JPH0459977B2 - - Google Patents

Info

Publication number
JPH0459977B2
JPH0459977B2 JP4765585A JP4765585A JPH0459977B2 JP H0459977 B2 JPH0459977 B2 JP H0459977B2 JP 4765585 A JP4765585 A JP 4765585A JP 4765585 A JP4765585 A JP 4765585A JP H0459977 B2 JPH0459977 B2 JP H0459977B2
Authority
JP
Japan
Prior art keywords
column
structures
beam steel
formwork
reinforcing bars
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP4765585A
Other languages
Japanese (ja)
Other versions
JPS61206536A (en
Inventor
Kazuhiro Tategami
Kenji Okihana
Noboru Nakasone
Yoshimi Kaihara
Yasutaka Sunochi
Hideaki Yamamoto
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Original Assignee
Shimizu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd filed Critical Shimizu Construction Co Ltd
Priority to JP4765585A priority Critical patent/JPS61206536A/en
Publication of JPS61206536A publication Critical patent/JPS61206536A/en
Publication of JPH0459977B2 publication Critical patent/JPH0459977B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Wire Processing (AREA)

Description

【発明の詳細な説明】 「産業上の利用分野」 本発明は、鉄筋鉄骨複合柱の製造方法に関する
ものである。
DETAILED DESCRIPTION OF THE INVENTION "Field of Industrial Application" The present invention relates to a method of manufacturing a reinforced steel composite column.

「技術背景」 本発明の出願人は、柱部分を鉄筋構造に、ま
た、梁を鉄骨構造とした複合構造の複数階用の鉄
筋鉄骨複合柱を開発している。この鉄筋鉄骨複合
柱は、梁鉄骨を交差状態で一体化して構成された
梁鉄骨部と前記梁鉄骨部の交差部分を囲んで梁鉄
骨部に一体化された型枠兼用プレート部とからな
り、前記型枠兼用プレート部の内側の梁鉄骨部の
上下両面に各々対向して複数の挿通孔が形成され
てなる複数の仕口構成体と、前記複数の仕口構成
体の挿通孔を通して全仕口構成体を連結した複数
の柱主筋とからなり、各仕口構成体が柱主筋の長
さ方向の所要位置に所定間隔離間して固定されて
構成され、建設現場において前記型枠兼用プレー
ト部と前記柱主筋の周囲部とにコンクリートを打
設して構築物の柱とするものである。
"Technical Background" The applicant of the present invention has developed a reinforced steel-frame composite column for multiple floors with a composite structure in which the column part has a reinforced structure and the beam has a steel frame structure. This reinforced steel frame composite column consists of a beam steel section formed by integrating beam steel frames in an intersecting state, and a formwork/form plate section that surrounds the intersection of the beam steel sections and is integrated with the beam steel section, A plurality of joint structures are formed in which a plurality of insertion holes are formed facing each other on both upper and lower surfaces of the beam steel frame section inside the formwork-cum-plate section, and the entire structure is passed through the insertion holes of the plurality of joint structures. Consisting of a plurality of column main reinforcements connected to each other, each joint structure is fixed at a predetermined position in the length direction of the column main reinforcements with a predetermined distance between them, and the formwork/form plate part is installed at the construction site. Concrete is poured around the main reinforcement of the column and the main reinforcement of the column to form the column of the structure.

そして更に本発明の出願人は、この鉄筋鉄骨複
合柱の効率的製造方法を確立し、本発明に至つ
た。
Furthermore, the applicant of the present invention has established an efficient manufacturing method for this reinforced steel composite column, and has arrived at the present invention.

「発明の目的」 本発明は前記事情に鑑みてなされたもので、工
場あるいは作業現場等において効率よく安全に複
数階用の鉄筋鉄骨複合柱を製造できる方法の提供
を目的とする。
``Object of the Invention'' The present invention was made in view of the above-mentioned circumstances, and an object of the present invention is to provide a method for efficiently and safely manufacturing a reinforced steel frame composite column for multiple floors in a factory or a work site.

「問題点を解決するための手段」 本発明は、作業場の上に複数の仕口構成体を
各々挿通孔の開口面を横に向け、かつ、対向する
仕口構成体の挿通孔を同一中心軸位置にして並設
し、前記同一中心軸位置に配置した挿通孔に柱主
筋を通し、その後に各柱主筋を仕口構成体に固定
するものである。
``Means for Solving the Problems'' The present invention provides a plurality of shigou structures on a workshop with the opening surfaces of the insertion holes of each facing sideways, and the insertion holes of the opposing shiguit structures are aligned at the same center. The main pillar reinforcements are arranged in parallel at axial positions, and the main pillar reinforcements are passed through the insertion holes arranged at the same central axis position, and then each main pillar reinforcement is fixed to the shiiguchi structure.

