JPH0449533Y2 - - Google Patents
Info
- Publication number
- JPH0449533Y2 JPH0449533Y2 JP5748687U JP5748687U JPH0449533Y2 JP H0449533 Y2 JPH0449533 Y2 JP H0449533Y2 JP 5748687 U JP5748687 U JP 5748687U JP 5748687 U JP5748687 U JP 5748687U JP H0449533 Y2 JPH0449533 Y2 JP H0449533Y2
- Authority
- JP
- Japan
- Prior art keywords
- gauge
- sash frame
- casing
- frame
- inclinometers
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 238000005259 measurement Methods 0.000 claims description 4
- 238000009434 installation Methods 0.000 description 11
- 230000002093 peripheral effect Effects 0.000 description 10
- 230000000452 restraining effect Effects 0.000 description 6
- 239000000463 material Substances 0.000 description 4
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 229910052782 aluminium Inorganic materials 0.000 description 2
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 238000007664 blowing Methods 0.000 description 1
- 239000004567 concrete Substances 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000003100 immobilizing effect Effects 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
【考案の詳細な説明】
a 考案の目的
(産業上の利用分野)
この考案に係るサツシ枠取付作業用ゲージは、
建設現場に於いて、建物の開口部の内側にサツシ
枠を装着する場合に利用する。[Detailed description of the invention] a. Purpose of the invention (industrial field of application) The gauge for sash frame installation work according to this invention is:
Used when installing a sash frame inside the opening of a building at a construction site.
(従来の技術)
鉄筋コンクリート建物の窓開口に、アルミニウ
ムサツシ等の金属製窓枠を取り付ける場合、第9
〜10図に示す様に、サツシ枠1の外周面の大き
さよりも少しだけ大きく形成された窓開口2の内
側に上記サツシ枠1を挿入し、上記窓開口2の内
周面に露出した鉄筋とサツシ枠1の外周面に固定
したアンカ(図示せず)とを溶接固定した後、サ
ツシ枠1の外周面と窓開口2の内周面との間に形
成された隙間3内にモルタルを流し込んで、上記
隙間3を塞ぐと共に、サツシ枠1を窓開口2の内
側にしつかりと固定する。(Prior art) When installing a metal window frame such as aluminum sash into a window opening of a reinforced concrete building, the 9th
~ As shown in Figure 10, the sash frame 1 is inserted inside a window opening 2 formed slightly larger than the outer circumferential surface of the sash frame 1, and the reinforcing bars exposed on the inner circumferential surface of the window opening 2 are inserted. and an anchor (not shown) fixed to the outer peripheral surface of the sash frame 1 are welded, and then mortar is poured into the gap 3 formed between the outer peripheral surface of the sash frame 1 and the inner peripheral surface of the window opening 2. It is poured to close the gap 3 and firmly fix the sash frame 1 inside the window opening 2.
ところで、この様にしてサツシ枠1を窓開口2
の内側に取り付ける場合、サツシ枠1を鉛直に固
定しないと、窓障子の体裁が悪くなつたり、窓障
子の開閉動作を円滑に行なえなくなるだけでな
く、建物内の仕上等を窓開口2の内側に取り付け
られたサツシ枠1の位置を基準として行なう場合
に、基準が曖昧となつて、上記仕上等が正しく行
なえなくなつてしまう。 By the way, in this way, the sash frame 1 is connected to the window opening 2.
If the sash frame 1 is not fixed vertically, it will not only make the window shoji look unsightly and make it difficult to open and close the window shoji smoothly, but also prevent the finish inside the building from being If the position of the sash frame 1 attached to the sash frame 1 is used as a reference, the reference becomes vague and the above-mentioned finishing etc. cannot be performed correctly.
この為従来から、第11図に示す様な、糸30
の先に倒立円錐状の重錘31を結び付けた用具を
用い、下げ振りと呼ばれる作業を行なつて、窓開
口2の内側に装着したサツシ枠1が正しく鉛直に
なる様にしていた。 For this reason, conventionally, thread 30 as shown in FIG.
Using a tool with an inverted cone-shaped weight 31 tied to the end, a work called plumb bobbing was performed to ensure that the sash frame 1 attached to the inside of the window opening 2 was properly vertical.
この下げ振りと呼ばれる作業を行なう場合、サ
ツシ枠1の前面(或は後面)に近い部分で糸30
を垂らし、この糸30とサツシ枠1の前面(或は
後面)をが平行になる様に、このサツシ枠1の図
面表裏方向に亘る傾斜を調節する。又、上記糸3
0は、サツシ枠1の外周面に近い部分にも垂ら
し、この外周面と糸30とが互いに平行になる様
にする。 When performing this work called plumb swing, the thread 30 is attached near the front (or rear) of the sash frame 1.
is hung down, and the inclination of the sash frame 1 in the front and back directions in the drawing is adjusted so that the thread 30 and the front (or rear) surface of the sash frame 1 are parallel to each other. Also, the above thread 3
0 is also hung on a portion close to the outer circumferential surface of the sash frame 1 so that this outer circumferential surface and the thread 30 are parallel to each other.
ところが、上述の様な下げ振りと呼ばれる作業
によつてサツシ枠1の傾斜を直す場合、作業が面
倒で熟練を要するだけでなく、風のある日には作
業を行なえなくなつて、建設作業の能率が悪くな
つてしまう。 However, when correcting the inclination of the sash frame 1 by the above-mentioned work called plumb bobbing, not only is the work troublesome and requires skill, but it also becomes difficult to carry out the work on windy days. Efficiency will deteriorate.
この様な不都合を解消する為に、例えば実願昭
61−191755号に開示されている様な取付作業用ゲ
ージが提案されている。 In order to solve this kind of inconvenience, for example,
61-191755 has been proposed.
