JPH0449379A - 沈下土間の補修工法 - Google Patents

沈下土間の補修工法

Info

Publication number
JPH0449379A
JPH0449379A JP15951390A JP15951390A JPH0449379A JP H0449379 A JPH0449379 A JP H0449379A JP 15951390 A JP15951390 A JP 15951390A JP 15951390 A JP15951390 A JP 15951390A JP H0449379 A JPH0449379 A JP H0449379A
Authority
JP
Japan
Prior art keywords
pile
floor
earth floor
jack
earth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP15951390A
Other languages
English (en)
Inventor
Takehiro Horikiri
堀切 武廣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daiwa House Industry Co Ltd
Original Assignee
Daiwa House Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daiwa House Industry Co Ltd filed Critical Daiwa House Industry Co Ltd
Priority to JP15951390A priority Critical patent/JPH0449379A/ja
Publication of JPH0449379A publication Critical patent/JPH0449379A/ja
Pending legal-status Critical Current

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。

Description

【発明の詳細な説明】 〈産業上の利用分野) 本発明は沈下土間を容易に補修する補修工法に関するも
のである。
(従来の技術) 従来において土間か沈下した場合にはそれを撒去し新た
に施工し・ており手用かかかっていた。
(発明か解決しようとする課題) 本発明は以上の従来の課題を解決し沈下土間を極めて容
易に補修出来る沈下土間の補修工法の提供を目的とする
(課題を解決するための手段) 本発明は以上の目的達成のために 1、沈下し・た土間の適所に孔を開け該孔から地面に杭
を打設し次に杭上に梁を位置決めし・次に梁のジヤツキ
により土間を上方に引き上はた文机と土間の間に充填材
を充填する沈下土間の補(b工法を提案するものである
(作用) (1)本発明の補修工法は特に土間をジヤツキで弓き上
げて補修するため補修が極めて容易である。
(2)本発明の補修工法は特に既設の土間をそのまま補
修するため床設備をそのまま使用出来る。
(実施例) 以下本発明の沈下土間の補修工法を図面に示す実施例に
従い説明する。
第1図は本発明の補修工法の最初の工程を示し、該工程
は沈下し・た土間(1)の適所に孔(υを開け該孔(2
)から地面(9)に杭(3)(例えば鋼杭)を打設する
ものである。
次に第2図に示す様に杭(3)上に梁(5)を位置決め
する。
該梁(5)にはジヤツキ(7)か設けられ該シャツキク
7)をねし鉄筋等の連結手段(6)を介して土間(1)
に連結させる。
次に第3図に示す様にジヤツキ(7)を駆動して土間(
1)を上方に引き上げる。
この状態て杭(3)と土間(1)の間にモルタル(急結
性のもの)、スペーサー鋼板等の充填材(8)を充填す
る。
すなわち土間(])を充填材(8)を介して抗(3)に
より支持させるのである。
次に梁(5)を撤去し・て補修作業を完了するのである
(発明の効果) 本発明の沈下土間の補修工法の実施例は以上の通りであ
りその効果を次に列記する。
(1)本発明の補修工法は特に土間をジヤツキで引き上
げて補修するため補修か極めて容易である。
(2)本発明の補修工法は特に既設の土間をそのまま補
修するため床設罐をそのまま使用出来る。
【図面の簡単な説明】
図乃至第3図は本発明の補修工法を示す概念第1 図 1:土間 3:杭 6:連結手段 8:充填材 :孔 ・ l :シャッキ :地面 出願人 大和ハウス工業株式会社

Claims (1)

    【特許請求の範囲】
  1. 1、沈下した土間の適所に孔を開け該孔から地面に杭を
    打設し次に杭上に梁を位置決めし次に梁のジャッキによ
    り土間を上方に引き上げた後杭と土間の間に充填材を充
    填する沈下土間の補修工法
JP15951390A 1990-06-18 1990-06-18 沈下土間の補修工法 Pending JPH0449379A (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP15951390A JPH0449379A (ja) 1990-06-18 1990-06-18 沈下土間の補修工法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP15951390A JPH0449379A (ja) 1990-06-18 1990-06-18 沈下土間の補修工法

Publications (1)

Publication Number Publication Date
JPH0449379A true JPH0449379A (ja) 1992-02-18

Family

ID=15695417

Family Applications (1)

Application Number Title Priority Date Filing Date
JP15951390A Pending JPH0449379A (ja) 1990-06-18 1990-06-18 沈下土間の補修工法

Country Status (1)

Country Link
JP (1) JPH0449379A (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6009116B1 (ja) * 2016-07-07 2016-10-19 中村建設株式会社 既設構造物の土間コンクリートの補修方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6009116B1 (ja) * 2016-07-07 2016-10-19 中村建設株式会社 既設構造物の土間コンクリートの補修方法

Similar Documents

Publication Publication Date Title
US6074133A (en) Adjustable foundation piering system
US9587362B2 (en) Systems and methods for coupling a drill rig to a screw pile
US3852970A (en) Building raising and underpinning system
US6872031B2 (en) Apparatus and method of supporting a structure with a pier
CN100513695C (zh) 利用加压装置的反作用力维修和加固已有结构的系统及其方法
CN108798065B (zh) 一种古建筑物整体顶升方法
JP2007182741A (ja) アンダーピニングによる不同沈下基礎修正補強工法。
JP5540044B2 (ja) 建物の不同沈下の修復工事に用いる油圧ジャッキ用治具及びこれを用いた不同沈下した建物の修復工法
JPH0464620A (ja) オープンケーソンの施工方法及びその装置
JPH0449379A (ja) 沈下土間の補修工法
CN1034750C (zh) 锚梁式静压桩法及其压桩专用设备
US2213169A (en) Construction method for underground structures
JPH0449378A (ja) 沈下土間の補修工法
CN114438904A (zh) 一种大跨度下承式连续钢桁梁顶推工艺
CN115839082B (zh) 一种拉森钢板桩支护结构及其施工方法
CN110984590A (zh) 预制柱定位装置及安装方法
CN108797586A (zh) 一种锚杆静压桩的施工方法
US1822550A (en) Foundation for buildings, bridges, and the like
JP4049467B2 (ja) 土間コンクリートの不同沈下修正方法
JP5097761B2 (ja) 沈下束石の修復方法
JP4722691B2 (ja) 既設構造物の土間コンクリートの補修方法
JP7466044B1 (ja) アンダーピニング杭と検査用アンカー杭の施工方法
CN217811018U (zh) 一种灌注桩压桩结构
CN111945711B (zh) 一种高承载大直径装配式复合工程桩及其施工方法
JPH09125386A (ja) 鋼管杭施工方法と鋼管杭圧入装置