JPH0448890B2 - - Google Patents
Info
- Publication number
- JPH0448890B2 JPH0448890B2 JP3259389A JP3259389A JPH0448890B2 JP H0448890 B2 JPH0448890 B2 JP H0448890B2 JP 3259389 A JP3259389 A JP 3259389A JP 3259389 A JP3259389 A JP 3259389A JP H0448890 B2 JPH0448890 B2 JP H0448890B2
- Authority
- JP
- Japan
- Prior art keywords
- steel pipe
- sheet piles
- pipe sheet
- double
- fence
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 229910000831 Steel Inorganic materials 0.000 claims description 66
- 239000010959 steel Substances 0.000 claims description 66
- 239000000463 material Substances 0.000 claims description 24
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 23
- 238000010276 construction Methods 0.000 claims description 8
- 238000000034 method Methods 0.000 description 12
- 238000005192 partition Methods 0.000 description 4
- 239000004576 sand Substances 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- 238000003466 welding Methods 0.000 description 3
- 238000009412 basement excavation Methods 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000945 filler Substances 0.000 description 1
- 238000012856 packing Methods 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
- Revetment (AREA)
Description
【発明の詳細な説明】
〔産業上の利用分野〕
本発明は、橋脚等を構築するため水底地盤を掘
削する場合、その周囲を二重締切りにより止水し
たり、あるいは海中に作業用の突堤や、さん橋を
構築する際にその周囲を止水する鋼管矢板と直線
矢板を用いた二重柵の施工方法及びその直線矢板
の頭部連結方法に関するものである。[Detailed Description of the Invention] [Field of Industrial Application] The present invention is applicable to when excavating underwater ground to construct a bridge pier, etc., to shut off water around the excavation with a double cofferdam, or to construct a work jetty underwater. This invention relates to a method for constructing a double fence using steel pipe sheet piles and straight sheet piles to stop water around the bridge when constructing a bridge, and a method for connecting the head of the straight sheet piles.
上記のごとき二重柵を海上等の水中に設置する
には、従来鋼管矢板を用いたものが一般的であ
り、その従来方法は、鋼管矢板を平行に順に打設
して、所定の区間を囲み、それらの鋼管矢板の対
応する頭部をタイロツド等で連結し、鋼管矢板で
囲まれた二重柵の区域内に土砂等の中詰材を投入
して中詰するというものである。
To install a double fence like the one above underwater, such as at sea, conventional steel pipe sheet piles are generally used. The corresponding heads of the steel pipe sheet piles are connected using tie rods, etc., and filling materials such as earth and sand are put into the area of the double fence surrounded by the steel pipe sheet piles.
しかしながら、上記従来の方法では、外海等に
面した場所では大きな波浪が襲来するので、鋼管
矢板を打設した後、中詰材の投入が完了するまで
の間は、波浪に対して自立した鋼管矢板のみで抵
抗しなければならず、作業が非常に不安定な状態
で行なわれるという問題があり、また非常に大き
な直径の鋼管矢板をかなり深く根入れさせる必要
があり、また二重柵の対応する鋼管矢板同志の頭
部を海上でボルト止めまたは溶接する作業は困難
が伴うと共に、充分な剛性を有するラーメン構造
とすることは容易でない。 However, with the above conventional method, large waves attack areas facing the open sea, etc., so after the steel pipe sheet pile is installed and until the filling material is completed, the steel pipe is independent from the waves. There is a problem in that the work must be carried out in a very unstable condition as resistance must be provided only with sheet piles, and steel pipe sheet piles with a very large diameter must be deeply rooted, and double fences are not suitable. Bolting or welding the heads of steel pipe sheet piles together at sea is difficult, and it is not easy to create a rigid frame structure with sufficient rigidity.
本発明は、前記従来の問題点を解決するために
なされたものであり、大きな波浪が来襲する場所
においても二重柵を安定した状態で、しかも経済
的に施工できる二重柵の施工方法と、その際に使
用する鋼管矢板の頭部を充分な剛性をもたして経
済的に連結して容易にラーメン構造を形成する鋼
管矢板の頭部連結方法を提供することを解決課題
としたものである。
The present invention was made in order to solve the above-mentioned conventional problems, and provides a method for constructing double fences that can be constructed stably and economically even in places where large waves attack. The problem to be solved is to provide a method for connecting the heads of the steel pipe sheet piles used at that time, which provides sufficient rigidity and economically connects the heads of the steel pipe sheet piles to easily form a rigid frame structure. It is.
