Prior art keywords
chamber
molten metal
flow
injecting
pouring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP61025279A
Other languages
Japanese (ja)
Other versions
JPS62182210A (en
Inventor
Tateo Aoki
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Sumitomo Metal Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Metal Industries Ltd filed Critical Sumitomo Metal Industries Ltd
Priority to JP2527986A priority Critical patent/JPS62182210A/en
Publication of JPS62182210A publication Critical patent/JPS62182210A/en
Publication of JPH0468362B2 publication Critical patent/JPH0468362B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Manufacture Of Metal Powder And Suspensions Thereof (AREA)

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は、大量の溶融金属を安定的に注入する
方法と装置、例えば、アトマイズ法により金属粉
末を製造する場合の、溶融金属の噴霧媒面への注
入方法および装置に関する。さらに詳しくは、連
続的または間欠的に供給される溶融金属を、噴射
された噴霧媒面に安定した状態で注入することが
できる溶融金属の注入方法および装置に関する。
Detailed Description of the Invention (Industrial Field of Application) The present invention relates to a method and apparatus for stably injecting a large amount of molten metal, such as a spray medium for molten metal when manufacturing metal powder by an atomization method. The present invention relates to a surface injection method and apparatus. More specifically, the present invention relates to a molten metal injection method and apparatus that can stably inject molten metal supplied continuously or intermittently onto the surface of an injected atomizing medium.

(従来の技術) アトマイズ法により金属粉末を製造するには、
溶融金属を噴射された噴霧媒面に注入する。第5
図は、従来のアトマイズ法による金属粉末の製造
装置の一例を示したものである。
(Conventional technology) To produce metal powder by the atomization method,
Inject molten metal onto the surface of the injected spray medium. Fifth
The figure shows an example of an apparatus for producing metal powder using a conventional atomization method.

電気炉等で調整された溶融金属2は、ストツパ
(図示せず)を有する容器1に収容される。溶融
金属2の容器1への収容が終わつた後、ストツパ
が開かれ、注入ノズル3から溶融金属2が注入流
21となつてアトマイズ装置に注入される。アト
マイズ装置のアトマイズノズル4からは、噴霧媒
が噴射され噴霧媒面41を形成しており、注湯ノ
ズル3からの注入流21は噴霧媒面41上に落下
し粉末となつて、噴霧媒とともにアトマイズ槽5
に収容される。
Molten metal 2 prepared in an electric furnace or the like is stored in a container 1 having a stopper (not shown). After the molten metal 2 has been placed in the container 1, the stopper is opened and the molten metal 2 is injected from the injection nozzle 3 into the atomizing device as an injection stream 21. The atomizing nozzle 4 of the atomizing device injects a spraying medium to form a spraying medium surface 41, and the injection stream 21 from the pouring nozzle 3 falls onto the spraying medium surface 41, becomes powder, and is mixed with the spraying medium. Atomization tank 5
be accommodated in.

(発明が解決しようとする問題点) このように従来の装置においては、容器1に溶
融金属2を収容後にストツパを開いて注湯を行つ
ている。連続的または間欠的に供給される溶融金
属2を容器1に収容しながら、同時に溶融金属2
を注入することはできない。これは次の理由によ
る。
(Problems to be Solved by the Invention) As described above, in the conventional apparatus, after the molten metal 2 is placed in the container 1, the stopper is opened to pour the molten metal. While the molten metal 2 that is continuously or intermittently supplied is accommodated in the container 1, the molten metal 2 is
cannot be injected. This is due to the following reason.

従来の容器1は、一室構造である。このため、
溶融金属2の供給を受けながら注湯ノズル3から
注入を行うと、容器1内の溶融金属2の乱流のた
め注入流21が乱れてしまう。すなわち、容器1
に注がれる溶融金属2により生じた容器1内の乱
れが注湯ノズル3の近傍にもおよび、注入流21
に振れ、ばらけ、ねじれ等の乱れが発生する。注
入流21の振れとは、注入流21が注湯ノズル3
の鉛直下方から一方にずれて落下する現象であ
り、ばらけとは、注入流21が分裂して多数の粒
の形で落下する現象である。またねじれとは、注
入流21がやや偏平になつて螺旋状に旋回しなが
ら落下する現象である。
The conventional container 1 has a one-chamber structure. For this reason,
If the molten metal 2 is poured from the pouring nozzle 3 while being supplied, the injection flow 21 will be disturbed due to the turbulent flow of the molten metal 2 in the container 1. That is, container 1
The turbulence in the container 1 caused by the molten metal 2 being poured into the container 1 extends to the vicinity of the pouring nozzle 3, causing the injection flow 21
Disturbances such as shaking, unraveling, and twisting occur. The fluctuation of the injection flow 21 means that the injection flow 21 is
This is a phenomenon in which the injected flow 21 is deviated from vertically downward to one side and falls, and the scattering is a phenomenon in which the injected flow 21 is split and falls in the form of many particles. Further, twisting is a phenomenon in which the injected flow 21 becomes slightly flattened and falls while swirling in a spiral shape.

