JPH0536111U - Long body hanging bracket - Google Patents

Long body hanging bracket

Info

Publication number
JPH0536111U
JPH0536111U JP8598191U JP8598191U JPH0536111U JP H0536111 U JPH0536111 U JP H0536111U JP 8598191 U JP8598191 U JP 8598191U JP 8598191 U JP8598191 U JP 8598191U JP H0536111 U JPH0536111 U JP H0536111U
Authority
JP
Japan
Prior art keywords
metal fitting
receiving
bolt
receiving member
hanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP8598191U
Other languages
Japanese (ja)
Other versions
JPH083687Y2 (en
Inventor
宏二 竹永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inaba Denki Sangyo Co Ltd
Original Assignee
Inaba Denki Sangyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inaba Denki Sangyo Co Ltd filed Critical Inaba Denki Sangyo Co Ltd
Priority to JP8598191U priority Critical patent/JPH083687Y2/en
Publication of JPH0536111U publication Critical patent/JPH0536111U/en
Application granted granted Critical
Publication of JPH083687Y2 publication Critical patent/JPH083687Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Connection Of Plates (AREA)
  • Clamps And Clips (AREA)

Abstract

(57)【要約】 【目的】 取り付け、及び、取り付け後の位置調整が簡
単で、位置調整中にも不用意に外れにくいようにする。 【構成】 長尺体支持用の受け部6cの一端に、ボルト
2に外嵌状態で取り付いた金具受け止め部材3に対する
載置部9を連設し、その載置部9にボルト2受入用の受
入部9aを切り欠きで形成すると共に、受入部9aにボ
ルト2を受け入れた載置部9を金具受け止め部材3に載
置した状態で、金具受け止め部材3に係合する係合部1
2を、載置部9に設けてある。
(57) [Summary] [Purpose] It is easy to install and adjust the position after installation, and prevent it from accidentally coming off during position adjustment. [Structure] A mounting portion 9 for a metal fitting receiving member 3 attached to a bolt 2 in an externally fitted state is continuously provided at one end of a receiving portion 6c for supporting a long body, and the mounting portion 9 is used for receiving the bolt 2. The receiving portion 9a is formed by a cutout, and the mounting portion 9 that receives the bolt 2 in the receiving portion 9a is mounted on the metal fitting receiving member 3 and engages with the metal fitting receiving member 3
2 is provided on the mounting portion 9.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial applications]

本考案は、例えば、配管等の長尺体を吊すのに用いる長尺体吊り金具に関し、 詳しくは、長尺体支持用の受け部の一端に、吊り固定用のボルトに外嵌状態で取 り付いた金具受け止め部材の一例であるボルトやナットに載置可能な載置部を連 設し、その載置部に吊り固定用のボルトを挿通させた状態で受け入れる受入部を 設け、その受入部にボルトを受け入れた状態で、金具受け止め部材に載置部を載 置させて受け部上の長尺体を支持するもので、前記ボルトに対して、前記金具受 け止め部材を上下させることで、支持した長尺体のレベル調整を実施できる長尺 体吊り金具に関する。 The present invention relates to a long body hanging metal fitting used, for example, for hanging a long body such as a pipe. More specifically, it is attached to one end of a receiving portion for supporting the long body in a state where it is fitted onto a bolt for suspension fixing. A mounting part that can be mounted on a bolt or nut, which is an example of a metal fitting receiving member that is attached, is provided in series, and a receiving part that accepts the suspension fixing bolt inserted in the mounting part is provided. The mounting part is placed on the metal fitting receiving member to support the elongated body on the receiving part in a state where the bolt is received in the portion, and the metal fitting receiving member is moved up and down with respect to the bolt. The present invention relates to a long body hanging metal fitting capable of adjusting the level of a long body supported.

【0002】[0002]

【従来の技術】[Prior Art]

従来、この種の長尺体吊り金具としては、ボルト受入用の受入部を貫通孔によ って形成していた。 Conventionally, in this type of long body hanging metal fitting, a receiving portion for receiving a bolt is formed by a through hole.

【0003】[0003]

【考案が解決しようとする課題】[Problems to be solved by the device]

この種の長尺体吊り金具(以後吊り金具という)の設置作業においては、まず 、長尺体・吊り金具を吊すためのボルトに、吊り金具を固定する固定用ナットを 設置しておき、次に、吊り金具を一方の手で保持しつつ、その吊り金具の載置部 に設けられたボルト受入用の貫通孔を、前記ボルトに挿通させて、その後から、 他方の手で金具受け止め部材となるワッシャ及びナットを前記ボルトにはめて螺 進させ、先に設置してある固定用ナットとの間に、吊り金具の載置部を挟持する 形で締め付けて取り付けるものである。 In the installation work of this type of long-body hanging fittings (hereinafter referred to as hanging fittings), first install the fixing nuts that fix the hanging fittings to the bolts for hanging the long-body hanging fittings. While holding the hanging metal fitting with one hand, insert the bolt receiving through hole provided in the mounting part of the hanging metal fitting into the bolt, and then use the other hand to hold the metal fitting receiving member. The above washer and nut are screwed into the bolt and screwed, and the mounting portion of the hanging metal fitting is clamped and mounted between the washer and the previously installed fixing nut.

