JPH05339954A - Construction method for block stacked retaining wall and stacking block - Google Patents

Construction method for block stacked retaining wall and stacking block

Info

Publication number
JPH05339954A
JPH05339954A JP14705892A JP14705892A JPH05339954A JP H05339954 A JPH05339954 A JP H05339954A JP 14705892 A JP14705892 A JP 14705892A JP 14705892 A JP14705892 A JP 14705892A JP H05339954 A JPH05339954 A JP H05339954A
Authority
JP
Japan
Prior art keywords
block
hole
slope
stacking
blocks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP14705892A
Other languages
Japanese (ja)
Other versions
JPH0735657B2 (en
Inventor
Yoshihiko Takagi
良彦 高木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MARUTAKA CONCRETE KOGYO KK
TAKAGI SHOJI KK
Original Assignee
MARUTAKA CONCRETE KOGYO KK
TAKAGI SHOJI KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MARUTAKA CONCRETE KOGYO KK, TAKAGI SHOJI KK filed Critical MARUTAKA CONCRETE KOGYO KK
Priority to JP14705892A priority Critical patent/JPH0735657B2/en
Publication of JPH05339954A publication Critical patent/JPH05339954A/en
Publication of JPH0735657B2 publication Critical patent/JPH0735657B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Retaining Walls (AREA)

Abstract

PURPOSE:To perform automatic formation of a drain hole by a method wherein one drain hole formed extending through blocks, stacked in a vertically and laterally adjoining state, and through synthesization of half-division grooves is freely formed without being constrained by the length and the width of a block. CONSTITUTION:A foundation angle regulating surface 2 is formed on a continuous footing 11 and the laying surface of stacked blocks 4 is formed according to the inclination angle of a sheathed ground 3. A through-hole 5 is formed throughout a portion ranging from the central part of the bottom of the stacked blocks to the midpoint of the upper edge of a back and half-division grooves 6 are formed in the two sides of the block and throughout a portion ranging from the midpoint of the side of the upper surface of the block to the lower edge of a front. Stacking is executed in a way that back filling at each stage is effected as synthesization of the half-division grooves 6 and intercommunication of the through-holes 5 are combined together. This method forms a drain whole by stacking itself of the blocks and improves the efficiency of both a work and a cost.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は掘割道路における掘削斜
面の土留や運河・河川の護岸等、傾斜面保護のために造
成されるブロック積み擁壁の造成工法とこれに使用され
る積みブロックに関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a block retaining wall for protection of slopes such as retaining soil on excavated slopes on excavated roads, revetment of canals and rivers, and a loading block used for the same. It is a thing.

【0002】[0002]

【従来の技術】従来、掘削斜面の土留や運河、河川の護
岸等のための擁壁は、強度的な要請から傾斜地盤から法
面を支える控えの部分が短い既製のコンクリートブロッ
クでは対応できないため、多くの場合現場打ちコンクリ
ートによっている。
2. Description of the Related Art Conventionally, retaining walls for retaining soil on excavated slopes, canals, revetments of rivers, etc. cannot be handled with ready-made concrete blocks that have a short reserve to support slopes from sloping ground due to strength requirements. , Often by cast-in-place concrete.

【0003】また、法面を支える控えの部分が長くな
り、地盤に浸透する雨水等を法面から排水する下降角度
を保つために水抜き孔については、長尺ビニールパイプ
を所定位置に支持してコンクリートを流し込む方法で、
コンクリート中に埋め込まれた長尺ビニールパイプが、
そのまま水抜き孔とされている。
In addition, the length of the space for supporting the slope becomes long, and in order to maintain the descending angle for draining rainwater and the like that penetrates into the ground from the slope, a long vinyl pipe is supported at a predetermined position for the drain hole. By pouring concrete into
A long vinyl pipe embedded in concrete
It is still used as a drain hole.

【0004】[0004]

【発明が解決しようとする問題点】従来の現場打ちコン
クリートによる擁壁の造成は、長尺ビニールパイプの支
持や型枠の組み立て等、多くの人手とコンクリート養生
のための多くの日数を要し、現在の人手不足や頻繁な交
通事情からこのような工事には対応できなくなっている
のが実情である。
[Problems to be Solved by the Invention] The conventional construction of a retaining wall using cast-in-place concrete requires a lot of manpower and many days for concrete curing, such as supporting long vinyl pipes and assembling formwork. However, due to the current lack of manpower and frequent traffic conditions, it is not possible to deal with such construction.