噴霧媒面41へ落下する溶融金属2の注入流2
1に乱れ(振れ、ばらけ、ねじれ等)が発生する
と、注入された注入流21がアトマイズされずア
トマイズノズル4内で凝固し、該ノズル内の空間
を閉塞してしまう。すなわちアトマイズノズル4
のブロツキングが発生する。ブロツキングが発生
すれば、アトマイズの中断は避けられない。
Injection stream 2 of molten metal 2 falling onto the spray medium surface 41
If turbulence (shaking, unraveling, twisting, etc.) occurs in the atomizing nozzle 4, the injected flow 21 will not be atomized and will solidify within the atomizing nozzle 4, thereby blocking the space within the nozzle. That is, atomize nozzle 4
Blocking occurs. If blocking occurs, interruption of atomization is inevitable.

したがつて従来の注入容器1では、溶融金属2
の供給を受けながら同時に注湯を行へばブロツキ
ングの発生は避けられない。よつて、このような
同時注湯は不可能であつた。
Therefore, in the conventional injection container 1, the molten metal 2
If molten metal is poured at the same time while being supplied with molten metal, blocking will inevitably occur. Therefore, such simultaneous pouring was impossible.

従来のように1回に処理される溶融金属2の量
が高々100Kgないし数トン程度の少量であれば、
容器1に溶融金属2の供給をうける過程とアトマ
イズの過程を別々に行つても大きな問題とはなら
ない。しかし、生産規模が拡大され、数10トンに
およぶ大量の溶融金属2を1回で処理することに
なると、両過程を分離して行うことは非能率的で
ある。よつて連続的または間欠的に容器1に溶融
金属2の供給を受けながら、同時にアトマイズ装
置への注湯をおこなう必要がある。
If the amount of molten metal 2 processed at one time is a small amount of at most 100 kg or several tons as in the past,
Even if the process of supplying the molten metal 2 to the container 1 and the process of atomizing are performed separately, no major problem arises. However, when the scale of production is expanded and a large amount of molten metal 2 weighing several tens of tons is to be processed in one go, it is inefficient to carry out both processes separately. Therefore, it is necessary to continuously or intermittently receive the molten metal 2 into the container 1 and simultaneously pour the metal into the atomizing device.

従つて、本発明の目的は、溶融金属2の供給を
受けながら同時に注湯をおこなつても注入流21
に乱れを生じない注入方法および装置を提供する
ことである。
Therefore, an object of the present invention is to maintain the injection flow 21 even when the molten metal 2 is supplied and simultaneously poured.
An object of the present invention is to provide an injection method and device that does not cause disturbances in the injection process.

(問題点を解決するための手段) 本発明者は、上述の目的を達成するため研究を
重ねた結果、容器を3室に分離し、供給された溶
融金属を順次これらの3室に所定の流路で導いて
流れを沈静化することに想到した。
(Means for Solving the Problems) As a result of repeated research to achieve the above-mentioned object, the present inventor separated the container into three chambers, and sequentially delivered the supplied molten metal to these three chambers in a predetermined manner. We came up with the idea of calming the flow by guiding it through a channel.

