JPH0458849B2 - - Google Patents

Info

Publication number
JPH0458849B2
JPH0458849B2 JP20322087A JP20322087A JPH0458849B2 JP H0458849 B2 JPH0458849 B2 JP H0458849B2 JP 20322087 A JP20322087 A JP 20322087A JP 20322087 A JP20322087 A JP 20322087A JP H0458849 B2 JPH0458849 B2 JP H0458849B2
Authority
JP
Japan
Prior art keywords
pile
soil cement
steel pipe
pipe pile
cement column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP20322087A
Other languages
Japanese (ja)
Other versions
JPS6448925A (en
Inventor
Hiroaki Nagaoka
Takashi Okamoto
Kimihisa Takano
Tetsuzo Hirose
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Engineering Corp
Original Assignee
Nippon Kokan Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Kokan Ltd filed Critical Nippon Kokan Ltd
Priority to JP20322087A priority Critical patent/JPS6448925A/en
Publication of JPS6448925A publication Critical patent/JPS6448925A/en
Publication of JPH0458849B2 publication Critical patent/JPH0458849B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Description

【発明の詳細な説明】 [産業上の利用分野] この発明は杭の施工方法、特に杭頭部の接合の
迅速、容易化に関する。
DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to a method for constructing piles, and in particular to quick and easy joining of pile heads.

[従来の技術] 第13図は従来のソイルセメント等を併用した
杭の施工法を示す工程図であり、このソイルセメ
ント工法においては第13図aに示すように例え
ばオーガー2で地盤1を削孔しながらセメントミ
ルク等の地盤固定液を注入して、セメントミルク
と孔内の土砂とを撹拌翼3で強制撹拌してソイル
セメント柱体4を造成する。このソイルセメント
柱体4が第13図bに示すように所定の深度まで
造成されるとオーガー2を抜き出し、第13図c
に示すように未硬化のソイルセメント柱体4内に
先端開口の中空円筒からなる構造体、例えば鋼管
杭5を建て込む。この鋼管杭5を第13図dに示
すように支持層6まで建て込み後、ソイルセメン
ト柱体4の硬化をまつてソイルセメント柱体4と
鋼管杭5が一体化した杭体を完成する。
[Prior Art] Fig. 13 is a process diagram showing a conventional pile construction method using soil cement, etc. In this soil cement method, for example, the ground 1 is excavated with an auger 2 as shown in Fig. 13a. A soil-cement column 4 is created by injecting a ground fixing liquid such as cement milk while drilling the hole, and forcibly stirring the cement milk and the earth and sand in the hole with a stirring blade 3. When the soil cement column 4 is built to a predetermined depth as shown in Figure 13b, the auger 2 is pulled out and
As shown in FIG. 2, a structure consisting of a hollow cylinder with an open end, for example, a steel pipe pile 5, is built into an unhardened soil cement column 4. After this steel pipe pile 5 is built up to the support layer 6 as shown in FIG. 13d, the soil cement column 4 is allowed to harden to complete a pile body in which the soil cement column 4 and the steel pipe pile 5 are integrated.

その後、鋼管杭5の杭頭内部につまつたソイル
セメント等を排除し、清掃を行つてから、第14
図に示すように鋼管杭5の杭頭部に鉄筋籠7を挿
入してコンクリート8を打設し、フーチングと結
合している。
After that, the soil cement etc. that had accumulated inside the pile head of the steel pipe pile 5 was removed and cleaned, and then the 14th
As shown in the figure, a reinforcing bar cage 7 is inserted into the pile head of a steel pipe pile 5, concrete 8 is placed, and it is connected to a footing.

[発明が解決しようとする問題点] 上記従来の杭の施工法においては、施工時に鋼
管杭5の杭頭内部に泥、土あるいはソイルセメン
トがつまり、杭とフーチングあるいは基礎梁等の
接合時に鋼管杭5の杭頭内部から泥、土あるいは
ソイルセメント等を排除し、清掃を行つた後でな
ければ杭とフーチング等の接合ができなかつた。
この杭頭内部からのソイルセメント等の排除、清
掃は容易でなく、かつ多数の杭の処理を行うため
杭頭部の施工が迅速にできないという問題点があ
つた。
[Problems to be Solved by the Invention] In the conventional pile construction method described above, the inside of the pile head of the steel pipe pile 5 is clogged with mud, soil, or soil cement during construction. The pile and the footing etc. could not be joined until after removing mud, soil, soil cement, etc. from the inside of the pile head of the pile 5 and cleaning it.
It is not easy to remove soil cement and the like from the inside of the pile head and clean it, and there is a problem that the pile head cannot be constructed quickly because a large number of piles must be disposed of.