【0005】また、プレキャストによるコンクリートブ
ロックで、この擁壁造成に対応するためには、コンクリ
ートブロックに水抜き孔を形成しなければならないが、
擁壁として充分な強度を保つコンクリートブロックとす
るためには傾斜地盤から法面を支える控えの部分を長く
取らなければならない。
Further, in order to cope with the construction of this retaining wall in the precast concrete block, it is necessary to form a drain hole in the concrete block.
In order to make a concrete block that retains sufficient strength as a retaining wall, it is necessary to take a long section from the sloping ground to support the slope.

【0006】ところが、ブロックの控えの部分を長く取
れば、傾斜地盤から法面に開口する水抜き孔の前方に下
降する傾斜角を1個のブロック内に収めることは不可能
になり、別に水抜き孔形成の方法を講じなければならな
くなる。
[0006] However, if the length of the block block is made long, it becomes impossible to fit the inclination angle descending from the sloping ground to the front of the drainage hole opening on the slope into one block, and another A method for forming a hole must be taken.

【0007】特に、法面を仰向させて後方に下降する傾
斜に積み上げて行く直方体のブロックでは、ブロックに
単純に水抜き孔を設ければ、積載時に水抜き孔が上を向
くことになり、排水どころか逆に雨水を基礎地盤に注入
する結果となってしまうものである。
In particular, in the case of a rectangular parallelepiped block which is piled up at an inclination with the slope facing upward and descending backward, if the block is simply provided with a water draining hole, the water draining hole will face upward during loading. Instead of draining, rainwater will be injected into the foundation ground.

【0008】[0008]

【問題点を解決するための手段】本発明は以上の問題点
に対処するため、上下左右に隣接して積み上げられる複
数のブロックを貫通し或いは合成して、1本の水抜き孔
が1つのブロックの長さや幅に拘束されることなく自由
に形成されるように構成したものである。
In order to solve the above problems, the present invention penetrates or combines a plurality of blocks which are vertically, horizontally and adjacently adjacent to each other to form one drain hole. It is configured to be freely formed without being restricted by the length or width of the block.

【0009】すなわち、積み上げられるブロックに、そ
の積み上げ完成時に上段ブロックの背面から排水角度を
もって下降し、下段ブロックの法面に連通開口する水抜
き孔を構成するように、積み上げ組み込まれる各位置に
応じて所定の通孔構成部を形成して、その組み合わせに
より擁壁の水抜き孔が構成されるようにした。
That is, depending on each position where the blocks are piled up, the blocks to be piled up are constructed so that when the stacking is completed, they descend from the rear surface of the upper block at a drain angle and form a drain hole communicating with the slope of the lower block. By forming a predetermined through hole forming portion, the water draining hole of the retaining wall is formed by the combination thereof.

【0010】[0010]

【作用】擁壁の壁体に働く外力は、壁体の自重載荷重及
び土圧であり、基礎地盤に浸透する雨水等が排出されな
ければ忽ち壁体を圧迫して崩壊を招く。そのため壁体の
法面には浸透する雨水等を排出する水抜き孔が必要とな
る。
The external force acting on the wall of the retaining wall is the weight of the wall itself and the earth pressure. If rainwater or the like that permeates the foundation ground is not discharged, the wall is pressed against the wall and collapses. Therefore, a drain hole for discharging permeating rainwater is required on the slope of the wall.

【0011】水抜き孔は雨水等を排出するため、当然一
定角度下降していなければならないが、1つのブロック
内に穿設される水抜き孔の下降角度は、その対角線を通
過する通孔が限度であり、ブロック自体が積み上げ時に
仰向設置されると水抜き孔の下降角度はその分だけ減殺
され、遂には水平或いは仰向状態になってしまう。
Since the drain hole discharges rainwater and the like, it must naturally descend by a certain angle. However, the descending angle of the drain hole formed in one block is such that the through hole passing through the diagonal line is This is the limit, and if the blocks themselves are installed in a supine position when piled up, the descending angle of the water draining hole is reduced by that amount, and eventually they become horizontal or supine.

【0012】裏込地盤から法面までの長さ、即ち控えの
長さがブロックの厚みに対して長くなればなる程、ブロ
ック側面の対角線の角度は水平に近くなり、排水角度を
保つことはできなくなる。
[0012] As the length from the backfill ground to the slope, that is, the length of the stay becomes longer with respect to the thickness of the block, the diagonal angle of the side surface of the block becomes closer to horizontal and the drainage angle cannot be maintained. become unable.