すなわち、本発明の溶融金属の注入方法は、連
続的または間欠的に供給される溶融金属を安定的
に注入する方法であつて、 (a) 連続的または間欠的に供給される溶融金属を
暫時、第1室に収容することと、 (b) 第1室に収容された溶融金属を第2室に一定
方向の流れとして導いて第2室の壁面に衝突さ
せ、溶融金属の流れの方向を反転させて溶融金
属の流れを減速、整流することと、 (c) 第2室において減速、整流された溶融金属の
流れをさらに第3室に導いて沈静化した後、第
3室に設けられた注湯ノズルから溶融金属を注
入することと、 (d) 前記(b)の過程において第1室に収容された溶
融金属を、第1室と第2室を連通する浸漬孔ま
たは狭い〓間を通して第2室に導くことと、 (e) 前記(c)の過程において、溶融金属を第2室か
ら第3室に導く流路の入口を溶湯表面まで完全
にオープンな〓間とすることと、 を特徴とする。
That is, the method for injecting molten metal of the present invention is a method for stably injecting molten metal that is continuously or intermittently supplied, and includes: (a) temporarily or intermittently injecting molten metal that is continuously or intermittently supplied; (b) directing the molten metal contained in the first chamber as a flow in a fixed direction into the second chamber and causing it to collide with the wall surface of the second chamber to change the direction of the flow of the molten metal; (c) The flow of the molten metal that has been decelerated and rectified in the second chamber is further guided to the third chamber and calmed down, and then the flow of the molten metal is (d) pouring the molten metal contained in the first chamber in the process of (b) above into an immersion hole or a narrow gap that communicates the first chamber with the second chamber; (e) In the step (c) above, the entrance of the flow path that leads the molten metal from the second chamber to the third chamber is a gap that is completely open to the surface of the molten metal. , is characterized by.

また、本発明にかかる溶融金属の注入装置は、
連続的または間欠的に供給される溶融金属を安定
的に注入する装置であつて、 (a) 連続的または間欠的に供給される溶融金属を
暫時、収容する第1室と、 (b) 第1室から第2室に連通する連通孔または狭
い〓間と、 (c) 第1室から流入する溶融金属の流れに対向
し、該溶融金属の流れの方向を反転させる壁面
を備える第2室と、 (d) 第2室から流入した溶融金属を注入する注湯
ノズルを備える、第2室と溶湯表面まで完全に
オープンな〓間で結ばれた第3室と を備えることを特徴とする。
Further, the molten metal injection device according to the present invention includes:
An apparatus for stably injecting molten metal that is continuously or intermittently supplied, comprising: (a) a first chamber that temporarily accommodates the molten metal that is continuously or intermittently supplied; (c) a second chamber comprising a communication hole or a narrow gap communicating from the first chamber to the second chamber; and (c) a wall surface that faces the flow of molten metal flowing from the first chamber and reverses the direction of the flow of the molten metal. (d) A third chamber is provided with a pouring nozzle for injecting the molten metal flowing from the second chamber, and is connected to the second chamber by a gap that is completely open to the surface of the molten metal. .

本発明は、噴射された噴霧媒のつくる面に溶融
金属を注入してアトマイズ法により金属粉末を製
造する場合に用いれば量産の効率化に大きな効果
をあげることができるが、これに限定されるもの
ではない。例えば連続鋳造法の場合のように大量
の溶融金属を安定的に注入することが要求される
場合には等しく応用されうるものである。
If the present invention is used when manufacturing metal powder by the atomization method by injecting molten metal onto the surface formed by the injected atomizing medium, it can have a great effect on increasing the efficiency of mass production, but it is limited to this. It's not a thing. For example, it can be equally applied to cases where stable injection of a large amount of molten metal is required, such as in the case of continuous casting.

なお、上記において溶融金属は、第1室から第
2室へ一定方向に開口する浸漬孔を通して導かれ
ることが好ましい。しかし浸漬孔の代わりに狭い
隙間を用いても良い。また、第2室から第3室へ
は、第2室の側壁の一端に設けられた隙間を流路
とすると良い。この際、該側壁端をくの字形に折
り曲げ、第2室から第3室への流路の入口の壁面
断面を該形状とすることが好ましい。また、注湯
ノズルは第3室のコーナーに極く近傍を避けるこ
とが好ましい。旋回流に起因する注入流のねじれ
の発生を防止するためである。
Note that in the above, it is preferable that the molten metal be guided through an immersion hole that opens in a fixed direction from the first chamber to the second chamber. However, instead of dipping holes, narrow gaps may also be used. Further, from the second chamber to the third chamber, a gap provided at one end of the side wall of the second chamber may be used as a flow path. At this time, it is preferable to bend the end of the side wall into a dogleg shape so that the cross section of the wall surface at the entrance of the flow path from the second chamber to the third chamber has this shape. Further, it is preferable to avoid placing the pouring nozzle very close to the corner of the third chamber. This is to prevent twisting of the injection flow due to swirling flow.