この発明はかかる問題点を解決するためになさ
れたものであり、杭頭部の施工を容易、迅速に行
うことができる杭の施工方法を提案することを目
的とするものである。
The present invention was made to solve these problems, and it is an object of the present invention to propose a method for constructing a pile that can easily and quickly construct a pile head.

[問題点を解決するための手段] この発明に係る杭の施工方法は、あらかじめ先
端開口の中空円筒からなる構造体の頭部先端より
内側に空気抜きを有する内蓋を取付け、この内蓋
を取付けた構造体をソイルセメント柱体に建て込
むことにより杭体を完成することを特徴とする。
[Means for Solving the Problems] The method for constructing a pile according to the present invention includes attaching an inner cover having an air vent inside the head tip of a structure consisting of a hollow cylinder with an opening in advance, and then attaching the inner cover. The pile body is completed by erecting the constructed structure into the soil cement column body.

[作用] この発明においては、構造体の頭部先端より内
側に取付けた空気抜きを有する内蓋により、構造
体をソイルセメント柱体に建て込む時の中空部の
空気抜きを容易にすると共に、ソイルセメントが
構造体の杭頭内部に流入することを防止する。
[Function] In this invention, the inner cover with the air vent installed inside the tip of the head of the structure makes it easy to vent air from the hollow part when the structure is built into the soil cement column, and the soil cement This prevents water from flowing into the pile cap of the structure.

[実施例] 第1図はこの発明の一実施例に係る鋼管杭5を
示す断面図であり、鋼管杭5の杭頭部には杭頭先
端部から所定距離おいた内側に内蓋9が固定され
ている。この内蓋9には第2図に示すように空気
は通すが、スラリ状となつたソイルセメントは通
さない程度の大きさの空気抜きの孔10が複数設
けられている。
[Embodiment] FIG. 1 is a sectional view showing a steel pipe pile 5 according to an embodiment of the present invention, and the pile head of the steel pipe pile 5 is provided with an inner cover 9 at a predetermined distance from the tip of the pile head. Fixed. As shown in FIG. 2, this inner lid 9 is provided with a plurality of air vent holes 10 of a size that allows air to pass through but not soil cement in the form of slurry.

上記のように構成された鋼管杭5を使用した杭
の施工を第3図の工程図に基いて説明する。
Pile construction using the steel pipe pile 5 configured as described above will be explained based on the process diagram of FIG. 3.

まず、オーガー等で地盤1を削孔しながら地盤
1中にセメントミルク等の地盤固定液を注入、撹
拌して第3図aに示すように所定の深度までソイ
ルセメント柱体4を造成する。次に第3図bに示
すようにソイルセメント柱体4の硬化前に内蓋9
を有する鋼管杭5をソイルセメント柱体4に圧入
する。この鋼管杭5の圧入の際、鋼管杭5の中空
部に下端開口部からソイルセメントが充満される
が、中空部の空気は内蓋9の空気抜きの孔10か
ら抜けるため余分な抵抗なしに鋼管杭5をソイル
セメント柱体4に圧入することができる。鋼管杭
5が所定の深度まで達するとソイルセメントは第
3図cに示すように内蓋9の下面まで充満される
が、内蓋9に設けた空気抜きの孔10はスラリ状
となつたソイルセメントを通さない程度の大きさ
であるため、第4図に示すように鋼管杭5の杭頭
部へソイルセメントが流入することを阻止する。
鋼管杭5を建て込み後、ソイルセメント柱体4の
硬化をまつてソイルセメント柱体4と鋼管杭5が
一体化した杭体を完成する。
First, while drilling a hole in the ground 1 with an auger or the like, a ground fixing liquid such as cement milk is injected into the ground 1 and stirred to form a soil cement column 4 to a predetermined depth as shown in FIG. 3a. Next, as shown in FIG. 3b, before the soil cement column 4 hardens, the inner cover 9 is
A steel pipe pile 5 having a diameter is press-fitted into the soil cement column 4. When press-fitting the steel pipe pile 5, the hollow part of the steel pipe pile 5 is filled with soil cement from the lower end opening, but since the air in the hollow part escapes through the air vent hole 10 of the inner cover 9, the steel pipe pile 5 can be inserted without any extra resistance. The piles 5 can be press-fitted into the soil cement columns 4. When the steel pipe pile 5 reaches a predetermined depth, the soil cement is filled up to the bottom surface of the inner cover 9 as shown in FIG. Since the size is such that it cannot pass through, soil cement is prevented from flowing into the pile head of the steel pipe pile 5, as shown in FIG.
After the steel pipe pile 5 is erected, the soil cement column 4 is allowed to harden to complete a pile body in which the soil cement column 4 and the steel pipe pile 5 are integrated.

