Prior art keywords
deck plate
support member
attached
members
reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP15098984A
Other languages
Japanese (ja)
Other versions
JPS6131545A (en
Inventor
Seiji Kasai
Tasaburo Shimizu
Akio Miho
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP15098984A priority Critical patent/JPS6131545A/en
Publication of JPS6131545A publication Critical patent/JPS6131545A/en
Publication of JPH0472018B2 publication Critical patent/JPH0472018B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Floor Finish (AREA)

Description

【発明の詳細な説明】 (産業上の利用分野) この発明は厚板の床スラブの施工方法に関する
ものである。
DETAILED DESCRIPTION OF THE INVENTION (Industrial Field of Application) This invention relates to a method of constructing a thick plate floor slab.

(この発明が解決すべき問題点) 従来、鉄筋コンクリート構造等にて床スラブを
施工する場合には、下面に配した型枠1を仮設梁
2、ブラケツト3あるいは支保工等で支持し、配
筋作業を行つた後、コンクリート4を打設して構
築するのが一般的である。
(Problems to be solved by this invention) Conventionally, when constructing a floor slab with a reinforced concrete structure, etc., the formwork 1 placed on the lower surface is supported by temporary beams 2, brackets 3, or shoring, etc. After the work is completed, concrete 4 is generally poured and constructed.

しかし、仮設梁等を取付けるために床スラブ下
面の有効作業空間を広くとれないので−作業が困
難であり、配管類との干渉が多い。
However, since a large effective working space under the floor slab cannot be secured in order to install temporary beams, etc., the work is difficult and often interferes with piping.

また配筋を行う場合も、型枠の上部位置等に配
筋スペーサ5を取付ける必要があり、作業の煩雑
化を招いている。
Further, when performing reinforcement, it is necessary to attach reinforcement spacers 5 to the upper part of the formwork, etc., which makes the work complicated.

(発明の目的) この発明は以上の問題点を解決すべく創案され
たもので、施工の省力化と工期の短縮化を達成し
得る厚い床スラブの施工方法を提供することを目
的とする。
(Objective of the Invention) The present invention was devised to solve the above-mentioned problems, and its purpose is to provide a method for constructing a thick floor slab that can save labor and shorten the construction period.

(発明の構成) この発明はデツキプレート7の左右両端に下部
形鋼9,9を取付け、かつそのデツキプレート7
より上方に位置し、頂部で上部形鋼10に接合す
る2つの斜材8の下部を前記下部形鋼9,9に取
付けて支持部材6を構成し、その支持部材6の両
端を支持させ、かつ幅方向に所定間隔に配置し、
前記支持部材6間には中間のデツキプレート7′
を配置し、かつ前記下部形鋼9,9に取付け、支
持部材の上部に上端筋を、デツキプレート7およ
び中間のデツキプレート7′の上面に下端筋をそ
れぞれ配筋した後、前記支持部材6を埋設するよ
うにコンクリートを打設することを特徴とする床
スラブの施工方法である。
(Structure of the Invention) This invention includes lower section steels 9, 9 attached to both left and right ends of the deck plate 7, and the deck plate 7
The lower parts of two diagonal members 8 located higher up and connected to the upper section steel 10 at the top are attached to the lower section steels 9, 9 to form a support member 6, and both ends of the support member 6 are supported, and arranged at predetermined intervals in the width direction,
An intermediate deck plate 7' is disposed between the supporting members 6.
and attached to the lower section steels 9, 9, upper end reinforcement is placed on the upper part of the support member, and lower end reinforcement is placed on the upper surface of the deck plate 7 and the intermediate deck plate 7', and then the support member 6 is placed. This is a floor slab construction method characterized by pouring concrete so as to bury the concrete.

(実施例) この発明の実施例を図面によつて説明する。(Example) Embodiments of the invention will be described with reference to the drawings.

