JPH0481503A - Turbine control device - Google Patents
Turbine control deviceInfo
- Publication number
- JPH0481503A JPH0481503A JP19244990A JP19244990A JPH0481503A JP H0481503 A JPH0481503 A JP H0481503A JP 19244990 A JP19244990 A JP 19244990A JP 19244990 A JP19244990 A JP 19244990A JP H0481503 A JPH0481503 A JP H0481503A
- Authority
- JP
- Japan
- Prior art keywords
- speed
- steam
- control signal
- turbine
- valve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Control Of Turbines (AREA)
Abstract
Description
【発明の詳細な説明】
〔発明の目的〕
(産業上の利用分野)
本発明は、タービン制御装置に係り、特に電力系統外乱
発生等によりタービンの速度変動が生じた場合に、例え
ば原子炉スクラムを招くようなことがなく原子炉運転を
継続させることかできるようにしたタービン制御装置に
関する。[Detailed Description of the Invention] [Object of the Invention] (Industrial Application Field) The present invention relates to a turbine control device, and in particular, when a turbine speed fluctuation occurs due to an electric power system disturbance, etc. The present invention relates to a turbine control device that allows nuclear reactor operation to continue without causing problems.
(従来の技術)
第3図は、−船釣な発電プラントの主管系統を示す図で
あり、蒸気発生器1で発生した蒸気は主蒸気管2を通り
、蒸気加減弁3でその量が制御されてタービン4に流入
する。そして、このタービン4で仕事を行ない、タービ
ン4に同軸的に連結されている発電機5を駆動して発電
し、その発電機5で発生した電力はしゃ断器6を介して
系統7に供給される。そして、上記蒸気タービン4で仕
事をした蒸気は復水器8で復水される。また、蒸気発生
器1で発生した蒸気のうち蒸気加減弁3を経てタービン
4に流入しなかった蒸気は、パイパス弁9を経由して直
接復水器8に流入する。(Prior art) Fig. 3 is a diagram showing the main pipe system of a power generation plant, in which steam generated in a steam generator 1 passes through a main steam pipe 2, and its amount is controlled by a steam control valve 3. and flows into the turbine 4. This turbine 4 performs work and drives a generator 5 coaxially connected to the turbine 4 to generate electricity, and the electricity generated by the generator 5 is supplied to the grid 7 via a breaker 6. Ru. The steam that has done work in the steam turbine 4 is condensed in a condenser 8. Furthermore, the steam generated in the steam generator 1 that does not flow into the turbine 4 through the steam control valve 3 flows directly into the condenser 8 through the bypass valve 9.
一方、主蒸気圧力およびタービン速度がそれぞれ圧力セ
ンサ10および速度センサ11によって検出されるよう
になっており、これらの各検出値か上記蒸気加減弁3お
よびバイパス弁9の開度制御用のパラメータとなる。On the other hand, the main steam pressure and turbine speed are detected by a pressure sensor 10 and a speed sensor 11, respectively, and these detected values are used as parameters for controlling the openings of the steam control valve 3 and bypass valve 9. Become.
第4図は蒸気加減弁3およびバイパス弁9の制御装置の
一例を示す図であって、圧力センサ10で検出された主
蒸気圧力Aと圧力設定器20で設定された圧力設定値B
とが加算器21に加えられ、その加算器21で両者の偏
差か演算される。そして、この偏差に増幅器22でゲイ
ンに1が乗ぜられ圧力制御信号Eとなる。ここで、17
に1は一般に圧力調定率と呼ばれており、例えば一方、
前記速度センサ11で検出されたタービン速度Cと速度
設定値りの偏差も加算器23で演算され、その偏差に増
幅器24てゲインに2が乗ぜられ、速度制御信号Fとな
る。ここで、]/に2は一般に速度調定率と呼ばれてお
り、例ところで、上記速度制御信号Fは負荷設定器25
で設定された負荷設定値Jと加算器26で加算され、そ
の加算信号か速度負荷制御信号Gとして出力する。FIG. 4 is a diagram showing an example of a control device for the steam control valve 3 and the bypass valve 9, in which the main steam pressure A detected by the pressure sensor 10 and the pressure setting value B set by the pressure setting device 20 are shown.
