JPH0443549Y2 - - Google Patents

Info

Publication number
JPH0443549Y2
JPH0443549Y2 JP1986022286U JP2228686U JPH0443549Y2 JP H0443549 Y2 JPH0443549 Y2 JP H0443549Y2 JP 1986022286 U JP1986022286 U JP 1986022286U JP 2228686 U JP2228686 U JP 2228686U JP H0443549 Y2 JPH0443549 Y2 JP H0443549Y2
Authority
JP
Japan
Prior art keywords
formwork
excavation
arch
hollow part
shape
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP1986022286U
Other languages
Japanese (ja)
Other versions
JPS62135742U (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP1986022286U priority Critical patent/JPH0443549Y2/ja
Publication of JPS62135742U publication Critical patent/JPS62135742U/ja
Application granted granted Critical
Publication of JPH0443549Y2 publication Critical patent/JPH0443549Y2/ja
Expired legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

【考案の詳細な説明】 (産業上の利用分野) 本考案は道路、鉄道、炭坑等の岩盤を堀削して
行なうトンネル工事において、堀削により形成さ
れる中空部の断面形状を、目標形状に成型する基
準となるアーチ状の型枠に関するものである。
[Detailed explanation of the invention] (Industrial application field) This invention is used to create tunnels for roads, railways, coal mines, etc. by excavating the rock, and the cross-sectional shape of the hollow part formed by excavation is changed to the target shape. This relates to an arch-shaped formwork that serves as a reference for molding.

(従来の技術) トンネルの施工方法は、トンネルの規模、地
質、岩盤の状態等により異なるが、第6図第7図
は、道路、鉄道等の山岳トンネルにおける、一般
的な施工方法を示す説明図で、第7図は、堀削に
おける中空部断面の目標形状と、実際の形状との
関係を示す断面図である。
(Prior art) Tunnel construction methods vary depending on the scale of the tunnel, geology, rock condition, etc., but Figures 6 and 7 show general construction methods for mountain tunnels for roads, railways, etc. In the figures, FIG. 7 is a sectional view showing the relationship between the target shape of the cross section of the hollow part during excavation and the actual shape.

発破および堀削用重機により、岩盤1を1ない
し数m堀削し、堀削により形成された岩盤1の底
面5を除く内周壁7に、必要に応じてアーチ支保
工8等により補強しながら、コンクリート9を吹
き付ける。
Using heavy machinery for blasting and excavation, the rock mass 1 is excavated by 1 to several meters, and the inner peripheral wall 7 of the rock mass 1 formed by excavation, excluding the bottom surface 5, is reinforced with arch supports 8, etc. as necessary. , spray concrete 9.

この作業を繰り返し、中空部2を適当な長さに
延長後、吹付コンクリート9の内周壁10に、覆
工コンクリート11を打設し、最終的な中空部形
状に成型する。さらに、この一連の作業を繰り返
しながら、中空部2を延長し、トンネルを貫通さ
せるわけである。
After repeating this operation and extending the hollow part 2 to an appropriate length, lining concrete 11 is placed on the inner circumferential wall 10 of the shotcrete 9 and formed into the final shape of the hollow part. Furthermore, by repeating this series of operations, the hollow part 2 is extended and the tunnel is penetrated.

この施工方法において、中空部2の断面形状
を、できるだけ目標形状に等しく、かつ平滑に堀
削することは、応力集中による岩盤1の破壊を防
ぐと同時に、吹付コンクリート9の支保効果が増
すため、トンネルの安定性を高め、かつ不必要な
余堀り12により、吹付コンクリート9および覆
工コンクリート11の打設量が増し、施工コスト
が高くなることを防ぐ。
In this construction method, excavating the cross-sectional shape of the hollow part 2 to be as equal to the target shape as possible and as smooth as possible prevents the destruction of the rock 1 due to stress concentration, and at the same time increases the supporting effect of the shotcrete 9. To improve the stability of a tunnel and prevent unnecessary over-excavation 12 from increasing the amount of shotcrete 9 and lining concrete 11 and increasing construction cost.

この理由により、堀削作業は慎重に行なうべき
であるが、アーチ支保工8が、堀削終了後の中空
部2に比較的狭い間隔で、逐次建て込まれていく
場合は、切羽13直前のアーチ支保工8を目安に
して、堀削を進行させることができるが、中空部
を長く延長した後アーチ支保工8を建て込む場合
や、アーチ支保工8を全く使用しない場合は、堀
削者は堀削を進める上で、目安にするものがな
く、距離感がつかみにくい。
For this reason, the excavation work should be carried out carefully, but if the arch supports 8 are to be built one after another at relatively narrow intervals in the hollow part 2 after excavation, Excavation can proceed using the arch support 8 as a guide, but if the arch support 8 is to be erected after extending the hollow part for a long time, or if the arch support 8 is not used at all, the excavator There is no guideline for digging, and it is difficult to get a sense of distance.

