JPH0471478B2 - - Google Patents

Info

Publication number
JPH0471478B2
JPH0471478B2 JP61076465A JP7646586A JPH0471478B2 JP H0471478 B2 JPH0471478 B2 JP H0471478B2 JP 61076465 A JP61076465 A JP 61076465A JP 7646586 A JP7646586 A JP 7646586A JP H0471478 B2 JPH0471478 B2 JP H0471478B2
Authority
JP
Japan
Prior art keywords
torus
wall
reactor
containment vessel
reactor building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP61076465A
Other languages
Japanese (ja)
Other versions
JPS62233789A (en
Inventor
Yukio Tsukada
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Tokyo Shibaura Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Shibaura Electric Co Ltd filed Critical Tokyo Shibaura Electric Co Ltd
Priority to JP61076465A priority Critical patent/JPS62233789A/en
Publication of JPS62233789A publication Critical patent/JPS62233789A/en
Publication of JPH0471478B2 publication Critical patent/JPH0471478B2/ja
Granted legal-status Critical Current

Links

Classifications

    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00—Energy generation of nuclear origin
    • Y02E30/30—Nuclear fission reactors

Landscapes

  • Monitoring And Testing Of Nuclear Reactors (AREA)
  • Structure Of Emergency Protection For Nuclear Reactors (AREA)

Description

【発明の詳細な説明】 〔発明の目的〕 (産業上の利用分野) 本発明は、トーラス型圧力抑制室を備えた原子
炉格納容器を持つ沸騰水型原子炉を有する原子力
発電所の建設方法に関する。
[Detailed Description of the Invention] [Object of the Invention] (Industrial Application Field) The present invention provides a method for constructing a nuclear power plant having a boiling water reactor having a reactor containment vessel equipped with a torus-shaped pressure suppression chamber. Regarding.

(従来の技術) 一般に原子炉建屋に対するトーラス型原子炉格
納容器の配設構造は、第3図の縦断面図に示され
るように、鋼製の原子炉格納容器3が、コンクリ
ートを打設した原子炉建屋マツト()1、同
()4にアンカー(図示省略)で固定され、側
面を地下シールドウオール()5、同()
9、1階シールドウオール12等で囲まれた上、
底部空間にコンクリート8を充填して設置され
る。トーラス2は、同じく原子炉建屋マツト
()1にアンカー2Aで固定され、原子炉建屋
マツト()1から立上つてトーラス2の外方を
囲む壁6、および壁6と地下シールドウオール
()9を繋いでトーラス2の上方を覆う原子炉
建屋1階の床10により画成されるトーラス室7
内に収納されている。床10の上方には1階の壁
11、2階の床13が配設される。
(Prior art) In general, the arrangement structure of a torus-type reactor containment vessel in a nuclear reactor building is as shown in the vertical cross-sectional view of Fig. It is fixed to the reactor building mats () 1 and () 4 with anchors (not shown), and the sides are attached to underground shield walls () 5 and ()
9. Surrounded by 12th grade shield wall on the 1st floor,
The bottom space is filled with concrete 8 and installed. The torus 2 is also fixed to the reactor building mat ( ) 1 with an anchor 2A, and a wall 6 rises from the reactor building mat ( ) 1 and surrounds the outside of the torus 2, and the wall 6 and the underground shield wall ( ) 9 A torus room 7 defined by the floor 10 of the first floor of the reactor building that connects the torus 2 and covers the upper part of the torus 2.
It is stored inside. A wall 11 on the first floor and a floor 13 on the second floor are arranged above the floor 10.