「作用」 本発明は仕口構成体の挿通孔を横にして挿通孔
に柱主筋を通すようにすると柱主筋を横にして挿
入できるために挿入作業が容易になり、工場や作
業場で複数階用の鉄筋鉄骨複合柱を短時間に製造
できるとともに、作業場に設置した仕口構成体の
数あるいは相互の間隔を適宜設定することにより
梁鉄骨部の相互の間隔を設定することができるた
めに任意階数の構築物の鉄筋鉄骨複合柱を精度よ
く製造することを可能にする。
``Function'' The present invention allows the insertion of the column main reinforcement into the insertion hole with the insertion hole of the joint structure sideways, which makes the insertion work easier because it allows the insertion of the column main reinforcement horizontally. In addition to being able to manufacture reinforced steel frame composite columns for use in a short time, it is also possible to set the mutual spacing of the beam steel sections by appropriately setting the number of shikiguchi structures installed in the workshop or the mutual spacing. It is possible to accurately manufacture reinforced steel frame composite columns for multi-story structures.

「実施例」 第1図ないし第14図は、3階建ての建物用に
構成された鉄筋鉄骨複合柱Aを本発明を実施して
製造する場合について説明するためのものであ
る。
Embodiment FIGS. 1 to 14 are for explaining a case where a reinforcing steel frame composite column A configured for a three-story building is manufactured by implementing the present invention.

本発明を実施して製造される鉄筋鉄骨複合柱A
は、第9図に示すような梁鉄骨を交差状態で一体
化して構成された梁鉄骨部1Bと前記梁鉄骨部1
Bの交差部分を囲んで梁鉄骨部1Bに一体化され
た型枠兼用プレート部1Aとからなる3個の仕口
構成体1と、前記3個の仕口構成体1を第9図等
に示すように貫通した3種類の鉄筋2A,2B,
2Cとから成つている。
Reinforced steel frame composite column A manufactured by implementing the present invention
is a beam steel frame part 1B constructed by integrating beam steel frames in an intersecting state as shown in FIG. 9, and the beam steel frame part 1.
FIG. 9 etc. shows three shikiguchi structures 1 consisting of a formwork/form plate part 1A that is integrated with the beam steel frame part 1B surrounding the intersection of B and the three shishaguchi structures 1. As shown, three types of reinforcing bars 2A, 2B,
It consists of 2C.

ここで鉄筋鉄骨複合柱Aの製造に先立つて、ま
ず、鉄筋鉄骨複合柱Aの構成について説明する。
Here, prior to manufacturing the reinforced steel composite column A, the configuration of the reinforced steel composite column A will be described first.

鉄筋鉄骨複合柱Aにおいて、仕口構成体1の梁
鉄骨部1Bは、第9図に示す如く、上部水平プレ
ート1aと下部水平プレート1bと垂直プレート
1cとからなるH型の梁鉄骨を十字上に一体化し
て形成され、更に各板の交差部分が梁鉄骨部1B
に一体化された平面L字状の型枠兼用プレート部
1Aで囲まれ、各型枠兼用プレート部1Aの上端
が上部水平プレート1aどうしの交差部分の側方
に、また、下端が下部水平プレート1bどうしの
交差部分の側方に各々位置されている。そして、
前記上部水平プレート1aの下部水平プレート1
bの各々には、上部水平プレート1aと下部水平
プレート1bの交差部分の中心を囲むように4つ
の第一挿通孔1dが第10図に示すように形成さ
れ、互いに対向する上部水平プレート1aの第一
挿通孔1dと下部水平プレート1bの第一挿通孔
1dとは同一中心軸位置に形成されている。な
お、上部水平プレート1aと下部水平プレート1
bの交差部分の中心には空気抜き孔1fが形成さ
れている。また、型枠兼用プレート部1Bに近い
各上部水平プレート1aと各下部水平プレート1
bの部分には一対の第二挿通孔1eが形成されて
いる。そしてこれらの第二挿通孔1eも互いに対
向するものが同一中心軸位置に形成されている。
In the reinforced steel composite column A, the beam steel section 1B of the joint structure 1 consists of an H-shaped beam steel frame consisting of an upper horizontal plate 1a, a lower horizontal plate 1b, and a vertical plate 1c, as shown in FIG. It is formed integrally with the beam steel frame part 1B, and the intersection part of each plate is the beam steel frame part 1B.
The upper end of each formwork-combining plate part 1A is on the side of the intersection of the upper horizontal plates 1a, and the lower end is surrounded by a planar L-shaped formwork-cum-plate part 1A integrated with the lower horizontal plate. They are located on the sides of the intersections of the two parts 1b. and,
Lower horizontal plate 1 of the upper horizontal plate 1a
As shown in FIG. 10, four first insertion holes 1d are formed in each of the upper horizontal plates 1a so as to surround the center of the intersection of the upper horizontal plate 1a and the lower horizontal plate 1b. The first insertion hole 1d and the first insertion hole 1d of the lower horizontal plate 1b are formed at the same central axis position. In addition, the upper horizontal plate 1a and the lower horizontal plate 1
An air vent hole 1f is formed at the center of the intersection of b. In addition, each upper horizontal plate 1a and each lower horizontal plate 1 close to the formwork plate part 1B
A pair of second insertion holes 1e are formed in the portion b. These second insertion holes 1e are also formed to face each other at the same central axis position.

