- ore
- coke
- charging
- small coke
- charged
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Landscapes
- Manufacture Of Iron (AREA)
- Blast Furnaces (AREA)
Description
(イ) 産業上の利用分野
本発明は、高炉内に原料を装入する方法に関
し、さらに詳しく言えば、高炉装入時の原料の堆
積・排出等の挙動を利用して鉱石層中に小塊コー
クスを混合する方法に関するものである。
(ロ) 従来技術
従来より鉱石中に小塊コークスを混合して装入
する方法が実施されているが、従来技術では鉱石
層中に小塊コークスが均一に存在しないで偏析を
生じるため、上記効果を充分発揮することができ
なかつた。
例えば、貯槽で小塊コークスを少量ずつ切り出
してコンベア上で鉱石に均一混合しても、サー
ジ・ホツパを経由するさい、ホツパ排出時にコー
クスが均一に排出されないために、装入ベルト・
コンベアの長手方向で鉱石中の小塊コークスの偏
在が生じていた。
さらに、鉱石層中のコークスの偏在は、高炉内
へ鉱石を装入する際にも生じる。第2図に示すよ
うに、高炉内に塊コークス2を装入した後、小塊
コークス3を完全混合した鉱石4を装入しても、
大ベルまたはベルレス・シユートから落下中およ
び堆積している塊コークス斜面21を降下中に鉱
石と小塊コークスとの再分離が生じ、比重の小さ
い小塊コークスは鉱石層表面近傍に偏在する。
そこで、第3図AおよびBに示すように、鉱石
を少なくとも2つに分割し、初期装入分の鉱石
4′には小塊コークス3を混合し、最終装入分の
鉱石4″には小塊コークス3を混合せずに装入す
る方法(特開昭59−211509号公報)が提案され
た。
このようにすれば、初期装入分の鉱石を炉内に
装入する際、混合した小塊コークス3が鉱石層の
表面近傍に偏在しても、最終装入の鉱石はその上
に装入されるので、小塊コークスを確実に鉱石層
中に補捉することができる。しかし、この方法で
も、鉱石層中の高さ方向の小塊コークス3の混在
率の偏析は大きく、鉱石4中への小塊コークス3
の混在による効果を十分発揮することができな
い。
(ハ) 発明が解決しようとする問題点
本発明が解決しようとする問題点は、高炉内に
原料を装入するに当り起る高炉装入前の鉱石中の
小塊コークスの偏在および高炉装入時の鉱石層中
の小塊コークスの偏在を解消することにある。
(ニ) 問題点を解決するための手段
本発明の高炉用原料の装入方法は、高炉内に原
料を装入するに際して、コークスを分割して装入
すること、最終装入コークスに小塊コークスを用
いること、該小塊コークスを初期装入鉱石の炉内
落下位置近傍に装入すること、鉱石を分割して装
入すること、鉱石装入の初期は鉱石のみを装入す
ること、鉱石装入の2回目以降の装入時には大ベ
ル・ホツパまたはベルレス・バンカ内下部に小塊
コークスを堆積させた後に上部に鉱石を堆積させ
て同時に炉内に装入することいよつて、上記問題
点を解決している。
(ホ) 実施例
図面を参照して、本発明の方法について具体的
に説明する。本発明の方法を、従来法および
と対比して図式的に書けば次のようになる。
本発明法(第1図):CL↓CS↓O〓↓(CS+O〓)
↓
従来法(第2図):CL↓(OCS)↓
従来法(第3図):CL↓(O〓CS)↓O〓↓
ここで、
CL:塊コークス
O〓:初期装入鉱石
↓:炉内への装入
CS:小塊コークス
O〓:最終装入鉱石
(A+B):大ベルホツパまたはベルレス・バ
ンカ内で下部に原料Aを、上部に原料Bを
堆積させ、同時に炉内装入をする。
(AB):大ベルホツパまたはベルレス・バ
ンカ内に、原料Bを原料A中に混在させた
ものを装入し、炉内装入する。
第2図に示す従来法では塊コークス2の装入
後、小塊コークス3を鉱石4の全量に混在させて
炉内に装入する。第3図に示す従来法では、初
期装入鉱石4′(O〓)には小塊コークス3(CS)
を混合するが(第3図)、最終装入鉱石4″(O〓)
には小塊コークス3を混合しない。
一方、本発明法では第1図に示すように初期装
入コークスは分離装入する。塊コークス2(CL)
を装入後、小塊コークス3(CS)を鉱石4(O〓)
の落下位置周辺に装入する。小塊コークス3は、
次に述べるように、初期装入鉱石4中に混在させ
るコークスである。次に、小塊コークス3を混在
していない初期装入鉱石4を装入する。この鉱石
装入時に、鉱石4の落下衝撃エネルギによつて落
下位置近傍の小塊コークス3が削り取られて、鉱
石4と混合して炉中心部の方へ押し流され、中心
部に広範囲な混合層を形成する。
この鉱石装入時の混合層形成については、Y.