従来このような構造部の建設は、第4図の工程
図に示すように、まず原子炉建屋マツト()1
の完成後に、トーラス2のアンカーボルトおよび
原子炉格納容器3のアンカーボルトの設定を行な
う。次に原子炉建屋マツト()4の打設を行な
い、地下シールドウオール()5を施工し、原
子炉格納容器3を組立てる。一方、並行してトー
ラス室の壁6の施工を行ない、地下シールドウオ
ール()5と、トーラス室の壁6が完成したな
らば、トーラス室7にトーラス2を搬入し、据付
ける。こうして、トーラス2の据付けが完了した
ならば、先に組立てが完了している原子炉格納容
器3と合せ、耐圧試験を行なう。次に、原子炉格
納容器3の塗装を行ない、原子炉格納容器3の下
部空間にコンクリート8を充填し、地下シールド
ウオール()9を施工し、次に1階の床10を
施工する。この後、1階の壁11と1階のシール
ドウオール12を施工し、2階の床13を施工し
ていた。
Conventionally, in the construction of such a structure, as shown in the process diagram in Figure 4, the first step was to build the reactor building
After this is completed, the anchor bolts of the torus 2 and the reactor containment vessel 3 are set. Next, the reactor building mat (2) 4 is placed, the underground shield wall (2) 5 is constructed, and the reactor containment vessel 3 is assembled. On the other hand, the wall 6 of the torus room is constructed in parallel, and once the underground shield wall ( ) 5 and the wall 6 of the torus room are completed, the torus 2 is carried into the torus room 7 and installed. After the installation of the torus 2 is completed in this way, a pressure test is performed together with the reactor containment vessel 3, which has been assembled previously. Next, the reactor containment vessel 3 is painted, the lower space of the reactor containment vessel 3 is filled with concrete 8, an underground shield wall (2) 9 is constructed, and then the first floor floor 10 is constructed. After this, the walls 11 on the first floor and the shield wall 12 on the first floor were constructed, and the floor 13 on the second floor was constructed.

(発明が解決しようとする問題点) 上述した建設工程では、トーラス2とトーラス
室の壁6との間隔が狭い為、トーラス室の壁6を
施工する際の配筋作業、型枠取付け及び取外し作
業に用いる足場とトーラス2が干渉することか
ら、トーラス室の壁4が完成し、足場を撤去して
からでなければトーラス2の搬入・据付工事がで
きない。この為、原子炉格納容器3の組立てが完
了していても、トーラス室の壁6が完成しトーラ
ス2の搬入・据付工事が完了しなければ、原子炉
格納容器3の耐圧試験が実施できない。したがつ
て、トーラス室の壁6の施工からトーラス2の搬
入・据付工事までの作業が建設工事全体のクリテ
イカルパスとなり、原子力発電所建設工期の長期
化を招く要因となつていた。
(Problems to be Solved by the Invention) In the construction process described above, since the distance between the torus 2 and the wall 6 of the torus chamber is narrow, reinforcement work, formwork attachment and removal when constructing the torus chamber wall 6 are difficult. Since the torus 2 interferes with the scaffolding used for the work, the torus 2 cannot be carried in and installed until the wall 4 of the torus room is completed and the scaffolding is removed. For this reason, even if the assembly of the reactor containment vessel 3 is completed, the pressure test of the reactor containment vessel 3 cannot be carried out until the walls 6 of the torus chamber are completed and the carrying-in and installation work of the torus 2 is completed. Therefore, the work from the construction of the wall 6 of the torus room to the carrying-in and installation of the torus 2 became a critical path for the entire construction work, and became a factor that led to a prolongation of the construction period of the nuclear power plant.

本発明は、上記の事情を考慮してなされたもの
であり、原子力発電所の建設工期を短縮すること
ができるとともに、建設作業の作業効率を向上さ
せることができる原子力発電所の建設方法を提供
することを目的とする。
The present invention has been made in consideration of the above circumstances, and provides a method for constructing a nuclear power plant that can shorten the construction period of a nuclear power plant and improve the work efficiency of construction work. The purpose is to

〔発明の構成〕[Structure of the invention]

(問題点を解決するための手段) 本発明は原子炉建屋マツト上に設置される原子
炉格納容器の建設と、この原子炉格納容器の下部
外周を包囲して原子炉建屋マツト上に設置され、
原子炉格納容器の圧力抑制室を構成するトーラス
の建設と、このトーラスの外周に原子炉建屋マツ
トから立上り設置される鉄筋コンクリート製の壁
の建設とを含む原子力発電所の建設方法であつ
て、建設されるべき壁のトーラスとの対向面に一
致する板状部材を原子炉建屋マツト上に立設し、
板状部材を壁のトーラスとの対向面造成用型枠兼
壁の恒久構成要素として用いながら壁を原子炉建
屋マツト上に立設開始し、壁の設立完了を待つこ
となく部分形成されたトーラスを原子炉建屋マツ
ト上に搬入設置する工程から成る。
(Means for Solving the Problems) The present invention relates to the construction of a reactor containment vessel installed on a reactor building mat, and the construction of a reactor containment vessel that is installed on the reactor building mat surrounding the lower outer periphery of the reactor containment vessel. ,
A method for constructing a nuclear power plant, comprising constructing a torus constituting a pressure suppression chamber of a reactor containment vessel, and constructing a reinforced concrete wall rising from a reactor building pine around the outer circumference of the torus, the method comprising: A plate-like member corresponding to the surface of the wall facing the torus is erected on the reactor building pine,
The wall was started to be erected on the reactor building pine using plate-like members as formwork for creating the facing surface of the wall and as a permanent component of the wall, and the torus was partially formed without waiting for the completion of the wall construction. The process consists of transporting and installing the equipment on the reactor building mat.