前記鉄筋には、異形鉄筋状のコーナ鉄筋(柱鉄
筋)2Aとネジ鉄筋(柱鉄筋)2Bとシヤー鉄筋
2Cの種類があり、コーナ鉄筋2Aとネジ鉄筋2
Bとは3階建ての建物の高さに対応する長さにさ
れ、シヤー鉄筋2Cは梁鉄骨部1Bの上部水平プ
レート1aと下部水平プレート1bとの間の間隔
より若干長くされている。
The reinforcing bars include corner reinforcing bars (column reinforcing bars) 2A, threaded reinforcing bars (column reinforcing bars) 2B, and shear reinforcing bars 2C, which are shaped like deformed reinforcing bars. Corner reinforcing bars 2A and threaded reinforcing bars 2
B has a length corresponding to the height of a three-story building, and the shear reinforcing bars 2C are slightly longer than the distance between the upper horizontal plate 1a and the lower horizontal plate 1b of the beam steel frame portion 1B.

前記鉄筋鉄骨複合柱Aを製造するには、まず、
現場あるいは工場等の平坦な作業場に、架台Bを
設置する。この架台Bは、作業場に所定間隔で並
設した支持脚5の上に、建物の3階分の高さに相
当する長さのH型鋼からなる支持棒6を設置して
構成されたもので作業場に相互に平行に一対設置
され、この架台B,B間の間隔は架台B,B間に
前記型枠兼用プレート部1Aを入れて前記支持脚
5に梁鉄骨部1Bの両端部を載置できるようにさ
れている。また、支持棒6には3つの当り板6a
が取り付けられている。これら当り板6aは仕口
構成体1の位置決めをなすもので、各当り板6a
に仕口構成体1を沿わせると各梁鉄骨部1Bが、
仕口構成体1を用いて構築する3階建ての建物の
各階の梁高さに合致するようになつている。な
お、前記支持棒6は、I型鋼あるいは溝型鋼、ま
たは山形鋼、さらには丸鋼管や角鋼管等、あるい
は木材で形成してもよい。
In order to manufacture the reinforced steel composite column A, first,
Mount B is installed on a flat work area such as a site or a factory. This frame B is constructed by installing support rods 6 made of H-shaped steel with a length equivalent to the height of three floors of a building on support legs 5 that are arranged in parallel at predetermined intervals in the work area. A pair of frames B and B are installed in parallel to each other in the workshop, and the interval between these frames B and B is such that the plate portion 1A that also serves as a formwork is inserted between the frames B and B, and both ends of the beam steel frame portion 1B are placed on the support legs 5. It is made possible. In addition, the support rod 6 has three contact plates 6a.
is installed. These contact plates 6a are for positioning the joint structure 1, and each contact plate 6a
When the shiiguchi structure 1 is placed along the
It is designed to match the beam height of each floor of a three-story building to be constructed using the shiiguchi structure 1. The support rod 6 may be made of I-shaped steel, channel steel, angle steel, round steel pipes, square steel pipes, or wood.

次に、前記架台Bの当り板6aの側部のうち、
第1図に示す右側2つの当り板6aの側方に、ク
レーンを用いて仕口構成体1を設置する。この設
置に当つては、型枠兼用プレート部1Aを架台B
の間に入れるとともに梁鉄骨部1Bの両端を第1
0図に示す如く架台Bに載せ、梁鉄骨部1Bの下
板1bを前記当り板6aに当接させて万力により
固定する。この状態で各仕口構成体1の間の間隔
は鉄筋鉄骨複合柱Aを用いて構築される建物の上
下の梁間の間隔と同一になる。即ち、前記当り板
6aの間隔を建物に合わせて適宜設定しておけ
ば、仕口構成体1の位置決めが容易にできるので
ある。
Next, among the sides of the abutment plate 6a of the pedestal B,
A crane is used to install the joint structure 1 on the sides of the two right side contact plates 6a shown in FIG. For this installation, place the formwork plate part 1A on the frame B.
and both ends of the beam steel part 1B to the first
As shown in Figure 0, it is placed on a pedestal B, and the lower plate 1b of the beam steel frame part 1B is brought into contact with the abutment plate 6a and fixed in a vise. In this state, the spacing between each shingle structure 1 is the same as the spacing between the upper and lower beams of a building constructed using reinforced steel composite columns A. That is, by appropriately setting the spacing between the contact plates 6a according to the building, the positioning of the joint structure 1 can be easily performed.