(作 用) 第1室から第2室へ溶融金属は、浸漬孔または
狭い隙間を通して一定方向に向かう噴流状態で導
かれる。この溶融金属の噴流は、第2室に設けら
れた該方向に対向する壁に衝突し反転する。この
結果、減速、整流された溶融金属の流れは、第2
室と第3室の間の流路を形成する隙間を通して第
3室に導かれる。第2室から第3室への流路を形
成する隙間の入口の壁面をくの字形状とすること
にすれば、これにより生じる渦流により溶融金属
の流れをさらに沈静化することができる。
(Function) Molten metal is guided from the first chamber to the second chamber in the form of a jet flowing in a fixed direction through an immersion hole or a narrow gap. This jet of molten metal collides with a wall provided in the second chamber facing in this direction and is reversed. As a result, the flow of molten metal that has been decelerated and rectified is
It is led to the third chamber through a gap forming a flow path between the chamber and the third chamber. If the wall surface of the entrance of the gap forming the flow path from the second chamber to the third chamber is formed into a dogleg shape, the flow of the molten metal can be further calmed by the swirling current generated thereby.

(実施例) 次に本発明の実施例について、添付図面を参照
しながら詳しく説明する。この説明によつて本発
明の詳細はさらに明らかとなろう。
(Example) Next, an example of the present invention will be described in detail with reference to the accompanying drawings. Through this description, the details of the invention will become clearer.

第1図および第2図は、本発明の第一の実施例
装置を示すものであり、第1図は該装置の平面
図、第2図は、第1図の鎖線−に沿う該装置
の断面図である。
1 and 2 show a first embodiment of the device of the present invention, FIG. 1 is a plan view of the device, and FIG. 2 is a view of the device taken along the chain line - in FIG. FIG.

取鍋10から連続的または間欠的に供給される
溶融金属2は、第1室11に収容される。したが
つて第1室11内の溶融金属の流れは極めて乱れ
が大きい。第1室11と第2室12の間を画する
壁には浸漬孔6が穿設され、第1室11と第2室
12を連通する。浸漬孔6を通過した溶融金属
は、噴流となつて第2室12内に流れ込む。この
結果、第1室11の流速が大きく、乱れの激し
い、時間的に変化の大きな流れは、流速は大きい
が、方向の一定な安定した噴流となる。浸漬孔6
の代わりに、第1室11と第2室12の間の壁に
狭い縦方向の隙間を設けてもよいが、浸漬孔6に
よるほうが安定した噴流を得ることができる。
Molten metal 2 continuously or intermittently supplied from ladle 10 is accommodated in first chamber 11 . Therefore, the flow of molten metal in the first chamber 11 is extremely turbulent. An immersion hole 6 is bored in the wall separating the first chamber 11 and the second chamber 12, so that the first chamber 11 and the second chamber 12 communicate with each other. The molten metal that has passed through the immersion hole 6 flows into the second chamber 12 as a jet stream. As a result, the flow in the first chamber 11 that has a high flow velocity, is highly turbulent, and has large temporal changes becomes a stable jet with a high flow velocity but a constant direction. Immersion hole 6
Alternatively, a narrow vertical gap may be provided in the wall between the first chamber 11 and the second chamber 12, but the immersion hole 6 provides a more stable jet flow.

浸漬孔6を通過した溶融金属の噴流は、浸漬孔
に対向する第2室12の壁12aに衝突して広が
りながら反転する。壁12aにより反転された減
速、整流された溶融金属の流れは、壁12aと反
対側の壁12bに当たつて第3室13に導かれ
る。
The jet of molten metal that has passed through the immersion hole 6 collides with the wall 12a of the second chamber 12 facing the immersion hole, and is reversed while spreading. The flow of molten metal that has been reversed, decelerated, and rectified by the wall 12a hits the wall 12b opposite to the wall 12a and is guided to the third chamber 13.