上記取付作業用ゲージは第2図に示す様に、上
端から下端迄同じ大きさの四角形断面を有するケ
ーシング4に、2個の傾斜計5a,5bを、両傾
斜計5a,5bの計測方向を互いに直角にずらせ
た状態で内蔵し、上記両傾斜計5a,5bの指示
盤6a,6bを、上記ケーシング4の側面7a,
7bに露出させて、各傾斜計5a,5bの測定値
を、ケーシング4の外部から読み取れる様にした
ものである。 As shown in Fig. 2, the above-mentioned installation work gauge has two inclinometers 5a, 5b mounted on a casing 4 having a rectangular cross section of the same size from the upper end to the lower end, and the measuring direction of both inclinometers 5a, 5b. The indicator panels 6a and 6b of both the inclinometers 5a and 5b are mounted on the sides 7a and 7a of the casing 4, respectively, so as to be shifted at right angles to each other.
7b so that the measured values of each inclinometer 5a, 5b can be read from the outside of the casing 4.
上記した様に構成される取付作業用ゲージ9を
用いてサツシ枠1を窓開口2に取付ける作業を行
なう場合、上記サツシ枠1の竪枠に対して上記ゲ
ージ9を平行に装着し、このゲージ9を装着した
ままの状態で上記サツシ枠1の取付作業を行な
う。 When attaching the sash frame 1 to the window opening 2 using the installation gauge 9 configured as described above, the gauge 9 is mounted parallel to the vertical frame of the sash frame 1, and the gauge 9 is mounted parallel to the vertical frame of the sash frame 1. Attach the sash frame 1 with the sash frame 9 still attached.
サツシ枠1が傾斜している場合、何れかの、或
は双方の傾斜計5a,5bの指示盤6a,6bに
より、上記サツシ枠1の竪枠が傾斜している事と
その傾斜方向とを知る事が出来る為、何れの傾斜
計5a,5bの指示盤6a,6bも竪枠が傾斜し
ていない事を指示する様に、サツシ枠1の取付姿
勢を調節すれば、上記サツシ枠1を窓開口2に正
しく鉛直に取付ける事が出来る。 When the sash frame 1 is tilted, the indication panels 6a and 6b of one or both of the inclinometers 5a and 5b indicate that the vertical frame of the sash frame 1 is tilted and the direction of the inclination. Therefore, by adjusting the mounting posture of the sash frame 1 so that the indicator panels 6a and 6b of both the inclinometers 5a and 5b indicate that the vertical frame is not tilted, the sash frame 1 can be adjusted. It can be installed correctly and vertically in the window opening 2.
(考案が解決しようとする問題点)
ところが上述した様な鉛直部材取付作業用ゲー
ジ9に於いても依然として以下に述べる様な解決
すべき問題点が存在する。(Problems to be Solved by the Invention) However, even with the gauge 9 for vertical member attachment work as described above, there are still problems to be solved as described below.
即ち、上記ゲージ9はサツシ枠1(第9図参
照)の竪枠36,36に対して平行に装着しなけ
ればならない。この為、例えば取付作業用ゲージ
9を構成するケーシング4の側面の上下両端部に
支持ピン22,22と抑えカム23(第2〜3図
参照)とを設け、この支持ピン22,22と抑え
カム23との間でサツシ枠1の上下両枠に、突出
量を等しく設けた突条21(第8図参照)を強く
挟む事で上記ゲージ9をサツシ枠1に対して平行
に装着する様にしている。 That is, the gauge 9 must be mounted parallel to the vertical frames 36, 36 of the sash frame 1 (see FIG. 9). For this purpose, for example, support pins 22, 22 and a restraining cam 23 (see Figs. 2 and 3) are provided at both upper and lower ends of the side surface of the casing 4 constituting the mounting gauge 9. The gauge 9 can be mounted parallel to the sash frame 1 by strongly sandwiching the protrusions 21 (see Fig. 8), which have equal protrusion amounts, on both the upper and lower frames of the sash frame 1 between the cam 23 and the cam 23. I have to.
しかしながら、上記した様な支持ピン22,2
2と抑えカム23とによつて上記ゲージ9をサツ
シ枠1に装着した場合、互いに対向する上記ゲー
ジ9の内側面と上記サツシ枠1の側面とは平行と
なるが、上記サツシ枠1の左右の竪枠36に対し
ては必ずしも平行になるとは限らない。 However, the support pins 22, 2 as described above
When the gauge 9 is mounted on the sash frame 1 using the holding cam 23 and the sash frame 23, the inner surfaces of the gauge 9 and the side surfaces of the sash frame 1, which face each other, are parallel to each other. It is not necessarily parallel to the vertical frame 36.
この様に、上記サツシ枠1の左右の竪枠36に
対して上記ゲージ9が非平行に装着されたまま、
このサツシ枠1を窓開口2内に取付ける作用を行
なつても、上記サツシ枠1を窓開口2に対して鉛
直に取付ける事が出来ない。 In this way, while the gauge 9 is mounted non-parallel to the left and right vertical frames 36 of the sash frame 1,
Even if this sash frame 1 is installed within the window opening 2, the sash frame 1 cannot be installed perpendicularly to the window opening 2.
本考案のサツシ枠取付作業用ゲージは上述の様
な不都合を解消し、このゲージをサツシ枠に装着
した際に、互いに対向するサツシ枠の側面とゲー
ジの内側面とが平行になると共に、このゲージと
サツシ枠を構成する竪枠との平行も容易に合わせ
られる様にしたものである。 The gauge for sash frame installation work of the present invention solves the above-mentioned inconveniences, and when this gauge is attached to the sash frame, the sides of the sash frame that are opposite to each other and the inside surface of the gauge become parallel, and this The parallelism between the gauge and the vertical frame constituting the sash frame can be easily adjusted.
b 考案の構成
(問題を解決するための手段)
本考案のサツシ枠取付作業用ゲージは先考案の
ゲージと同様に、上端から下端迄同じ大きさの四
角形断面を有するケーシングに、2個の傾斜計
を、両傾斜計の計測方向を互いに直角にずらせた
状態で内蔵し、上記両傾斜計の指示盤を上記ケー
シングの側面に露出させて、各傾斜計の測定値
を、ケーシングの外部から読み取れる様にしてゲ
ージ本体を構成している。b. Structure of the invention (means for solving the problem) The gauge for sash frame installation work of the invention is similar to the gauge of the previous invention, in which the casing has a rectangular cross section of the same size from the upper end to the lower end, and two inclined The measurement directions of both inclinometers are shifted at right angles to each other, and the indicator panels of both inclinometers are exposed on the side of the casing, so that the measured values of each inclinometer can be read from the outside of the casing. The main body of the gauge is constructed in the following manner.