ついで、フープ筋7を装着した吊り治具8を架
台Bに設置する。この吊り治具8は、第6図に示
すように、矩形状の支持枠8Aとこの支持枠8A
の四隅部に取り付けられた支持脚8Bとからな
り、支持脚8Bは前記架台B,Bに設置可能な形
状にされている。また、前記支持枠8Aの対抗す
る二辺の中央部分にはクレーンのフツクを掛ける
ための掛け具8aが各々取り付けられ、掛け具8
aの両側下方の支持枠8Aにはフツク部材8bが
取り付けられている。そして、支持枠8Aの下に
は前記フツク部材8bに支持されて支持ロツド9
が2本吊り下げられ、これら支持ロツド9,9を
通して環状の複数のフープ筋7が吊り下げられて
いる。前記吊り治具8の設置は、クレーンによつ
て掛け具8aを利用して吊り治具8を吊り上げ、
架台Bに設置した一対の仕口構成体1の間と第1
図に示す右端の仕口構成体1の右方とに、フープ
筋7の開口面を仕口構成体1に向け、かつ、支持
脚8Aを架台Bに載せて設置するようにする。
Next, the hanging jig 8 to which the hoop wire 7 is attached is installed on the pedestal B. As shown in FIG. 6, this hanging jig 8 includes a rectangular support frame 8A and a support frame 8A.
It consists of support legs 8B attached to the four corners of the support legs 8B, and the support legs 8B are shaped so that they can be installed on the mounts B, B. Furthermore, hangers 8a for hanging crane hooks are respectively attached to the center portions of two opposing sides of the support frame 8A.
Hook members 8b are attached to the support frame 8A below both sides of a. Under the support frame 8A, a support rod 9 is supported by the hook member 8b.
are suspended, and a plurality of annular hoops 7 are suspended through these support rods 9,9. The installation of the lifting jig 8 involves hoisting the hanging jig 8 with a crane using the hanger 8a,
Between the pair of shikiguchi structures 1 installed on the stand B and the first
To the right of the right end shingle structure 1 shown in the figure, the opening surface of the hoop muscle 7 is directed toward the shisha structure 1, and the support leg 8A is placed on a pedestal B.

吊り治具8の設置が終了したならば、吊り治具
8の横に、第7図等に示すローラ装置12を設置
する。このローラ装置12は、前記架台Bに設置
される一対の支柱12Aとこの支柱12A,12
A間に上下に設けられた4本の回転ローラ12B
とからなつている。
After the installation of the hanging jig 8 is completed, a roller device 12 shown in FIG. 7 and the like is installed next to the hanging jig 8. This roller device 12 includes a pair of supports 12A installed on the pedestal B, and the supports 12A, 12
Four rotating rollers 12B provided above and below between A
It is made up of.

続いて、あらかじめ用意しておいた各種鉄筋2
A,2Bを3つの仕口構成体1の同一中心軸位置
に並んだ第2挿通孔1eとフープ筋7に、後述す
る如き操作をしつつ各ローラ装置12の回転ロー
ラ12Bに案内させて通す。
Next, various reinforcing bars prepared in advance 2
A, 2B are guided through the second insertion holes 1e and hoop lines 7 arranged on the same central axis position of the three shiguchi structures 1, and guided by the rotating rollers 12B of each roller device 12 while performing operations as described later. .