【0013】1本の水抜き孔を上下左右に隣接して積み
上げられる複数のブロックを貫通し特に上下に貫通し、
或いは合成して形成するようにすれば、ブロックの上下
幅は水抜き孔の下降角度を制約するものではなくなり、
ブロック積み上げ時における仰向角度を計算に入れた自
由な水抜き孔の下降角度を確保できる。
One water drain hole is penetrated through a plurality of blocks which are vertically and horizontally adjacent to each other and particularly vertically penetrated,
Alternatively, if they are formed by combining them, the vertical width of the block does not restrict the descending angle of the water drain hole,
It is possible to secure a free descending angle of the water draining hole that takes into account the elevation angle when the blocks are stacked.

【0014】[0014]

【実施例】以下図面に従って本発明の実施例を説明す
る。1は所定の擁壁傾斜角に対応してブロック法面が形
成されるように基礎角度を調整する布基礎で、基礎掘り
に砕石、グリ石を基礎材とし又は捨てコンを打設しコン
クリートの現場打ち、又はあらかじめ調整された基礎ブ
ロックを並列して構築される。
Embodiments of the present invention will be described below with reference to the drawings. 1 is a cloth foundation that adjusts the foundation angle so that a block slope is formed corresponding to a predetermined retaining wall inclination angle. Built in-situ or in parallel with preconditioned basic blocks.

【0015】2は布基礎1の基礎角度調整面で、土留地
盤3の傾斜角に従って積みブロック4の敷設面を構成す
る。
Reference numeral 2 denotes a foundation angle adjusting surface of the cloth foundation 1, which constitutes a laying surface of the loading block 4 in accordance with the inclination angle of the soil retaining ground 3.

【0016】積みブロック4には、底面の中央部から背
面の上縁中点に貫通する通孔5aが穿設され、更にブロッ
ク上面の側辺中点から正面下縁に貫通して凹陥する半割
の孔溝6a、6bが両側面に形成されている。
The stacking block 4 is provided with a through hole 5a penetrating from the central portion of the bottom surface to the midpoint of the upper edge of the back surface, and further penetrating from the midpoint of the side edge of the upper surface of the block to the lower edge of the front surface. Split hole grooves 6a, 6b are formed on both side surfaces.

【0017】この半割の孔溝6a、6bは、ブロック4に隣
接するブロック4Aに設けられた半割の孔溝6c、ブロック
4Bに設けられた半割の孔溝6dと合体して、それぞれ1本
の通孔を構成すると共に、該通孔が、ブロック4と隣接
ブロック4Aの上に積載されるブロック4Cの底面の中央部
から背面の上縁中点に貫通する通孔5bに連通する。
These half-divided hole grooves 6a and 6b are formed in the block 4A adjacent to the block 4 and the half-divided hole grooves 6c and 6b.
The holes 6d provided in 4B are combined with each other to form one through hole, and the through hole is formed in the center of the bottom surface of the block 4C stacked on the block 4 and the adjacent block 4A. From the part to the through hole 5b penetrating to the midpoint of the upper edge of the back surface.

【0018】擁壁法面を構成するブロック4の正面Sに
は、必要に応じて額縁型に縁取り縁内に梨地模様を施し
たり、或いは石垣型の模様や組み合わせにより擁壁法面
が疑似石垣が構成されるように石垣型の凹凸を形成する
等の装飾を施す。
On the front surface S of the block 4 constituting the retaining wall slope, if necessary, a pear-skin pattern is applied in the edging edge in a frame type, or the retaining wall slope is a pseudo-stone wall by a stone wall type pattern or combination. The stone wall-shaped unevenness is formed so that

【0019】また、上記ブロック4とブロック4A、ブロ
ック4B、ブロック4Cとの関係は、最下段と最上段、両側
のブロック列を例外として、各ブロック間の連鎖として
成立する。勿論、全体に連鎖させないで特定の部分だけ
にこの構造の水抜き孔を設けたり、2段に限らず数段の
ブロックを貫通して水抜き孔が構成されるようにしても
良い。
The relationship between the block 4 and the blocks 4A, 4B, and 4C is established as a chain between the blocks, except for the bottom row, the top row, and the row of blocks on both sides. Needless to say, the drainage holes of this structure may be provided only in a specific part without being chained to the whole, or the drainage holes may be formed not only in two stages but also through blocks of several stages.

【0020】また、ブロック4とブロック4A、ブロック
4B、ブロック4C等の隣接関係については、接合面に適宜
の凹凸による嵌合部を設けてブロック同志が正確に接合
されるようにすれば、更に効率てきである。
Block 4, block 4A, block
Regarding the adjoining relationship between the blocks 4B, the blocks 4C, etc., it is more efficient if the blocks are accurately joined by providing a fitting portion with appropriate unevenness on the joining surface.