are added to the adder 21, and the adder 21 calculates the deviation between the two. Then, this deviation is multiplied by a gain of 1 in the amplifier 22 to produce the pressure control signal E. Here, 17
1 is generally called the pressure adjustment rate, for example, on the other hand,
A deviation between the turbine speed C detected by the speed sensor 11 and the speed setting value is also calculated in an adder 23, and the deviation is multiplied by a gain of 2 in an amplifier 24 to form a speed control signal F. Here, ]/2 is generally called the speed regulation rate, and for example, the speed control signal F is the load setter 25.
The adder 26 adds the load setting value J set in , and outputs the added signal as the speed load control signal G.
上記圧力制御信号Eと速度負荷制御信号Gはともに低値
優先回路27に入力され、その低値信号が加減弁流量要
求信号りとして出力し蒸気加減弁3に制御信号として加
えられる。一方、前記圧力制御信号Eおよび加減弁流量
要求信号りは加算器28にも印加され、上記圧力制御信
号Eと加減弁流量要求信号りとの偏差信号がバイパス弁
流量要求信号にとなりバイパス弁9に制御信号として加
えられる。Both the pressure control signal E and speed load control signal G are input to the low value priority circuit 27, and the low value signal is outputted as a control valve flow rate request signal and is applied to the steam control valve 3 as a control signal. On the other hand, the pressure control signal E and the control valve flow rate request signal are also applied to the adder 28, and the deviation signal between the pressure control signal E and the control valve flow rate request signal becomes the bypass valve flow rate request signal. is added as a control signal.
このような制御装置においては、発電プラントの通常運
転時には、通例負荷設定値Jか通常運転時の加減弁流量
要求信号よりも10%大きく設定されているために、圧
力制御信号Eの方か速度負荷制御信号Gよりも小さくな
り、加減弁流量負荷制御信号りは圧力制御信号Eに等し
くなり、バイパス弁流量要求信号には零となる。すなわ
ち、蒸気発生器1で発生した蒸気は全て蒸気加減弁3を
通ってタービン4に流入し、バイパス弁9は全開となる
ような制御が行なわれる。In such a control device, during normal operation of the power plant, the load setting value J is usually set 10% larger than the regulating valve flow rate request signal during normal operation, so the pressure control signal E is higher than the speed. It becomes smaller than the load control signal G, the regulating valve flow rate load control signal becomes equal to the pressure control signal E, and the bypass valve flow rate request signal becomes zero. That is, all the steam generated by the steam generator 1 flows into the turbine 4 through the steam control valve 3, and the bypass valve 9 is controlled to be fully open.
したがって、通常運転時に、速度設定値りとタービン速
度Cとの偏差からなる速度制御信号Fが一10%以内(
50Hzの場合0.25Hzに相当する)となるタービ
ン速度上昇に対して蒸気加減弁3は応答せず、圧力制御
が優先的になされている。Therefore, during normal operation, the speed control signal F consisting of the deviation between the speed setting value and the turbine speed C is within 10% (
The steam control valve 3 does not respond to the increase in turbine speed (corresponding to 0.25 Hz in the case of 50 Hz), and pressure control is performed preferentially.
一方、速度制御信号Fが一10%以下(50Hzの場合
0.25Hz以上の周波数上昇)となるタービン速度上
昇となった場合、速度負荷制御信号Gが圧力制御信号E
以下となり、蒸気加減弁3は絞り込まれる。この蒸気加
減弁の絞り動作により余剰となった蒸気は、圧力制御信
号Eから加減弁流量要求信号りを差引いた信号からなる
バイパス弁流量要求信号Kにより開制御されるバイパス
弁9により処理される。このように、蒸気加減弁3とバ
イパス弁9とを協調動作させると、原子炉圧力は殆ど変
化することなく、プラント運転を安定に継続できること
になる。On the other hand, when the speed control signal F increases by less than 10% (frequency increase of 0.25Hz or more in the case of 50Hz), the speed load control signal G changes to the pressure control signal E.