このため、中空部2の断面が目標形状に対して
小さくなるのを恐れて、堀削を進行するにつれて
大きく堀削し、不必要な余堀り12が大きくなる
傾向があつた。
For this reason, for fear that the cross section of the hollow portion 2 would become smaller than the target shape, the excavation tends to become larger as the excavation progresses, resulting in an increase in unnecessary over-excavation 12.

設計寸法および強度を確保するためには、目標
寸法に対し、一部分でも小さくなることは避けな
ければならないため、余堀り12を皆無にするこ
とは不可能で、必要最少限におさえることが堀削
する上での課題である。
In order to ensure the design dimensions and strength, it is necessary to avoid making even a part of the design smaller than the target dimensions. This is an issue in reducing the amount of waste.

この余堀り12を少なくするには、堀削を1m
ないし数m進行する間に、幾度となく断面形状を
計測し、目標寸法と比較しながら堀削を進行させ
れば良いわけであるが、切羽13の外縁部14を
先行して堀削した後、中央部15を堀削および発
破する一般的な施工方法においては、中央部15
の堀削および発破する前に、堀削した外縁部14
の寸法を計測することは非常に困難である。
In order to reduce this over-drilling 12, the excavation should be done by 1 m.
It is sufficient to proceed with the excavation while measuring the cross-sectional shape many times and comparing it with the target dimension while the excavation progresses for a few meters, but after excavating the outer edge 14 of the face 13 in advance. , in the general construction method of excavating and blasting the central part 15,
Before excavating and blasting the excavated outer edge 14
It is very difficult to measure the dimensions of

また、切羽13の中央部15から堀削し、徐々
に中空部2を外縁部14まで広げていく場合で
も、その中空部2の断面形状を計測するには、多
くの時間と労力を必要とすることから、従来は堀
削を数m進行させる間は計測を行なわず、堀削者
の技量にたよらなければならないという欠点があ
つた。
Furthermore, even when excavating from the center part 15 of the face 13 and gradually expanding the hollow part 2 to the outer edge part 14, it takes a lot of time and effort to measure the cross-sectional shape of the hollow part 2. Therefore, in the past, measurements were not taken while the excavation progressed for several meters, and it was necessary to rely on the skill of the excavator.

(考案が解決しようとする問題点) 本考案は以上のような欠点を解消するため、堀
削により形成された中空部2の断面形状を、目視
により目標形状と容易に比較し、不必要な余堀り
を最少限におさえる軽量、安価な岩盤内周壁の型
枠列を提供することを目的とする。
(Problems to be solved by the invention) In order to solve the above-mentioned drawbacks, the invention can easily visually compare the cross-sectional shape of the hollow part 2 formed by excavation with the target shape, and eliminate unnecessary The purpose of the present invention is to provide a lightweight and inexpensive formwork row for an inner peripheral wall of rock that minimizes over-excavation.

(問題点を解決するための手段) 次に本考案を図面に示した実施例で、以下に詳
細に説明する。
(Means for Solving the Problems) Next, the present invention will be described in detail below with reference to embodiments shown in the drawings.

第1図は、本考案を適用した岩盤内周壁の型枠
列を示す説明図、第2図は、リツプミゾ形鋼の断
面図である。
FIG. 1 is an explanatory view showing a row of forms for an inner peripheral wall of a rock mass to which the present invention is applied, and FIG. 2 is a cross-sectional view of a lip groove section.

型枠28は、リツプミゾ形鋼30の両端面に、
継手板16を溶着した上部アーチ部材17および
リツプミゾ形鋼30の一端面に底板18を溶着
し、他端面に継手板16を溶着した脚部アーチ部
材19を、継手板16を介して連結し、アーチを
形成している。
The formwork 28 is provided on both end surfaces of the lip groove section 30,
The bottom plate 18 is welded to one end face of the upper arch member 17 and the lip groove steel 30 to which the joint plate 16 is welded, and the leg arch member 19 to which the joint plate 16 is welded to the other end face are connected via the joint plate 16, forming an arch.