上記の課題を解決するための手段として、本発
明の二重柵の施工方法は、天端が水面上に位置す
る鋼管矢板と天端が水底面からやや上方に位置す
る直線矢板とを交互に連続して水底地盤に所定間
隔をおいて二重柵状に打設し、これらの二重柵の
対応する各鋼管矢板の頭部をタイロツドや型鋼材
等の連結材で連結した後、上記の直線矢板上に、
水底面から水面上までを適宜に分割した高さを有
する追加の直線矢板を突き合せし、そしてその直
線矢板の天端よりやや下の高さまで二重柵内に土
砂等の中詰材の投入による中詰を行なう作業を、
水面上の所定の高さまで行なうことを特徴とする
が、この場合必要に応じて鋼管矢板と直線矢板を
交互に打設した中仕切りを二重柵内に設けて中詰
を行なつてもよい。
As a means to solve the above problems, the double fence construction method of the present invention alternates between steel pipe sheet piles whose tops are located above the water surface and straight sheet piles whose tops are located slightly above the water bottom surface. Continuously cast double fences on the underwater ground at predetermined intervals, and connect the corresponding heads of the steel pipe sheet piles of these double fences with connecting materials such as tie rods or shaped steel materials. on the straight sheet pile,
Additional straight sheet piles with appropriate heights divided from the water bottom to the water surface are butted together, and filling materials such as earth and sand are poured into the double fence to a height slightly below the top of the straight sheet piles. The work of filling the inside with
It is characterized by filling up to a predetermined height above the water surface, but in this case, if necessary, partitions made of alternately driven steel pipe sheet piles and straight sheet piles may be installed inside the double fence to perform filling. .
このような方法で二重柵を施工すれば、波浪は
各鋼管矢板間の直線矢板上を通過するので鋼管矢
板に波浪などの大きな力がかからずに、安定した
状態で二重柵の施工ができる。 If you construct a double fence using this method, the waves will pass over the straight sheet piles between the steel pipe sheet piles, so you can construct the double fence in a stable condition without applying large forces such as waves to the steel pipe sheet piles. Can be done.
また、上記のごとく水底地盤に二重柵状に打設
した鋼管矢板の頭部連結方法としては、それぞれ
対応する各鋼管矢板の頭部を、その内側に設けた
切込みを介して、両端下部に適宜長さの鋼材をあ
らかじめ剛結し、かつその鋼材の下部に鋼管矢板
の内径に合せた形状の底プレートを現場合せによ
り取付けたタイロツドや型鋼材等の連結材で連結
した後、上記切込みと連結材との〓間をプレート
等で塞いでその鋼管矢板の上部にコンクリートを
充填することを特徴とし、これにより容易に剛性
のあるラーメン構造とするものである。 In addition, as a method for connecting the heads of steel pipe sheet piles that are cast into the underwater ground in the form of double fences as described above, the heads of each corresponding steel pipe sheet pile are connected to the lower part of both ends through the notches made inside the steel pipe sheet piles. Steel materials of appropriate length are rigidly tied together in advance, and a bottom plate with a shape that matches the inner diameter of the steel pipe sheet pile is connected to the bottom of the steel materials using connecting materials such as tie rods or shaped steel materials that are installed according to the existing layout. It is characterized by filling the upper part of the steel pipe sheet pile with concrete by closing the space between it and the connecting member with a plate, etc., thereby easily creating a rigid rigid frame structure.
以下図面を参照して本発明の方法を適用して二
重柵を構築する施工時の一実施例を説明する。
An example of construction of a double fence by applying the method of the present invention will be described below with reference to the drawings.