As a result, the steam control valve 3 is narrowed down. The surplus steam resulting from the throttling operation of the steam control valve is processed by the bypass valve 9, which is controlled to open by the bypass valve flow rate request signal K, which is a signal obtained by subtracting the control valve flow rate request signal from the pressure control signal E. . In this way, when the steam control valve 3 and the bypass valve 9 are operated in a coordinated manner, the reactor pressure hardly changes, and the plant operation can be stably continued.
(発明が解決しようとする課題)
このように通常運転においては、タービン速度が変動し
ても蒸気加減弁およびバイパス弁の開度がそれぞれ指令
値に対して遅れなく追従するので問題は生じないが、系
統事故などで急激な外乱か生じた場合には、下記のよう
な問題が生しる。(Problem to be Solved by the Invention) In this way, in normal operation, even if the turbine speed fluctuates, no problem occurs because the opening degrees of the steam control valve and the bypass valve follow the respective command values without delay. When a sudden disturbance occurs due to a system accident or the like, the following problems occur.
すなわち、第5図のタイムチャートに示すように、圧力
制御運転中に、時点t1でタービン速度Cが基準速度か
ら急上昇したとすると、速度負荷制御信号Gが低下し、
圧力制御信号Eより小さくなった時点t2から蒸気加減
弁3の開度が減少され、同時にバイパス流量要求信号K
が上昇し、バイパス弁9の開度もともに増大する。That is, as shown in the time chart of FIG. 5, if the turbine speed C suddenly increases from the reference speed at time t1 during pressure control operation, the speed load control signal G decreases,
From the time point t2 when the pressure becomes smaller than the pressure control signal E, the opening degree of the steam control valve 3 is decreased, and at the same time the bypass flow rate request signal K
increases, and the opening degree of the bypass valve 9 also increases.
この場合、蒸気加減弁3の閉動作量とバイパス弁9の開
動作量とは大きさがほぼ等しいので、主蒸気圧力Aには
変動は生じない。しかし、タービン速度Cが時点t4で
急激に基準速度に復帰するときは、加減弁流量要求信号
りは開方向に、バイパス弁流量要求信号には閉方向に変
化する。In this case, since the closing operation amount of the steam control valve 3 and the opening operation amount of the bypass valve 9 are approximately equal in magnitude, no fluctuation occurs in the main steam pressure A. However, when the turbine speed C suddenly returns to the reference speed at time t4, the regulator valve flow rate request signal changes in the opening direction, and the bypass valve flow rate request signal changes in the closing direction.
この場合、加減弁流量要求信号りとバイパス弁流量要求
信号りとバイパス弁流量要求信号にとの変化速度および
開/閉量は同じであるか、実際の蒸気加減弁3の開速度
とバイパス弁9の閉速度は弁の機械的制約から特性が異
なり、バイパス弁9の閉速度に対して蒸気加減弁3の開
速度が遅れるため、蒸気発生器1からの蒸気が制限され
、主蒸気圧力Aが上昇する。In this case, are the change speeds and opening/closing amounts of the regulator valve flow rate request signal, the bypass valve flow rate request signal, and the bypass valve flow rate request signal the same, or the actual opening speed of the steam regulator valve 3 and the bypass valve The closing speed of the steam regulator 9 has different characteristics due to the mechanical constraints of the valve, and the opening speed of the steam control valve 3 lags behind the closing speed of the bypass valve 9, so the steam from the steam generator 1 is restricted and the main steam pressure A rises.