ここで、各鉄筋2A,2Bの挿入順序と挿入作
業について第10図を基に詳述すると、まず、ネ
ジ鉄筋2Bの先端にナツト10を螺入し、ナツト
10を通したネジ鉄筋2Bの先端を1つの仕口構
成体1の第二挿通孔1eに回転ローラ12Bに案
内させつつ通し、仕口構成体1を通つたネジ鉄筋
2Bの先端に更にナツト10を通し、次にその先
方の仕口構成体1の第二挿通孔1eに案内ローラ
12Bに案内させつつ通すといつた操作を繰り返
し行つて3つの仕口構成体1の総てにネジ鉄筋2
Bを通す。このネジ鉄筋2Bの挿入操作は、最初
に仕口構成体1の上部2つの第二挿通孔1eにつ
いて行う。更に、コーナ鉄筋2Aを型枠兼用プレ
ート部1Aの上部両側のコーナ部に通し、更にネ
ジ鉄筋2Bの挿入操作と同様の操作を行つて4本
のネジ鉄筋2Bを型枠兼用プレート部1Aの中央
部両側の左右2対の第二挿通孔1eに通す。この
ように行う各鉄筋2A,2Bの挿入操作は仕口構
成体1が横になつていて、横から各鉄筋2A,2
Bを挿入するとともに回転ローラ12Bによつて
各鉄筋2A,2Bを案内させるために3階用の大
重量の鉄筋2A,2Bであつても挿入作業は容易
になしうる。
Here, the insertion order and insertion work of each reinforcing bar 2A, 2B will be explained in detail based on FIG. is passed through the second insertion hole 1e of one shingle structure 1 while being guided by the rotating roller 12B, the nut 10 is further passed through the tip of the threaded reinforcing bar 2B that passed through the shingle structure 1, and then The threaded reinforcing bars 2 are inserted into all three shingle structures 1 by repeating the operation of passing them through the second insertion holes 1e of the opening structures 1 while being guided by the guide rollers 12B.
Pass B. This insertion operation of the threaded reinforcing bars 2B is first performed in the upper two second insertion holes 1e of the shiiguchi structure 1. Furthermore, pass the corner reinforcing bars 2A through the corners on both sides of the upper part of the formwork plate part 1A, and insert the four threaded reinforcing bars 2B into the center of the formwork plate part 1A by performing the same operation as inserting the screw reinforcing bars 2B. through the two pairs of left and right second insertion holes 1e on both sides of the part. Inserting the reinforcing bars 2A, 2B in this manner is performed when the shikiguchi structure 1 is lying down, and each reinforcing bar 2A, 2B is inserted from the side.
Since the reinforcing bars 2A and 2B are guided by the rotating rollers 12B while inserting the reinforcing bars 2A and 2B, the insertion work can be easily performed even if the reinforcing bars 2A and 2B are heavy for the third floor.

この状態で架台Bの上の各吊り治具8の支持ロ
ツド9をフツク部材8bから抜去し、各フープ筋
7をネジ鉄筋2Bとコーナ鉄筋2Aとに載せる。
In this state, the support rods 9 of each hanging jig 8 on the pedestal B are removed from the hook member 8b, and each hoop reinforcement 7 is placed on the threaded reinforcing bar 2B and the corner reinforcing bar 2A.

次に、残り4組の第二挿通孔1eに前記した操
作と同等の操作を施してコーナ鉄筋2Aとネジ鉄
筋2Bとを通し、シヤー鉄筋2Cを各仕口構成体
1の第一挿通孔1dに挿通し、シヤー鉄筋2Cの
両端にナツト11を螺入してナツト11を締め付
ける。
Next, the remaining four sets of second insertion holes 1e are subjected to the same operation as described above to pass the corner reinforcing bars 2A and threaded reinforcing bars 2B, and the shear reinforcing bars 2C are inserted into the first insertion holes 1d of each joint structure 1. , screw the nuts 11 into both ends of the shear reinforcing bar 2C, and tighten the nuts 11.

その後に第4図の各鉄筋2A,2Bの左端部に
ナツト10を螺入し、仕口構成体1を各鉄筋2
A,2Bに通して架台Bの上に設置し、各鉄筋2
A,2Bの左端にナツト10を螺入してこれらを
締め付ける。なお、この仕口構成体1の第一挿通
孔1dにも前記と同様にシヤー鉄筋2Cを通しナ
ツト11で締め付けておく。
After that, screw the nut 10 into the left end of each reinforcing bar 2A, 2B in FIG.
A, 2B and install it on top of frame B, and each reinforcing bar 2
Screw the nuts 10 into the left ends of A and 2B and tighten them. Note that the shear reinforcing bar 2C is also passed through the first insertion hole 1d of the joint structure 1 and tightened with the nut 11 in the same manner as described above.

この後に、第12図に示すような座屈防止枠1
3を各鉄筋2A,2Bの間に所要の間隔で挿入す
るとともにローラ装置12を架台Bから取り外
し、各フープ筋7の各鉄筋2A,2Bに沿わせて
各鉄筋2A,2Bの長さ方向に広げて所定の位置
に結束線でつなぎ止め、更に、ナツト10を仕口
構成体1に溶接する。このように、フープ筋7を
各鉄筋2A,2Bに載せて溶接するようにすれ
ば、フープ筋7の位置決めが容易であり、溶接中
にフープ筋7を各鉄筋2A,2Bが支持するため
に、溶接作業性も向上する。この点従来のフープ
筋の溶接作業は上下に向く柱主筋に沿わせたフー
プ筋を落下しないように適当な支持手段で支持し
つつ溶接しなくてはならず、溶接作業は煩雑であ
つたが、前記のようにすれば溶接作業の簡略化を
なしうる。
After this, the buckling prevention frame 1 as shown in FIG.
3 is inserted between each reinforcing bar 2A, 2B at a required interval, and at the same time, the roller device 12 is removed from frame B, and the roller device 12 is inserted along each reinforcing bar 2A, 2B of each hoop bar 7 in the length direction of each reinforcing bar 2A, 2B. It is spread out and tied to a predetermined position with a binding wire, and then the nut 10 is welded to the joint structure 1. In this way, if the hoop reinforcement 7 is placed on each reinforcing bar 2A, 2B and welded, the hoop reinforcement 7 can be easily positioned, and the hoop reinforcement 7 can be supported by each reinforcing bar 2A, 2B during welding. , welding workability is also improved. In this regard, in the conventional welding work of hoop reinforcements, the hoop reinforcements along the vertically oriented main reinforcement of the column had to be supported with appropriate support means to prevent them from falling, and the welding work was complicated. , By doing as described above, the welding work can be simplified.