第2室12と第3室13をつなぐ流路は、第2
室12と第3室13の間を画する壁12cの壁端
7に設けられた隙間によりこの〓間は、第1図お
よび第2図からも明らかなように溶湯表面まで完
全にオープンな〓間となつている。この壁端7
は、くの字形に屈曲し、第2室12から第3室1
3への流路の入口の側壁断面を該形状とする。こ
の結果、該流路の入口において渦流が発生する
(第1図参照)。この渦流の発生は、第2室12か
ら第3室13への溶融金属の流れをさらに沈静化
する効果がある。
The flow path connecting the second chamber 12 and the third chamber 13 is
Due to the gap provided at the wall end 7 of the wall 12c that separates the chamber 12 and the third chamber 13, this gap is completely open to the molten metal surface, as is clear from FIGS. 1 and 2. It is in between. This wall edge 7
is bent in a dogleg shape, and from the second chamber 12 to the third chamber 1
The cross section of the side wall of the inlet of the flow path to No. 3 has this shape. As a result, a vortex is generated at the inlet of the flow path (see FIG. 1). The generation of this vortex has the effect of further calming the flow of molten metal from the second chamber 12 to the third chamber 13.

このように第3室13に流入した溶融金属は、
ほとんど乱れのない、ゆるやかな流れとなつて第
3室13内を巡回し、注湯ノズル3から注入流2
1となつてアトマイズノズルのつくる噴霧媒面
(図示せず)に落下する。したがつて、注入流2
1に、振れ、ばらけ、ねじれ等の乱れが発生する
ことはない。
The molten metal that has flowed into the third chamber 13 in this way is
The flow circulates in the third chamber 13 as a gentle flow with almost no turbulence, and the injected flow 2 flows from the pouring nozzle 3.
1 and falls onto the spray medium surface (not shown) created by the atomizing nozzle. Therefore, injection flow 2
1. Disturbances such as shaking, unraveling, twisting, etc. do not occur.

なお、この注湯ノズル3は、第3室13のコー
ナー部分の近傍、とくにコーナーの角の二等分線
(第1図に破線でしめす)上を避けることが重要
である。注湯ノズル3を該位置に設けると、溶融
金属に旋回流が発生し、注入流21にねじれを生
じ易いからである。
It is important to avoid placing the pouring nozzle 3 near the corner of the third chamber 13, especially on the bisector of the corner (indicated by a broken line in FIG. 1). This is because if the pouring nozzle 3 is provided at this position, a swirling flow is generated in the molten metal, and the pouring flow 21 is likely to be twisted.

また、取鍋10からの溶融金属2の供給の開始
時においてはストツパ8を下げて注湯ノズル3を
閉じ、容器1内の溶融金属が所定のレベルに達し
たところでストツパ8を上げて注湯ノズル3を開
くものとする。容器1内の溶融金属レベルが所定
値に達するまでは、注入流21の安定が得られな
いからである。
Furthermore, at the start of supplying molten metal 2 from ladle 10, stopper 8 is lowered to close pouring nozzle 3, and when the molten metal in container 1 reaches a predetermined level, stopper 8 is raised to pour the molten metal. Assume that nozzle 3 is opened. This is because the injection flow 21 cannot be stabilized until the molten metal level in the container 1 reaches a predetermined value.

第3図は、第2室12の両側に、第3室13を
分けて配置した他の実施例装置の平面図である。
容器1は、第1室11、第2室12、第3室13
よりなり、第1室11と第2室12は、浸漬孔6
で連通する。第2室12から第3室13への流路
は溶湯表面まで完全にオープンな〓間から構成さ
れ、第2室12の壁12cの壁端7はくの字形に
屈曲し、該流路の側壁断面を該形状とする。な
お、図の破線は第3室13のコーナーの角の二等
分線をしめす。注湯ノズル3はこれらの近傍を避
けて配置することが好ましい。
FIG. 3 is a plan view of another example device in which a third chamber 13 is arranged separately on both sides of the second chamber 12.
The container 1 has a first chamber 11, a second chamber 12, and a third chamber 13.
The first chamber 11 and the second chamber 12 are connected to the immersion hole 6.
Communicate with. The flow path from the second chamber 12 to the third chamber 13 is completely open to the molten metal surface, and the wall end 7 of the wall 12c of the second chamber 12 is bent in a dogleg shape. The cross section of the side wall has this shape. Note that the broken line in the figure indicates the bisector of the corner of the third chamber 13. It is preferable that the pouring nozzle 3 is placed avoiding the vicinity of these areas.