このため圧力制御信号Eが開方向に変化し、バイパス弁
9は時点t から開らき始め時点t8で全開となり、こ
の時点で圧力制御が許容制御範囲を越え、時点t9で主
蒸気圧力Aが制限値を越え、原子炉保護インターロック
か作動して原子炉スクラムに至る恐れがある。For this reason, the pressure control signal E changes in the opening direction, and the bypass valve 9 starts opening at time t and becomes fully open at time t8, at which point the pressure control exceeds the allowable control range, and at time t9, the main steam pressure A is limited. There is a risk that the value will be exceeded and the reactor protection interlock will be activated, leading to a reactor scram.
この対策として蒸気加減弁或はバイパス弁開閉特性を調
整することが考えられるか、バイパス弁は負荷しゃ断又
はタービントリップ発生時等に極めて高速に動作するこ
とか要求されており、一方加減弁は弁構成上および法規
制上の制約があるため弁本体を改善することは困難であ
る。As a countermeasure to this problem, it may be possible to adjust the opening/closing characteristics of the steam control valve or bypass valve.Bypass valves are required to operate at extremely high speeds during load cut-off or when a turbine trip occurs, while control valves are It is difficult to improve the valve body due to structural and regulatory constraints.
本発明はこのような点に鑑み、電力系統外乱によるター
ビン速度変動が生じ蒸気加減弁が開閉動作する場合にも
、不要な原子炉スクラムを回避しながら原子炉運転を継
続可能なタービン制御装置を得ることを目的とする。In view of these points, the present invention provides a turbine control device that can continue reactor operation while avoiding unnecessary reactor scrams even when turbine speed fluctuations occur due to power system disturbances and the steam control valve opens and closes. The purpose is to obtain.
(課題を解決するための手段)
本発明は、蒸気発生器で発生した蒸気のタービンへの流
入量を制御する蒸気加減弁と、上記蒸気発生器で発生し
た蒸気のうちタービンへ流入しない蒸気を復水器等に逃
す蒸気量を制御するバイパス弁とを有し、主蒸気圧力と
設定圧力との偏差信号およびタービン速度と設定速度と
の偏差信号によって前記蒸気加減弁およびバイパス弁の
開度を制御し、タービン入口蒸気圧力およびタービン速
度を制御するようにしたタービン制御装置において、タ
ービン速度と設定速度との偏差信号からなる速度制御信
号或は速度負荷制御信号に蒸気加減弁の実動作速度相当
の変化率特性を持たせる変化率制限器を設けたことを特
徴とする。(Means for Solving the Problems) The present invention provides a steam control valve that controls the amount of steam generated in a steam generator flowing into a turbine, and a steam control valve that controls the amount of steam generated in the steam generator that does not flow into the turbine. and a bypass valve that controls the amount of steam released to a condenser etc., and the opening degree of the steam control valve and the bypass valve is controlled by a deviation signal between the main steam pressure and the set pressure and a deviation signal between the turbine speed and the set speed. In a turbine control device that controls turbine inlet steam pressure and turbine speed, a speed control signal consisting of a deviation signal between the turbine speed and a set speed or a speed load control signal corresponding to the actual operating speed of the steam control valve is used. The present invention is characterized in that a rate-of-change limiter is provided to provide a rate-of-change characteristic of .
(作用)
上述のように蒸気加減弁の実動作速度相当の変化率特性
を持たせた変化率制限器を設けたので、電力系統外乱な
どによるタービン速度変動時において、蒸気加減弁およ
びバイパス弁の開閉動作速度および動作量が一致し、タ
ービン速度変動に対して不要なタービン入口蒸気圧力の
変動が生ずることが防止される。(Function) As mentioned above, since the rate of change limiter is provided with a rate of change characteristic corresponding to the actual operating speed of the steam regulator valve, the steam regulator valve and the bypass valve are The opening/closing operation speed and operation amount match, and unnecessary fluctuations in turbine inlet steam pressure due to turbine speed fluctuations are prevented.
(実施例)
以下、第1図および第2図を参照して本発明の実施例に
ついて説明する。(Example) Hereinafter, an example of the present invention will be described with reference to FIGS. 1 and 2.