更に本考案のサツシ枠取付作業用ゲージに於い
ては、上記ゲージ本体の上下2個所位置にブラケ
ツトを、それぞれゲージ本体の側方に同じ長さだ
け突出する様に設けている。 Furthermore, in the gauge for attaching the sash frame of the present invention, brackets are provided at two positions above and below the gauge body so as to project to the sides of the gauge body by the same length.
このブラケツトの突出方向と直角な面には、ゲ
ージ本体の上下両端部を、サツシ枠を構成する上
下枠に装着する手段を設けている。 Means for attaching the upper and lower ends of the gauge body to the upper and lower frames constituting the sash frame is provided on a surface perpendicular to the projecting direction of the bracket.
(作用)
上述の様に構成される本考案のサツシ枠取付作
業用ゲージを用いて、サツシ枠の取付作業を行な
う場合、先考案のゲージと同様、鉛直に固定すべ
きサツシ枠に対して本考案のゲージを平行に装着
する。即ち、上記ゲージを、このゲージを構成す
るゲージ本体の上下両端部をサツシ枠の上下枠に
それぞれ装着する事で、互いに対向する上記サツ
シ枠の側面とゲージの内側面とを平行にする。(Function) When installing a sash frame using the sash frame installation gauge of the present invention constructed as described above, the main body is attached to the sash frame to be fixed vertically, similar to the gauge of the previous invention. Attach the devised gauges in parallel. That is, by attaching the upper and lower ends of the gauge body constituting the gauge to the upper and lower frames of the sash frame, the side surfaces of the sash frame and the inner surface of the gauge, which are opposed to each other, are made parallel.
この際、ゲージ本体に付設した上下2個のブラ
ケツトの先端を、上記サツシ枠を構成する竪枠に
当接させる事で、このゲージ本体と竪枠とを平行
にする。 At this time, the ends of the two upper and lower brackets attached to the gauge body are brought into contact with the vertical frame constituting the sash frame, thereby making the gauge body and the vertical frame parallel.
この様にして、ゲージ本体とサツシ枠を構成す
る竪枠とを互いに平行にしたならば、ゲージ本体
をサツシ枠に装着したままの状態でこのサツシ枠
の取付作業を行なう。 Once the gauge body and the vertical frame constituting the sash frame are made parallel to each other in this way, the sash frame is attached with the gauge body still attached to the sash frame.
(実施例)
次に、図示の実施例を説明しつつ本考案を更に
詳しく説明する。(Example) Next, the present invention will be explained in more detail by explaining the illustrated embodiment.
第1図は本考案のサツシ枠取付作業用ゲージの
上端部側面図である。 FIG. 1 is a side view of the upper end of the gauge for attaching the sash frame of the present invention.
本考案のサツシ枠取付作業用ゲージは、第2図
に示した先考案のゲージと同様に、アルミニウム
材を一体押し出し成型する事により造られ、上端
から下端迄同じ大きさの正方形断面を有するケー
シング4に、2個の傾斜計5a,5bを、両傾斜
計5a,5bの計測方向を互いに直角にずらせた
状態で内蔵している。 The gauge for attaching the sash frame of the present invention, like the gauge of the previous design shown in Fig. 2, is made by integrally extruding aluminum material, and has a casing with a square cross section of the same size from the upper end to the lower end. 4, two inclinometers 5a and 5b are built in with the measurement directions of both inclinometers 5a and 5b being shifted at right angles to each other.
上記両傾斜計5a,5bの指示盤6a,6b
は、上記ケーシング4の、互いに隣り合う側面7
a,7bに露出させて、各傾斜計5a,5bの測
定値を、ケーシング4の外部から読み取れる様に
している。 Indication panels 6a, 6b of the above-mentioned both inclinometers 5a, 5b
are the mutually adjacent side surfaces 7 of the casing 4
a, 7b so that the measured values of each inclinometer 5a, 5b can be read from the outside of the casing 4.
各傾斜計5a,5bは、下端に重錘を吊り下げ
たロツドの傾きを機械的、或は電気的に増幅し
て、上記指示盤6a,6bの指針を動かすもの
で、従来から知られているものを使用する。この
様な傾斜計5a,5bには、上記指針を不動にす
る為の摘み8,8、この指針の零点調整を行なう
為の摘み(図示省略)等が設けられている。 Each of the inclinometers 5a and 5b mechanically or electrically amplifies the inclination of a rod with a weight suspended from its lower end to move the pointers on the indicator panels 6a and 6b. Use what you have. Such inclinometers 5a, 5b are provided with knobs 8, 8 for immobilizing the pointer, a knob (not shown) for adjusting the zero point of the pointer, and the like.
更に、本考案のサツシ枠取付作業用ゲージ9に
於いては、このゲージ9を構成するケーシング4
と、鉛直に固定すべきサツシ枠の竪枠36とが、
互いに平行になる様にして、ゲージ9をサツシ枠
1に装着する為の、ブラケツト34を、ゲージ本
体の上下両端部に、止め螺子37の回転による着
脱を自在として、付設している。 Furthermore, in the gauge 9 for sash frame installation work of the present invention, the casing 4 constituting this gauge 9 is
and the vertical frame 36 of the sash frame to be fixed vertically,
Brackets 34 for mounting the gauge 9 on the sash frame 1 so as to be parallel to each other are attached to both upper and lower ends of the gauge body so as to be freely attachable and detachable by rotating a set screw 37.