その後、完成された杭とフーチングあるいは基
礎梁等との接合を行う。この接合の際、鋼管杭5
の杭頭部にはソイルセメントが流入しておらず内
面が汚されていないため清掃が不必要となる。
After that, the completed piles are joined to footings or foundation beams, etc. During this joining, the steel pipe pile 5
No soil cement has flowed into the pile head and the inside surface is not contaminated, so cleaning is not necessary.

なお、上記実施例においては空気抜きの孔10
を複数有する内蓋9を固定した鋼管杭5を使用し
た場合について説明したが、第5図に示すように
空気抜き弁11を有する内蓋9aを鋼管杭5に固
定しても上記実施例と同様な作用を奏することが
できる。
In addition, in the above embodiment, the air vent hole 10
Although the case where the steel pipe pile 5 to which the inner cover 9 having a plurality of air vent valves 11 is fixed is used is used, as shown in FIG. It is possible to have a powerful effect.

空気抜き弁11は軸12の両端にナツト15で
取付けられた弁座13とフロート14からなり弁
座13が内蓋9aの中央開口部周囲上部に所定間
隔を置いて設けたスペーサ16に当接している。
この状態で第6図に示すように鋼管杭5をソイル
セメント柱体4に圧入すると、弁座13とスペー
サ16間から鋼管杭5お中空部の空気が外部へ流
出する。さらに鋼管杭5が圧入しソイルセメント
とフロート14が接すると空気抜き弁11が押し
上げられ、内部9aの中央開口部を閉じて、第7
図に示すように鋼管杭5の杭頭部にソイルセメン
トが流入することを阻止する。
The air vent valve 11 consists of a valve seat 13 and a float 14, which are attached to both ends of a shaft 12 with nuts 15, and the valve seat 13 is in contact with a spacer 16 provided at a predetermined interval above the central opening of the inner lid 9a. There is.
When the steel pipe pile 5 is press-fitted into the soil cement column 4 in this state as shown in FIG. 6, the air in the hollow part of the steel pipe pile 5 flows out from between the valve seat 13 and the spacer 16. Further, when the steel pipe pile 5 is press-fitted and the soil cement and the float 14 come into contact with each other, the air vent valve 11 is pushed up, closing the central opening of the interior 9a, and the seventh
As shown in the figure, soil cement is prevented from flowing into the pile head of the steel pipe pile 5.

また、第8図の断面図及び第9図の平面図に示
すように、小径の管17を複数個上部に取付けた
内蓋9bを固定した鋼管杭5を用いても良い。す
なわち、この鋼管杭5をソイルセメント柱体4に
圧入し、所定の深度に達すると第10図に示すよ
うにソイルセメントは管17の中に流入するが、
その他の杭頭部に流入することは阻止される。な
お、この場合、管17はフーチング等を接合する
ための鉄筋と兼用することもできる。
Alternatively, as shown in the cross-sectional view of FIG. 8 and the plan view of FIG. 9, a steel pipe pile 5 may be used to which an inner cover 9b having a plurality of small-diameter pipes 17 attached to the top is fixed. That is, the steel pipe pile 5 is press-fitted into the soil cement column 4, and when it reaches a predetermined depth, the soil cement flows into the pipe 17 as shown in FIG.
Flow into other pile heads is prevented. In this case, the pipe 17 can also be used as a reinforcing bar for joining footings and the like.