圧力センサで検出された主蒸気圧力Aは圧力設定器20
で設定された圧力設定値Bと加算器21で比較され、そ
の偏差信号に増幅器22でゲインに1が乗ぜられて圧力
制御信号Eとなり、低値優先回路27および加算器28
に入力される。The main steam pressure A detected by the pressure sensor is transferred to the pressure setting device 20.
The difference signal is compared with the pressure setting value B set in the adder 21, and the difference signal is multiplied by a gain of 1 in the amplifier 22 to become the pressure control signal E, which is sent to the low value priority circuit 27 and the adder 28.
is input.
一方、速度センサで検出されたタービン速度Cと速度設
定値りとの偏差信号には増幅器24でゲインに2が乗ぜ
られ、速度制御信号Fとなり、加算器26でその速度制
御信号Fに負荷設定値Jが加算され、速度負荷制御信号
Gが出力される。On the other hand, the difference signal between the turbine speed C detected by the speed sensor and the speed setting value is multiplied by a gain of 2 in the amplifier 24 to become the speed control signal F, and the adder 26 uses the speed control signal F to set the load. The value J is added and the speed load control signal G is output.
ここで、本発明においては、上記速度負荷制御信号Gが
変化率制限器29に入力されるようにしである。この変
化率制限器29は、実際の蒸気加減弁の開閉速度に合う
ように速度負荷制御信号の変化率を制限するものであっ
て、上記速度負荷制御信号Gはこの変化率制限器29に
おいて実際の蒸気加減弁の開閉速度に合った変化率を有
する速度負荷制御信号Hに変えられる。Here, in the present invention, the speed load control signal G is input to the rate of change limiter 29. This change rate limiter 29 limits the change rate of the speed load control signal to match the actual opening/closing speed of the steam control valve, and the speed load control signal G is actually controlled in this change rate limiter 29. The speed load control signal H has a rate of change that matches the opening/closing speed of the steam control valve.
そして、この速度負荷制御信号Hが前記低値優先回路2
7に入力される。Then, this speed load control signal H is transmitted to the low value priority circuit 2.
7 is input.
一方、上記低値優先回路27で選択された低値信号は、
従来装置と同様に加減弁流量要求信号りとして蒸気加減
弁に加えられるとともに、加算器28に入力され圧力制
御信号Eと比較され、その偏差信号がバイパス弁流量要
求信号にとしてバイパス弁に加えられる。On the other hand, the low value signal selected by the low value priority circuit 27 is
Similar to the conventional device, the signal is applied to the steam control valve as a control valve flow rate request signal, and is also input to the adder 28 and compared with the pressure control signal E, and the deviation signal is added to the bypass valve as a bypass valve flow rate request signal. .
第2図は第1図に示す装置の動作を示すタイムチャート
であって、通常の圧力制御運転中に、時点t1で系統外
乱によりタービン速度Cが上昇しはじめると、速度負荷
制御信号Hが閉方向に変化し、時点t2で、速度負荷制
御信号Hく圧力制御信号Eとなり、加減弁流量要求信号
りが弁閉方向に変化し、蒸気加減弁が閉方向に制御され
る。この時、バイパス弁流量要求信号には圧力制御信号
Eからの加減弁流量要求信号りを引いた偏差分弁開方向
に変化し、バイパス弁が開方向に制御される。FIG. 2 is a time chart showing the operation of the device shown in FIG. 1. During normal pressure control operation, when the turbine speed C starts to increase due to system disturbance at time t1, the speed load control signal H closes. At time t2, the speed load control signal H becomes the pressure control signal E, the regulator valve flow rate request signal changes in the valve closing direction, and the steam regulator valve is controlled in the closing direction. At this time, the bypass valve flow rate request signal changes in the valve opening direction by a deviation obtained by subtracting the regulating valve flow rate request signal from the pressure control signal E, and the bypass valve is controlled in the opening direction.