まず、この実施例における二重柵の施工方法を
各手順ごとに説明すると、第1手順として、第1
図の正面図及び第2図の側断面図に示すごとく、
天端が水面W.L上に位置する鋼管矢板1と、天端
が水底面からやや上方に位置する直線矢板2とを
第3図の拡大平面図に示すごとく、それぞれ各側
端部に設けた継手3を介して交互に連続して、水
底地盤Bに所定間隔おいた二列からなる二重柵状
に打設し、さらにこれらの二重柵の対応する各鋼
管矢板1の頭部を、連結材4であるタイロツドま
たは型鋼材等で連結する。 First, the construction method of the double fence in this example will be explained step by step.
As shown in the front view in Figure 2 and the side sectional view in Figure 2,
As shown in the enlarged plan view of Fig. 3, a steel pipe sheet pile 1 whose top end is located above the water surface WL and a straight sheet pile 2 whose top end is located slightly above the water bottom surface are joints provided at each side end. 3, the steel pipe sheet piles 1 are alternately and continuously driven into a double fence shape consisting of two rows spaced apart at a predetermined interval on the underwater ground B, and the corresponding heads of the respective steel pipe sheet piles 1 of these double fences are connected. Connect with material 4, such as tie rods or shaped steel.
次に、第2手順として、第4図の側断面図及び
第5図の二重柵の内側から見た正面図に示すごと
く、直線矢板2の天端上に、水底面から水面W.L
上までを適宜に分割した高さを有する追加の直線
矢板2Aを突き合せするが、この場合、止水等を
要求される場合にはパツキンなどの継手を介して
突き合せし、止水したり、中詰砂の洩れを防止す
る。 Next, as a second step, as shown in the side sectional view in Fig. 4 and the front view seen from the inside of the double fence in Fig. 5, from the water bottom surface to the water surface WL
Additional straight sheet piles 2A having appropriate heights divided up to the top are butted against each other, but in this case, if water stoppage is required, they are butted together through a joint such as a packing to stop water. , Prevents leakage of filling sand.
そこで、直線矢板2Aの突き合せの行なわれた
水底地盤B上の二重柵内に直線矢板2Aの天端よ
りやや下の高さまで土砂等の中詰材5の投入によ
る中詰を行なう作業をする。 Therefore, we carried out filling work by putting filling material 5 such as earth and sand into the double fence on the water bottom ground B where the straight sheet piles 2A were butted to a height slightly below the top of the straight sheet piles 2A. do.
次に、第3手順として、第6図の側断面図及び
第7図の二重柵内から見た正断面図のごとく、分
割された適宜な高さの追加の直線矢板2Bの直線
矢板2A上に突き合せし、その二重柵内に第2手
順で説明したと同様な中詰材5の中詰めを行な
い、この作業を水面W.L上の所定高さまで直線矢
板2C及び中詰材5が到達するまで行なう。 Next, as a third step, as shown in the side sectional view in FIG. 6 and the front sectional view seen from inside the double fence in FIG. Then fill the inside of the double fence with the filling material 5 similar to that explained in the second step, and continue this work until the straight sheet pile 2C and the filling material 5 reach a predetermined height above the water surface WL. Do it until you reach it.
上記第2及び第3手順の作業を行なう際に必要
ならば、第8図の平面図に示すごとく、二重柵内
に、更に鋼管矢板1Aと直線矢板2Eとを交互に
連続して打設して、Xで示す範囲の中仕切りを設
け、中詰の施工速度に合せて、順次追加の直線矢
板2A,2B,2Cの突き合せを行ない中詰材5
の投入を行ない、水面W.L上の所定高さまで到達
したら、第8図の矢印Y方向に次の中仕切りを設
け、順次直線矢板2A,2B,2C及び中詰材5
の施工を行なうものとし、これにより二重柵の構
築が完了する。 If necessary when carrying out the work in the second and third steps above, further steel pipe sheet piles 1A and straight sheet piles 2E are alternately and consecutively driven within the double fence as shown in the plan view of Fig. 8. Then, a partition is provided in the range indicated by
When it reaches a predetermined height above the water surface WL, the next partition is installed in the direction of arrow Y in Fig. 8, and the straight sheet piles 2A, 2B, 2C and filling material 5 are placed in order.
This will complete the construction of the double fence.