【0021】布基礎1にはアンカー筋が所定間隔で植設
配置され、積みブロックに設けられた空洞部7を挿通し
てブロック配列後、壁体の支持鉄筋として擁壁を支持す
るものである。
Anchorings are planted and arranged at a predetermined interval on the cloth foundation 1, and after the cavities 7 provided in the stacking blocks are inserted and the blocks are arranged, the retaining walls are supported as supporting reinforcing bars of the wall body. .

【0022】ブロックの積み上げ配列は、上記半割の孔
溝6の合成、貫通孔5の連通を合わせながら1段ごとに
傾斜地盤とブロックの間に砕石・栗石等を裏込めして締
固め水抜き孔の背面の地盤側に開口部にはフィルターを
設けて土石が水抜き孔に吸い込まれて孔を詰まらせない
ようにして積み上げるものである。
The block stacking arrangement is such that while synthesizing the above-mentioned half-grooves 6 and communicating the through holes 5, crushed stones, crushed stones, etc. are backfilled between the sloping ground and the blocks for each stage and compacted water. A filter is installed in the opening on the ground side on the back side of the drainage hole to prevent debris from being sucked into the drainage hole and clog the hole.

【0023】[0023]

【発明の効果】本発明は以上のように構成したので、従
来ビニールパイプ等によって複雑な施工と養生期間を要
した水抜き孔を、ブロックの積み上げ自体によって確実
に行うことができ、しかも控え幅を広く取って極めて堅
固な擁壁を造成することができるので、作業面、コスト
面の両面から効率を高める効果がある。
EFFECTS OF THE INVENTION Since the present invention is constructed as described above, it is possible to surely perform the water draining hole which has conventionally required a complicated construction and a curing period by using a vinyl pipe or the like by stacking the blocks themselves, and yet the width of the block is narrow. Since a very strong retaining wall can be constructed by taking a wide area, there is an effect of improving efficiency in terms of both work and cost.

【0024】[0024]

【図面の簡単な説明】[Brief description of drawings]

【図1】擁壁を側断面としてブロック積みの施工状況を
示す全体説明図
FIG. 1 is an overall explanatory view showing a construction state of block stacking with a retaining wall as a side section.

【図2】正面の模様、空洞部等の構造を省略して水抜き
孔の合成・連通関係を示すブロック積み部分の透視斜視
FIG. 2 is a perspective perspective view of a block stacking portion showing a composite / communication relationship of water drainage holes by omitting a structure such as a front pattern and a cavity.

【図3】基本となる積みブロックの単体斜視図FIG. 3 is a single perspective view of a basic stacking block.

【符号の説明】[Explanation of symbols]

1 布基礎 2 基礎角度調整面 3 土留地盤 4 積みブロック 4A・4B・4C 隣接ブロック 5a・5b 貫通孔 6a・6b・・ 半割の孔溝 7 ブロックの空洞部 8 裏込め 9 フィルター S ブロックの正面 1 Fabric foundation 2 Foundation angle adjustment surface 3 Soil retention ground 4 Stacking block 4A, 4B, 4C Adjacent block 5a, 5b Through hole 6a, 6b, ... Half groove groove 7 Block cavity 8 Backfill 9 Filter Front of S block