そこで、時点t4でタービン速度Cが基準値に戻りはじ
めると、速度負荷制御信号Gはタービン速度Cの変化と
同等の変化率で上昇するが、速度負荷制御信号Hは、変
化率制限器29で制限された変化率、すなわち加減弁の
開速度相当の上昇率で負荷設定値Jを目標に復帰して行
く。Therefore, when the turbine speed C starts to return to the reference value at time t4, the speed load control signal G increases at the same rate of change as the change in the turbine speed C, but the speed load control signal H increases due to the rate of change limiter 29. The load setting value J is returned to the target at a limited rate of change, that is, at a rate of increase corresponding to the opening speed of the control valve.
これによって、加減弁流量要求信号りは、蒸気加減弁自
体のもつ開方向速度の変化率特性で上昇し、同時に、バ
イパス弁流量要求信号には、圧力制御信号Eと加減弁流
量要求信号りの偏差からなることから、蒸気加減弁自体
のもつ開方向速度の変化率特性で低下して行く。そして
時点t6でタービン速度Cが基準値に復帰しても、速度
負荷制御信号Hは変化率制限器のもつ特性で制御される
ため、実際の蒸気加減弁およびバイパス弁の開度も、加
減弁流量要求信号りおよびバイパス弁流量要求信号Kに
よりゆっくりと制御される。As a result, the control valve flow rate request signal rises due to the rate of change characteristic of the opening speed of the steam control valve itself, and at the same time, the bypass valve flow rate request signal is generated based on the pressure control signal E and the control valve flow rate request signal. Since it consists of a deviation, it decreases due to the rate of change characteristic of the speed in the opening direction of the steam control valve itself. Even if the turbine speed C returns to the reference value at time t6, the speed load control signal H is controlled by the characteristics of the rate of change limiter, so the actual opening degrees of the steam control valve and bypass valve also change. It is slowly controlled by the flow rate demand signal and the bypass valve flow rate demand signal K.
このようにして、加減弁開速度とバイパス弁閉速度が同
じで且つその変化量が等しくなるため、主蒸気圧力Aの
変動が防止される。In this way, since the adjustment valve opening speed and the bypass valve closing speed are the same and the amount of change thereof is equal, fluctuations in the main steam pressure A are prevented.
なお、上記実施例においては、速度負荷制御信号Gを変
化率制限器29に入力するようにしたものを示したが、
速度側?a信号Fを変化率制限器に入力するようにして
も全く同一である。In the above embodiment, the speed load control signal G is input to the rate of change limiter 29, but
On the speed side? Even if the a signal F is inputted to the rate of change limiter, it is exactly the same.
以上説明したように、本発明においては速度制御信号或
は速度負荷制御信号に蒸気加減弁の実動作速度相当の変
化率特性をもたせる変化率制限器を設けたので、電力系
統外乱によるタービン速度変動が生じ加減弁およびバイ
パス弁が開閉動作する場合、特にタービン速度が上昇後
急激に復帰側に変化しても、蒸気加減弁の開方向速度と
バイパス弁の閉方向速度の変化率が等しくなるため、蒸
気加減弁とバイパス弁に流れる蒸気の総流量が変化せず
、タービン入口蒸気圧力に変動が生じるようなことがな
い。したがって、原子カプラントにおいては、系統外乱
による不要な原子炉スクラムを避けることができ、原子
カプラントの稼動率を向上させることができる。As explained above, in the present invention, a rate-of-change limiter is provided that gives the speed control signal or speed load control signal a rate-of-change characteristic corresponding to the actual operating speed of the steam control valve. When this occurs and the regulator and bypass valve open and close, the rate of change of the speed in the opening direction of the steam regulator and the speed in the closing direction of the bypass valve will be equal, especially even if the turbine speed suddenly changes to the return side after increasing. , the total flow rate of steam flowing through the steam control valve and the bypass valve does not change, and there is no fluctuation in the steam pressure at the turbine inlet. Therefore, in the nuclear coupler, unnecessary reactor scrams due to system disturbances can be avoided, and the operating rate of the nuclear coupler can be improved.