次に、上記二重柵状に打設した鋼管矢板1の対
応する各頭部を、H型鋼等の連結材4により連結
する方法につき説明すると、第9図の要部拡大側
面図及び第9図のA−A方向の要部正断面図の第
10図のごとく、鋼管矢板1の対応する頭部を連
結するのに使用する連結材4、即ちこの実施例の
H型鋼材の断面形状に合せて、鋼管矢板1の頭部
内側に切込み8を設けておき、そこを介し連結材
4の両端下部に剛結された適宜な長さの鋼材9を
鋼管矢板1の頭部に差し込んで連結する。 Next, a method for connecting the corresponding heads of the steel pipe sheet piles 1 cast in the double fence shape using connecting members 4 such as H-shaped steel will be explained. As shown in FIG. 10, which is a front sectional view of the main part in the direction of A-A in the figure, the cross-sectional shape of the connecting member 4 used to connect the corresponding heads of the steel pipe sheet piles 1, that is, the H-shaped steel member of this embodiment, is In addition, a notch 8 is provided inside the head of the steel pipe sheet pile 1, and a steel material 9 of an appropriate length rigidly connected to the bottom of both ends of the connecting member 4 is inserted through the cut into the head of the steel pipe sheet pile 1 to connect it. do.
上記の鋼材9はあらかじめ連結材4の両端下部
に剛結したものであるが、その鋼材9の下部に鋼
管矢板1の内径に合せた形状の底プレート10を
現場の寸法に合せて取付けた上で鋼材9を鋼管矢
板1に連結するものであり、この底プレート10
のうちの片方の底プレート10は鋼材9にあらか
じめ取付けておき、他方の底プレート10のみを
現場の寸法に合せて取付けてもよい。 The above-mentioned steel material 9 is rigidly connected to the bottom of both ends of the connecting member 4 in advance, but a bottom plate 10 having a shape matching the inner diameter of the steel pipe sheet pile 1 is attached to the bottom of the steel material 9 according to the dimensions of the site. This bottom plate 10 connects the steel material 9 to the steel pipe sheet pile 1.
One of the bottom plates 10 may be attached to the steel material 9 in advance, and only the other bottom plate 10 may be attached in accordance with the dimensions of the site.
上記の連結材4による二重柵の鋼管矢板1の連
結の後、鋼管矢板1の内側の切込み8と連結材4
との〓間をプレート11で塞いで、鋼管矢板1の
上部の二重斜線で示す部分にコンクリート12を
充填することにより、2個の鋼管矢板1と連結材
4との剛性の高いラーメン構造が、ボルトや溶接
によらずに形成される。 After connecting the steel pipe sheet piles 1 of the double fence with the above-mentioned connecting members 4, the notches 8 inside the steel pipe sheet piles 1 and the connecting members 4
By closing the space between the two steel pipe sheet piles 1 with a plate 11 and filling the area indicated by double diagonal lines at the top of the steel pipe sheet piles 1 with concrete 12, a highly rigid rigid frame structure between the two steel pipe sheet piles 1 and the connecting member 4 is created. , formed without bolts or welding.
以上に説明した本発明の二重柵の施工方法によ
れば、中詰材を投入する際には、直線矢板は水底
面までしか施工されていないので、鋼管矢板と鋼
管矢板との間の〓間があり、その〓間の直線矢板
の上を波浪などが自由に通過でき、従つて大きな
波浪が襲来しても鋼管矢板にそれ程大きな力がか
からず、小なさ断面で抵抗できるので鋼管矢板の
根入れ深さを浅くでき、それだけ経済的で安定し
た施工作業ができるという効果がある。
According to the double fence construction method of the present invention described above, when inserting filler material, the straight sheet piles are only constructed up to the bottom surface of the water, so there is a gap between the steel pipe sheet piles and the steel pipe sheet piles. There is a gap, and waves can freely pass over the straight sheet piles between them.Therefore, even if large waves attack, the steel pipe sheet piles do not have that much force applied to them, and their small cross section can resist them. This has the effect of reducing the depth of penetration, making construction work more economical and stable.
また、追加の直線矢板は、打設された直線矢板
上に差し込む突き合せ作業だけで施工できるの
で、中詰を行なう高さに応じた高さまで差し込む
ことにより、安定した状態を保つことができる。 Further, the additional straight sheet piles can be constructed by simply inserting them onto the cast straight sheet piles and butting them together, so a stable state can be maintained by inserting the additional straight sheet piles to a height that corresponds to the height at which filling is to be performed.