即ち、このブラケツト34は、第1図に示す様
に、止め螺子37の緊締によりゲージ本体の端部
に固定した際に、ゲージ本体を形成するケーシン
グ4の側面から一定長さだけ突出する様に構成し
ている。 That is, as shown in FIG. 1, when the bracket 34 is fixed to the end of the gauge body by tightening the set screw 37, it protrudes by a certain length from the side surface of the casing 4 forming the gauge body. It consists of
更に図示の実施例に於いては、前述した先考案
の取付作業用ゲージと同様、このゲージ9を高さ
の異なるサツシ枠に装着出来る様にする為の伸縮
機構、このゲージ9をサツシ枠に着脱する作業を
容易且つ迅速に行なえる様にする為の着脱機構、
及び上記傾斜計5a,5bの指針の零点調整を行
なう際に、ケーシング4を基準となる壁面に対し
て平行に保つ為の支持機構とが組み込まれてい
る。 Furthermore, in the illustrated embodiment, like the previously devised installation work gauge described above, there is a telescoping mechanism that allows this gauge 9 to be attached to sash frames of different heights, and a telescoping mechanism that allows this gauge 9 to be mounted on sash frames of different heights. Attachment/detachment mechanism for easy and quick attachment/detachment work;
A support mechanism is also incorporated to keep the casing 4 parallel to the reference wall surface when zeroing the pointers of the inclinometers 5a, 5b.
この内の伸縮機構に就いて先ず説明する。第3
図に示す様に断面が正方形のケーシング4内に
は、断面がL字形の支持材10を、摺動自在に挿
入している。支持材10の挿入時に於いて、この
支持材10の外側面とケーシング4の隅部内面と
は密に当接する為、支持材10とケーシング4と
は互いに直線的に結合される。 The expansion and contraction mechanism among these will be explained first. Third
As shown in the figure, a support member 10 having an L-shaped cross section is slidably inserted into a casing 4 having a square cross section. When the support member 10 is inserted, the outer surface of the support member 10 and the inner surface of the corner of the casing 4 come into close contact, so that the support member 10 and the casing 4 are linearly connected to each other.
支持材10の先端部で、ケーシング4から突出
した部分には、外周をケーシング4の外周と同じ
形状と大きさとに形成した端部ブロツク11を、
皿螺子12,12により固定している。 At the tip of the support member 10 that protrudes from the casing 4, there is an end block 11 whose outer periphery is formed to have the same shape and size as the outer periphery of the casing 4.
It is fixed with countersunk screws 12, 12.
一方、ケーシング4の端部内側には、1対の平
行壁13a,13bを連結壁13cにより連結す
る事で断面をU字形とした、抑えブロツク13を
挿入し、この抑えブロツク13の外側面と、ケー
シング4の内周面との間で、上記支持材10を抑
えられる様にしている。 On the other hand, a restraining block 13 having a U-shaped cross section by connecting a pair of parallel walls 13a and 13b with a connecting wall 13c is inserted inside the end of the casing 4, and the outer surface of this restraining block 13 and , and the inner circumferential surface of the casing 4, the supporting material 10 can be held down.
上記抑えブロツク13の平行壁13a,13b
の内、支持材10と当接する平行壁13aの上下
2個所位置には、固定螺子14(1本のみ図示し
たが、実際には2本使用する。)の先端部を螺合
させる螺子孔15,15が、他方の平行壁13b
には、上記固定螺子14を挿通する為の通孔16
が、それぞれ穿設されている。又、両平行壁13
a,13bを連続させる連結壁13cには、別の
固定螺子17(上記固定螺子14の場合と同様、
一本のみ図示したが、実際には2本使用する。)
の先端部を螺合させる為の螺子孔18,18を形
成している。 Parallel walls 13a, 13b of the holding block 13
Among them, screw holes 15 into which the tips of fixing screws 14 (only one is shown, but two are actually used) are screwed at two positions, upper and lower, of the parallel wall 13a that abuts the support member 10. , 15 is the other parallel wall 13b
has a through hole 16 through which the fixing screw 14 is inserted.
are drilled in each. Also, both parallel walls 13
Another fixing screw 17 (as in the case of the above fixing screw 14) is attached to the connecting wall 13c that connects a and 13b.
Although only one is shown in the diagram, two are actually used. )
Screw holes 18, 18 are formed for screwing the tips of the.
一方、ケーシング4の上端部で、上記抑えブロ
ツク13に形成した通孔16、或は螺子孔18,
18に整合する部分には、上記固定螺子14,1
7を挿通自在な通孔19,20を穿設する事で、
ケーシング4の外側からこのケーシング4内に挿
入した固定螺子14,17を、それぞれ螺子孔1
5,18に螺入出来る様にしている。各固定螺子
14,17がケーシング4を挿通する部分は、各
固定螺子14,17が回転は出来るが、長さ方向
に亘る移動は出来ない様にしている。 On the other hand, at the upper end of the casing 4, a through hole 16 or a screw hole 18 formed in the restraining block 13,
The fixing screws 14, 1
By drilling through holes 19 and 20 through which 7 can be inserted,
Fixing screws 14 and 17 inserted into the casing 4 from the outside of the casing 4 are inserted into the screw holes 1, respectively.
It is designed so that it can be screwed into parts 5 and 18. The portions where each of the fixing screws 14 and 17 pass through the casing 4 are configured such that each of the fixing screws 14 and 17 can rotate, but cannot move in the length direction.