さらに、第11図に示すような鋼管杭5の内径
より若干径の小さい円形鋼板18を底部に有する
フレキシブルな不透水性の袋19により内蓋9c
を形性し、この内蓋9cを第12図に示すように
鋼管杭5の内壁に固定したストツパ20上に載置
し、鋼管杭5の内壁と袋19との間〓から、鋼管
杭5の中空部の空気を抜きながら鋼管杭5をソイ
ルセメント柱体4に圧入する。鋼管杭5が圧入さ
れて袋19の底部がソイルセメント柱体4の上端
位置に致つたところで、袋19内に水等を注入
し、ソイルセメントと水を水頭差でバランスさせ
てソイルセメントの杭頭部への流入を阻止しなが
ら鋼管杭5を所定の深度まで圧入する。ソイルセ
メントが硬化後、内蓋9cを取りのぞき、杭頭処
理を行なう。
Furthermore, an inner cover 9c is provided with a flexible water-impermeable bag 19 having a circular steel plate 18 with a diameter slightly smaller than the inner diameter of the steel pipe pile 5 at the bottom as shown in FIG.
The inner cover 9c is placed on the stopper 20 fixed to the inner wall of the steel pipe pile 5 as shown in FIG. The steel pipe pile 5 is press-fitted into the soil cement column 4 while removing the air from the hollow part. When the steel pipe pile 5 is press-fitted and the bottom of the bag 19 reaches the upper end of the soil cement column 4, water or the like is injected into the bag 19, and the soil cement and water are balanced by the water head difference to form a soil cement pile. The steel pipe pile 5 is press-fitted to a predetermined depth while preventing the inflow into the head. After the soil cement has hardened, the inner cover 9c is removed and the pile cap is treated.

なお、上記各実施例においては鋼管杭を使用し
た場合について説明したが既製杭等他の構造体を
使用した場合も上記各実施例と同様な作用を奏す
ることができる。
In each of the above embodiments, the case where steel pipe piles are used has been described, but even when other structures such as ready-made piles are used, the same effect as in each of the above embodiments can be achieved.

[発明の効果] この発明は以上説明したように空気抜きを有す
る内蓋を頭部先端より内側に中空部に取付けた構
造体をソイルセメント柱体に建て込むようにした
ので、構造体の中空部の空気抜きを容易にすると
共に構造体の杭頭内部にソイルセメントが流入す
ることを防止するから、杭頭部からのソイルセメ
ントの排除作業を省略することができる。
[Effects of the Invention] As explained above, in this invention, a structure in which an inner cover having an air vent is attached to a hollow part inside the tip of the head is built into a soil cement column, so that the hollow part of the structure is This makes it easy to remove air from the pile head and prevents soil cement from flowing into the pile head of the structure, making it possible to omit the work of removing soil cement from the pile head.

また杭頭部内面が汚されないため清掃が不要と
なり、杭とフーチングあるいは基礎梁等との接合
処理を迅速に行なうことができると共に杭頭処理
に際し杭頭部に良好なコンクリートを打設するこ
とができる効果も有する。
Additionally, since the inside surface of the pile head is not contaminated, there is no need to clean it, making it possible to quickly connect the pile to footings or foundation beams, etc., and to place good quality concrete on the pile head when processing the pile head. It also has the effect of

【図面の簡単な説明】[Brief explanation of drawings]

第1図はこの発明の実施例に係る鋼管杭を示す
断面図、第2図は第1図に示した鋼管杭の内蓋を
示す平面図、第3図a,b,cは上記実施例の工
程図、第4図は上記実施例により形成された杭頭
部を示す断面図、第5図はこの発明の第2の実施
例に係る鋼管杭の杭頭部を示す断面図、第6図、
第7図は各々第5図に示した実施例の動作説明
図、第8図、第9図はこの発明の第3の実施例に
係る鋼管杭を示し、第8図は杭頭部を示す断面
図、第9図は平面図、第10図は第8図に示した
実施例の動作説明図、第11図はこの発明の第4
の実施例に係る内蓋を示す側面図、第12図は第
11図に示した実施例の動作説明図、第13図a
〜dは従来例を示す工程図、第14図は杭頭処理
を示す説明図である。 1……地盤、4……ソイルセメント柱体、5…
…鋼管杭、9,9a,9b,9c……内蓋。
Fig. 1 is a sectional view showing a steel pipe pile according to an embodiment of the present invention, Fig. 2 is a plan view showing the inner cover of the steel pipe pile shown in Fig. 1, and Figs. FIG. 4 is a sectional view showing the pile head formed by the above embodiment, FIG. 5 is a sectional view showing the pile head of the steel pipe pile according to the second embodiment of the present invention, and FIG. figure,
Fig. 7 is an explanatory diagram of the operation of the embodiment shown in Fig. 5, Fig. 8 and Fig. 9 show a steel pipe pile according to a third embodiment of the present invention, and Fig. 8 shows the pile head. 9 is a plan view, FIG. 10 is an explanatory diagram of the operation of the embodiment shown in FIG. 8, and FIG. 11 is a fourth embodiment of the present invention.
FIG. 12 is a side view showing the inner lid according to the embodiment shown in FIG. 11, and FIG. 13 a
-d are process diagrams showing a conventional example, and FIG. 14 is an explanatory diagram showing pile cap treatment. 1...Ground, 4...Soil cement column, 5...
...Steel pipe pile, 9, 9a, 9b, 9c...Inner cover.