Kajiwara等による「Transactions of Iron and
Steel Instiute of Japan、23巻1983年(1045
頁)」に報告がある。
発明者等はさらに扇形実物大模型(扇形角20°)
を使用して、鉱石落下位置近傍のコークス粒径を
種々変更して、混合層形成量に及ぼす影響を調査
し、小塊コークスを鉱石落下位置近傍に堆積させ
ても充分鉱石層中に混合できることを確認した。
本発明の特徴は、初期装入鉱石4′(O〓)中に
混合する小塊コークス3(CS)を塊コークス2
(CL)と分割して装入すること、およびその装入
位置は初期装入鉱石4′(O〓)の落下位置近傍と
し、前記の鉱石装入時の落下衝撃エネルギを有効
に利用することである。
次に、2回目以降の装入鉱石4″(O〓)中への
小塊コークス3の混合法について述べる。鉱石
4″を大ベル・ホツパまたは、ベルレス・バンカ
内に装入する前に、鉱石層中に混合させる小塊コ
ークス3を大ベル・ホツパまたは、ベルレス・バ
ンカに装入し、下部に推進させる。その上に、2
回目以降装入鉱石4″(O〓)を推進させる。
大ベル・ホツパおよびベルレス・バンカ内の原
料の堆積状況を第4図AおよびBに概略的に示
す。この状態で、ベル式装入の場合A、原料を炉
内に装入するために大ベル5を開くと、まず固定
壁6側の小塊コークス3が大ベル・ホツパから排
出され、続いて上部に堆積していた鉱石4″が排
出され、最後に大ベル側の小塊コークス3が排出
される。ベルレス装入の場合B、ゲート弁8を開
くと、まず、固定壁6側の小塊コークス3が大ベ
ル・ホツパから排出され、続いて上部に堆積して
いた鉱石4″が排出され、最後に大ベル側の小塊
コークス3が排出される。ベルレス装入の場合
B、ゲート弁8を開くと、まずベルレス・バンカ
7の底部に堆積している小塊コークス3が、続い
て上部に堆積していた鉱石4″が排出され、最後
にバンカ壁部の小塊コークス3が排出される。
したがつて、最終的な鉱石層中の小塊コークス
3の堆積状況は第1図のようになる。2回目以降
の装入鉱石4″(O〓)中への小塊コークス3の混
合は、大ベル・ホツパまたはベルレス・バンカか
らの原料排出特性を利用して行い、小塊コークス
3の大半が鉱石層表面近傍に偏在するのを抑制す
ることができる。なお、大ベル・ホツパまたはベ
ルレス・バンカの下部に鉱石4″を、上部に小塊
コークス3を堆積させた場合、小塊コークス3は
装入中期に排出されるものの、炉内で再分離して
鉱石層表面近傍に偏在しやすく、所期の目的を十
分達成できない。
使用する小塊コークス3の粒径範囲は、上限粒
径は高炉使用塊小塊コークスの下限と、滴下帯上
部に到達するまでにソルーシヨン・ロス反応を受
けて消滅する上限とで決まる。また、下限粒径は
焼結機使用粉コークスの上限と、高炉内通気性を
阻害しない上限とで決まる。通常は、7〜20mmの
粒径を使用する。
また鉱石およびコークスの装入数は2分割の例
について示したが、分割数が増えても同様の効果
がえられる。
(ヘ) 効果
本発明法の効果を確認するために、前述の扇形
実物大模型を使用して、従来法,とともに装
入試験を実施し、鉱石層中の小塊コークスの混在
率分布を測定した。このときの試験条件を第1表
に、使用したコークスの粒径分布を第2表にそれ
ぞれ示す。
小塊コークスの混在率は、装入試験後、装置内
中央部の壁面効果の及ばない部分で、半径方向5
点で樹脂を硬化剤とともに混錬して流し込み、試
料の堆積構造を崩さずにサンプリングをし、その
断面の観察図から求めた結果を第5図に示す。
第5図において、Aは装置内中央部を、またB
は装置内壁部の試験結果をそれぞれ示す。第5図
の縦軸および横軸を次のように定義する。
無次元小塊コークス混在率=その位置での小塊コーク
ス混在率(%)/均一混合を仮定した時の小塊コークス
混在率(%)
無次元高さ方向位置=鉱石層底面からの垂直距離(m
)/その位置における鉱石層厚(m)
(b) Industrial application field The present invention relates to a method of charging raw materials into a blast furnace, and more specifically, the present invention relates to a method of charging raw materials into a blast furnace. The present invention relates to a method of mixing lump coke. (b) Conventional technology A method of mixing small coke into ore and charging it has been practiced in the past, but in the conventional technology, small coke does not exist uniformly in the ore layer and segregation occurs, so the above-mentioned The effect could not be fully demonstrated. For example, even if small coke is cut out in small quantities in a storage tank and mixed uniformly with ore on a conveyor, when it passes through a surge hopper, the coke is not discharged uniformly when the hopper is discharged, so the charging belt
Small coke particles in the ore were unevenly distributed in the longitudinal direction of the conveyor. Furthermore, uneven distribution of coke in the ore layer also occurs when ore is charged into the blast furnace. As shown in Fig. 2, even after charging lump coke 2 into the blast furnace, ore 4 with complete mixture of small coke 3 is charged.