ついで、座屈防止枠13を各鉄筋2A,2Bに
溶接し、フープ筋7を各鉄筋2A,2Bに溶接
し、孔付きフランジ板17を第4図に示すように
各鉄筋2A,2Bの右端部に挿入し各鉄筋2A,
2Bの右端にスリーブジヨイント18を取り付け
て鉄筋鉄骨柱Aを形成する。
Next, the buckling prevention frame 13 is welded to each reinforcing bar 2A, 2B, the hoop reinforcing bar 7 is welded to each reinforcing bar 2A, 2B, and the flange plate 17 with holes is attached to the right end of each reinforcing bar 2A, 2B as shown in FIG. Insert each reinforcing bar 2A into the
A sleeve joint 18 is attached to the right end of 2B to form a reinforced steel column A.

以上の如く製造された鉄筋鉄骨柱Aは、第14
図に示すように建築現場にて、基礎に立設された
かご状の鉄筋16にスリーブジヨイント18によ
つて接続して立設され、後に各鉄筋2A,2Bの
周囲と仕口構成体1の型枠兼用プレート部1A内
にコンクリートを打設することによつて建物の柱
として使用される。このように構成された柱にあ
つては、梁鉄骨部1Bに作用した応力は、仕口構
成体1を貫通する各鉄筋2A,2B、および梁鉄
骨部1Bのコンクリートへの付着力により各鉄筋
2A,2Bまわりのコンクリートへ伝達され、鉄
筋2A,2Bと仕口構成体1とそれらの周囲に打
設されたコンクリートとからなる剛接合が実現す
る。
The reinforced steel column A manufactured as described above is the 14th
As shown in the figure, at the construction site, the cage-shaped reinforcing bars 16 are erected and connected to the cage-shaped reinforcing bars 16 erected on the foundation by sleeve joints 18. By pouring concrete into the plate portion 1A which also serves as a formwork, it is used as a pillar of a building. In a column configured in this way, the stress acting on the beam steel frame portion 1B is reduced by the adhesion force of each reinforcing bar 2A, 2B penetrating through the joint structure 1 and the concrete of the beam steel frame portion 1B to the concrete. It is transmitted to the concrete around 2A, 2B, and a rigid connection consisting of the reinforcing bars 2A, 2B, the joint structure 1, and the concrete placed around them is realized.

また、コンクリートの打設によつて型枠兼用プ
レート部1Aにコンクリートが流入した際に空気
孔1fが有るためにコンクリートは型枠兼用プレ
ート部1Aの内側の隅々まで行き渡るようになつ
ている。
Further, when concrete flows into the formwork plate part 1A during concrete pouring, the concrete is spread to every corner inside the formwork plate part 1A because of the air holes 1f.

なお、前記実施例にあつては、3階の建物用の
鉄筋鉄骨柱の製造について説明したが、2階や4
階、あるいはその他の階数の建物についても仕口
構成体1の設置個数および設置間隔の調整と各鉄
筋2A,2Bの長さを変更するのみで対応できる
のは勿論である。なおまた、前記実施例では、鉄
筋鉄骨複合柱Aの上端部に仕口構成体1を取り付
けた例について説明したが、鉄筋鉄骨複合柱Aの
上端部には、通常の梁を取り付ける場合もあり、
この場合には、鉄筋鉄骨複合柱Aの上端部に仕口
構成体1を取り付けずに鉄筋鉄骨複合柱Aを構成
し、この鉄筋鉄骨複合柱Aを現場に建て込み、そ
の後に挿通孔を有する梁材を鉄筋鉄骨複合柱Aの
上端部に接合すればよい。
In addition, in the above example, manufacturing of reinforced steel columns for buildings with three floors was explained, but manufacturing of reinforced steel columns for buildings with two floors or four floors
It goes without saying that buildings with multiple floors or other numbers of floors can also be accommodated by simply adjusting the number and spacing of the joint structures 1 and changing the lengths of the reinforcing bars 2A and 2B. In addition, in the above embodiment, an example was explained in which the joint structure 1 was attached to the upper end of the reinforced steel composite column A, but a normal beam may be attached to the upper end of the reinforced steel composite column A. ,
In this case, a reinforced steel composite column A is constructed without attaching the joint structure 1 to the upper end of the reinforced steel composite column A, and this reinforced steel composite column A is erected on the site, and an insertion hole is formed afterward. The beam material may be joined to the upper end of the reinforced steel composite column A.

