam to beam joint structure, building unit, unit building and building
JPS62178634A (en) Frame construction method for structures
JPH0514063B2 (en)
JPH0230492Y2 (en)
JP2713139B2 (en) Floor method using steel assembly as beam form
JPS6029524Y2 (en) Three-dimensional truss joint hardware
JPH0423137Y2 (en)
JP2890983B2 (en) Beam connection structure of PC column
JPH02261145A (en) Joist slab construction method using precast concrete girders
JPH044091Y2 (en)
JP3366980B2 (en) Composite slab and method of constructing the same
JPS5925931Y2 (en) Composite girder using π-shaped steel
JPS5923078Y2 (en) concrete fence culvert
JP3749935B2 (en) Column and beam construction method and enclosure
JPS6126485Y2 (en)
JPS6023371Y2 (en) composite precast concrete beam
JPH0332165Y2 (en)
JPS6347201Y2 (en)
JPH0637128Y2 (en) Joint structure of columns and beams
JPH0518414Y2 (en)
JPH0223678Y2 (en)
JPS5938801Y2 (en) Three-dimensional truss joint hardware