JPH05272155A - Working-machine interference preventing device - Google Patents
Working-machine interference preventing deviceInfo
- Publication number
- JPH05272155A JPH05272155A JP10066192A JP10066192A JPH05272155A JP H05272155 A JPH05272155 A JP H05272155A JP 10066192 A JP10066192 A JP 10066192A JP 10066192 A JP10066192 A JP 10066192A JP H05272155 A JPH05272155 A JP H05272155A
- Authority
- JP
- Japan
- Prior art keywords
- cab
- area
- interference prevention
- operator
- interference
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/20—Drives; Control devices
- E02F9/2025—Particular purposes of control systems not otherwise provided for
- E02F9/2033—Limiting the movement of frames or implements, e.g. to avoid collision between implements and the cabin
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Operation Control Of Excavators (AREA)
- Component Parts Of Construction Machinery (AREA)
Abstract
(57)【要約】
【目的】 作業機干渉防止装置の干渉防止領域を適正化
したもの。
【構成】 運転室1の前方側にオフセットした作業機2
を運転室に向かって屈曲させたとき、作業機2が干渉を
起こす運転室1回りの干渉防止領域3をコントロ−ラに
記憶させて、作業機2が領域3内で自動停止するように
した作業機干渉防止装置において、干渉防止領域3内の
運転室1側に緊急停止領域4を設け、この緊急停止領域
4を運転室1の下側に設けた干渉防止領域4でカバ−す
ると共に、運転室1回りの前部と側部が交差するコ−ナ
部干渉防止領域5を面取り状にカットしたもの。
【効果】 バケット刃先が運転室下側から緊急停止領域
に侵入しても、下側に設けた干渉防止領域により、通常
の自動停止となる。また、干渉防止領域でのコ−ナ部を
カットしてこの部分の自動停止をなくしたので作業の効
率化が図れる。
(57) [Summary] [Purpose] The interference prevention area of the work equipment interference prevention device has been optimized. [Structure] Work implement 2 offset to the front side of the cab 1
When the vehicle is bent toward the operator's cab, the interference preventing area 3 around the operator's cab 1 where the working machine 2 interferes is stored in the controller so that the working machine 2 automatically stops in the area 3. In the work machine interference prevention device, an emergency stop area 4 is provided in the interference prevention area 3 on the side of the operator's cab 1, and the emergency stop area 4 is covered by the interference prevention area 4 provided on the lower side of the operator's cab 1. The corner interference prevention area 5 where the front part and the side part around the cab 1 intersect is cut into a chamfer. [Effect] Even if the bucket blade edge enters the emergency stop area from the lower side of the operator's cab, the interference prevention area provided on the lower side causes normal automatic stop. Further, since the corner portion in the interference prevention area is cut to eliminate the automatic stop of this portion, the work efficiency can be improved.
Description
【0001】[0001]
【産業上の利用分野】本発明はパワ−ショベルのような
掘削積込み用車両において作業時、作業機が運転室と干
渉して運転室を破損させるような事故を起こさないよう
にした作業機干渉防止装置に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a work machine interference which prevents an accident such that the work machine interferes with the driver's cab and damages the operator's cab when working on a vehicle for excavation and loading such as a power shovel. Regarding prevention device.
【0002】[0002]
【従来の技術】パワ−ショベルのような掘削積込み用車
両においては、一般に上部旋回体の上に左側に運転室、
右側にブ−ム、ア−ム、およびバケット等からなる作業
機が設けられている。そして作業時はブ−ムが上部旋回
体に対して起伏し、ブ−ムの先端に設けられたア−ムお
よびその先端のバケットが前後方向に回動するようにな
っており、同じく上部旋回体の上部に設けられた運転室
と干渉するようなことはない。ところが、車両の側方を
掘る場合には上述した作業機では掘ることができないた
めに図3(a)に側面を、(b)に平面を示すように従
来のブ−ムを上下に分割して上側ブ−ム42を下側ブ−
ム41に対して左右方向にオフセットできるようにした
ものがある。このような機構を持つ掘削積込み用車両に
おいては、上側ブ−ム42が運転室43側すなわち左側
にオフセットした場合、ア−ム44やバケット45の作
業範囲は運転室43と干渉する危険がある。これに対し
て運転室43の回りに干渉防止領域を設け、この領域を
すべてコントロ−ラに記憶させておき、作業機がこの領
域に入った場合にはコントロ−ラの指令により作業機の
作動を停止させるようにした作業機干渉防止装置が考え
られている。2. Description of the Related Art In a vehicle for excavation and loading such as a power shovel, a driver's cab is generally provided on the left side above an upper swing structure.
A working machine including a boom, an arm, and a bucket is provided on the right side. At the time of work, the boom undulates with respect to the upper revolving structure, and the arm provided at the tip of the boom and the bucket at the tip of the boom rotate in the front-rear direction. It does not interfere with the cab on the upper part of the body. However, when the side of the vehicle is to be dug, it cannot be dug with the working machine described above, and therefore the conventional boom is divided into upper and lower parts as shown in the side view of FIG. 3A and the plan view of FIG. 3B. The upper boom 42 to the lower
There is one that can be offset in the left-right direction with respect to the frame 41. In the vehicle for excavation and loading having such a mechanism, when the upper boom 42 is offset to the driver's cab 43 side, that is, the left side, the working range of the arm 44 and the bucket 45 may interfere with the driver's cab 43. .. On the other hand, an interference prevention area is provided around the operator's cab 43, and all of this area is stored in the controller. When the working machine enters this area, the working machine operates according to a command from the controller. A work implement interference prevention device designed to stop the work is considered.
【0003】[0003]
【発明が解決しようとする課題】しかしながら、従来の
作業機干渉防止装置では干渉防止装置の不良で作動しな
い場合の対策として干渉防止領域の内側に全操作が不能
となる緊急停止領域を設けているので運転室の下側に作
業機が移動した場合も緊急停止領域に入ってしまって作
業機の作動が止まるため、作業性が悪い。さらに、干渉
防止領域を運転室の前面および側面の所定幅に設けるた
めにコ−ナ部は角になってしまい、コ−ナ部で停止した
場合は運転室からの距離が遠すぎることになるために、
必要以上に干渉防止領域が広くなり過ぎる欠点があっ
た。However, in the conventional work machine interference prevention device, an emergency stop region where all operations are disabled is provided inside the interference prevention region as a countermeasure when the interference prevention device does not operate due to a defect. Therefore, even when the working machine moves to the lower side of the operator's cab, it enters the emergency stop area and the operation of the working machine stops, resulting in poor workability. Further, since the interference prevention area is provided at the predetermined width on the front and side surfaces of the operator's cab, the corner portion becomes a corner, and when stopped at the corner portion, the distance from the operator's cab is too long. for,
There is a drawback that the interference prevention area becomes too wide than necessary.
【0004】本発明はこれに鑑み、干渉防止領域を適正
化できる作業機干渉防止装置を提供して従来技術の持つ
欠点の解消を図ることを目的としてなされたものであ
る。In view of this, the present invention has been made in order to solve the drawbacks of the prior art by providing a working machine interference prevention device capable of optimizing an interference prevention area.
【0005】[0005]
【課題を解決するための手段】上記従来技術の問題点を
解決する手段として本発明は、運転室の前方側にオフセ
ットした作業機を運転室に向かって屈曲させたとき、作
業機が干渉を起こす運転室回りの干渉防止領域をコント
ロ−ラに記憶させて、作業機が該領域内で自動停止する
ようにした作業機干渉防止装置において、該干渉防止領
域内の運転室側に緊急停止領域を設け、この緊急停止領
域を運転室の下側に設けた干渉防止領域でカバ−すると
共に、運転室回りの前部と側部の交差するコ−ナ部干渉
防止領域を面取り状にカットしたことを特徴とする。SUMMARY OF THE INVENTION As a means for solving the above-mentioned problems of the prior art, the present invention is directed to a case where a working machine offset toward the front side of the operator's cab is bent toward the operator's cab. In a work machine interference prevention device in which a controller stores an interference prevention area around a driver's cab to cause the work machine to automatically stop within the area, an emergency stop area is provided on the operator's cab side in the interference prevention area. This emergency stop area is covered by the interference prevention area provided on the lower side of the operator's cab, and the corner interference prevention area where the front and side portions around the operator's cab intersect is cut into a chamfer. It is characterized by
【0006】[0006]
【作用】上記構成によれば、緊急停止領域を運転室の下
側に設けた干渉防止領域でカバ−しているため、運転室
の下側に移動した作業機は緊急停止することなく、カバ
−された干渉防止領域内で自動停止することが可能とな
り、また、コ−ナ部干渉防止領域は面取り状にカットし
たために、必要以上の干渉防止領域がなくなる。According to the above construction, since the emergency stop area is covered by the interference prevention area provided under the driver's cab, the work implement moved to the lower side of the operator's cab does not undergo an emergency stop and is covered. It becomes possible to automatically stop in the interference prevention area that has been cut, and since the corner interference prevention area is cut into a chamfer, there is no more interference prevention area than necessary.
【0007】[0007]
【実施例】図1は本発明にかかる作業機干渉防止装置の
一実施例を示す回路図、図2は本発明の要部を示す一実
施例を示し、(a)は側面図、(b)は(a)のA−A
断面図である。DESCRIPTION OF THE PREFERRED EMBODIMENTS FIG. 1 is a circuit diagram showing an embodiment of a work implement interference prevention device according to the present invention, FIG. 2 shows an embodiment showing the essential parts of the present invention, (a) is a side view, and (b) is a side view. ) Is A-A of (a)
FIG.
【0008】以下、本発明を図1乃至図2に示す実施例
を参照して説明する。本発明は運転室1の前方側にオフ
セットした作業機2を運転室に向かって屈曲させたと
き、作業機2が干渉を起こす運転室1回りの干渉防止領
域3をコントロ−ラに記憶させて、作業機2が該領域3
内で自動停止するようにした作業機干渉防止装置におい
て、該干渉防止領域3内の運転室1側に緊急停止領域4
を設け、この緊急停止領域4を運転室1の下側に設けた
干渉防止領域3でカバ−すると共に、運転室1回りの前
部と側部が交差するコ−ナ部干渉防止領域5を面取り状
にカットしたもので構成されている。The present invention will be described below with reference to the embodiments shown in FIGS. According to the present invention, when the working machine 2 offset to the front side of the operator's cab 1 is bent toward the operator's cab, the controller can store the interference prevention region 3 around the operator's cab 1 which causes interference. , The working machine 2 is in the area 3
In a work implement interference prevention device that automatically stops in a room, an emergency stop area 4 is provided on the operator cab 1 side in the interference prevention area 3.
This emergency stop area 4 is covered by an interference prevention area 3 provided below the operator's cab 1, and a corner interference prevention area 5 where the front and side portions around the operator's cab 1 intersect. It is made up of chamfered cuts.
【0009】図1は運転室1の前方にオフセットした作
業機2を運転室1に向かって屈曲しうるようにした掘削
積込車両の油圧回路を示し、図示しない所望のアクチュ
エ−タに油圧を供給する方向切換弁61 ,62 ,63 ,
…の切換えを、パイロットポンプ7からの油圧でパイロ
ット圧制御弁81 ,82 ,83 が行うようになってい
る。このうち、ブ−ム制御弁81 上げ側からブ−ム方向
切換弁61 上げ側に至る回路9途中にはブ−ム上げ停止
用電磁比例弁10が、ア−ム制御弁82 掘削側からア−
ム方向切換弁62 掘削側に至る回路11途中にはア−ム
掘削停止用電磁比例弁12がそれぞれ連結され、そして
前記電磁比例弁10,12はコントロ−ラ13に接続さ
れている。前記ブ−ム制御弁81 は右操作レバ−14に
より、ア−ム制御弁82 は左操作レバ−15によりそれ
ぞれ操作され、また、オフセット制御弁83 は操作ペダ
ル16により操作され、オフセット方向切換弁63左側
に至る回路19には電磁弁35が連結され前記電磁弁3
5はコントローラ13に接続されている。これら制御弁
81 ,82 ,83 はそれぞれブ−ム方向切換弁61 ,ア
−ム方向切換弁62 ,オフセット方向切換弁63 の各左
右端にパイロット回路9,11,17,18,19,2
0により連結されている。さらに前記各方向切換弁61
,62 は主ポンプ21,22から、方向切換弁63 は
主ポンプ23からそれぞれ主回路24,25,26を通
して吐出油が供給されるようになっている。前記コント
ロ−ラ13は作業機2の作動時にブ−ム27の支点部に
設けたポテンショ信号27a,ア−ム28の支点部に設
けたポテンショ信号28a,オフセットブ−ム29の支
点部に設けたポテンショ信号29aを入力して作業機2
が運転室1に対して予め設定した干渉防止領域aに近づ
いた時これを回避するための出力信号を発するようにな
っている。前記比例電磁弁10,12はコントロ−ラ1
3からの出力信号を受けると、電流の大きさに比例して
作動するようになっており、停止ショックを低減してバ
ケットの荷こぼれを防止すると共に、停止位置のバラツ
キを少なくするもので、スピ−ドに応じて絞り量を加減
でき、速い時には絞りを大きくして流れる面積を少なく
している。また、電磁弁35はコントロ−ラ13からの
出力信号を受けると、開閉の作動をするものであるが、
オフセットブーム29がオフセットするスピ−ドは速く
ないので比例電磁弁を用いる必要はない。さらに、前記
各制御弁81 ,82 ,83 とパイロットポンプ7との間
の回路30途中には油圧ロック電磁弁31が設けられ、
この弁31は前記コントロ−ラ13からの出力信号を受
けると回路30を遮断するようになっている。図中、3
2はバケットである。FIG. 1 shows a hydraulic circuit of an excavation and loading vehicle in which a working machine 2 offset to the front of the operator's cab 1 can be bent toward the operator's cab 1. The hydraulic pressure is applied to a desired actuator (not shown). Supply direction switching valves 61, 62, 63,
The pilot pressure control valves 81, 82, and 83 are switched by the hydraulic pressure from the pilot pump 7. Among them, in the middle of the circuit 9 from the boom control valve 81 raising side to the boom direction switching valve 61 raising side, a boom raising stop electromagnetic proportional valve 10 and an arm control valve 82 from the excavating side are provided. −
A solenoid valve for stopping arm excavation 12 is connected in the middle of the circuit 11 extending to the excavation side of the solenoid valve 6, and the solenoid proportional valves 10 and 12 are connected to a controller 13. The boom control valve 81 is operated by the right operation lever 14, the arm control valve 82 is operated by the left operation lever 15, the offset control valve 83 is operated by the operation pedal 16, and the offset direction switching valve. A solenoid valve 35 is connected to the circuit 19 extending to the left side of the solenoid valve 63.
Reference numeral 5 is connected to the controller 13. These control valves 81, 82, and 83 are pilot circuits 9, 11, 17, 18, 19, 2 at the left and right ends of the boom direction switching valve 61, the arm direction switching valve 62, and the offset direction switching valve 63, respectively.
Connected by 0. Furthermore, each of the directional control valves 61
, 62 are supplied from the main pumps 21 and 22, and the directional control valve 63 is supplied from the main pump 23 through the main circuits 24, 25 and 26, respectively. The controller 13 is provided at the fulcrum of the offset boom 29, the potentiometer signal 27a provided at the fulcrum of the boom 27, the potentiometer signal 28a provided at the fulcrum of the arm 28 when the working machine 2 is operated. Input the potentiometer signal 29a
When the vehicle approaches the preset interference prevention area a for the driver's cab 1, an output signal for avoiding this is issued. The proportional solenoid valves 10 and 12 are the controller 1
When the output signal from 3 is received, it operates in proportion to the magnitude of the current, which reduces the stop shock to prevent the bucket from spilling and reduces the variation in the stop position. The throttle amount can be adjusted according to the speed, and when the speed is fast, the throttle is enlarged to reduce the flowing area. Further, the solenoid valve 35 operates to open and close when receiving the output signal from the controller 13.
Since the speed at which the offset boom 29 is offset is not fast, it is not necessary to use a proportional solenoid valve. Further, a hydraulic lock solenoid valve 31 is provided in the circuit 30 between the control valves 81, 82 and 83 and the pilot pump 7.
This valve 31 shuts off the circuit 30 when receiving the output signal from the controller 13. 3 in the figure
2 is a bucket.
【0010】つぎに作用を説明する。右操作レバ−14
および左操作レバ−15によりブ−ム制御弁81 を上げ
に、ア−ム操作弁82 を掘削側に操作して、さらにオフ
セット用の操作ペダル16を操作して作業機2を作動さ
せ、作動中にバケット32刃先が運転室1との干渉防止
領域3に接近したとき、コントロ−ラ13はこれを検知
して電磁比例弁10,12の一方もしくは両方に信号を
出力する。今、両方が信号を受けたとすると、電磁比例
弁10,12はそれぞれの方向切換弁61 ,62 の回路
9,11の流量を絞るように作動する。これにより作業
速度が遅くなり、ゆっくり干渉領域3で停止することが
できる。しかしながら電磁比例弁10,12が不良等に
より干渉防止領域3に入ってしまう場合がある。こうし
た事態を防止するため、本発明では干渉領域3内の運転
室1に接近した緊急停止領域4を設けて、この領域4内
に入った場合は前記油圧ロック電磁弁31が作動して作
業機2を緊急に停止させることになる。しかしながらこ
のような緊急停止領域4を設けた場合はバケット32刃
先が作業により運転室1の下側に接近して、緊急停止領
域4に近づくと途端に油圧ロック電磁弁31が作動して
全操作が停止してしまう。これを防止するために、干渉
防止領域3を運転室1下側に延設して前記電磁比例弁1
0,12による自動停止させるものである。また、運転
室1回りの干渉防止領域を前方および側方に設けるとコ
−ナ部干渉防止領域5が角になり、この部分は運転室1
から遠いにも拘らず(干渉しない領域となるが)作業機
2が接近すると停止することになり作業効率が低下す
る。したがってコ−ナ部干渉防止領域5をカットするこ
とにより作業中のバケット32刃先が面取り部分に接近
して平行に通過することが可能となる。Next, the operation will be described. Right operation lever-14
The left operation lever 15 is used to raise the boom control valve 81, the arm operation valve 82 is operated to the excavation side, and the operation pedal 16 for offsetting is further operated to operate the working machine 2 to operate. When the blade edge of the bucket 32 approaches the area 3 for preventing interference with the cab 1, the controller 13 detects this and outputs a signal to one or both of the solenoid proportional valves 10 and 12. Now, assuming that both receive signals, the solenoid proportional valves 10 and 12 operate so as to throttle the flow rates of the circuits 9 and 11 of the respective directional control valves 61 and 62. As a result, the working speed becomes slower, and it is possible to slowly stop in the interference area 3. However, the electromagnetic proportional valves 10 and 12 may enter the interference prevention area 3 due to a defect or the like. In order to prevent such a situation, in the present invention, an emergency stop area 4 is provided in the interference area 3 close to the operator's cab 1, and when it enters the area 4, the hydraulic lock solenoid valve 31 operates to operate the work machine. 2 will be stopped urgently. However, when such an emergency stop area 4 is provided, the blade edge of the bucket 32 approaches the lower side of the operator's cab 1 due to work, and when approaching the emergency stop area 4, the hydraulic lock solenoid valve 31 is actuated and the hydraulic lock solenoid valve 31 is activated. The operation stops. In order to prevent this, the interference prevention area 3 is extended to the lower side of the operator's cab 1 and the electromagnetic proportional valve 1 is provided.
It is automatically stopped by 0 and 12. Further, when the interference prevention region around the driver's cab 1 is provided in the front and side, the corner interference prevention region 5 becomes a corner, and this portion is in the driver's cab 1
Despite the fact that the working machine 2 approaches even though the working machine 2 is far from the work machine 2, the work efficiency is lowered. Therefore, by cutting the corner interference prevention region 5, the blade edge of the bucket 32 during work can approach the chamfered portion and pass in parallel therewith.
【0011】[0011]
【発明の効果】以上説明したように本発明は、運転室の
前方側にオフセットした作業機を運転室に向かって屈曲
させたとき、作業機が干渉を起こす運転室回りの干渉防
止領域をコントロ−ラに記憶させて、作業機が該領域内
で自動停止するようにした作業機干渉防止装置におい
て、該干渉防止領域内の運転室寄りに緊急停止領域を設
け、この緊急停止領域を運転室の下側に設けた干渉防止
領域でカバ−すると共に、運転室回りの前部と側部の交
差するコ−ナ部干渉防止領域を面取り状にカットしたか
ら、バケット刃先が運転室下側から緊急停止領域に侵入
しても、下側に設けた干渉防止領域により緊急停止せ
ず、通常の自動停止となり、緊急停止による頻度が少な
くなるため機器の作業性が向上すると共に、干渉防止領
域でのコ−ナ部をカットしたことによりこの部分での自
動停止がなくなり、作業が継続できるので作業の効率化
が図れる。As described above, according to the present invention, when the working machine offset to the front side of the operator's cab is bent toward the operator's cab, the interference preventing area around the operator's cab that causes the working machine to interfere is controlled. -In a work implement interference prevention device that is stored in LA and the work implement automatically stops in the region, an emergency stop region is provided near the driver's cab in the interference prevention region, and the emergency stop region is set in the driver's cab. In addition to covering in the interference prevention area provided on the lower side of the driver's cab and cutting the corner interference prevention area around the front and side of the cab around the chamfered edge, the bucket blade edge from the lower side of the cab Even if you enter the emergency stop area, the interference prevention area on the lower side does not stop the emergency, but it becomes a normal automatic stop. The corner of And it eliminates the automatic stop at this moiety, work efficiency can be improved work so can continue.
【図1】本発明にかかる作業機干渉防止装置の回路の一
実施例を示す説明図である。FIG. 1 is an explanatory diagram showing an embodiment of a circuit of a work implement interference prevention device according to the present invention.
【図2】本発明の要部を示す一実施例を示し、(a)は
側面図、(b)は(a)のA−A断面を示す説明図であ
る。2A and 2B show an embodiment showing a main part of the present invention, FIG. 2A is a side view, and FIG. 2B is an explanatory view showing a cross section taken along the line AA of FIG.
【図3】従来オフセット式掘削積込車両を示し、(a)
は側面、(b)は平面の説明図である。FIG. 3 shows a conventional offset excavation and loading vehicle, (a)
Is a side view and (b) is a plan view.
1 運転室 2 作業機 3 干渉防止領域 4 緊急停止領域 5 コ−ナ部干渉防止領域 13 コントロ−ラ 1 Operator's cab 2 Work machine 3 Interference prevention area 4 Emergency stop area 5 Corner interference prevention area 13 Controller
Claims (1)
を運転室に向かって屈曲させたとき、作業機が干渉を起
こす運転室回りの干渉防止領域をコントロ−ラに記憶さ
せて、作業機が該領域内で自動停止するようにした作業
機干渉防止装置において、該干渉防止領域内の運転室寄
りに緊急停止領域を設け、この緊急停止領域を運転室の
下側に設けた干渉防止領域でカバ−すると共に、運転室
回りの前部と側部の交差するコ−ナ部干渉防止領域を面
取り状にカットしたことを特徴とする作業機干渉防止装
置。1. A work machine, in which an interference prevention area around the cab where the work machine causes interference when the work machine offset to the front side of the cab is bent toward the cab, is stored in a controller. In the work equipment interference prevention device configured to automatically stop in the area, an emergency stop area is provided near the operator's cab in the interference prevention area, and the emergency stop area is provided below the operator's cab. The work machine interference prevention device is characterized in that a corner interference prevention region where a front portion and a side portion around a driver's cab intersect is cut into a chamfered shape.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP10066192A JP3269843B2 (en) | 1992-03-26 | 1992-03-26 | Work machine interference prevention device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP10066192A JP3269843B2 (en) | 1992-03-26 | 1992-03-26 | Work machine interference prevention device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH05272155A true JPH05272155A (en) | 1993-10-19 |
| JP3269843B2 JP3269843B2 (en) | 2002-04-02 |
Family
ID=14279987
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP10066192A Expired - Lifetime JP3269843B2 (en) | 1992-03-26 | 1992-03-26 | Work machine interference prevention device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3269843B2 (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2014192473A1 (en) * | 2013-12-06 | 2014-12-04 | 株式会社小松製作所 | Hydraulic shovel |
| CN115539694A (en) * | 2022-08-08 | 2022-12-30 | 厦门威迪思汽车设计服务有限公司 | Method, device and storage medium for controlling movable parts |
-
1992
- 1992-03-26 JP JP10066192A patent/JP3269843B2/en not_active Expired - Lifetime
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2014192473A1 (en) * | 2013-12-06 | 2014-12-04 | 株式会社小松製作所 | Hydraulic shovel |
| CN104641046A (en) * | 2013-12-06 | 2015-05-20 | 株式会社小松制作所 | Hydraulic shovel |
| US9284714B2 (en) | 2013-12-06 | 2016-03-15 | Komatsu Ltd. | Hydraulic excavator |
| US9476180B2 (en) | 2013-12-06 | 2016-10-25 | Komatsu Ltd. | Hydraulic excavator |
| CN104641046B (en) * | 2013-12-06 | 2016-10-26 | 株式会社小松制作所 | Hydraulic crawler excavator |
| CN115539694A (en) * | 2022-08-08 | 2022-12-30 | 厦门威迪思汽车设计服务有限公司 | Method, device and storage medium for controlling movable parts |
Also Published As
| Publication number | Publication date |
|---|---|
| JP3269843B2 (en) | 2002-04-02 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3501902B2 (en) | Construction machine control circuit | |
| JPH0794737B2 (en) | Linear excavation control device in hydraulic excavator | |
| JP3124962B2 (en) | Hydraulic control circuit of work machine | |
| JP2733354B2 (en) | How to limit the working height of construction machinery | |
| JP2739358B2 (en) | Work machine interference avoidance device | |
| JP2757089B2 (en) | Work machine interference prevention device | |
| JP3461407B2 (en) | Hydraulic excavator cab interference prevention device | |
| JPH05272155A (en) | Working-machine interference preventing device | |
| JPH084046A (en) | Work machine interference prevention device | |
| JPH07207697A (en) | Hydraulic circuit for construction machine | |
| JP2870599B2 (en) | Work machine interference prevention device for construction machinery | |
| JP3037677B1 (en) | Hydraulic control circuit of work machine | |
| JPH0790887A (en) | Work machine interference prevention device | |
| JPH07197492A (en) | How to set the emergency stop area of the work equipment interference prevention device | |
| JP2996762B2 (en) | Work machine interference prevention circuit | |
| JP4859431B2 (en) | Hydraulic control device | |
| JP4446042B2 (en) | Hydraulic shovel interference prevention control device | |
| JP2926035B1 (en) | Hydraulic control circuit of work machine | |
| JPH05280075A (en) | Control method of working machine using working machine interference prevention circuit | |
| JPS5952031A (en) | Excavating working vehicle | |
| JP3849974B2 (en) | Interference prevention control device for construction machinery | |
| JP3531904B2 (en) | Hydraulic control circuit of work machine | |
| JP2006291647A (en) | Controller of work machine for avoiding interference | |
| JP3739441B2 (en) | Work equipment interference prevention device | |
| JP2685871B2 (en) | Hydraulic circuit at the gutter front |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090118 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 8 Free format text: PAYMENT UNTIL: 20100118 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110118 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 9 Free format text: PAYMENT UNTIL: 20110118 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 10 Free format text: PAYMENT UNTIL: 20120118 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 11 Free format text: PAYMENT UNTIL: 20130118 |
|
| EXPY | Cancellation because of completion of term | ||
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130118 Year of fee payment: 11 |