Claims (1)

【特許請求の範囲】 1 地盤中にソイルセメント柱体を造成し、ソイ
ルセメント柱体の硬化前にその内部に先端開口の
中空円筒からなる構造体を建て込み、ソイルセメ
ント柱体の硬化により構造体とソイルセメント柱
体を一体化させることにより杭体を構成する工法
において、 あらかじめ上記構造体の頭部先端より内側の中
空部に空気抜きを有する内蓋を取付け、内蓋を取
付けた構造体をソイルセメント柱体に建て込み杭
体を完成することを特徴とする杭の施工方法。
[Claims] 1. A soil cement column is created in the ground, and before the soil cement column hardens, a structure consisting of a hollow cylinder with an opening at the tip is built inside the column, and the structure is created by hardening the soil cement column. In the construction method in which the pile body is constructed by integrating the pile body and the soil cement column, an inner cover with an air vent is installed in the hollow part inside the head tip of the above structure in advance, and the structure with the inner cover attached is A pile construction method characterized by completing the pile body by erecting it in a soil cement column body.
JP20322087A 1987-08-17 1987-08-17 Construction of pile Granted JPS6448925A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20322087A JPS6448925A (en) 1987-08-17 1987-08-17 Construction of pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20322087A JPS6448925A (en) 1987-08-17 1987-08-17 Construction of pile

Publications (2)

Publication Number Publication Date
JPS6448925A JPS6448925A (en) 1989-02-23
JPH0458849B2 true JPH0458849B2 (en) 1992-09-18

Family

ID=16470447

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20322087A Granted JPS6448925A (en) 1987-08-17 1987-08-17 Construction of pile

Country Status (1)

Country Link
JP (1) JPS6448925A (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6727361B2 (en) 2000-11-07 2004-04-27 Symyx Technologies, Inc. Phosphino substituted pyridine amine ligands
JP6582578B2 (en) * 2015-06-12 2019-10-02 ジャパンパイル株式会社 Pile foundation, hollow ready-made pile with soil cement shielding device and pile foundation construction method

Also Published As

Publication number Publication date
JPS6448925A (en) 1989-02-23

Similar Documents

Publication Publication Date Title
US20080019779A1 (en) Steel-Cased Concrete Piers
JPS5985028A (en) Steel pipe pile and laying work thereof
JP3077747B2 (en) Method and apparatus for removing concrete at pile head extra
JP4373824B2 (en) Joining method of cast-in-place pile and steel pipe column
JPS6146610B2 (en)
JPH0649840A (en) Construction method of steel pipe foundation pile for preventing liquefaction
JPH07197473A (en) Open caisson structure
JPH09324422A (en) Cast-in-place composite pile and its construction method
JP2002054164A (en) Pillars and their construction method
JP2008223337A (en) Foundation pile construction method, and washing device of hollow pile inner peripheral wall used in construction method
JPH07324341A (en) Reinforcement method of existing pile foundation building
JP4800716B2 (en) Artificial ground
JP2905129B2 (en) Ground improvement method
JPH073781A (en) Construction method of foundation footing on cast-in-place concrete pile head.
JPH1171754A (en) Pile construction method and construction equipment
JPH0626583Y2 (en) Connection structure between prefabricated pile and footing
JPS6054461B2 (en) Connection structure method between the head of cast-in-place concrete pile and foundation footing
JPH0521533Y2 (en)
JPH0511166B2 (en)
JPS6011165Y2 (en) Continuous column pile drilling bit
JPH0351365Y2 (en)
JPH0328416A (en) Construction method to build up pile
JP3239947B2 (en) Construction method of foundation work
JPS61179918A (en) Reinforcing bar cage for cast-in-place concrete pile
JPS6223128B2 (en)