「発明の効果」 以上説明したように本発明は、作業場の上に複
数の仕口構成体を各挿通孔の開口面を横に向け、
かつ、対向する仕口構成体の挿通孔を同一中心軸
位置にして並設し、前記同一中心軸位置に配置し
た挿通孔に鉄筋を通し、その後に各鉄筋を仕口構
成体に固定するものであり、多層階用の大重量の
鉄筋であつても鉄筋を横にして挿入できるために
挿入作業を容易に成し得る効果がある。また、仕
口構成体を横に並べて設置する関係から、仕口構
成体の設置数を変えて鉄筋の長さを変更するのみ
で任意階数の建物に対応した鉄骨鉄筋柱を構成で
きるとともに、設置する仕口構成体の間隔を適宜
調節することによつて、上下階の梁の間隔を適宜
設定できるために、種々の建物に対応した鉄骨鉄
筋柱を精度よくかつ安全に製造できる効果があ
る。
"Effects of the Invention" As explained above, the present invention has a plurality of shigou structures placed above a workplace with the opening surfaces of each insertion hole facing sideways,
In addition, the insertion holes of the opposing shikichi structures are arranged side by side with the same center axis position, reinforcing bars are passed through the insertion holes arranged at the same center axis position, and each reinforcing bar is then fixed to the shikichi structure. Even if the reinforcing bars are heavy for multi-story construction, the reinforcing bars can be inserted horizontally, making the insertion work easier. In addition, since the Shiguchi components are installed side by side, by simply changing the number of Shiguchi components installed and the length of the reinforcing bars, it is possible to construct a steel reinforced column that is compatible with buildings of any number of floors. By appropriately adjusting the spacing between the joint structures, the spacing between the beams on the upper and lower floors can be appropriately set, which has the effect of making it possible to accurately and safely manufacture steel reinforced columns suitable for various buildings.

【図面の簡単な説明】[Brief explanation of the drawing]

図面は本発明の一実施例を説明するためのもの
で、第1図は架台に仕口構成体とフープ筋とを設
置した状態を示す平面図、第2図は第1図に示す
状態の側面図、第3図は鉄筋の挿入状態を示す側
面図、第4図は架台上の仕口構成体に鉄筋を通し
た状態を示す側面図、第5図は第4図に示す状態
の平面図、第6図は吊り治具の斜視図、第7図は
架台に取り付けたローラ装置を示す正面図、第8
図は前記ローラ装置によつて案内中の鉄骨を示す
斜視図、第9図は仕口構成体の斜視図、第10図
は第4図のE−E線に沿う断面図、第11図は鉄
筋に対するフープ筋の固定状態を示す平面図、第
12図は座屈防止枠の取り付け状態を示す断面
図、第13図はベースプレートの平面図、第14
図は鉄筋鉄骨複合柱の使用状態を示す側面図であ
る。 A……鉄筋鉄骨複合柱、B……架台、1……仕
口構成体、1A……型枠兼用プレート部、1e…
…第二挿通孔、2A……コーナ鉄筋(柱主筋)、
2B……ネジ鉄筋(柱主筋)、7……フープ筋。
The drawings are for explaining one embodiment of the present invention, and FIG. 1 is a plan view showing the state in which the shigashi structure and the hoop wire are installed on the frame, and FIG. 2 is a plan view of the state shown in FIG. 1. FIG. 3 is a side view showing the reinforcing bars inserted, FIG. 4 is a side view showing the reinforcing bars passed through the shikiguchi structure on the frame, and FIG. 5 is a plan view of the state shown in FIG. 4. Figure 6 is a perspective view of the hanging jig, Figure 7 is a front view showing the roller device attached to the pedestal, and Figure 8 is a perspective view of the hanging jig.
The figure is a perspective view showing the steel frame being guided by the roller device, FIG. 9 is a perspective view of the joint structure, FIG. 10 is a cross-sectional view taken along line E-E in FIG. 4, and FIG. 11 is FIG. 12 is a sectional view showing the attachment state of the buckling prevention frame; FIG. 13 is a plan view of the base plate; FIG.
The figure is a side view showing how the reinforced steel composite column is used. A... Reinforced steel frame composite column, B... Frame, 1... Connection structure, 1A... Plate portion that also serves as formwork, 1e...
...Second insertion hole, 2A...Corner reinforcement (column main reinforcement),
2B...Screw reinforcing bar (column main bar), 7...Hoop bar.