(作 用) 壁のトーラスとの対向面は、壁の建設中であつ
ても、予め原子炉建屋マツト上に立設された板状
部材に何等手を加えることなく維持されるので、
トーラスは、壁の建設中であつても、何等障害物
に阻止されることなく、原子炉建屋マツト上に搬
入設置される。
(Function) Even during the construction of the wall, the surface of the wall facing the torus can be maintained without any modification to the plate-shaped member that has been erected on the reactor building mat.
The torus is carried and installed on the reactor building mat without being blocked by any obstacles even during the construction of the wall.

(実施例) 以下本発明の一実施例を第1図乃至第3図を参
照して説明する。
(Embodiment) An embodiment of the present invention will be described below with reference to FIGS. 1 to 3.

第1図は、本実施例を適用した場合のトーラス
室の壁6の水平断面を拡大して表す一部切欠き断
面図であり、図の右側面が第3図のトーラス室7
に対面している。
FIG. 1 is a partially cutaway sectional view showing an enlarged horizontal section of the wall 6 of the torus chamber when this embodiment is applied, and the right side of the figure is the torus chamber 7 of FIG. 3.
is facing.

第1図において、符号15は第3図の原子炉建
屋マツト()1に植設されたH型鋼であり、鉄
筋コンクリート製の壁6に埋込まれる鉄筋16が
植立されたプレキヤストコンクリート板14が、
隣接するH型鋼15の凹部間に挿入保持されてい
る。符号17はその他の配筋を表す。なおプレキ
ヤストコンクリート板14は鉄板等であつてもよ
い。
In FIG. 1, the reference numeral 15 is an H-shaped steel installed in the reactor building mat ( ) 1 shown in FIG. but,
It is inserted and held between the recesses of adjacent H-shaped steels 15. Reference numeral 17 represents other reinforcements. Note that the precast concrete plate 14 may be an iron plate or the like.

本実施例においては、第2図に示す工程図のよ
うに、原子炉建屋マツト()1の打設の際、壁
6の設定予定面のトーラス室7側に沿つて、定め
られた間隔を保ちながら壁6の予定高さまでH型
鋼15を立てこむ。次いでトーラス2のアンカー
ボルトおよび原子炉格納容器3のアンカーボルト
の設定を行なう。
In this embodiment, as shown in the process diagram shown in FIG. 2, when pouring the reactor building mats (2) 1, predetermined intervals are placed along the torus room 7 side of the planned surface of the wall 6. The H-shaped steel 15 is built up to the planned height of the wall 6 while maintaining the height. Next, the anchor bolts of the torus 2 and the anchor bolts of the reactor containment vessel 3 are set.