The ore and the small coke are re-separated while falling from the large bell or bell-less chute and descending the accumulated lump coke slope 21, and the small coke with low specific gravity is unevenly distributed near the surface of the ore layer. Therefore, as shown in Figure 3A and B, the ore is divided into at least two parts, the initial charge of ore 4' is mixed with small coke 3, and the final charge of ore 4'' is mixed with ore. A method (Japanese Patent Laid-Open No. 59-211509) has been proposed in which small coke 3 is charged without mixing. By doing this, when the initial charge of ore is charged into the furnace, mixing is not required. Even if the small coke 3 is unevenly distributed near the surface of the ore layer, the final charge of ore is charged on top of it, so the small coke can be reliably trapped in the ore layer. Even with this method, the segregation of the mixed ratio of small coke 3 in the height direction in the ore layer is large, and the small coke 3 in the ore 4 is
The effect of the mixture cannot be fully demonstrated. (c) Problems to be solved by the present invention The problems to be solved by the present invention are the uneven distribution of small coke in the ore before charging into the blast furnace and the problem in the blast furnace charging process. The aim is to eliminate the uneven distribution of small coke in the ore layer at the time of input. (d) Means for Solving the Problems The method of charging raw materials for a blast furnace of the present invention includes charging the coke in parts when charging the raw materials into the blast furnace, and adding small lumps to the final charged coke. using coke, charging the small coke near the position where the initially charged ore falls in the furnace, charging the ore in parts, charging only the ore at the initial stage of ore charging; During the second ore charging, the above problem can be solved by depositing small coke at the bottom of the large bell hopper or bellless bunker, then depositing ore at the top and charging into the furnace at the same time. points are resolved. (e) Examples The method of the present invention will be specifically explained with reference to the drawings. The method of the present invention can be diagrammatically written as follows in comparison with the conventional method. Invention method (Figure 1): C L ↓C S ↓O〓↓ (C S +O〓)
↓ Conventional method (Fig. 2): C L ↓ (OC S ) ↓ Conventional method (Fig. 3): C L ↓ (O〓C S )↓O〓↓ Where, C L : Lump coke O: Initial stage Charging ore ↓: Charge into the furnace C S : Small coke O〓: Final charging ore (A+B): In a large bellhopper or bellless bunker, raw material A is deposited in the lower part and raw material B in the upper part, At the same time, install the furnace. (AB): A mixture of raw material B and raw material A is charged into a large bell hopper or bellless bunker, and loaded into the furnace. In the conventional method shown in FIG. 2, after charging lump coke 2, small lump coke 3 is mixed with the entire amount of ore 4 and charged into the furnace. In the conventional method shown in Figure 3, the initially charged ore 4' (O〓) contains small coke 3 ( CS ).