リツプミゾ形鋼30は、開口部20を有する外
周面21を内側にし、アーチを形成した時、外周
面21と対面する外周面3の曲率が、目標とする
中空部断面外周線4の底線5を除く、アーチ曲線
6の曲率に等しくなるように曲げられている。
When the lip groove shaped steel 30 is formed into an arch with the outer circumferential surface 21 having the opening 20 on the inside, the curvature of the outer circumferential surface 3 facing the outer circumferential surface 21 is such that the bottom line 5 of the target hollow section outer circumferential line 4 is except for the arch curve 6.

さらに、各部材17,19のほぼ中央部に溶着
したさや係止具およびこれに端部が嵌入するはり
25により、隣接する型枠22と係止可能にして
いる。
Furthermore, each member 17, 19 can be locked to the adjacent formwork 22 by a sheath locking tool welded to approximately the center and a beam 25 into which the end is fitted.

第3図は、継手板26の構造を示す説明図で、
左右に孔27をあけ、リツプミゾ形鋼30の端面
に溶着した継手板16を重ね合わせ、重ね合わせ
た2枚の継手板16の孔27を貫通するボルト2
9、およびボルト29に螺着するナツト31によ
り接合されている。
FIG. 3 is an explanatory diagram showing the structure of the joint plate 26,
Holes 27 are formed on the left and right sides, and the joint plates 16 welded to the end faces of the lip groove shaped steel 30 are stacked, and the bolts 2 pass through the holes 27 of the two stacked joint plates 16.
9 and a nut 31 screwed onto the bolt 29.

第4図は、型枠28の下端部32の構造を示す
説明図で、リツプミゾ形鋼30の端面に、底板1
8を溶着しており、この底板18により、型枠2
8が直立安定するとともに、下端部32が岩盤1
に埋没するのを防ぐ。
FIG. 4 is an explanatory diagram showing the structure of the lower end 32 of the formwork 28, in which a bottom plate 1 is attached to the end face of the lip groove section 30.
8 is welded, and this bottom plate 18 allows the formwork 2
8 is upright and stable, and the lower end 32 is attached to the bedrock 1.
prevent it from being buried in the

第5図は、本考案における型枠のはり係止具と
して、さや管23を用いて、はり25で係合した
構造を示す説明図で、リツプミゾ形鋼30の開口
部20を有する外側面21に、孔33を有するさ
や管23を2個溶着し、端部24をL字形に曲げ
たはり25の一端を孔33に、他端を隣接する型
枠22に同じく溶着されたさや管の孔に嵌入させ
ることにより、隣接する型枠22との間隔を保持
し、型枠28がねじれたり傾いたりするのを防
ぐ。
FIG. 5 is an explanatory view showing a structure in which a sheath pipe 23 is used as a formwork beam locking device in the present invention and is engaged with a beam 25. Then, two sheath tubes 23 each having a hole 33 are welded, and one end of the beam 25 with the end 24 bent into an L shape is attached to the hole 33, and the other end is attached to the hole of the sheath tube, which is also welded to the adjacent formwork 22. By fitting into the molds 28, the distance between the molds 22 and the adjacent molds 22 is maintained, and the molds 28 are prevented from being twisted or tilted.

周知のようにリツプミゾ形鋼は、断面積に対し
て断面2次モーメントが比較的大きく、ゆえに軽
量、安価な鋼材として広い分野で使用されている
が、これを本考案の型枠に使用するとき、前記の
利点に加えて、曲げ加工において、つぶれや波打
ち等の形状不良が比較的発生しにくい。
As is well known, lip groove steel has a relatively large moment of inertia relative to its cross-sectional area, and is therefore used in a wide range of fields as a lightweight and inexpensive steel material. In addition to the above-mentioned advantages, shape defects such as crushing and waving are relatively less likely to occur during bending.

また、コンクリート吹付けにおいては、リツプ
ミゾ形鋼の開口部から、コンクリートが内空部に
充点されるため、空間ができず、コンクリートと
一体化し、コンクリートの支保効果を低下させな
い等数々の優れた性質を有している。
In addition, in concrete spraying, the concrete is filled into the inner space through the opening of the lip groove section, so there are many excellent advantages such as not creating a space and integrating with the concrete, which does not reduce the supporting effect of the concrete. It has properties.

以上本考案を主として、リツプミゾ形鋼により
説明したが、棒鋼、山形鋼、鋼管等の鋼材あるい
は木材、プラスチツク等の材料も、施工性、曲げ
加工性、強度、価格等を考慮して、本考案の型枠
に使用可能である。
The present invention has been explained above mainly using lip groove shaped steel, but the present invention can also be applied to steel materials such as steel bars, angle steel, and steel pipes, as well as materials such as wood and plastic, taking into consideration workability, bending workability, strength, cost, etc. Can be used for formwork.