先ず第2図に示すように工場にてデツキプレー
ト7の左右両端下面に下部形鋼9,9を取付け、
かつその下部形鋼9にデツキプレート7より上方
に位置し、頂部で上部形鋼10に接合する2つの
斜材8,8の下部を取付けて側面三角形状の支持
部材6を形成する。
First, as shown in Fig. 2, the lower section steels 9, 9 are attached to the bottom surface of both the left and right ends of the deck plate 7 at the factory.
Further, the lower portions of two diagonal members 8, 8 located above the deck plate 7 and connected to the upper section steel 10 at the top are attached to the lower section steel 9 to form a support member 6 having a triangular side surface.

デツキプレート7は長手方向(図において前後
方向)に連続するものであり、また上下部形鋼
9,10も同様に連続している。形鋼9は第3図
に示すように平板状のデツキプレート当接部9a
と、2つのL形鋼からなる斜材当接部9bとから
形成されている。
The deck plate 7 is continuous in the longitudinal direction (front-back direction in the figure), and the upper and lower section steels 9 and 10 are also continuous. As shown in FIG. 3, the shaped steel 9 has a flat deck plate contact portion 9a.
and a diagonal member contact portion 9b made of two L-shaped steels.

上部形鋼材10はL形鋼等で形成する。 The upper section steel material 10 is formed of L-section steel or the like.

また、斜材8は山形鋼、帯板等で形成するとと
もに長手方向に所定間隔に配置する。次に第4図
に示すように現場にて2つの支持部材6を所定間
隔に配置し、その支持部材6,6間に中間のデツ
キプレート7′を取付ける。また支持部材6は建
物の梁等の建物構造体に支持させる。
Further, the diagonal members 8 are formed of angle iron, strip plates, etc., and are arranged at predetermined intervals in the longitudinal direction. Next, as shown in FIG. 4, two supporting members 6 are arranged at a predetermined interval on site, and an intermediate deck plate 7' is installed between the supporting members 6, 6. Further, the support member 6 is supported by a building structure such as a beam of a building.

中間のデツキプレート7′は左右のアングル材
9,9のデツキプレート当接部9aに溶接等で固
定し、下面を全て覆うようにする。
The intermediate deck plate 7' is fixed by welding or the like to the deck plate abutting portions 9a of the left and right angle members 9, 9 so as to cover the entire lower surface.

鉄筋配置手順は、まず支持部材9の上部に上端
鉄筋11を取付け、その上に上端主筋12を配筋
する。デツキプレート7および中間のデツキプレ
ート7′の上に下端主筋14を集合させ、かつ仮
留めして吊り込み下端配力筋13を形鋼材9で支
持させ次いで下端主筋14を所定間隔に配置す
る。
In the reinforcing bar placement procedure, first, the upper end reinforcing bars 11 are attached to the upper part of the support member 9, and the upper end main reinforcing bars 12 are arranged thereon. The lower end main reinforcing bars 14 are assembled on the deck plate 7 and the intermediate deck plate 7' and are temporarily fastened to support the lower end distribution reinforcing bars 13 with the shaped steel members 9, and then the lower end main reinforcing bars 14 are arranged at predetermined intervals.

なお、下端筋13,14を上端筋11,12よ
り先行して配筋してもよい。
Note that the lower end reinforcements 13 and 14 may be arranged prior to the upper end reinforcements 11 and 12.

上端鉄筋11の端部近傍には隣接セツト分の上
端主筋12を仮止めしておき、また下端配力筋1
3の端部近傍には同じく隣接セツト分の中間のデ
ツキプレート7′と下端主筋14を仮止めしてお
く。
Near the end of the upper end reinforcing bar 11, the upper end main reinforcement 12 of the adjacent set is temporarily fixed, and the lower end distribution reinforcement 1
In the vicinity of the end of 3, the middle deck plate 7' and the lower end main reinforcing bar 14 of the adjacent set are temporarily fixed.