この為、各固定螺子14,17を回転させる事
により、抑えブロツク13の外側面と、ケーシン
グ4の内周面との間隔を変化させ、両面の間に挟
まれた支持材10の長さ方向に亘る摺動を自在と
したり、或はこの様な摺動を不能としたり出来
る。尚、この様な伸縮機構を採用した場合、ブラ
ケツト34の一方は、支持材10の端部に装着自
在とする。 Therefore, by rotating each of the fixing screws 14 and 17, the distance between the outer surface of the holding block 13 and the inner peripheral surface of the casing 4 can be changed in the length direction of the support material 10 sandwiched between both surfaces. It is possible to freely slide over the range, or to disable such sliding. Incidentally, when such a telescopic mechanism is employed, one side of the bracket 34 can be freely attached to the end of the support member 10.
次に、ゲージ9をサツシ枠1に着脱する作業を
容易且つ迅速に行なえる様にする為の着脱機構に
就いて説明する。 Next, a description will be given of an attachment/detachment mechanism for easily and quickly attaching and detaching the gauge 9 to and from the sash frame 1.
尚、以下に述べる着脱機構により、本考案のゲ
ージ9を着脱出来るサツシ枠1は、第8図に示す
様に、サツシ枠1を構成する上枠32と下枠33
との室内側面に、突条21,21が固設されてい
る事が必要である。 The sash frame 1 to which the gauge 9 of the present invention can be attached and detached by the attachment/detachment mechanism described below has an upper frame 32 and a lower frame 33 that constitute the sash frame 1, as shown in FIG.
It is necessary that protrusions 21, 21 are fixedly installed on the interior side of the room.
この様な突条21,21を固設した上枠32と
下枠33とを有するサツシ枠1に本考案のゲージ
9を着脱する為の着脱機構は、第3図に示す様に
端部ブロツク11の外周面、或はケーシング4の
外周面(端部ブロツク11を設けない側)の同じ
高さ位置に設けた1対(上下合わせて2対)の支
持ピン22,22と、この支持ピン22,22の
近傍に設けた枢軸24に回転自在に支承された抑
えカム23とから構成されている。上記枢軸24
は、抑えカム23の中心から外れた部分を支持し
ており、この為抑えカム23を回転させた場合、
上記支持ピン22,22を結んだ直線と抑えカム
23の外周面との間に存在する隙間の大きさが
変化し、この隙間の内側に挿入した前記突条21
を強く挟む事が出来る。但し、抑えカム23と対
向する支持ピン22,22は必ずしも2個1組と
する必要はなく、土手状に長いものを1個(上下
合わせて2個)のみ設けても良い。 The attachment/detachment mechanism for attaching and detaching the gauge 9 of the present invention to and from the sash frame 1 having the upper frame 32 and lower frame 33 on which the protrusions 21, 21 are fixedly attached is an end block as shown in FIG. 11 or the outer peripheral surface of the casing 4 (the side where the end block 11 is not provided), a pair (two pairs in total) of support pins 22, 22 provided at the same height, and this support pin. 22, and a restraining cam 23 rotatably supported on a pivot shaft 24 provided near the cams 22, 22. The above axis 24
supports the off-center portion of the holding cam 23, so when the holding cam 23 is rotated,
The size of the gap existing between the straight line connecting the support pins 22, 22 and the outer peripheral surface of the holding cam 23 changes, and the protrusion 21 inserted into this gap changes.
can be strongly pinched. However, the support pins 22, 22 facing the holding cam 23 do not necessarily have to be a set of two, and only one long bank-like pin (two in total above and below) may be provided.
更に、本実施例に於いては第5〜6図に示す様
に、上記した着脱機構の他に、端部ブロツク11
の上面、及び底面25の下面に、前述したブラケ
ツト34の突出方向と直角な方向に向けた磁石3
5,35を装着している為、サツシ枠1が鉄製の
場合は、この磁石35,35により、サツシ枠取
付作業用ゲージをサツシ枠1に装着する事も出来
る。 Furthermore, in this embodiment, as shown in FIGS. 5 and 6, in addition to the above-mentioned attachment/detachment mechanism, the end block 11
The magnet 3 is placed on the top surface and the bottom surface of the bottom surface 25 in a direction perpendicular to the protruding direction of the bracket 34 mentioned above.
If the sash frame 1 is made of iron, the magnets 35, 35 can also be used to attach a gauge for the sash frame installation work to the sash frame 1.
次に、ケーシング4に内装した傾斜計5a,5
bの指針の零点調整を行なう際に、ケーシング4
を基準となる壁面に対して平行に保つ為の支持機
構に就いて説明する。 Next, inclinometers 5a and 5 installed inside the casing 4
When adjusting the zero point of the pointer b, casing 4
The support mechanism for keeping the wall parallel to the reference wall will be explained.
支持材10の端部に固定した端部ブロツク11
の上面(或はケーシング4の下端開口部を塞いだ
底板25の下面)には、対角線方向に亘つてX字
形の凹部26が形成されており、この凹部26内
にそれぞれ4本ずつの、同じ形状と大きさの突出
板27,27が、長さ方向に亘る摺動をがたつき
なく行なえる様にして嵌装されている。 End block 11 fixed to the end of support 10
An X-shaped recess 26 is formed in the upper surface (or the lower surface of the bottom plate 25 that closes the lower end opening of the casing 4) in the diagonal direction. Projecting plates 27, 27 of different shapes and sizes are fitted in such a way that they can slide in the length direction without rattling.
各突出板27,27には、それぞれ同じ長さの
長孔28,28を穿設しており、各突出板27,
27の長孔28,28を上方から挿通した止め螺
子29,29を、上記端部ブロツク11の上面
(或いは底板25の下面)に形成した螺子孔に螺
入している。各止め螺子29,29の螺着位置
は、各突出板27,27を、上記止め螺子29,
29が長孔28,28の端部に衝合する迄外方に
移動させた場合、各突出板27,27の先端が端
部ブロツク11(或いは底板25)の外周面から
突出する量が等しくなる様な位置にしている。 Elongated holes 28, 28 of the same length are bored in each of the protruding plates 27, 27, respectively.