第4図は、第3室13が第2室12を包囲する
構造を有する他の実施例装置の平面図である。注
湯ノズル3が3個設けられている他は、上述の実
施例と同様に構成されているので、詳しい説明は
省略する。
FIG. 4 is a plan view of another example device having a structure in which the third chamber 13 surrounds the second chamber 12. Since the structure is the same as that of the above embodiment except that three pouring nozzles 3 are provided, detailed explanation will be omitted.

以上においては、本発明について実施例を参照
しながら説明したが、上述の実施例は単に本発明
を例示するものであり、本発明を限定するもので
はない。
Although the present invention has been described above with reference to Examples, the above-mentioned Examples merely illustrate the present invention and do not limit the present invention.

(発明の効果) 本発明によれば、連続的または間欠的に供給さ
れる溶融金属2を容器1に収容しながら、同時に
溶融金属を次工程のアトマイズ装置などに注入し
ても注入流21が乱れることはない。従来の一室
構造の容器を用いた場合、溶融金属の容器への供
給と同時に注湯をおこなうと、注入流21に乱れ
が発生することは避けられなかつたものである。
(Effects of the Invention) According to the present invention, even if the molten metal 2 that is continuously or intermittently supplied is accommodated in the container 1 and simultaneously injected into the atomizing device or the like in the next step, the injection flow 21 is There will be no disturbance. When a conventional single-chamber container is used, if molten metal is supplied to the container and poured at the same time, turbulence will inevitably occur in the injection flow 21.

この本発明の効果を確かめるため、第1図およ
び第2図に示した装置の1/2寸法の模型を製作
して水モデル実験をおこなつた。ストツパ8を下
ろして取鍋10から水を注入し、所定の水位にな
つたところで、ストツパ8を上げて注湯ノズル3
を開き注入を開始する。その後も取鍋10からの
水の供給を続けたが、第1室11内の水流の乱れ
は第3室13には影響せず、注湯ノズル3からの
注入流21に振れ、ばらけ、ねじれ等の乱れは生
じなかつた。また、取鍋10からの第1室11へ
の水の供給を間欠的におこなつた場合にも注入流
21は全く安定した状態を保ち、乱れは見られな
かつた。
In order to confirm the effects of the present invention, a water model experiment was conducted using a half-sized model of the apparatus shown in FIGS. 1 and 2. Lower the stopper 8, pour water from the ladle 10, and when the water reaches the predetermined level, raise the stopper 8 and pour water into the ladle 10.
Open and start injection. After that, water continued to be supplied from the ladle 10, but the turbulence of the water flow in the first chamber 11 did not affect the third chamber 13, and the water was swayed by the injection flow 21 from the pouring nozzle 3, dispersing, No disturbances such as twisting occurred. Further, even when water was intermittently supplied from the ladle 10 to the first chamber 11, the injection flow 21 remained completely stable and no disturbance was observed.

次に第1図および第2図に示した装置(実物タ
ンデイツシユ)を耐火物で製作し、実際のアトマ
イズに使用した。1回の溶融金属(溶鋼)処理量
を30トンとし、70回の操業をおこなつた。製造条
件によつては、処理時間が2時間を超えることも
あつたが、注入流21はきわめて良好であり、そ
の乱れによるブロツキングの発生は一度もなかつ
た。
Next, the device shown in FIGS. 1 and 2 (actual tundish) was manufactured from refractory material and used for actual atomization. The amount of molten metal (molten steel) processed at one time was 30 tons, and 70 operations were conducted. Depending on the manufacturing conditions, the processing time could exceed 2 hours, but the injection flow 21 was extremely good and no blocking occurred due to its turbulence.