次に原子炉建屋マツト()4の工事開始と同
時に、トーラス室の壁6の施工を行なう。この
際、原子炉建屋マツト()1の打設時に立てて
おいたH型鋼15にプレキヤストコンクリート板
14を挿入設定し、トーラス室7の外側に足場を
組立てて、鉄筋16と係合させた配筋17の作業
等を行なつた後、外側の型枠を設定しコンクリー
トを打設する。一方、原子炉建屋マツト()4
の打設終了後、地下シールドウオール()5を
施工する。この後、原子炉格納容器3の組立て
と、トーラス2の搬入・据付工事を並行して行な
う。次に、原子炉格納容器3の耐圧試験を実施
し、終了したならば原子炉格納容器3の塗装を行
なう。塗装が完了したならば、原子炉格納容器3
の下部空間にコンクリート8を充填し、地下シー
ルドウオール()9を施工する。この後、1階
の床10、1階の壁11、1階のシールドウオー
ル12、2階の床13の順で順次施工してゆく。
Next, at the same time as the construction of the reactor building Matsut ( ) 4 begins, the walls 6 of the torus room are constructed. At this time, a precast concrete plate 14 was inserted into the H-shaped steel 15 that had been erected when the reactor building Matsut (2012) 1 was placed, and a scaffold was assembled outside the torus room 7 and engaged with the reinforcing bars 16. After carrying out work such as reinforcing reinforcement 17, the outer formwork is set and concrete is poured. On the other hand, the reactor building Matsuto ()4
After the completion of pouring, construct the underground shield wall (2). After this, the assembly of the reactor containment vessel 3 and the carrying-in and installation of the torus 2 are carried out in parallel. Next, the reactor containment vessel 3 is subjected to a pressure test, and upon completion of the pressure test, the reactor containment vessel 3 is painted. Once the painting is completed, reactor containment vessel 3
The space below is filled with concrete 8 and an underground shield wall () 9 is constructed. Thereafter, the floor 10 on the first floor, the wall 11 on the first floor, the shield wall 12 on the first floor, and the floor 13 on the second floor are constructed in this order.

本実施例によれば、壁6の施工中であつても、
トーラス室7の側に足場等の障害物がないので、
トーラス2の搬入・据付ができる。すなわち第4
図に示す従来の工程と比較しても明らかなよう
に、壁6の施工とは無関係に、原子炉格納容器3
の組立と並行して、トーラス2の搬入・据付が行
なえるので、従来原子炉格納容器3の組立が終了
してもトーラス2の搬入・据付が終了するまで、
原子炉格納容器3の耐圧試験の開始が遅延して生
じた損失時間は消滅した。また板状部材をH型鋼
の各々の凹部間に挿入保持して立設するので、板
状部材とH型鋼とは、直接外表面を接合する場合
に比較して、より強固に結合することができる。
According to this embodiment, even during construction of the wall 6,
Since there are no obstacles such as scaffolding on the side of torus room 7,
We can transport and install Taurus 2. That is, the fourth
As is clear from the comparison with the conventional process shown in the figure, regardless of the construction of the wall 6, the reactor containment vessel 3
Since the torus 2 can be carried in and installed in parallel with the assembly of the reactor containment vessel 3, it is possible to carry in and install the torus 2 in parallel with the assembly of the reactor containment vessel 3.
The time lost due to the delay in starting the pressure test of the reactor containment vessel 3 has disappeared. In addition, since the plate member is inserted and held between the recesses of each H-shaped steel, the plate member and the H-shaped steel can be more firmly connected than when their outer surfaces are directly joined. can.

〔発明の効果〕〔Effect of the invention〕

本発明によれば、トーラス室の施工から原子炉
格納容器の耐圧試験までに到る作業工程が改善さ
れ、原子力発電所の建設工期を短縮することがで
きるとともに、建設作業の作業効率をも向上させ
ることができる。
According to the present invention, the work process from the construction of the torus chamber to the pressure test of the reactor containment vessel is improved, the construction period of a nuclear power plant can be shortened, and the work efficiency of construction work is also improved. can be done.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明の一実施例が適用された一部を
表す一部切欠き断面図、第2図は本発明の一実施
例を表す工程図、第3図はトーラス型原子炉格納
容器が収納された原子炉建屋の要部を表す縦断面
図、第4図は従来の工程図である。 1…原子炉建屋マツト、2…トーラス、3…原
子炉格納容器、6…壁、14…プレキヤストコン
クリート板、15…H型鋼、16…鉄筋。
Fig. 1 is a partially cutaway sectional view showing a part to which an embodiment of the present invention is applied, Fig. 2 is a process diagram showing an embodiment of the present invention, and Fig. 3 is a torus-type reactor containment vessel. FIG. 4 is a longitudinal sectional view showing the main parts of the reactor building in which the reactor building is housed, and is a conventional process diagram. DESCRIPTION OF SYMBOLS 1... Reactor building mat, 2... Torus, 3... Reactor containment vessel, 6... Wall, 14... Precast concrete plate, 15... H-shaped steel, 16... Rebar.