29・・・変化率制限器。29... Rate of change limiter.
Claims (1)
する蒸気加減弁と、上記蒸気発生器で発生した蒸気のう
ちタービンへ流入しない蒸気を復水器等に逃す蒸気量を
制御するバイパス弁とを有し、主蒸気圧力と設定圧力と
の偏差信号およびタービン速度と設定速度との偏差信号
によって前記蒸気加減弁およびバイパス弁の開度を制御
し、タービン入口蒸気圧力およびタービン速度を制御す
るようにしたタービン制御装置において、タービン速度
と設定速度との偏差信号からなる速度制御信号或は速度
負荷制御信号に蒸気加減弁の実動作速度相当の変化率特
性を持たせる変化率制限器を設けたことを特徴とする、
タービン制御装置。A steam control valve that controls the amount of steam generated in the steam generator flowing into the turbine, and a bypass valve that controls the amount of steam generated in the steam generator that does not flow into the turbine and is released to a condenser or the like. The opening degree of the steam control valve and the bypass valve is controlled by the deviation signal between the main steam pressure and the set pressure and the deviation signal between the turbine speed and the set speed, and the turbine inlet steam pressure and the turbine speed are controlled. In such a turbine control device, a rate-of-change limiter is provided to give a speed control signal or a speed load control signal consisting of a deviation signal between the turbine speed and a set speed a rate-of-change characteristic corresponding to the actual operating speed of the steam control valve. It is characterized by
Turbine control device.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP19244990A JPH0481503A (en) | 1990-07-20 | 1990-07-20 | Turbine control device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP19244990A JPH0481503A (en) | 1990-07-20 | 1990-07-20 | Turbine control device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH0481503A true JPH0481503A (en) | 1992-03-16 |
Family
ID=16291490
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP19244990A Pending JPH0481503A (en) | 1990-07-20 | 1990-07-20 | Turbine control device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0481503A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2019143626A (en) * | 2018-02-21 | 2019-08-29 | 株式会社東芝 | Steam regulating valve control device for power generating plant and steam regulating valve control method for power generating plant |
-
1990
- 1990-07-20 JP JP19244990A patent/JPH0481503A/en active Pending
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2019143626A (en) * | 2018-02-21 | 2019-08-29 | 株式会社東芝 | Steam regulating valve control device for power generating plant and steam regulating valve control method for power generating plant |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102654751A (en) | Coordination control method based on nonlinear control and fuzzy control | |
| JPS6344922B2 (en) | ||
| JPH0566601B2 (en) | ||
| JPH0481503A (en) | Turbine control device | |
| JPH11223302A (en) | Automatic control device and method of power generating plant | |
| JPS5946373A (en) | Controller for speed of water wheel | |
| JP2515797B2 (en) | Turbin controller | |
| JPS6123365B2 (en) | ||
| JPH0577841B2 (en) | ||
| JPH04219405A (en) | Turbine controller | |
| JPS62240404A (en) | Turbine control device | |
| JPS61266029A (en) | Automatic frequency controller | |
| JPS639602A (en) | Inlet steam pressure control method for geothermal turbine | |
| JPS6156401B2 (en) | ||
| JPS62210205A (en) | Turbine controller | |
| JPH0345638B2 (en) | ||
| JPH01123199A (en) | Controlling of nuclear reactor output | |
| JPH03215198A (en) | Load controller for combined cycle plant | |
| JPS63154807A (en) | Turbine controller having nonlinear characteristic | |
| JPH04339105A (en) | Load controlling device for power generating plant | |
| JPH0441799B2 (en) | ||
| JPH02201003A (en) | Electric-hydraulic governor apparatus | |
| JPS59185808A (en) | Control device for main steam pressure of power plant | |
| JPS62150011A (en) | Control device for nuclear turbine power plant | |
| JPH0245601A (en) | Turbine control device |