次に本考案による型枠28の使用方法を説明す
ると、堀削により、適当な長さに延長された中空
部2に、型枠28をすでに建て込み済みの隣接す
る型枠22に、はり係止具を介してはり25によ
り係止して建て込む。この時、複数のはり25の
作用により隣接する型枠22との間隔を均等に保
持し、型枠28がねじれたり傾いたりするのを防
ぎながら、たやすく建て込むことができる。堀削
者は、この型枠28すなわち目標形状を見なが
ら、これを基準にしてさらに前方へと堀削を進め
ていくのである。
Next, to explain how to use the formwork 28 according to the present invention, the formwork 28 is inserted into the hollow part 2 which has been extended to an appropriate length by drilling, and the formwork 28 is attached to the adjacent formwork 22 which has already been built. It is secured by a beam 25 via a stopper and erected. At this time, the spacing between adjacent formworks 22 is maintained evenly by the action of the plurality of beams 25, and the formworks 28 can be easily erected while being prevented from being twisted or tilted. The excavator continues excavating further forward while looking at this formwork 28, that is, the target shape, and using this as a reference.

かくて本考案の型枠列は従来のアーチ支保工に
替り、覆工コンクリート内に埋設される。
Thus, the formwork rows of the present invention are buried in the lining concrete instead of conventional arch supports.

(考案の効果) 本考案の型枠を使用して堀削を行なうと、たや
すく正確に型枠を建て込め、堀削者は常に中空部
の形状を、本型枠を基準目標形状として目視比較
しながら堀削を進めることができるため、不必要
な余堀りを最少限にすることができ、トンネルの
安定性を高めることができる。
(Effects of the invention) When excavating using the formwork of this invention, the formwork can be easily and accurately erected, and the excavator can always visually check the shape of the hollow part using the formwork as the reference target shape. Since excavation can proceed while making comparisons, unnecessary over-excavation can be minimized and the stability of the tunnel can be improved.

又堀削および堀削により発生する、ずりの搬出
時間、コンクリートの吹き付け時間を短縮し、ま
た、コンクリートの使用量も少なくてすむことか
ら、工期短縮、施工コストの低減に効果がある。
In addition, the time required to remove shear and the time required for concrete spraying, which occur during excavation and excavation, can be shortened, and the amount of concrete used can be reduced, which is effective in shortening the construction period and reducing construction costs.

トンネルの湾曲部では、光学的な計測がしにく
いため、特に効果的である。
This is particularly effective at curved portions of tunnels, where optical measurements are difficult to perform.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図から第5図は、本考案の実施例を示す説
明図で、第1図は全体図、第2図はリツプミゾ形
鋼の断面図、第3図は継手部の構造図、第4図は
型枠底部構造図、第5図は隣接する型枠に係止す
る部分の構造図、第6図は、一般的なトンネル施
工方法を示す正面断面図、第7図は同じく側面断
面図、第8図は堀削により形成される中空部の目
標形状と実際の形状の関係を示す説明図である。 1……岩盤、2……中空部、3……型枠外周
面、4……目標断面外周線、5……底線、 6…
…アーチ曲線、7……岩盤内周壁、8……アーチ
支保工、9……吹付コンクリート、10……吹付
コンクリート内周壁、11……覆工コンクリー
ト、12……余堀り、13……切羽、14……切
羽外縁部、15……切羽中央部、16……継手
板、17……上部アーチ部材、18……底板、1
9……脚部アーチ部材、20……開口部、21…
…外周面、22……隣接する型枠、23……さや
管、24……はり端部、25……はり、26……
継手部、27……継手板孔、28……型枠、29
……ボルト、30……リツプミゾ形鋼、31……
ナツト、32……型枠下端部、33……さや管
孔。
Figures 1 to 5 are explanatory diagrams showing an embodiment of the present invention. Figure 1 is an overall view, Figure 2 is a cross-sectional view of the lip groove section, Figure 3 is a structural diagram of the joint, and Figure 4 is an illustration of the embodiment of the present invention. Figure 5 is a structural diagram of the bottom of the formwork, Figure 5 is a structural diagram of the part that locks into the adjacent formwork, Figure 6 is a front sectional view showing a general tunnel construction method, and Figure 7 is a side sectional view. , FIG. 8 is an explanatory diagram showing the relationship between the target shape and the actual shape of the hollow portion formed by excavation. 1...Bedrock, 2...Hollow part, 3...Formwork outer circumferential surface, 4...Target cross-section outer circumference line, 5...Bottom line, 6...
... Arch curve, 7 ... Rock inner wall, 8 ... Arch support, 9 ... Shotcrete, 10 ... Shotcrete inner wall, 11 ... Concrete lining, 12 ... Excess, 13 ... Face , 14... Outer edge of the face, 15... Center part of the face, 16... Joint plate, 17... Upper arch member, 18... Bottom plate, 1
9... Leg arch member, 20... Opening, 21...
...outer peripheral surface, 22...adjacent formwork, 23...sheath pipe, 24...beam end, 25...beam, 26...
Joint part, 27...Joint plate hole, 28...Formwork, 29
...Bolt, 30...Rip groove section, 31...
Nut, 32... lower end of formwork, 33... sheath pipe hole.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 予め目標形状に成形した複数のアーチ部材を連
結し、両端部に底板を設けて型枠を構成し、前記
アーチ部材にはり係止具を複数対固着して、前記
型枠相互をはり係止具を介して複数のはりで係合
したことを特徴とするトンネル堀削における岩盤
内周壁の型枠列。
A plurality of arch members formed in advance into a target shape are connected, a bottom plate is provided at both ends to form a formwork, and a plurality of pairs of beam locking tools are fixed to the arch members to lock the formworks together with the beams. A row of formwork for an inner peripheral wall of rock in tunnel excavation, characterized in that a plurality of beams are engaged with each other via tools.
JP1986022286U 1986-02-19 1986-02-19 Expired JPH0443549Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1986022286U JPH0443549Y2 (en) 1986-02-19 1986-02-19