Claims (1)

【特許請求の範囲】[Claims] 1 原子炉建屋マツト上に設置される原子炉格納
容器の建設と、この原子炉格納容器の下部外周を
包囲して前記原子炉建屋マツト上に設置され前記
原子炉格納容器の圧力抑制室を構成するトーラス
の建設と、このトーラスの外周に前記原子炉建屋
マツトから立上り設置される鉄筋コンクリート製
の壁の建設とを含む原子力発電所の建設方法にお
いて、予め板状部材に前記壁の鉄筋を付設し、建
設されるべき前記壁の前記トーラスとの対向面に
H形鋼を多数植設し、この植設されたH形鋼の
各々の凹部間に前記板状部材を挿入保持して前記
壁を前記原子炉建屋マツト上に立設し、かつ前記
壁の設立完了を待つことなく部分形成された前記
トーラスを前記原子炉建屋マツト上に搬入設置す
ることを特徴とする原子力発電所の建設方法。
1 Construction of a reactor containment vessel installed on the reactor building mat, and a pressure suppression chamber of the reactor containment vessel that is installed on the reactor building mat and surrounding the lower outer periphery of the reactor containment vessel. A method of constructing a nuclear power plant includes constructing a torus, and constructing a reinforced concrete wall rising from the reactor building pine around the outer periphery of the torus. , a large number of H-beams are planted on the surface of the wall to be constructed facing the torus, and the plate member is inserted and held between the recesses of each of the planted H-beams to construct the wall. A method for constructing a nuclear power plant, characterized in that the torus is erected on the reactor building pine, and the partially formed torus is carried and installed on the reactor building pine without waiting for completion of the construction of the wall.
JP61076465A 1986-04-04 1986-04-04 Method of building nuclear power plant Granted JPS62233789A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP61076465A JPS62233789A (en) 1986-04-04 1986-04-04 Method of building nuclear power plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP61076465A JPS62233789A (en) 1986-04-04 1986-04-04 Method of building nuclear power plant

Publications (2)

Publication Number Publication Date
JPS62233789A JPS62233789A (en) 1987-10-14
JPH0471478B2 true JPH0471478B2 (en) 1992-11-13

Family

ID=13605912

Family Applications (1)

Application Number Title Priority Date Filing Date
JP61076465A Granted JPS62233789A (en) 1986-04-04 1986-04-04 Method of building nuclear power plant

Country Status (1)

Country Link
JP (1) JPS62233789A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2727116B1 (en) * 2011-07-02 2016-06-29 Björn S. Rump Method for the construction of a secure nuclear reactor plant, and corresponding reactor plant

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57165792A (en) * 1981-04-07 1982-10-12 Tokyo Shibaura Electric Co Method of constructing nuclear reactor building
JPS57175290A (en) * 1981-04-21 1982-10-28 Tokyo Shibaura Electric Co Nuclear reactor building
JPS58118987A (en) * 1982-01-06 1983-07-15 株式会社日立製作所 Reactor building construction method

Also Published As

Publication number Publication date
JPS62233789A (en) 1987-10-14

Similar Documents

Publication Publication Date Title
US5119598A (en) Method of construction of top slab for a nuclear containment building
JP3946352B2 (en) Construction method of reactor containment vessel
JPS62233789A (en) Method of building nuclear power plant
JPS5829922A (en) Constructing method for underground outer wall
JPH0699959B2 (en) Nuclear power plant building construction method
JPH0953277A (en) Nuclear power plant construction method
JPS63308B2 (en)
JPS63274897A (en) Cask cleaning pit in common use as depot for head of nuclear reactor pressure vessel
JP4352071B2 (en) Construction method of reactor containment vessel
JP3273668B2 (en) How to construct a containment vessel
JPS5926095A (en) Method of constructing reactor building
JP2967452B2 (en) Building construction methods and lightweight floor slabs
JPH10339791A (en) Partition structure in spent fuel storage pool and method of constructing the partition
JPH07103583B2 (en) Construction method for large span underground structure
JPS62165185A (en) Construction method of reactor containment vessel superstructure
JPS6367875B2 (en)
JPS6324276B2 (en)
JPH09217448A (en) Wall structure
JPS6156474B2 (en)
JPS6145745B2 (en)
JPS6331076B2 (en)
JPH0765313B2 (en) Underground construction method
JPS63272690A (en) Construction of lining tank
JPS6291895A (en) Method of constructing housing of nuclear reactor
JPH07189274A (en) Structure pillar and reverse-casting ramen prefab construction method