更に完成した二重柵の構造物は、鋼管矢板と直
線矢板とを交互に組合せて用いているので使用鋼
材が少なく経済的であるという効果もある。 Furthermore, the completed double-fence structure uses a combination of steel pipe sheet piles and straight sheet piles alternately, so it has the effect of being economical because it uses less steel.
一方、本発明の二重柵の鋼管矢板の頭部連結方
法によれば、対応する鋼管矢板の頭部の連結が、
現場の寸法に応じた施工により行なわれ、しかも
ボルトや溶接によらずにコンクリート充填のみで
容易に剛性の高いラーメン構造が経済的に形成で
きるという利点がある。 On the other hand, according to the double fence steel pipe sheet pile head connection method of the present invention, the head connections of the corresponding steel pipe sheet piles are
It has the advantage that construction is carried out according to the dimensions of the site, and that a highly rigid rigid frame structure can be easily and economically formed simply by filling with concrete without using bolts or welding.
図面は本発明の方法を適用して二重柵を構築す
る一実施例における作業手順を示す一連の説明図
であり、第1図は第1手順の正面図、第2図は第
1図の側断面図、第3図は第1図の拡大平面図、
第4図は第2手順の側断面図、第5図は第4図の
二重柵内から見た正面図、第6図は第3手順の側
断面図、第7図は第6図の二重柵内から見た正面
図、第8図は上記第2及び第3手順の中仕切りを
設けた場合の平面図、第9図は第2図の連結材を
鋼管矢板の対応する頭部に連結する連結方法を説
明する要部拡大側面図、第10図は第9図のA−
A方向の要部正断面図である。
1……鋼管矢板、2,2A,2B,2C……直
線矢板、4……連結材、5……中詰材、8……切
込み、9……鋼材、10……底プレート、11…
…プレート、12……コンクリート、B……水底
地盤、W.L……水面。
The drawings are a series of explanatory diagrams showing the working procedure in one embodiment of constructing a double fence by applying the method of the present invention, and FIG. 1 is a front view of the first step, and FIG. A side sectional view, Figure 3 is an enlarged plan view of Figure 1,
Fig. 4 is a side sectional view of the second step, Fig. 5 is a front view seen from inside the double fence of Fig. 4, Fig. 6 is a side sectional view of the third step, and Fig. 7 is a side sectional view of Fig. 6. A front view as seen from inside the double fence, Figure 8 is a plan view when partitions are installed in the second and third steps above, and Figure 9 shows the connecting members in Figure 2 connected to the corresponding heads of steel pipe sheet piles. FIG. 10 is an enlarged side view of the main parts explaining the connection method for connecting to the A-
It is a front sectional view of the main part in the A direction. 1... Steel pipe sheet pile, 2, 2A, 2B, 2C... Straight sheet pile, 4... Connecting material, 5... Filling material, 8... Notch, 9... Steel material, 10... Bottom plate, 11...
...Plate, 12...Concrete, B...Underwater ground, WL...Water surface.