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1986022286U JPH0443549Y2 (en) 1986-02-19 1986-02-19

Publications (2)

Publication Number Publication Date
JPS62135742U JPS62135742U (en) 1987-08-26
JPH0443549Y2 true JPH0443549Y2 (en) 1992-10-14

Family

ID=30819526

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1986022286U Expired JPH0443549Y2 (en) 1986-02-19 1986-02-19

Country Status (1)

Country Link
JP (1) JPH0443549Y2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2585869Y2 (en) * 1992-11-18 1998-11-25 西松建設株式会社 Support steel
JP4527829B2 (en) * 2000-02-18 2010-08-18 新日本製鐵株式会社 Detachment protection structure of tunnel lining

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61122370A (en) * 1984-11-16 1986-06-10 岡部株式会社 Mold frame apparatus for arch concrete

Also Published As

Publication number Publication date
JPS62135742U (en) 1987-08-26

Similar Documents

Publication Publication Date Title
CN110130927B (en) Large deformation control construction method for carbon slate tunnel
KR100866162B1 (en) Construction method of chair-type freestanding wall
JP7178243B2 (en) Tunnel lining construction method
CN102562099B (en) Method for carrying out rapid face excavation construction of loess tunnel by double rows of small conduits
CN108661655B (en) Large-section U-shaped earth pressure balance shield tunnel construction method based on U-shaped shield machine
CN102996133A (en) Construction method applicable to intersection between inclined shaft and slant hole of weak surrounding rock tunnel
US3412562A (en) Structural wall and method
CN103306289A (en) Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof
CN113216980A (en) Complex weak surrounding rock shallow-buried bias tunnel and construction method
CN211006756U (en) Interface structure of open cut station and large-span duplex arch buried tunnel
CN111425217A (en) A reusable prefabricated sleeve arch structure and construction method thereof
CN109339800A (en) A rapid construction method of tunnel in the connecting section of bridge and tunnel
CN112127921B (en) Construction method of buried grit chamber
JP2001520340A (en) Arch support structure
CN107780942B (en) Novel prefabricated assembled pipe shed for pre-reinforcing soft soil tunnel and manufacturing process thereof
CN104088646A (en) Construction method of U-shaped open-type shield machine
CN207609428U (en) The ground handling well Shed-pipe Advanced Support pre-add solid system of existing object is worn under shield section
CN105840209B (en) Construction method for controlling deformation of anchor pile in tunnel body section
CN203373753U (en) Pile anchor retaining wall concrete anchor cable top beam structure of foundation ditches
CN114922063B (en) A suspension bridge tunnel anchorage
CN217107041U (en) Underpinning structure for pile foundation in tunnel
CN216974879U (en) A prefabricated corrugated steel-filled layer composite tunnel support system
JP2566162B2 (en) Method for cutting and expanding between parallel tunnels and supporting device used therefor
CN114876469A (en) High-speed super-large section tunnel excavation construction method
US3601945A (en) Structural units, suitable for use in reinforcing concrete