Set screws 29, 29 inserted from above through the long holes 28, 28 of 27 are screwed into screw holes formed in the upper surface of the end block 11 (or the lower surface of the bottom plate 25). The screwing position of each set screw 29, 29 is such that each protruding plate 27, 27 is connected to the above set screw 29,
29 is moved outward until it abuts the ends of the elongated holes 28, 28, the tips of the respective protruding plates 27, 27 protrude by the same amount from the outer peripheral surface of the end block 11 (or the bottom plate 25). I'm positioning it so that it will work.
上述の様に構成される本考案のサツシ枠取付作
業用ゲージ9を用いて、第8図に示す様なサツシ
枠1を取付ける作業を行なう場合、先ずゲージ9
の長さをサツシ枠1の高さに合わせる。 When installing the sash frame 1 as shown in FIG. 8 using the sash frame mounting gauge 9 of the present invention constructed as described above, first the gauge 9 is
Adjust the length of to the height of Satsushi frame 1.
この様なゲージ9の長さ調節作業を行なう場
合、抑えブロツク13の螺子孔15,18に螺合
させた固定螺子14,17を緩め、抑えブロツク
13の外側面とケーシング4の内周面との間隔を
広げ、支持材10をケーシング4に対して摺動自
在な状態とする。この状態で支持材10をケーシ
ング4に対して摺動させれば、ケーシング4から
の支持材10の突出量が変化し、ゲージ9の全長
を調節する事が出来る。 When adjusting the length of the gauge 9 like this, loosen the fixing screws 14 and 17 screwed into the screw holes 15 and 18 of the holding block 13, and make sure that the outer surface of the holding block 13 and the inner peripheral surface of the casing 4 are aligned. The distance between the supporting members 10 and 10 is increased so that the supporting member 10 can freely slide with respect to the casing 4. If the support member 10 is slid against the casing 4 in this state, the amount of protrusion of the support member 10 from the casing 4 changes, and the overall length of the gauge 9 can be adjusted.
ゲージ9の全長をサツシ枠1の高さに合わせて
調節したならば、固定螺子14,17を上記の場
合と反対方向に回転させる事で、抑えブロツク1
3の外側面とケーシング4の内周面との間隔を狭
め、支持材10を上記両面の間で強く挟持して、
支持材10のケーシング4に対する摺動を不能と
し、ゲージ9の全長を固定する(第4図参照)。 Once the overall length of the gauge 9 has been adjusted to match the height of the sash frame 1, the holding block 1 can be adjusted by rotating the fixing screws 14 and 17 in the opposite direction to the above case.
The distance between the outer surface of the casing 3 and the inner circumferential surface of the casing 4 is narrowed, and the support member 10 is strongly held between the two surfaces.
The supporting member 10 is made unable to slide relative to the casing 4, and the entire length of the gauge 9 is fixed (see FIG. 4).
この様にゲージ9の全長をサツシ枠1の高さに
合わせて調節したならば、サツシ枠1の突条2
1,21を、ゲージ9の上下両端部にそれぞれ設
けた支持ピン22,22と抑えカム23との間に
挿入する。この際、サツシ枠1の竪枠36に、ゲ
ージ本体の上下2個所に付設したブラケツト34
の先端を当接させ、このゲージ9の位置を決め
る。尚、この挿入作業の際、支持ピン22,22
を結ぶ直線と抑えカム23の外周面と間の隙間の
幅は大きくしておく。 If the overall length of the gauge 9 is adjusted to match the height of the sash frame 1 in this way, then the protrusion 2 of the sash frame 1
1 and 21 are inserted between the support pins 22 and 22 provided at the upper and lower ends of the gauge 9, respectively, and the holding cam 23. At this time, the brackets 34 attached to the vertical frame 36 of the sash frame 1 are attached to the upper and lower parts of the gauge body.
The position of this gauge 9 is determined by touching the tip of the gauge. In addition, during this insertion work, the support pins 22, 22
The width of the gap between the straight line connecting the lines and the outer peripheral surface of the holding cam 23 is made large.
サツシ枠1を構成する上下両枠32,33に個
設した突条21,21を、何れもゲージ9の上下
両端部に設けた支持ピン22,22と抑えカム2
3の外周面との間の隙間内に挿入したならば、上
記抑えカム23を回転させる事で、上記隙間の幅
を小さくする。この作業により、上記突条2
1,21が支持ピン22,22と抑えカム23の
外周面との間で強く挟まれ、ゲージ9がサツシ枠
1にしつかりと装着される。又この状態に於い
て、互いに対向するゲージ9の内側面とサツシ枠
1の室内側面とが互いに平行になると共に、ゲー
ジ9とサツシ枠1を構成する竪枠36とが、ブラ
ケツト34の突出量に見合う間隔をあけて、互い
に平行になる。 Projections 21, 21 provided individually on both upper and lower frames 32, 33 constituting the sash frame 1 are connected to support pins 22, 22 provided at both upper and lower ends of the gauge 9, and a holding cam 2.
3, the width of the gap is reduced by rotating the restraining cam 23. By this work, the above protrusion 2
1 and 21 are strongly sandwiched between the support pins 22 and 22 and the outer peripheral surface of the holding cam 23, and the gauge 9 is firmly attached to the sash frame 1. Also, in this state, the inner surfaces of the gauge 9 and the indoor side surfaces of the sash frame 1, which face each other, are parallel to each other, and the gauge 9 and the vertical frame 36 constituting the sash frame 1 are arranged so that the amount of protrusion of the bracket 34 is be parallel to each other with a distance corresponding to .
この様にしてサツシ枠1の竪枠36に対して、
本考案のゲージ9を平行に装着したならば、第7
図に示す様にゲージ9を装着したままの状態でサ
ツシ枠1の取付作業を行なう。 In this way, for the vertical frame 36 of the satsushi frame 1,
If the gauge 9 of the present invention is installed in parallel, the seventh
As shown in the figure, the sash frame 1 is installed with the gauge 9 still attached.