(Fig. 3), the final charging ore is 4″ (O〓)
Do not mix small coke 3 with. On the other hand, in the method of the present invention, the initially charged coke is separately charged as shown in FIG. Lump coke 2 ( CL )
After charging, small coke 3 (C S ) is added to ore 4 (O〓)
Charge around the dropping position. Small coke 3 is
As described below, this is coke to be mixed in the initially charged ore 4. Next, the initial charging ore 4 without mixed small coke 3 is charged. When charging the ore, the small coke 3 near the falling position is scraped off by the impact energy of the falling ore 4, mixed with the ore 4, and swept toward the center of the furnace, creating a wide mixed layer in the center. form. Regarding the formation of a mixed layer during ore charging, Y.
“Transactions of Iron and
Steel Institute of Japan, Volume 23, 1983 (1045
There is a report in ``Page)''. The inventors also created a full-scale fan-shaped model (fan angle 20°).
We investigated the effect on the amount of mixed layer formation by varying the coke particle size near the ore falling position using It was confirmed. The feature of the present invention is that the small coke 3 (C S ) mixed into the initial charging ore 4' (O〓) is replaced by the lump coke 2
(C L ) and the charging position should be near the falling position of the initially charged ore 4' (O〓) to effectively utilize the falling impact energy during the above-mentioned ore charging. That's true. Next, we will discuss the method of mixing small coke 3 into charged ore 4'' (O〓) from the second time onward.Before charging ore 4'' into a large bell hopper or bellless bunker, Small coke 3 to be mixed into the ore layer is charged into a large bell hopper or bellless bunker and propelled downward. On top of that, 2
From the first time onwards, the charged ore 4" (O〓) is propelled. The accumulation of raw materials in the large bell hopper and bellless bunker is schematically shown in Figure 4 A and B. In this state, the bell type charging is carried out. In case A, when the large bell 5 is opened to charge raw materials into the furnace, the small coke 3 on the fixed wall 6 side is first discharged from the large bell hopper, and then the ore 4 deposited on the top is discharged. '' is discharged, and finally the small coke 3 on the large bell side is discharged. In the case of bellless charging B, when the gate valve 8 is opened, the small coke 3 on the fixed wall 6 side is first discharged from the large bell hopper, then the ore 4'' accumulated on the top is discharged, and finally The small coke 3 on the large bell side is discharged.In the case of bellless charging B, when the gate valve 8 is opened, the small coke 3 accumulated at the bottom of the bellless bunker 7 is first discharged, and then the small coke 3 is discharged at the top. The accumulated ore 4'' is discharged, and finally the small coke 3 on the bunker wall is discharged. Therefore, the final state of accumulation of small coke 3 in the ore layer is as shown in FIG. The second and subsequent mixing of the small coke 3 into the charged ore 4″ (O〓) is carried out using the raw material discharge characteristics from the large bell hopper or bellless bunker, and most of the small coke 3 is It is possible to suppress uneven distribution near the surface of the ore layer.In addition, when ore 4'' is deposited at the bottom of a large bell hopper or bellless bunker and small coke 3 is deposited at the top, the small coke 3 Although it is discharged during the middle stage of charging, it is likely to re-separate in the furnace and be unevenly distributed near the surface of the ore layer, making it impossible to fully achieve the intended purpose. The particle size range of the small coke 3 to be used is determined by the lower limit of the particle size of the small coke used in the blast furnace and the upper limit at which the small coke undergoes a solution loss reaction and disappears before reaching the upper part of the dripping zone. Further, the lower limit particle size is determined by the upper limit of coke powder used in the sintering machine and the upper limit that does not impede the permeability in the blast furnace. Usually particle sizes of 7 to 20 mm are used. Further, although the example in which the number of charged ore and coke is divided into two is shown, the same effect can be obtained even if the number of divided parts is increased. (f) Effects In order to confirm the effects of the present invention method, a charging test was carried out along with the conventional method using the above-mentioned full-scale fan-shaped model, and the mixed ratio distribution of small coke in the ore layer was measured. did. The test conditions at this time are shown in Table 1, and the particle size distribution of the coke used is shown in Table 2. After the charging test, the mixing rate of small coke was determined in the central part of the equipment, which is not affected by the wall effect, and in the radial direction.