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 所定の擁壁傾斜角に対応してブロック法
面が形成されるように基礎角度を調整する布基礎を構築
し、同布基礎上に積み上げて法面形成を行うブロック
に、その積み上げ完成時に上段ブロックの背面から排水
角度をもって下降し、下段ブロックの法面に連通開口す
る水抜き孔を構成するように、積み上げ組み込まれる各
位置に応じて所定の通孔構成部を形成して、その組み合
わせにより擁壁の水抜き孔を構成することを特徴とする
ブロック積み擁壁の造成工法
1. A block for constructing a slope for forming a slope by adjusting a foundation angle so that a block slope is formed corresponding to a predetermined retaining wall inclination angle, and stacking on the cloth foundation to form a slope, When the stacking is completed, a predetermined through hole forming part is formed according to each position to be built up so as to form a drain hole that descends from the back surface of the upper block with a drain angle and communicates with the slope of the lower block. And constructing a water retaining hole for the retaining wall by combining them together.
【請求項2】 ブロック底面の中央部から背面の上縁中
点に貫通する通孔を穿設し、更にブロック上面の側辺中
点から正面下縁に貫通して凹陥し、隣接積載ブロックに
設けられた半割の孔溝と合体して1本の通孔を構成する
と共に、該通孔が、該ブロックと隣接ブロックの上に積
載されるブロックの前記ブロック底面の中央部から背面
の上縁中点に貫通する通孔に連通するように構成される
半割の孔溝を両側に備えるブロックを、各ブロックに設
けられた通孔構成部が裏込地層から法面に連通する通孔
に組み合わされるように、布基礎上に積み上げて法面形
成を行うようにした「請求項1」記載のブロック積み擁
壁の造成工法
2. A through hole penetrating from the central portion of the bottom surface of the block to the midpoint of the upper edge of the back surface is further formed, and further penetrates from the midpoint of the side edge of the upper surface of the block to the lower edge of the front surface to form a recess, thereby adjoining the adjacent loading block. One through hole is formed by combining with the half hole groove provided, and the through hole is formed from the central portion of the block bottom surface of the block loaded on the block and the adjacent block to the rear surface. Through-holes, each of which has a block having half-hole grooves configured to communicate with a through-hole penetrating to the midpoint of the edge, provided on each side of the block so that the through-hole formation portion communicates with the slope from the backfill layer The method for constructing a block stack retaining wall according to claim 1, wherein the slope is formed by stacking on a cloth foundation so as to be combined with
【請求項3】 ブロック底面の中央部から背面の上縁中
点に貫通する通孔を備え、両側にブロック上面の側辺中
点から正面下縁に貫通して凹陥する半割の孔溝を設けた
ことを特徴とする積みブロック
3. A through hole penetrating from a central portion of the bottom surface of the block to a middle point of an upper edge of the back surface, and a half hole groove which is recessed and penetrates from a middle point of a side edge of the upper surface of the block to a lower edge of the front surface on both sides. Stacking block characterized by being provided
JP14705892A 1992-06-08 1992-06-08 Block stacking wall construction method and stacking block Expired - Fee Related JPH0735657B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14705892A JPH0735657B2 (en) 1992-06-08 1992-06-08 Block stacking wall construction method and stacking block

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14705892A JPH0735657B2 (en) 1992-06-08 1992-06-08 Block stacking wall construction method and stacking block

Publications (2)

Publication Number Publication Date
JPH05339954A true JPH05339954A (en) 1993-12-21
JPH0735657B2 JPH0735657B2 (en) 1995-04-19

Family

ID=15421545

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14705892A Expired - Fee Related JPH0735657B2 (en) 1992-06-08 1992-06-08 Block stacking wall construction method and stacking block

Country Status (1)

Country Link
JP (1) JPH0735657B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002194755A (en) * 2000-12-26 2002-07-10 Landes Co Ltd Block equipped with drain gutters
KR100590411B1 (en) * 2005-12-01 2006-06-19 주식회사 혜원까치종합건축사사무소 Eco-Friendly Retaining Wall Structure in Building Complex

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002194755A (en) * 2000-12-26 2002-07-10 Landes Co Ltd Block equipped with drain gutters
KR100590411B1 (en) * 2005-12-01 2006-06-19 주식회사 혜원까치종합건축사사무소 Eco-Friendly Retaining Wall Structure in Building Complex

Also Published As

Publication number Publication date
JPH0735657B2 (en) 1995-04-19

Similar Documents

Publication Publication Date Title
AU691039B2 (en) Embankment wall construction and method and block construction for making the same
US7503729B2 (en) Reinforced retaining wall and method of construction
JP3817676B2 (en) Module block retaining wall structure and components
US6615561B2 (en) Retaining wall block
CA2017578C (en) Embankment reinforcing structures
US4982544A (en) Module and method for constructing sealing load-bearing retaining wall
KR200263961Y1 (en) Sectional block for retaining wall building
JP2000144769A (en) Method of landslide protection work for preparing housing lot
JPH05339954A (en) Construction method for block stacked retaining wall and stacking block
CN1204714A (en) Method for forming retaining wall
JP3955763B2 (en) Retaining wall block and retaining wall construction method using the same
US4880334A (en) Tunnel construction apparatus and method
JPH0641993A (en) Learned retaining wall
JP4555972B2 (en) Waterway construction method and waterway structure
JP2791744B2 (en) Retaining wall block
JPH06207417A (en) Retaining wall assembly block of precast gravity type
JPH04254618A (en) Structure of stone masonary retaining wall
JP7532694B1 (en) Retaining wall blocks and retaining walls
JP3057013U (en) Concrete block for draining water from ground slope
KR100465828B1 (en) Retaining wall block
JP3294715B2 (en) Block structure for retaining wall and method for forming retaining wall
JP3345587B2 (en) Concrete block for draining water from ground slope
CN210887088U (en) A ecological depressed place formula barricade base of permeating water for river course shore protection
JPS639601Y2 (en)
JP3236880B2 (en) Greening seawall and concrete block for seawall

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100419

Year of fee payment: 15

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110419

Year of fee payment: 16

LAPS Cancellation because of no payment of annual fees