取付けるべきサツシ枠1が傾斜している場合、
ケーシング4に内装された2個の傾斜計5a,5
bの内の何れかの、或は双方の傾斜計の指示盤6
a,6bにより、上記サツシ枠1が傾斜している
事とその傾斜方向とを知る事が出来る為、何れの
傾斜計5a,5bの指示盤6a,6bもサツシ枠
1が傾斜していない事を指示する様に、サツシ枠
1の取付姿勢を調節すれば、このサツシ枠1を何
れの方向に就いても、正しく鉛直にする事が出来
る。 If the sash frame 1 to be installed is tilted,
Two inclinometers 5a, 5 built into the casing 4
Indicator panel 6 of either or both of b.
Since it is possible to know from a and 6b that the sash frame 1 is tilted and the direction of inclination, the indicator panels 6a and 6b of both the inclinometers 5a and 5b indicate that the sash frame 1 is not tilted. By adjusting the mounting posture of the sash frame 1 as indicated, the sash frame 1 can be properly vertical no matter which direction it is placed.
上述の様に構成され、使用される本考案のゲー
ジ9に組み込まれた傾斜計5a,5bの指示値が
狂つていた場合(零点調整が正しく行なわれてい
ない場合)、サツシ枠1の取付を正しく行なう事
が出来ない為、図示の実施例の場合、次の様にし
て各傾斜計5a,5bの零点調整を行なう。 If the indicated values of the inclinometers 5a and 5b incorporated in the gauge 9 of the present invention constructed and used as described above are incorrect (zero point adjustment is not done correctly), the installation of the sash frame 1 Therefore, in the illustrated embodiment, the zero point adjustment of each inclinometer 5a, 5b is performed as follows.
即ち、零点調整作業を行なう場合には先ず、端
部ブロツク11の上面、及び底板25の下面に装
着した4本1組、合計8本の突出板27,27を
ケーシング4から外方に突出させ、止め螺子2
9,29の緊締によつて各突出板27,27を固
定する。 That is, when performing the zero point adjustment work, first, a total of eight protruding plates 27, 27, each set of four attached to the upper surface of the end block 11 and the lower surface of the bottom plate 25, are made to protrude outward from the casing 4. , set screw 2
Each protruding plate 27, 27 is fixed by tightening the parts 9, 29.
この状態でケーシング4の1面を適当な壁面に
対向させ、更に上下の突出板27,27の先端部
を上記壁面に当接させ、ケーシング4と壁面とを
互いに平行にした状態で、上記1面の傾斜角度を
示す傾斜計5a(或は5b)により、この壁面の
傾斜角度を測定する。次いで上記ケーシング4を
裏返し、再び同じ作業を行なう。 In this state, one side of the casing 4 is opposed to a suitable wall surface, and the tips of the upper and lower protruding plates 27, 27 are brought into contact with the wall surface, so that the casing 4 and the wall surface are parallel to each other. The inclination angle of this wall surface is measured by an inclinometer 5a (or 5b) that indicates the inclination angle of the surface. Next, the casing 4 is turned over and the same operation is performed again.
傾斜計5a(或は5b)の零点調整が正しく行
なわれていれば、同じ壁面の傾斜角度測定をケー
シング4を裏返して行なつた場合にも、測定値の
絶対値は等しくなるが、零点調整が正しく行なわ
れていない場合には、上記測定値の絶対値に差が
生じる。 If the zero point adjustment of the inclinometer 5a (or 5b) is performed correctly, even if the inclination angle measurement of the same wall surface is performed with the casing 4 turned over, the absolute value of the measured value will be the same, but the zero point adjustment If this is not done correctly, there will be a difference in the absolute values of the above measured values.
従つて、ケーシング4の正面を壁面に対向させ
た場合の測定値の絶対値と、同じく裏面を対向さ
せた場合の測定値の絶対値とが等しくなる様に零
点調整を行なえば、各傾斜計5a,5bの零点調
整を正しく行なえる。 Therefore, if the zero point is adjusted so that the absolute value of the measured value when the front side of the casing 4 faces the wall is equal to the absolute value of the measured value when the back side faces the same, each inclinometer The zero points of 5a and 5b can be adjusted correctly.
尚、本考案のゲージ9をサツシ枠1に装着する
為の構造は、図示の実施例のものに限定されるも
のではなく、他にも種々の構造を採用する事が可
能である。 Note that the structure for mounting the gauge 9 of the present invention on the sash frame 1 is not limited to that of the illustrated embodiment, and various other structures may be adopted.
c 考案の効果
本考案のサツシ枠取付作業用ゲージは、以上に
述べた通り構成され作用する為、サツシ枠の位置
決めを容易且つ迅速に行なう事が出来、しかも風
が吹いている様な場合にも支障なく位置決め作業
を行なう事が出来る為、建設作業の能率化に果た
す役割は大きい。c. Effects of the invention The gauge for sash frame installation work of the present invention is configured and operates as described above, so that the sash frame can be positioned easily and quickly, and moreover, it can be used even when the wind is blowing. Since positioning work can be performed without any hindrance, it plays a major role in streamlining construction work.