The resin was kneaded with a curing agent at a point and poured in, and the sample was sampled without disturbing the deposited structure of the sample. The results obtained from the observation of the cross section are shown in FIG. In Fig. 5, A indicates the central part of the device, and B
shows the test results for the inner wall of the device. The vertical and horizontal axes in FIG. 5 are defined as follows. Dimensionless small coke mixing ratio = Small coke mixing ratio at that position (%) / Small coke mixing ratio assuming uniform mixing (%) Dimensionless height direction position = Vertical distance from the bottom of the ore layer (m
)/Ore layer thickness at that location (m)
【表】【table】
【表】
従来法(第2図)では、鉱石層の表面近傍に
小塊コークスが偏在していることおよび従来法
(第3図)では初期装入鉱石と最終装入鉱石との
境界近傍に小塊コークスが偏在していることがわ
かる。
これに対して、本発明では、特に中央部では高
さ方向の小塊コークスの偏在はほとんどなくな
り、炉壁部でも小塊コークスの混在率は底部、中
間部、表層部と3ケ所にピークをもつており、従
来法の1箇所のピークに比較して、はるかに偏在
が抑制されている。
このように、本発明法を用いれば、高炉装入前
に小塊コークスを鉱石層中に混在させる必要がな
いため、貯槽での偏在防止対策をとらなくてす
み、設備コストの低減だけでなく、高炉内におい
て、鉱石層中に小塊コークスを偏在させることな
く混合することができ、小塊コークスを安定して
使用できる高炉操業が可能である。[Table] In the conventional method (Fig. 2), small coke is unevenly distributed near the surface of the ore layer, and in the conventional method (Fig. 3), small coke is unevenly distributed near the boundary between the initial charging ore and the final charging ore. It can be seen that small coke is unevenly distributed. On the other hand, in the present invention, the uneven distribution of small coke in the height direction is almost eliminated, especially in the central part, and even in the furnace wall, the mixed ratio of small coke peaks in three places: the bottom, the middle, and the surface layer. The uneven distribution is much suppressed compared to the conventional method, which has a peak at one location. In this way, if the method of the present invention is used, there is no need to mix small coke into the ore layer before charging into the blast furnace, so there is no need to take measures to prevent uneven distribution in the storage tank, which not only reduces equipment costs but also eliminates the need to take measures to prevent uneven distribution in the storage tank. In the blast furnace, it is possible to mix small coke in the ore layer without unevenly distributing it, and it is possible to operate the blast furnace in which small coke can be stably used.
第1図は本発明法による鉱石層中への小塊コー
クス混合装入時の炉内の原料分布図。第2図は従
来法による鉱石層中への小塊コークス混合装入
時の炉内の原料分布図。第3図は従来法による
鉱石層中の小塊コークス混合装入時の炉内の原料
分布図。第4図は2回目以降装入鉱石の大ベル・
ホツパおよびベルレス・バンカ内の堆積状況図。
第5図は実物大模型試験における従来法,と
本発明法の鉱石層中への小塊コークス混合率分布
図。
1……高炉、2……塊コークス、3……小塊コ
ークス、4,4′,4″……鉱石、5……大ベル、
6……大ベル固定壁、7……ベルレス・バンカ、
8……ゲート弁、21……塊コークス斜面。
FIG. 1 is a raw material distribution diagram in the furnace when small coke is mixed and charged into an ore layer according to the method of the present invention. Figure 2 is a raw material distribution diagram in the furnace when small coke is mixed and charged into an ore layer using the conventional method. Figure 3 is a raw material distribution diagram in the furnace when small coke is mixed and charged in the ore layer using the conventional method. Figure 4 shows the large bell of charged ore from the second time onwards.
Deposition map of Hotupa and Belres Bangka.