次いで、第5図に示すように前記建て込んだ支
持部材6,6、中間のデツキプレート7′等をセ
ツト毎に吊り上げて所定位置に固定する。
Next, as shown in FIG. 5, the built-in supporting members 6, 6, intermediate deck plate 7', etc. are lifted up and fixed in a predetermined position.

継手部においては第5図に示すように上端鉄筋
11,11どおしを重ね継手とし、下端鉄筋13
に仮止めした中間のデツキプレート7′を形鋼材
9に固定する。
In the joint part, as shown in FIG.
The intermediate deck plate 7' temporarily fixed to the section steel member 9 is then fixed.

また継手部の上端主筋12および下端筋13,
14を配筋する。
In addition, the upper end main reinforcement 12 and the lower end reinforcement 13 of the joint part,
Reinforce 14.

継手部の下端鉄筋13,13どおしは、上端鉄
筋11と同様重ね継手とする。
The lower end reinforcing bars 13, 13 of the joint part are a lap joint like the upper end reinforcing bars 11.

なお実施例においては、主筋12,14、鉄筋
11,13どもピッチを200mmとした。
In the example, the pitch of the main bars 12, 14 and the reinforcing bars 11, 13 was set to 200 mm.

最後にデツキプレート7,7′上にコンクリー
ト4を打設し、支持部材6を床スラブのコンクリ
ート4中に埋設する。
Finally, concrete 4 is placed on the deck plates 7, 7', and the support member 6 is buried in the concrete 4 of the floor slab.

〔発明の効果) この発明は以上の構成からなり、デツキプレー
トの左右両端に下部形鋼を取付け、かつそのデツ
キプレートより上方に位置し、頂部で上部形鋼に
接合する2つの斜材の下部を前記下部形鋼に取付
けて支持部材を構成し、その支持部材を梁等の建
物構造体で支持するとともに幅方向に所定間隔に
配置し、前記支持部材6間には中間のデツキプレ
ートを配置してあるので、デツキプレートの上面
にコンクリートを打設した時、そのコンクリート
の荷重を前記支持部材で支持することができ、仮
設梁、ブラケツト等が不要であり、施工の省力化
および工期の短縮化が図れ床下面の作業空間を広
くとることができ、配管類との干渉もなく容易に
作業を行うことができる。
[Effects of the Invention] The present invention has the above-mentioned configuration, in which the lower section steel is attached to both the left and right ends of the deck plate, and the lower sections of the two diagonal members located above the deck plate and joined to the upper section steel at the top. are attached to the lower section steel to constitute a support member, and the support members are supported by building structures such as beams and arranged at predetermined intervals in the width direction, and intermediate deck plates are arranged between the support members 6. Therefore, when concrete is placed on the top surface of the deck plate, the load of the concrete can be supported by the supporting member, and temporary beams, brackets, etc. are not required, saving labor and shortening the construction period. This allows for a wider working space under the floor, and allows for easier work without interference with piping.

さらに下端筋はデツキプレートの上面に、上端
筋は支持部材の上部に取付けるので、配筋作業が
容易であり、また配筋スペーサも不要である。
Further, since the lower end reinforcements are attached to the upper surface of the deck plate and the upper end reinforcements are attached to the upper part of the support member, reinforcement work is easy and reinforcement spacers are not required.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は従来例を示す横断面図、第2図〜第6
図はこの発明の実施例を示す正面図である。 1……捨て型枠、2……仮設梁、3……ブラケ
ツト、4……コンクリート、5……配筋スペー
サ、6……支持部材、7……デツキプレート、7
……中間のデツキプレート、8……斜材、9……
下部形鋼、10……上部形鋼、11……上端配力
筋、12……上端主筋、13……下端配力筋、1
4……下端主筋。
Figure 1 is a cross-sectional view showing a conventional example, Figures 2 to 6
The figure is a front view showing an embodiment of the invention. 1... Disposable formwork, 2... Temporary beam, 3... Bracket, 4... Concrete, 5... Reinforcement spacer, 6... Supporting member, 7... Deck plate, 7
...Intermediate deck plate, 8...Diagonal material, 9...
Lower section steel, 10... Upper section steel, 11... Upper end distribution reinforcement, 12... Upper end main reinforcement, 13... Lower end distribution reinforcement, 1
4...Lower end main reinforcement.