第1図は本考案のサツシ枠取付作業用ゲージの
端部側面図、第2図はサツシ枠取付作業用ゲージ
の全体構成を、ブラケツトを省略した状態で示す
斜視図、第3図はこのゲージの上端部を分解した
状態で示す斜視図、第4図は組み立てた状態を示
す、ゲージ上部の横断面図、第5図はこのゲージ
の上下面に磁石を装着した例を示す側面図、第6
図は第5図の右方から見た図、第7図は使用状態
を示す側面図、第8図は本考案のゲージを装着す
るサツシ枠の1例を示す縦断側面図、第9〜10
図はコンクリート壁に形成した窓開口の内側にサ
ツシ枠を装着する状態を示しており、第9図は正
面図、第10図は縦断側面図、第11図は従来の
鉛直部材の位置決めに使用していた用具の斜視図
である。
1……サツシ枠、2……窓開口、3……隙間、
4……ケーシング、5a,5b……傾斜計、6
a,6b……指示盤、7a,7b,7c,7d…
…側面、8……摘み、9……ゲージ、10……支
持材、11……端部ブロツク、12……皿螺子、
13……抑えブロツク、13a,13b……平行
壁、13c……連結壁、14……固定螺子、15
……螺子孔、16……通孔、17……固定螺子、
18……螺子孔、19,20……通孔、21……
突条、22……支持ピン、23……抑えカム、2
4……枢軸、25……底板、26……凹部、27
……突出板、28……長孔、29……止め螺子、
30……糸、31……重錘、32……上枠、33
……下枠、34……ブラケツト、35……磁石、
36……竪枠、37……止め螺子。
Fig. 1 is an end side view of the gauge for attaching the sash frame of the present invention, Fig. 2 is a perspective view showing the overall configuration of the gauge for attaching the sash frame with the bracket omitted, and Fig. 3 is the gauge. FIG. 4 is a cross-sectional view of the upper part of the gauge in an assembled state; FIG. 5 is a side view showing an example in which magnets are attached to the upper and lower surfaces of the gauge; 6
The figures are a view seen from the right side of Fig. 5, Fig. 7 is a side view showing the state of use, Fig. 8 is a vertical side view showing an example of the sash frame to which the gauge of the present invention is attached, and Figs. 9 to 10.
The figures show the state in which the sash frame is attached to the inside of a window opening formed in a concrete wall. Figure 9 is a front view, Figure 10 is a longitudinal side view, and Figure 11 is a conventional vertical member used for positioning. FIG. 1... Satsushi frame, 2... Window opening, 3... Gap,
4... Casing, 5a, 5b... Inclinometer, 6
a, 6b...Instruction board, 7a, 7b, 7c, 7d...
... Side surface, 8 ... Knob, 9 ... Gauge, 10 ... Support material, 11 ... End block, 12 ... Flat head screw,
13... Holding block, 13a, 13b... Parallel wall, 13c... Connecting wall, 14... Fixing screw, 15
...Screw hole, 16...Through hole, 17...Fixing screw,
18...Screw hole, 19,20...Through hole, 21...
Projection, 22... Support pin, 23... Holding cam, 2
4... Pivot, 25... Bottom plate, 26... Recess, 27
... protruding plate, 28 ... long hole, 29 ... set screw,
30... Thread, 31... Weight, 32... Upper frame, 33
...Bottom frame, 34...Bracket, 35...Magnet,
36... Vertical frame, 37... Set screw.
Claims (1)
るケーシングに2個の傾斜計を、両傾斜計の計測
方向を互いに直角にずらせた状態で内蔵し、両傾
斜計の指示盤を上記ケーシングの側面に露出させ
てゲージ本体を構成すると共に、このゲージ本体
の上下2個所位置に、このゲージ本体の側面から
等しい長さだけ突出するブラケツトを付設し、ゲ
ージ本体のこのブラケツトの突出方向と直角な面
に、ゲージ本体の上下両端部をサツシ枠を構成す
る上下枠に装着する手段を設けて成る、サツシ枠
取付作業用ゲージ。 Two inclinometers are built into a casing having a rectangular cross section of the same size from the top end to the bottom end, with the measurement directions of both inclinometers shifted at right angles to each other, and the indicator panels of both inclinometers are mounted on the side of the casing. This is exposed to form a gauge body, and brackets that protrude from the sides of this gauge body by equal lengths are attached at two positions above and below this gauge body, and the brackets are attached to a plane perpendicular to the direction in which the brackets protrude from the gauge body. , a gauge for mounting a sash frame, which is provided with means for attaching the upper and lower ends of the gauge body to the upper and lower frames constituting the sash frame.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP5748687U JPH0449533Y2 (en) | 1987-04-17 | 1987-04-17 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP5748687U JPH0449533Y2 (en) | 1987-04-17 | 1987-04-17 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS63165513U JPS63165513U (en) | 1988-10-27 |
| JPH0449533Y2 true JPH0449533Y2 (en) | 1992-11-20 |
Family
ID=30887234
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP5748687U Expired JPH0449533Y2 (en) | 1987-04-17 | 1987-04-17 |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0449533Y2 (en) |
-
1987
- 1987-04-17 JP JP5748687U patent/JPH0449533Y2/ja not_active Expired
Also Published As
| Publication number | Publication date |
|---|---|
| JPS63165513U (en) | 1988-10-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US2973584A (en) | Door frame profile gauge | |
| KR200496200Y1 (en) | Support holder for laser leveler | |
| US5136785A (en) | Apparatus for constructing masonry corners | |
| US5001839A (en) | Building profiling tools | |
| JPH0441287Y2 (en) | ||
| US5274929A (en) | Masonry guide | |
| KR200213267Y1 (en) | Angle adjusted flash board | |
| JPH1183407A (en) | Angle ruler | |
| JP2546943Y2 (en) | Anchor bolt measuring jig | |
| CN223446615U (en) | Fixing structure for controlling floor height difference | |
| CN222936458U (en) | Inclined support mounting structure of top unconstrained slat | |
| KR20000003887U (en) | Supporting device for wall formwork | |
| CN222414108U (en) | A kind of assembly type integral partition board hoisting construction positioning device | |
| JPH07260484A (en) | Measure tape end fitting | |
| JPS5831042Y2 (en) | Support metal fittings for level etc. | |
| CN215443203U (en) | Positioning device for construction plate surface reinforcing steel bars | |
| JPS6313354Y2 (en) | ||
| JPH041265Y2 (en) | ||
| JP2554125Y2 (en) | Structure of wall foundation | |
| JP2521532Y2 (en) | Measuring instrument for building materials | |
| JP4006489B2 (en) | Vertical holder | |
| JPH0431408Y2 (en) | ||
| JPH0533671Y2 (en) | ||
| JPS625610Y2 (en) | ||
| JPH0348970Y2 (en) |