Figure 5 is a distribution diagram of the mixing ratio of small coke in the ore layer in the conventional method and the method of the present invention in a full-scale model test. 1...Blast furnace, 2...Lump coke, 3...Small coke, 4,4',4''...Ore, 5...Large bell,
6...Large bell fixed wall, 7...Bellless banca,
8...Gate valve, 21...Lump coke slope.
Claims (1)
を分割して装入すること、最終装入コークスに小
塊コークスを用いること、該小塊コークスを初期
装入鉱石の炉内落下位置近傍に装入すること、鉱
石を分割して装入すること、鉱石装入の初期は鉱
石のみを装入すること、鉱石装入の2回目以降の
装入時には大ベル・ホツパまたはベルレス・バン
カ内下部に小塊コークスを堆積させた後に上部に
鉱石を堆積させて同時に炉内に装入することから
なる高炉用原料の装入方法。1 When charging raw materials into the blast furnace, the coke should be charged in parts, small coke should be used as the final coke charge, and the small coke should be placed near the position where the initially charged ore falls into the furnace. The ore should be charged in parts, the ore should be charged in parts, the ore should be charged only at the initial stage of ore charging, and the ore should be charged in the lower part of the large bell hoppa or bellless banka during the second or subsequent charging. A method for charging raw materials for a blast furnace, which consists of depositing small coke, depositing ore on top, and charging into the furnace at the same time.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP22549685A JPS6286105A (en) | 1985-10-09 | 1985-10-09 | Charging method for raw material for blast |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP22549685A JPS6286105A (en) | 1985-10-09 | 1985-10-09 | Charging method for raw material for blast |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS6286105A JPS6286105A (en) | 1987-04-20 |
| JPH0442443B2 true JPH0442443B2 (en) | 1992-07-13 |
Family
ID=16830229
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP22549685A Granted JPS6286105A (en) | 1985-10-09 | 1985-10-09 | Charging method for raw material for blast |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS6286105A (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4941122B2 (en) * | 2007-06-22 | 2012-05-30 | 住友金属工業株式会社 | Blast furnace operation method |
| JP5751037B2 (en) * | 2010-06-18 | 2015-07-22 | Jfeスチール株式会社 | Blast furnace operation method |
-
1985
- 1985-10-09 JP JP22549685A patent/JPS6286105A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS6286105A (en) | 1987-04-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20120210824A1 (en) | Methods, systems and devices for making cold bonded agglomerates | |
| CN116065018B (en) | Stainless steel ash carbon-matched high-quality pelletizing method for improving element yield | |
| RU2700977C1 (en) | Blast furnace charging method | |
| JPH0442443B2 (en) | ||
| US3598257A (en) | Apparatus for charging shaft-type furnaces | |
| US1673891A (en) | Method of preparing flotation concentrates | |
| JP3863052B2 (en) | Blast furnace raw material charging method | |
| US1073381A (en) | Utilizing fine ores, flue-dust, and the like. | |
| US2391588A (en) | Method of prepaking pellets for | |
| EP0495455A1 (en) | Method and apparatus for coating iron-bearing particles to be processed in a direct reduction process | |
| JP5387278B2 (en) | Raw material charging method for blast furnace | |
| JP2994026B2 (en) | Feeding method for bellless blast furnace | |
| JP3729371B2 (en) | MgO briquette for slag concentration adjustment | |
| JP4680344B2 (en) | Raw material charging method to blast furnace | |
| US4522649A (en) | Method of furnace operation with high pellet burdens | |
| KR102456735B1 (en) | How to charge raw materials in a blast furnace | |
| RU2137851C1 (en) | Method of preparing agglomerate for blast- furnace production at metallurgical enterprise | |
| JPH0421724B2 (en) | ||
| JP2018178165A (en) | Blast furnace operation method | |
| JPH0438809B2 (en) | ||
| Kajiwara et al. | Analysis and Control of Burden Distribution at the Blast Furnace Top.(Retroactive Coverage) | |
| CA1070953A (en) | Agglomerates for use in a blast furnace and method of making the same | |
| JP3760639B2 (en) | Method of blending ultrafine coke into sintering material | |
| SU1148868A1 (en) | Device for preparing charge for blast furnace melting | |
| JP3820677B2 (en) | Method and apparatus for charging reduced iron production raw material |