Claims (1)

【特許請求の範囲】[Claims] 1 梁鉄骨を交差状態で一体化して構成された梁
鉄骨部と前記梁鉄骨部の交差部分を囲んで梁鉄骨
部に一体化された型枠兼用プレート部とからな
り、前記型枠兼用プレート部の内側の梁鉄骨部の
上下両面に各々対向して複数の挿通孔が形成され
てなる複数の仕口構成体と、前記複数の仕口構成
体の挿通孔を通して全仕口構成体を連結した複数
の柱主筋とからなり、各仕口構成体が柱主筋の長
さ方向の所要位置に所定間隔離間して固定されて
なる鉄筋鉄骨複合柱を製造する方法であつて、作
業場の上に複数の仕口構成体を各挿通孔の開口面
を横に向け、かつ、対向する仕口構成体の挿通孔
を同一中心軸位置にして所要の間隔で並設し、前
記同一中心軸位置に配置した各挿通孔にこれら並
設した複数の仕口構成体の総てを貫通可能な長さ
の柱主筋を通し、その後に各柱主筋を仕口構成体
に固定して各仕口構成体を鉄筋を介して連結する
ことを特徴とする鉄筋鉄骨複合柱の製造方法。
1. Consisting of a beam steel section formed by integrating beam steel frames in an intersecting state and a formwork/formwork plate section that surrounds the intersection of the beam steel sections and is integrated with the beam steel section, the formwork/formwork plate section A plurality of shigouchi structures each having a plurality of through holes formed opposite to each other on both upper and lower surfaces of the inner beam steel frame part, and all the shigouchi structures are connected through the insertion holes of the plurality of shigouche structures. A method for manufacturing a reinforced steel frame composite column consisting of a plurality of main column reinforcements, each joint structure being fixed at a predetermined position in the longitudinal direction of the main column reinforcements with a predetermined distance between them, The opening surfaces of the respective insertion holes are oriented sideways, and the insertion holes of the opposing Shiguchi structures are arranged in parallel at a required interval with the same central axis position, and arranged at the same central axis position. Pass a column main reinforcement of a length that can penetrate all of the plurality of shisha structures arranged in parallel through each insertion hole, and then fix each column main reinforcement to the shisha structure and attach each shisha structure. A method for manufacturing a reinforced steel composite column, which is characterized in that it is connected through reinforcing bars.
JP4765585A 1985-03-11 1985-03-11 Production of reinforcing bar and steel frame compound column Granted JPS61206536A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4765585A JPS61206536A (en) 1985-03-11 1985-03-11 Production of reinforcing bar and steel frame compound column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4765585A JPS61206536A (en) 1985-03-11 1985-03-11 Production of reinforcing bar and steel frame compound column

Publications (2)

Publication Number Publication Date
JPS61206536A JPS61206536A (en) 1986-09-12
JPH0459977B2 true JPH0459977B2 (en) 1992-09-24

Family

ID=12781268

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4765585A Granted JPS61206536A (en) 1985-03-11 1985-03-11 Production of reinforcing bar and steel frame compound column

Country Status (1)

Country Link
JP (1) JPS61206536A (en)

Also Published As

Publication number Publication date
JPS61206536A (en) 1986-09-12

Similar Documents

Publication Publication Date Title
JPS6348753Y2 (en)
US4378664A (en) System for constructing a building
US20050066609A1 (en) Preassembled roof and floor deck panel system
JPH08284439A (en) Heavy load formwork support and its members
CN103038430A (en) Strut-equipped tie member and temporary scaffold
JP3247749B2 (en) Construction method of long span truss beams
JPH0438038Y2 (en)
JPH0536042Y2 (en)
JP3386785B2 (en) Scaffolding support device and scaffold device in bridge structure
JPS61206536A (en) Production of reinforcing bar and steel frame compound column
JP2001227094A (en) Floor structure of steel building
JPH0459978B2 (en)
JPH0449340A (en) Lay-in joint structure for column and beam
JPH0438039Y2 (en)
JPH0327166Y2 (en)
JPH07217074A (en) Reinforcement basket assembly assisting device and assembly method
JP3187618B2 (en) How to assemble beam reinforcement
JPH07119522B2 (en) Formwork device
JP2023055485A (en) Wedge type shoring
JPH08326211A (en) Column steel frame, jig used for connecting the columns, and steel frame connecting method
JPH0115800Y2 (en)
JPH0542513U (en) Vertical piping sleeve floor unit
JP3324807B2 (en) Column-beam pre-assembled reinforced body and pre-assembled reinforced construction method using it
CN115110766A (en) Pit internal vibration table suspended formwork structure and construction method
JPS628295Y2 (en)

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees