JPH05331908A - How to join precast concrete beams - Google Patents
How to join precast concrete beamsInfo
- Publication number
- JPH05331908A JPH05331908A JP16006892A JP16006892A JPH05331908A JP H05331908 A JPH05331908 A JP H05331908A JP 16006892 A JP16006892 A JP 16006892A JP 16006892 A JP16006892 A JP 16006892A JP H05331908 A JPH05331908 A JP H05331908A
- Authority
- JP
- Japan
- Prior art keywords
- precast concrete
- concrete beam
- beams
- concrete beams
- lower main
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
(57)【要約】
【目的】 鉄筋量が極端に多くも少なくもないような建
物、即ち1段配筋にも2段配筋にもそれぞれ対応でき、
なおかつ1段配筋と2段配筋とが混在するタイプのプレ
キャストコンクリート梁の定着にも容易に対応できるよ
うにすることである。
【構成】 プレキャストコンクリート梁2の接合端部2
dを柱頭部4に架設して下部主筋2aが柱4a内の正確
な位置に配筋されるように位置決めし、この位置決めさ
れた状態を維持しつつ、直交する独立のプレキャストコ
ンクリート梁3の接合端部3bを柱頭部4にそれぞれ対
向載置した後、これらのプレキャストコンクリート梁
2、3に上部主筋2g、3eを配筋する。
(57) [Summary] [Purpose] A building with an extremely large or small amount of rebar, that is, it can accommodate both single-stage and two-stage reinforcements.
In addition, it is also possible to easily cope with the fixation of precast concrete beams of the type in which the first-stage reinforcement and the second-stage reinforcement are mixed. [Constitution] Joint end 2 of precast concrete beam 2
d is installed on the pillar head 4 and positioned so that the lower main bar 2a is arranged at an accurate position in the pillar 4a, and while maintaining this positioned state, joining of independent precast concrete beams 3 orthogonal to each other After the end portions 3b are respectively placed on the column head 4 so as to face each other, the upper main reinforcements 2g and 3e are arranged on these precast concrete beams 2 and 3.
Description
【0001】[0001]
【産業上の利用分野】本発明は、ビル等のコンクリート
建造物において、各階層の柱の頭部に架設されるプレキ
ャストコンクリート梁の接合方法に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for joining precast concrete beams to be erected on the heads of columns of each floor in a concrete structure such as a building.
【0002】[0002]
【従来の技術】この種のプレキャストコンクリート梁の
接合方法に関しては、特開平3−281856号公報及
び図15に示した構成のものが従来例として周知であ
る。この特開平3−281856号公報のプレキャスト
コンクリート梁は、梁と梁とが直交して交叉するように
一体に形成され、それが互に交叉する梁の下部主筋のみ
で連結されている。一方、図15のプレキャストコンク
リート梁20は、それぞれ独立したプレキャストコンク
リート梁20aが、それぞれ別個に柱頭部30に載置さ
れて、各プレキャストコンクリート梁20aの主筋20
bをそれぞれ別個に定着していた。2. Description of the Related Art As a method of joining a precast concrete beam of this type, one having a structure shown in JP-A-3-281856 and FIG. 15 is well known as a conventional example. The precast concrete beam disclosed in JP-A-3-281856 is integrally formed so that the beams cross each other at right angles, and they are connected only by the lower main bars of the beams that cross each other. On the other hand, in the precast concrete beam 20 of FIG. 15, independent precast concrete beams 20a are separately mounted on the pillar heads 30, respectively.
b were established separately.
【0003】そして、これらのプレキャストコンクリー
ト梁20はいずれもビル構築の際に柱頭部30に架設
し、所要の型枠を取り付けた後に柱頭部30とプレキャ
ストコンクリート梁20との接合部40に現場打ちコン
クリートを打設してこれらを一体的に構築していた。All of these precast concrete beams 20 are erected on a column head 30 when building a building, and after a required formwork is attached, a joint 40 between the column head 30 and the precast concrete beam 20 is cast on site. These were constructed integrally by pouring concrete.
【0004】[0004]
【発明が解決しようとする課題】前記従来例において、
特開平3−281856号公報の下部主筋のみでプレキ
ャストコンクリート梁が接合されるものは、特に鉄筋量
が極端に多い高層鉄筋コンクリート造建物等の2段筋タ
イプに適し、また柱頭部で複数の梁がそれぞれ別個に主
筋を定着する方法は、鉄筋量が少ない建物等の1段筋タ
イプに適しており、それぞれ適応性のよい構造形式が決
まっている。しかし、鉄筋量が極端に多くも少なくもな
いような建物の柱頭部では、前記従来例のプレキャスト
コンクリート梁の定着方法は採用できず、その骨組に見
合ったプレキャストコンクリート梁の定着方法を採用し
ないと、プレキャストコンクリート梁の架設に伴うコス
ト、或は必要以上の無駄な鉄筋を使用することによるコ
スト高が生じ、建設コストの増加が余儀なくされる。SUMMARY OF THE INVENTION In the above conventional example,
JP-A-3-281856, in which a precast concrete beam is joined only by the lower main bar, is particularly suitable for a two-stage bar type such as a high-rise reinforced concrete building with an extremely large amount of rebar, and a plurality of beams at the pillar head. The method of fixing the main bars separately is suitable for the one-stage bar type such as a building with a small amount of reinforcing bars, and the structural form with good adaptability is determined for each. However, in the column head of a building where the amount of rebar is not extremely large or small, the fixing method of the precast concrete beam of the conventional example cannot be adopted, and the fixing method of the precast concrete beam corresponding to the frame must be adopted. The cost of constructing a precast concrete beam or the cost of using unnecessary rebar more than necessary causes an increase in construction cost.
【0005】本発明は上記のような問題に鑑みてなされ
たものであり、その目的は、鉄筋量が極端に多くも少な
くもないような建物、即ち1段配筋や2段配筋、或は1
段配筋と2段配筋とが混在するタイプのプレキャストコ
ンクリート梁の定着にも容易に対応できて、個々の建物
に適応した配筋のできる経済的なプレキャストコンクリ
ート梁の定着方法を提供することである。The present invention has been made in view of the above problems, and an object thereof is a building in which the amount of rebar is not extremely large or small, that is, a one-stage bar or a two-stage bar, or Is 1
To provide an economical precast concrete beam anchoring method capable of easily adapting to anchoring of a precast concrete beam of a type in which multi-tiered bar and two-tier bar are mixed and adapting to individual building. Is.
【0006】[0006]
【課題を解決するための手段】上記のような課題を解決
するための本発明の要旨は、柱頭部で十字状に交差する
プレキャストコンクリート梁において、下部主筋で接続
されかつその接続部のコンクリートが欠損されたプレキ
ャストコンクリート梁の接合端部を柱頭部に載置して前
記下部主筋を柱内に配筋せしめると共に、下部主筋が突
設された独立のプレキャストコンクリート梁の接合端部
を前記柱頭部に対向載置した後、これら互いに交差する
プレキャストコンクリート梁にさらに他の主筋を配筋し
て前記交差部にコンクリートを打設したことに存し、前
記独立のプレキャストコンクリート梁の対向した接合端
部を断面U字形にしたことに存し、また前記欠損部を備
えたプレキャストコンクリート梁の欠損部における対向
した接合端部を断面U字形にしたことに存し、さらに前
記独立のプレキャストコンクリート梁の対向した接合端
部と、欠損部を備えたプレキャストコンクリート梁の欠
損部における対向した接合端部とをそれぞれ断面U字形
にしたことに存する。Means for Solving the Problems The gist of the present invention for solving the above problems is that in a precast concrete beam that crosses in a cross shape at a column head, the concrete connected to the lower main bar is The joint end of the missing precast concrete beam is placed on the column head to arrange the lower main bar in the column, and the joint end of the independent precast concrete beam with the lower main bar protruding is formed on the column head. After placing them opposite to each other, it is due to placing another concrete bar on these precast concrete beams that intersect with each other and placing concrete at the intersections, and the facing joint ends of the independent precast concrete beams. Is made to have a U-shaped cross section, and the opposing joint ends in the defect part of the precast concrete beam having the defect part are cut off. U-shaped, and further, the opposing joint ends of the independent precast concrete beam and the opposing joint ends at the defect portion of the precast concrete beam having a defect portion are each U-shaped in cross section. Exist in.
【0007】[0007]
【作用】本発明の定着方法によれば、鉄筋量が極端に多
くも少なくもないような建物、即ち1段筋タイプや2段
筋タイプのプレキャストコンクリート梁の定着にもそれ
ぞれ対応でき、なおかつ1段筋と2段筋とが混在するタ
イプにも任意に対応した定着ができるので、必要以上の
無駄な鉄筋を使用することがなく、建設コストの低減を
図ることができる。According to the anchoring method of the present invention, it is possible to adapt to the anchorage of a building in which the amount of reinforcing bars is extremely large or small, that is, the precast concrete beams of the single-stage type or the two-stage type, respectively. Since it is possible to perform fixing that arbitrarily corresponds to a type in which stair bars and two stair bars are mixed, it is possible to reduce the construction cost without using unnecessary reinforcing bars.
【0008】次に、本発明を図示の実施例により更に詳
しく説明すると、図1〜図5に示した第1実施例におい
て、十字状を呈するプレキャストコンクリート梁1を示
すものであり、一方のプレキャストコンクリート梁2が
下部主筋2aで接合され、その接合部のコンクリートが
欠損され、この欠損部2bが梁2cの接合端部2dを形
成している。Next, the present invention will be described in more detail with reference to the illustrated embodiment. In the first embodiment shown in FIGS. 1 to 5, a precast concrete beam 1 having a cross shape is shown. The concrete beam 2 is joined by the lower main bar 2a, the concrete of the joined portion is broken, and this missing portion 2b forms the joined end portion 2d of the beam 2c.
【0009】この下部主筋2aは、図1に示すように、
1列数本(実施例においては4本)の主筋が配筋されて
相互の梁2cを接合している。またこのプレキャストコ
ンクリート梁2の一方の端部には下部主筋2aが所定長
さ突出され、その上面にはあばら筋2eが突出形成され
ている。The lower main bar 2a is, as shown in FIG.
The main bars of several rows (four in the embodiment) are arranged to join the mutual beams 2c. A lower main bar 2a is projected at a predetermined length from one end of the precast concrete beam 2, and a stir bar 2e is projectingly formed on the upper surface thereof.
【0010】また、前記プレキャストコンクリート2と
直交する他方のプレキャストコンクリート梁3はそれぞ
れ独立したものであり、その接合端部3bに下部主筋3
aが突設され、該下部主筋3bがL字状に折り曲げ形成
されている。この下部主筋3bも一列数本(実施例にお
いては3本)の主筋が配筋され、所定の定着長さを確保
している。またこのプレキャストコンクリート梁3の上
面には前記と同様にあばら筋3cが突出形成されてい
る。The other precast concrete beams 3 orthogonal to the precast concrete 2 are independent of each other, and the lower main reinforcement 3 is provided at the joint end 3b thereof.
a is projected, and the lower main bar 3b is bent and formed in an L shape. The lower main bar 3b is also provided with several main bars (three in the embodiment) in a row to secure a predetermined fixing length. In addition, on the upper surface of the precast concrete beam 3, there are formed streaks 3c in the same manner as described above.
【0011】そして、このように形成されたプレキャス
トコンクリート梁2の接合端部2dを、図1に示したよ
うに、柱頭部4に架設して下部主筋2aが柱4a内の正
確な位置に配筋されるように位置決めをする。Then, the joint end portion 2d of the precast concrete beam 2 thus formed is erected on the column head 4 as shown in FIG. 1 so that the lower main bar 2a is arranged at an accurate position in the column 4a. Position to be streaked.
【0012】次に、このプレキャストコンクリート梁2
の位置決めがなされた後に、その状態を維持しつつ、直
交する独立のプレキャストコンクリート梁3の接合端部
3bを柱頭部4にそれぞれ対向載置する。このとき下部
主筋3aは、図4に示すように、互いに重ね合わされて
前記プレキャストコンクリート梁2の下部主筋2aの上
部に交差して配筋される。そして、これら双方のプレキ
ャストコンクリート梁2、3の上端筋5、6を下部主筋
2a、3aに倣って夫々通し配筋する。Next, this precast concrete beam 2
After the positioning is performed, the joint ends 3b of the independent precast concrete beams 3 that are orthogonal to each other are placed on the column heads 4 so as to face each other, while maintaining this state. At this time, as shown in FIG. 4, the lower main bars 3a are overlapped with each other and arranged to intersect with the upper parts of the lower main bars 2a of the precast concrete beam 2. Then, the upper end reinforcements 5 and 6 of both of these precast concrete beams 2 and 3 are respectively arranged through the lower main reinforcements 2a and 3a.
【0013】この場合に、隣接して架設したプレキャス
トコンクリート梁の自由端部においても、隣接同士で各
下部主筋を連結し、前記上端筋5、6も夫々延長して同
様に配筋する。In this case, also at the free ends of the precast concrete beams installed adjacent to each other, the respective lower main reinforcements are connected to each other, and the upper reinforcements 5 and 6 are also extended and arranged in the same manner.
【0014】そして、所要の型枠を組み立てた後、プレ
キャストコンクリート梁2、3にハーフプレキャストコ
ンクリート床版(図示せず)を架設してその上及び前記
柱頭部4におけるプレキャストコンクリート梁2、3の
接合部にコンクリートを打設してこれらのプレキャスト
コンクリート梁2、3を定着するものである。この定着
方法は比較的鉄筋量が少ない建物の構築に適している。After assembling the required formwork, a half precast concrete floor slab (not shown) is erected on the precast concrete beams 2 and 3, and the precast concrete beams 2 and 3 on and above the pillar head 4 are installed. The precast concrete beams 2 and 3 are fixed by placing concrete at the joints. This fixing method is suitable for building a building with a relatively small amount of rebar.
【0015】また、図6〜図8に示した第2実施例は、
独立のプレキャストコンクリート梁3の下部主筋3aが
2段配筋されたものであって、接合端部3bが断面U字
状に形成されたものを示すものである。The second embodiment shown in FIGS. 6 to 8 is
The lower main bar 3a of the independent precast concrete beam 3 is arranged in two steps, and the joint end 3b is formed in a U-shaped cross section.
【0016】この実施例においても、一方のプレキャス
トコンクリート梁2が下部主筋2aで接合され、その接
合部のコンクリートが欠損され、この欠損部2bが梁2
cの接合端部2dを形成している点、及びこのプレキャ
ストコンクリート梁2と直交する他方のプレキャストコ
ンクリート梁3はそれぞれ独立したものであり、その接
合端部3bに下部主筋3aが突設され、該下部主筋3a
がL字状に折り曲げ形成されている点では前記第1実施
例と実質的に同一の構成を有する。Also in this embodiment, one of the precast concrete beams 2 is joined by the lower main bar 2a, the concrete at the joint is broken, and the missing portion 2b is formed by the beam 2
The point forming the joint end 2d of c and the other precast concrete beam 3 orthogonal to the precast concrete beam 2 are independent of each other, and the lower main bar 3a is projectingly provided at the joint end 3b, The lower main bar 3a
Is substantially the same as that of the first embodiment in that it is bent into an L shape.
【0017】そして、これら対向載置された独立のプレ
キャストコンクリート梁3の接合端部3bのU字溝3d
にわたって一列数本(実施例においては3本)の上部主
筋3eを配筋して2段配筋とすると共に、このプレキャ
ストコンクリート梁3の上端筋6を2段配筋する。次い
で、ハーフプレキャストコンクリート床版(図示せず)
を架設してその上及びプレキャストコンクリート梁3の
接合部にコンクリートを打設するものである。この定着
方法は鉄筋量が極端に多くも少なくもない建物の構築に
適している。Then, the U-shaped groove 3d of the joint end portion 3b of the independent precast concrete beams 3 placed facing each other.
A plurality of rows (three in the embodiment) of the upper main reinforcements 3e are arranged to form a two-stage reinforcement, and the upper end reinforcement 6 of the precast concrete beam 3 is arranged in two stages. Next, half precast concrete floor slab (not shown)
And the concrete is placed on the joint and the joint portion of the precast concrete beam 3. This fixing method is suitable for building a building in which the amount of reinforcing bars is extremely large or small.
【0018】また、図9〜図11に示した第3実施例
は、前記第2実施例とは反対のプレキャストコンクリー
ト梁2の下部主筋2aが2段配筋された、1段配筋と2
段配筋の混在タイプであり、欠損部2bにおける対向し
た接合端部2dが断面U字形に形成されたものである。In addition, the third embodiment shown in FIGS. 9 to 11 has a first main bar 2a in which the lower main bar 2a of the precast concrete beam 2, which is the opposite of that of the second embodiment, is two bar.
It is a mixed type of stepped bar, and the opposing joint ends 2d of the defective portion 2b are formed in a U-shaped cross section.
【0019】この実施例においても、基本的には前記第
2実施例と同一の構成を有するものであり、直交する独
立のプレキャストコンクリート梁3をそれぞれ対向載置
した後に、このプレキャストコンクリート梁2における
接合端部2dのU字溝2fにわたって一列数本(実施例
においては4本)の上部主筋2gを配筋して2段配筋と
するとともに、このプレキャストコンクリート梁3の上
端筋3eを2段配筋する。次いで、ハーフプレキャスト
コンクリート床版(図示せず)を架設してその上及びプ
レキャストコンクリート梁2の接合部にコンクリートを
打設するものである。これも前記第2実施例と同様に鉄
筋量が極端に多くも少なくもない建物の構築に適してい
る。This embodiment also has basically the same configuration as the second embodiment, and after the independent precast concrete beams 3 which are orthogonal to each other are placed opposite to each other, the precast concrete beams 2 are A plurality of rows (four in the embodiment) of the upper main reinforcements 2g are arranged over the U-shaped groove 2f of the joining end portion 2d to form a two-stage reinforcement, and the upper end reinforcement 3e of the precast concrete beam 3 is formed in two stages. Arrange the muscles. Next, a half precast concrete floor slab (not shown) is erected, and concrete is placed on the slab and the joint portion of the precast concrete beam 2. This is also suitable for constructing a building in which the amount of reinforcing bars is extremely large or small as in the second embodiment.
【0020】更に、図12〜図14に示した第4実施例
は、交差する双方のプレキャストコンクリート梁2、3
の下部主筋2a、3aが2段配筋されたタイプであり、
対向したそれぞれの接合端部2d、3bが断面U字形に
形成されたものである。Furthermore, in the fourth embodiment shown in FIGS. 12 to 14, the two precast concrete beams 2, 3 intersecting each other are crossed.
Is a type in which the lower main bars 2a, 3a of the
The opposing joint ends 2d and 3b are formed in a U-shaped cross section.
【0021】この実施例においても、基本的には前記第
2及び第3実施例と同一の構成を有するものであり、欠
損部2bを備えたプレキャストコンクリート梁2の接合
端部2dを柱頭部4に架設した後、直交する独立のプレ
キャストコンクリート梁3の接合端部3bを柱頭部4に
それぞれ対向載置して下部主筋2a、3a同士をそれぞ
れ交差配筋する。Also in this embodiment, the construction is basically the same as that of the second and third embodiments, and the joining end portion 2d of the precast concrete beam 2 having the cutout portion 2b is connected to the column head 4. Then, the joint ends 3b of the independent precast concrete beams 3 which are orthogonal to each other are placed on the column head 4 so as to face each other, and the lower main bars 2a and 3a are cross-arranged.
【0022】そして、欠損部2bを備えたプレキャスト
コンクリート梁2おける接合端部2dのU字溝2fにわ
たって一列数本(実施例においては4本)の上部主筋2
gを配筋して2段配筋とすると共に、直交する独立のプ
レキャストコンクリート梁3における接合端部3bのU
字溝3dにわたって一列数本(実施例においては3本)
の上部主筋3eを配筋して2段配筋とした後、これら双
方のプレキャストコンクリート梁2、3の上端筋2g、
3eをそれぞれ2段配筋する。次いで、ハーフプレキャ
ストコンクリート床版(図示せず)を架設してその上及
びプレキャストコンクリート梁3の接合部にコンクリー
トを打設するものである。これは鉄筋量が極端に多い高
層鉄筋コンクリート造建物の構築に適している。Then, in the precast concrete beam 2 having the cutout portion 2b, several upper main bars 2 (4 in the embodiment) are arranged in a row over the U-shaped groove 2f of the joint end 2d.
g is reinforced to form a two-stage reinforcement, and U of the joint end 3b in the independent precast concrete beams 3 orthogonal to each other is used.
Several lines in a row across the groove 3d (three in the embodiment)
After reinforcing the upper main bar 3e of the above to form a two-stage bar, the upper end bars 2g of both precast concrete beams 2 and 3
3e is arranged in two stages. Next, a half precast concrete floor slab (not shown) is erected, and concrete is placed on the slab and the joint portion of the precast concrete beam 3. This is suitable for constructing a high-rise reinforced concrete building with an extremely large amount of rebar.
【0023】[0023]
【発明の効果】下部主筋で接続されかつその接続部のコ
ンクリートが欠損されたプレキャストコンクリート梁の
接合端部を柱の頭部に載置して前記下部主筋を柱内に配
筋せしめると共に、下部主筋が突設された別個のプレキ
ャストコンクリート梁の接合端部を前記柱の頭部に対向
載置した後、これら互いに交差するプレキャストコンク
リート梁にさらに他の主筋を配筋して前記交差部にコン
クリートを打設したことにより、鉄筋量が極端に多くも
少なくもないような建物、即ち1段配筋や2段配筋、及
び1段配筋と2段配筋とが混在するタイプのプレキャス
トコンクリート梁の定着にも容易に対応することがで
き、個々の建物に応じて無駄な鉄筋を省くことができ、
建設コストの低減を図ることができる。EFFECTS OF THE INVENTION The joint end of a precast concrete beam, which is connected by a lower main bar and in which the concrete of the connecting part is missing, is placed on the head of a column to arrange the lower main bar in the column and After placing the joint ends of separate precast concrete beams with protruding main bars facing the heads of the columns, further precast concrete beams intersecting with each other are further reinforced to add concrete to the intersections. Precast concrete of the type where the amount of reinforcing bars is not extremely large or small, that is, the one-stage reinforcing bar and the two-stage reinforcing bar, and the mixture of the one-stage reinforcing bar and the two-stage reinforcing bar. It can easily support the fixing of beams and can eliminate unnecessary reinforcing bars depending on the individual building,
The construction cost can be reduced.
【0024】独立のプレキャストコンクリート梁の対向
した接合端部を断面U字形にしたことにより、このプレ
キャストコンクリート梁の下部主筋を2段配筋とするこ
とができる。By making the opposing joint ends of the independent precast concrete beam U-shaped in cross section, the lower main reinforcement of this precast concrete beam can be made into a two-stage reinforcement.
【0025】欠損を備えたプレキャストコンクリート梁
の欠損部における対向した接合端部を断面U字形にした
ことにより、このプレキャストコンクリート梁の下部主
筋を2段配筋とすることができる。By making the opposing joint ends of the defect portion of the precast concrete beam having a defect have a U-shaped cross section, the lower main reinforcement of this precast concrete beam can be a two-stage reinforcement.
【0026】独立のプレキャストコンクリート梁の対向
した接合端部と、欠損部を備えたプレキャストコンクリ
ート梁の欠損部における対向した接合端部とをそれぞれ
断面U字形にしたことにより、双方のプレキャストコン
クリート梁の下部主筋を2段配筋とすることができる。The opposing joint ends of the independent precast concrete beams and the opposing joint ends at the defect portion of the precast concrete beam having a defect portion are each U-shaped in cross section, so that The lower main bar may have a two-stage bar arrangement.
【図1】第1実施例のプレキャストコンクリート梁を柱
の頭部に架設した状態の平面図である。FIG. 1 is a plan view showing a state in which a precast concrete beam of a first embodiment is installed on a head of a column.
【図2】同実施例の図1に示した状態の斜視図である。FIG. 2 is a perspective view of the embodiment shown in FIG. 1;
【図3】プレキャストコンクリート梁を柱頭部に架設す
る前の斜視図である。FIG. 3 is a perspective view before a precast concrete beam is installed on a pillar head.
【図4】プレキャストコンクリート梁を柱頭部に架設し
た後の斜視図である。FIG. 4 is a perspective view after a precast concrete beam is installed on a column head.
【図5】第1実施例の接合部の断面図である。FIG. 5 is a sectional view of a joint portion of the first embodiment.
【図6】第2実施例のプレキャストコンクリート梁を柱
頭部に架設する前の斜視図である。FIG. 6 is a perspective view before the precast concrete beam of the second embodiment is installed on the pillar head.
【図7】第2実施例のプレキャストコンクリート梁を柱
頭部に架設した後の斜視図である。FIG. 7 is a perspective view after the precast concrete beam of the second embodiment is installed on the pillar head.
【図8】第2実施例の接合部の断面図である。FIG. 8 is a sectional view of a joint portion of a second embodiment.
【図9】第3実施例のプレキャストコンクリート梁を柱
頭部に架設する前の斜視図である。FIG. 9 is a perspective view before the precast concrete beam of the third embodiment is installed on the pillar head.
【図10】第3実施例のプレキャストコンクリート梁を
柱頭部に架設した後の斜視図である。FIG. 10 is a perspective view after the precast concrete beam of the third embodiment is installed on the pillar head.
【図11】第3実施例の接合部の断面図である。FIG. 11 is a sectional view of a joint portion of a third embodiment.
【図12】第4実施例のプレキャストコンクリート梁を
柱頭部に架設する前の斜視図である。FIG. 12 is a perspective view before the precast concrete beam of the fourth embodiment is installed on the pillar head.
【図13】第4実施例のプレキャストコンクリート梁を
柱頭部に架設した後の斜視図である。FIG. 13 is a perspective view after the precast concrete beam of the fourth embodiment is installed on the pillar head.
【図14】第4実施例の接合部の断面図である。FIG. 14 is a sectional view of a joint portion of a fourth embodiment.
【図15】従来のプレキャストコンクリート梁の定着方
法を示す断面図である。FIG. 15 is a cross-sectional view showing a method of fixing a conventional precast concrete beam.
1 十字状のプレキャストコンクリート梁 2 プレキャストコンクリート梁 2a、3a 下部主筋 2d、3b 接合端部 3 独立のプレキャストコンクリート梁 4 柱頭部 1 Cross-shaped precast concrete beam 2 Precast concrete beam 2a, 3a Lower main bar 2d, 3b Joint end 3 Independent precast concrete beam 4 Column head
Claims (4)
コンクリート梁において、下部主筋で接続されかつその
接続部のコンクリートが欠損されたプレキャストコンク
リート梁の接合端部を柱頭部に載置して前記下部主筋を
柱内に配筋せしめると共に、下部主筋が突設された独立
のプレキャストコンクリート梁の接合端部を前記柱頭部
に対向載置した後、これら互いに交差するプレキャスト
コンクリート梁にさらに他の主筋を配筋して前記交差部
にコンクリートを打設したことを特徴とするプレキャス
トコンクリート梁の接合方法。1. A precast concrete beam that crosses in a cross shape at a column head, wherein the joint end portion of the precast concrete beam that is connected by a lower main bar and has the concrete of the connecting portion missing is placed on the column head and the lower part is formed. After arranging the main reinforcement in the column, after placing the joint end of the independent precast concrete beam with the lower main reinforcement projecting on the column head, another main reinforcement is added to these precast concrete beams intersecting with each other. A method for joining precast concrete beams, comprising arranging and placing concrete at the intersection.
の対向した接合端部を断面U字形にしたことを特徴とす
る請求項1に記載のプレキャストコンクリート梁の接合
方法。2. The method of joining precast concrete beams according to claim 1, wherein the opposing joint ends of the independent precast concrete beams are U-shaped in cross section.
リート梁の欠損部における対向した接合端部を断面U字
形にしたことを特徴とする請求項1に記載のプレキャス
トコンクリート梁の接合方法。3. The method for joining precast concrete beams according to claim 1, wherein opposing joint ends of the precast concrete beams having the defect portions have U-shaped cross sections.
の対向した接合端部と、欠損部を備えたプレキャストコ
ンクリート梁の欠損部における対向した接合端部とをそ
れぞれ断面U字形にしたことを特徴とする請求項1に記
載のプレキャストコンクリート梁の接合方法。4. The opposing joint ends of the independent precast concrete beam and the opposing joint ends of the defect portion of the precast concrete beam having a defect portion are U-shaped in cross section, respectively. Item 2. A method for joining precast concrete beams according to Item 1.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP4160068A JP2784295B2 (en) | 1992-05-28 | 1992-05-28 | Precast concrete beam joining method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP4160068A JP2784295B2 (en) | 1992-05-28 | 1992-05-28 | Precast concrete beam joining method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH05331908A true JPH05331908A (en) | 1993-12-14 |
| JP2784295B2 JP2784295B2 (en) | 1998-08-06 |
Family
ID=15707202
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP4160068A Expired - Fee Related JP2784295B2 (en) | 1992-05-28 | 1992-05-28 | Precast concrete beam joining method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2784295B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106917452A (en) * | 2017-03-07 | 2017-07-04 | 南通华新建工集团有限公司 | Prestressed girder metal bellows Inner anchor construction methods at PC Structure Beam-column nodes |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0444544A (en) * | 1990-06-12 | 1992-02-14 | Maeda Corp | Column-beam connecting work in precast reinforced concrete structure |
-
1992
- 1992-05-28 JP JP4160068A patent/JP2784295B2/en not_active Expired - Fee Related
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0444544A (en) * | 1990-06-12 | 1992-02-14 | Maeda Corp | Column-beam connecting work in precast reinforced concrete structure |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106917452A (en) * | 2017-03-07 | 2017-07-04 | 南通华新建工集团有限公司 | Prestressed girder metal bellows Inner anchor construction methods at PC Structure Beam-column nodes |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2784295B2 (en) | 1998-08-06 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2535722B2 (en) | Reinforcement concrete column and steel beam connection structure and building construction method | |
| JPH05331908A (en) | How to join precast concrete beams | |
| JPH10280541A (en) | Mixed structure skeleton and method of constructing the same | |
| JPH0728269Y2 (en) | Precast beams | |
| JP2758208B2 (en) | Joint method between column and steel reinforced concrete beam | |
| JPH0781307B2 (en) | How to build a skyscraper | |
| JPH07252882A (en) | Construction method of construction frame | |
| JP2998450B2 (en) | Connection method between PC beam and column | |
| JP2893406B2 (en) | Precast concrete beam-column joining method | |
| JPS62178634A (en) | Frame construction method for structures | |
| JPH0449254Y2 (en) | ||
| JPH0558704U (en) | Precast reinforced concrete structure | |
| JPH0633513A (en) | How to join columns and beams | |
| JP2716634B2 (en) | Column-beam joint structure | |
| JPH06996B2 (en) | Reinforcing bar concrete structure and its construction method | |
| JPH0351849B2 (en) | ||
| JP2003184173A (en) | Column and beam joint structure | |
| JPH05179699A (en) | Manufacture of orthogonal precast beam | |
| JPH111960A (en) | Precast concrete building construction method | |
| JPS62260967A (en) | Method for assembling reinforcement for reinforced concrete structure | |
| JPS61286431A (en) | Connection of pc pillar and beam | |
| JPH073884A (en) | PC member and method of joining PC beam and PC column | |
| JPS61250240A (en) | Connection of pc pillar and beam | |
| JPH01187237A (en) | Method for beam-column joining in precast reinforced concrete structure | |
| JPH08100463A (en) | Work execution method for concrete structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 11 Free format text: PAYMENT UNTIL: 20090522 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100522 Year of fee payment: 12 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100522 Year of fee payment: 12 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 13 Free format text: PAYMENT UNTIL: 20110522 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 13 Free format text: PAYMENT UNTIL: 20110522 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 14 Free format text: PAYMENT UNTIL: 20120522 |
|
| LAPS | Cancellation because of no payment of annual fees |