このように本発明によれば、溶融金属を容器1
に受け入れながら同時に安定した注湯をおこなう
ことが可能になる。したがつて大量の溶融金属を
連続的に処理することができ、とくに処理量が多
い場合に作業時間の短縮と効率化に多いな効果が
ある。
As described above, according to the present invention, the molten metal is stored in the container 1.
This makes it possible to receive hot water while at the same time stably pouring hot water. Therefore, a large amount of molten metal can be processed continuously, which has a significant effect in shortening working time and increasing efficiency, especially when a large amount is to be processed.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は、本発明の実施例装置の平面図、第2
図は、第1図の鎖線−に沿う断面を示す縦断
面図、第3図は、本発明の他の実施例装置の平面
図、第4図は、さらに他の実施例装置の平面図、
および第5図は、従来のアトマイズ法による金属
粉末の製造装置の一部破断立面図である。 1:容器、2:溶融金属、3:注湯ノズル、
4:アトマイズノズル、5:アトマイズ槽、6:
浸漬孔、7:壁端、8:ストツパ、10:取鍋、
11:第1室、12:第2室、13:第3室、2
1:注入流。
FIG. 1 is a plan view of an embodiment of the device of the present invention, and FIG.
3 is a plan view of another embodiment of the device of the present invention; FIG. 4 is a plan view of still another embodiment of the device;
and FIG. 5 is a partially cutaway elevational view of a conventional metal powder production apparatus using the atomization method. 1: Container, 2: Molten metal, 3: Pouring nozzle,
4: Atomizing nozzle, 5: Atomizing tank, 6:
Immersion hole, 7: wall end, 8: stopper, 10: ladle,
11: 1st room, 12: 2nd room, 13: 3rd room, 2
1: Injection flow.

Claims (1)

【特許請求の範囲】 1 連続的または間欠的に供給される溶融金属を
安定的に注入する方法であつて、 (a) 連続的または間欠的に供給される溶融金属を
暫時、第1室に収容することと、 (b) 第1室に収容された溶融金属を第2室に一定
方向の流れとして導いて第2室の壁面に衝突さ
せ、溶融金属の流れの方向を反転させて溶融金
属の流れを減速、整流することと、 (c) 第2室において減速、整流された溶融金属の
流れをさらに第3室に導いて鎮静化した後、第
3室に設けられた注湯ノズルから溶融金属を注
入することと、 (d) 前記(b)の過程において第1室に収容された溶
融金属を、第1室と第2室を連通する浸漬孔ま
たは狭い〓間を通して第2室に導くことと、 (e) 前記(C)の過程において、溶融金属を第2室か
ら第3室に導く流路の入口を溶湯表面まで完全
にオープンな〓間とすることと、 を特徴とする溶融金属の注入方法。 2 前記(e)の過程において、溶融金属を第2室か
ら第3室に導く流路の入口を画成する壁面をくの
字形に屈曲させ、該流路を流れる溶融金属に渦流
を生ぜしめることを特徴とする特許請求の範囲第
1項記載の溶融金属の注入方法。 3 前記注湯ノズルは、第3室コーナー部分の近
傍から離れた位置の第3室の底面に設けられるこ
とを特徴とする特許請求の範囲第1項または第2
項記載の溶融金属の注入方法。 4 連続的または間欠的に供給される溶融金属を
安定的に注入する装置であつて、 (a) 連続的または間欠的に供給される溶融金属を
暫時、収容する第1室と、 (b) 第1室から第2室に連通する連通孔または狭
い〓間と、 (c) 第1室から流入する溶融金属の流れに対向
し、該溶融金属の流れの方向を反転させる壁面
を備える第2室と、 (d) 第2室から流入した溶融金属を注入する注湯
ノズルを備える、第2室と溶湯表面まで完全に
オープンな〓間で結ばれた第3室と を備えることを特徴とする溶融金属の注入装置。 5 前記第2室と第3室を結ぶ流路を画成する壁
面が、くの字形の断面形状を有する特許請求の範
囲第4項記載の溶融金属の注入装置。 6 前記第3室は複数の注湯ノズルを備えること
を特徴とする特許請求の範囲第4項ないし第5項
いずれかに記載の溶融金属の注入装置。
[Claims] 1. A method for stably injecting molten metal supplied continuously or intermittently, comprising: (a) temporarily injecting molten metal supplied continuously or intermittently into a first chamber; (b) The molten metal accommodated in the first chamber is guided as a flow in a fixed direction into the second chamber and collided with the wall surface of the second chamber, and the direction of the flow of the molten metal is reversed and the molten metal is (c) After the flow of molten metal that has been decelerated and rectified in the second chamber is further guided to the third chamber and calmed down, it is poured from the pouring nozzle provided in the third chamber. (d) Injecting the molten metal contained in the first chamber in the step (b) above into the second chamber through an immersion hole or a narrow gap communicating the first chamber and the second chamber. (e) In the process of (C) above, the entrance of the channel for guiding the molten metal from the second chamber to the third chamber is completely open to the surface of the molten metal. Method of pouring molten metal. 2. In the step (e) above, the wall defining the entrance of the channel that guides the molten metal from the second chamber to the third chamber is bent into a dogleg shape to create a vortex in the molten metal flowing through the channel. A method for injecting molten metal according to claim 1, characterized in that: 3. The pouring nozzle is provided on the bottom surface of the third chamber at a position away from the corner portion of the third chamber.
Method of pouring molten metal as described in Section 1. 4. A device for stably injecting molten metal that is continuously or intermittently supplied, which includes: (a) a first chamber that temporarily accommodates the molten metal that is continuously or intermittently supplied; (b) (c) a second chamber having a wall surface that faces the flow of molten metal flowing in from the first chamber and reverses the direction of the flow of the molten metal; and (d) a third chamber that is connected to the second chamber by a gap that is completely open to the surface of the molten metal and that is equipped with a pouring nozzle for injecting the molten metal that has flowed from the second chamber. Molten metal injection equipment. 5. The molten metal injection device according to claim 4, wherein the wall surface defining the flow path connecting the second chamber and the third chamber has a dogleg-shaped cross-sectional shape. 6. The molten metal injection device according to any one of claims 4 to 5, wherein the third chamber includes a plurality of pouring nozzles.
JP2527986A 1986-02-07 1986-02-07 Method and apparatus for pouring molten metal Granted JPS62182210A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2527986A JPS62182210A (en) 1986-02-07 1986-02-07 Method and apparatus for pouring molten metal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2527986A JPS62182210A (en) 1986-02-07 1986-02-07 Method and apparatus for pouring molten metal