Claims (1)

【特許請求の範囲】[Claims] 1 デツキプレート7の左右両端に下部形鋼9,
9を取付け、かつそのデツキプレート7より上方
に位置し、頂部で上部形鋼10に接合する2つの
斜材の下部を前記下部形鋼9,9に取付けて支持
部材6を構成し、その支持部材6を建物構造体で
支持するとともに幅方向に所定間隔に配置し、前
記支持部材6間には中間のデツキプレート7′を
配置し、かつ前記下部形鋼9,9に取付け、支持
部材6の上部に上端筋を、デツキプレート7およ
び中間のデツキプレート7′の上面に下端筋をそ
れぞれ配筋した後、前記支持部材6を埋設するよ
うにコンクリートを打設することを特徴とする床
スラブの施工方法。
1 Lower section steel 9,
9 is attached, and the lower parts of two diagonal members located above the deck plate 7 and connected to the upper section steel 10 at the top are attached to the lower section steels 9, 9 to constitute the support member 6, and the support member 6 is The members 6 are supported by the building structure and arranged at predetermined intervals in the width direction, intermediate deck plates 7' are arranged between the support members 6, and attached to the lower section steels 9, 9, the support members 6 After arranging upper end reinforcements on the upper part of the deck plate 7 and lower end reinforcements on the upper surface of the deck plate 7 and the intermediate deck plate 7', concrete is poured so as to bury the support member 6. construction method.
JP15098984A 1984-07-20 1984-07-20 Construction of floor slab Granted JPS6131545A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP15098984A JPS6131545A (en) 1984-07-20 1984-07-20 Construction of floor slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP15098984A JPS6131545A (en) 1984-07-20 1984-07-20 Construction of floor slab

Publications (2)

Publication Number Publication Date
JPS6131545A JPS6131545A (en) 1986-02-14
JPH0472018B2 true JPH0472018B2 (en) 1992-11-17

Family

ID=15508850

Family Applications (1)

Application Number Title Priority Date Filing Date
JP15098984A Granted JPS6131545A (en) 1984-07-20 1984-07-20 Construction of floor slab

Country Status (1)

Country Link
JP (1) JPS6131545A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5964026B2 (en) * 2011-09-07 2016-08-03 前田建設工業株式会社 Reinforced slab structure and its construction method

Also Published As

Publication number Publication date
JPS6131545A (en) 1986-02-14

Similar Documents

Publication Publication Date Title
JPH0472018B2 (en)
JPH0248497Y2 (en)
JPH0432901B2 (en)
JPH0122837Y2 (en)
JP2649887B2 (en) Construction method of mat slab
JP2707966B2 (en) Floor construction method using prestressed concrete plate as beam-side formwork
EP0385998B1 (en) Floor structure for buildings
JP2536250Y2 (en) Steel foundation beam
JP2864905B2 (en) Precast wall joining method
JPH01223248A (en) Folded plate unit slab construction method
KR200397203Y1 (en) Truss Deck Plate with Improved End Structure
JPH0230492Y2 (en)
JPS5925931Y2 (en) Composite girder using π-shaped steel
JPH0514063B2 (en)
JPH0312086Y2 (en)
JP2791734B2 (en) Mesh panel reinforcement and method of arranging the reinforcement
JPH044091Y2 (en)
JPH0328643Y2 (en)
JPH07119240A (en) Precast concrete beam
KR200215040Y1 (en) Deck panel of reinforced concrete slab
JPS6232303B2 (en)
JPH0634491Y2 (en) Formwork and floor slab
JPS61126255A (en) Reverse flat slab structure
JP3002681B2 (en) Building structure
JPH0211521Y2 (en)