Claims (1)
底面からやや上方に位置する直線矢板とを交互に
連続して、水底地盤に二重柵状に打設し、これら
の二重柵の対応する各鋼管矢板の頭部を連結材で
連結した後、上記直線矢板上に、水底面から水面
上までを適宜に分割した高さを有する直線矢板を
突き合せ、そしてその直線矢板の天端よりやや下
の高さまで二重柵内に中詰を行なう作業を、所定
高さまで繰返し行なう鋼管矢板と直線矢板を用い
た二重柵の施工方法。 2 水底地盤に二重柵状に打設した鋼管矢板の対
応する各鋼管矢板の頭部を、その内側に設けた切
込みを介して、両端下部に適宜長さの鋼材を剛結
し、かつその鋼材の下部に鋼管矢板の内径に合せ
た形状の底プレートを現場合せにより取付けた連
結材で連結した後、上記切込みと連結材との〓間
を塞いでその鋼管矢板の上部にコンクリートを充
填する二重柵の鋼管矢板の頭部連結方法。[Scope of Claims] 1. Steel pipe sheet piles whose tops are located above the water surface and straight sheet piles whose tops are located slightly above the water bottom surface are alternately and consecutively driven into the water bottom ground in the form of a double fence. , After connecting the heads of the corresponding steel pipe sheet piles of these double fences with connecting members, a straight sheet pile having a height divided appropriately from the water bottom surface to the water surface is butted on the above straight sheet pile, A construction method for a double fence using steel pipe sheet piles and straight sheet piles, in which the work of filling the double fence to a height slightly below the top of the straight sheet piles is repeated until a predetermined height is reached. 2. Steel pipes of appropriate length are rigidly connected to the lower parts of both ends of the corresponding heads of the steel pipe sheet piles cast in the form of double fences on the underwater ground, through cuts made inside the heads, and After connecting a bottom plate shaped to match the inner diameter of the steel pipe sheet pile to the lower part of the steel material using a connecting member installed according to the existing arrangement, the gap between the above notch and the connecting member is closed, and the upper part of the steel pipe sheet pile is filled with concrete. How to connect the head of double-fence steel pipe sheet piles.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP3259389A JPH02213512A (en) | 1989-02-14 | 1989-02-14 | Method of constructing double fence using steel pipe sheet pile and method of coupling head part of steel pipe sheet pile |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP3259389A JPH02213512A (en) | 1989-02-14 | 1989-02-14 | Method of constructing double fence using steel pipe sheet pile and method of coupling head part of steel pipe sheet pile |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH02213512A JPH02213512A (en) | 1990-08-24 |
| JPH0448890B2 true JPH0448890B2 (en) | 1992-08-10 |
Family
ID=12363157
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP3259389A Granted JPH02213512A (en) | 1989-02-14 | 1989-02-14 | Method of constructing double fence using steel pipe sheet pile and method of coupling head part of steel pipe sheet pile |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH02213512A (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104213566B (en) * | 2014-09-26 | 2016-05-25 | 安徽水利开发股份有限公司 | Double rows slip casting stake with draw shotcrete layer combined supporting structure |
| JP6641873B2 (en) * | 2015-10-19 | 2020-02-05 | 日本製鉄株式会社 | Reinforcement structure of quay and revetment and reinforcement construction method of quay and revetment |
-
1989
- 1989-02-14 JP JP3259389A patent/JPH02213512A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPH02213512A (en) | 1990-08-24 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2004197358A (en) | Yamadome support | |
| JP6015751B2 (en) | Steel wall and construction method of steel wall | |
| JPH11117315A (en) | Temporary deadline structure | |
| JP2001107319A (en) | Seismic retrofitting method for piers and seismic retrofitting structures | |
| JP2004052277A (en) | Construction method for double closing levee | |
| JP2022115624A (en) | Quay wall structure, and construction method of the same | |
| JP6298688B2 (en) | Embankment | |
| JP4636478B2 (en) | Liquefaction prevention structure | |
| JPH02213512A (en) | Method of constructing double fence using steel pipe sheet pile and method of coupling head part of steel pipe sheet pile | |
| JP4543268B2 (en) | Liquefaction prevention structure | |
| KR101983964B1 (en) | Cofferdam structure and cofferdam method using the same | |
| JP7126889B2 (en) | Steel wall and its construction method | |
| JP2766884B2 (en) | Underground diaphragm wall | |
| JPH0971951A (en) | Deep foundation structure using pipe piles and its construction method | |
| JPH04500544A (en) | Reinforcement of continuous poured concrete walls | |
| JPH10237874A (en) | Temporary deadline box and method of constructing structure using the same | |
| JPH01142121A (en) | Concrete retaining wall-forming sheet pile and forming of concrete retaining wall thereof | |
| JP7480069B2 (en) | How to reinforce existing revetments | |
| JPS5841227Y2 (en) | Element for mountain retainer | |
| JP2003328357A (en) | Steel pipe sheet pile method | |
| KR102586998B1 (en) | Underground continuous wall panel with reinforced connection part and its construction method | |
| JPS5853321Y2 (en) | Element for mountain retainer | |
| JPS6011165Y2 (en) | Continuous column pile drilling bit | |
| JP3753323B2 (en) | Underground beam construction method | |
| JP2947083B2 (en) | Construction method of deep groove block |