Publications (2)

Publication Number Publication Date
JPS62182210A JPS62182210A (en) 1987-08-10
JPH0468362B2 true JPH0468362B2 (en) 1992-11-02

Family

ID=12161581

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2527986A Granted JPS62182210A (en) 1986-02-07 1986-02-07 Method and apparatus for pouring molten metal

Country Status (1)

Country Link
JP (1) JPS62182210A (en)

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5928499B2 (en) * 1977-07-28 1984-07-13 株式会社神戸製鋼所 Bucket elevator shock absorber
JPS5958554U (en) * 1982-10-06 1984-04-17 川崎製鉄株式会社 Tundish for continuous casting machine

Also Published As

Publication number Publication date
JPS62182210A (en) 1987-08-10

Similar Documents

Publication Publication Date Title
KR100858684B1 (en) Collision pads for partitioning and distribution of molten metal
US5673857A (en) Discharge nozzle for continuous casting
US5840206A (en) Nozzle for introducing a liquid metal into a mold, for the continuous casting of metal products, the bottom of which has holes
US5868955A (en) Feed reservoir intended for retaining a molten metal, and in particular a steel
KR20090095590A (en) Hollow jet nozzle for continuous steel casting
US5716538A (en) Discharge nozzle for continuous casting
MXPA96005211A (en) Nozzle for the introduction of a liquid metal into a continuous machine of containers of metallic products whose fund understand orific
CN1154885A (en) Nozzle for introducing liquid metal into mould for continuous casting of metals
CH648500A5 (en) METHOD AND DEVICE FOR CONTINUOUSLY casting metal in a closed pouring system.
US5681498A (en) Discharge nozzle for a crystallizer for continuous casting of slabs
JPS59130663A (en) Casting nozzle
JPS6050841B2 (en) Metal powder manufacturing method and atomization device
JPS62182210A (en) Method and apparatus for pouring molten metal
KR20200064939A (en) Metal powder production apparatus
EP0396111B1 (en) Controlling teeming streams
CA2424085A1 (en) Process and device for the continuous casting of liquid steel
US4711429A (en) Tundish for mixing alloying elements with molten metal
JPH0114386Y2 (en)
US5232046A (en) Strand casting apparatus and method
EP1106286B1 (en) Device for feeding molten metal from a tundish through a submerged tube in a continuous casting mould
CS231153B2 (en) Method of molten metal spraying in making metal powder and device to perform the method
CN111593286B (en) High-performance powder steel thermal spraying deposition forming process
JPH0261048A (en) Seal box for molten metal plating or coating
KR101356071B1 (en) Device for supplying molten alloy
JPS5992951A (en) Granulated slag granulation method