【0004】 このような作業を、例えば、頭より上の位置で実施するには、両方の手を吊り 金具取り付け動作中使用するため、疲労を伴ったり、作業性が低下したりする問 題がある。更に、長いボルトの基端近くに吊り金具を取り付けるような場合は、 ナットの螺進距離も長くなって、より両手作業がきついものになる。In order to perform such work at a position above the head, for example, both hands are used during the attaching operation of the hanging metal fittings, which causes problems such as fatigue and deterioration of workability. is there. Furthermore, when attaching a hanging metal fitting near the base end of a long bolt, the threading distance of the nut also becomes long, and the work with both hands becomes more difficult.

【0005】 この問題を緩和するために、吊り金具のボルト受入部を、従来のものに形成さ れていた貫通孔に替えて、切り欠きにすることが考えられた。即ち、受入部を切 り欠きにすることで、金具受け止め部材を、ボルトに設置してからでも、先に設 置してある固定用ナットとの隙間に、載置部を挿入することが出来るようになり 、固定ナットか金具受け止め部材のナットの内、少なくとも一方のナットを締め 付けることで、吊り金具の取り付けができる。従って、吊り金具の取り付けに、 両手を長い間使用する必要がなくなる。In order to alleviate this problem, it has been considered to replace the bolt receiving portion of the hanging metal fitting with a through hole formed in the conventional one and make a notch. In other words, by making the receiving part cut out, the mounting part can be inserted into the gap with the previously installed fixing nut even after the metal fitting receiving member is installed on the bolt. Then, the hanging metal fitting can be attached by tightening at least one of the fixed nut and the nut of the metal fitting receiving member. Therefore, it is not necessary to use both hands for a long time to attach the hanging metal fitting.

【0006】 しかし、長尺体の長手方向に沿った複数箇所にそれぞれ取り付けた吊り金具に 対しては、それらの上に長尺体を載せた後、長尺体の姿勢を整えるために、各吊 り金具の取り付き位置を調整する作業を行う必要があり、この調整作業は、一旦 締め付けた前記ナットを、再度緩めて実施することとなる。従って、この調整作 業において手間がかかると共に、ナットを緩めた時に吊り金具が外れて、落下す る危険もあり、作業性・安全性ともに欠けるという欠点がある。However, with respect to the hanging metal fittings respectively attached to a plurality of positions along the longitudinal direction of the long body, after mounting the long body on them, each of the hanging metal fittings is adjusted to adjust the posture of the long body. It is necessary to perform the work of adjusting the mounting position of the hanging metal fitting, and this adjustment work is performed by loosening the once tightened nut again. Therefore, this adjustment work is troublesome, and when the nut is loosened, the hanging metal fitting may come off and fall, resulting in poor workability and safety.

【0007】 本考案の目的は、上述した欠点に鑑み、取り付け、及び、取り付け後の位置調 整が簡単で、位置調整中にも不用意に外れにくい長尺体吊り金具を提供するとこ ろにある。In view of the above-mentioned drawbacks, an object of the present invention is to provide a long body hanging metal fitting that is easy to mount and adjust the position after the fitting and is hard to accidentally come off during the position adjustment. is there.

【0008】[0008]

【課題を解決するための手段】[Means for Solving the Problems]

この目的を達成するための本考案の特徴構成は、ボルトに外嵌状態で取り付い た金具受け止め部材に載置させる載置部に、ボルトを挿通させた状態で受け入れ るための受入部を、切り欠きで形成すると共に、前記受入部にボルトを受け入れ た前記載置部を前記金具受け止め部材に載置した状態で、前記金具受け止め部材 に係合する係合部を、前記載置部に設けたところにある。 In order to achieve this object, the feature of the present invention is that the receiving portion for receiving the bolt inserted into the mounting portion to be mounted on the metal fitting receiving member mounted on the bolt in the fitted state is An engaging portion that engages with the metal fitting receiving member is provided on the metal fitting receiving member in a state in which the metal fitting receiving member is formed with a notch and the mounting portion that receives the bolt in the receiving portion is placed on the metal fitting receiving member. Where it is.

【0009】[0009]

【作用】[Action]

本考案の特徴構成によれば、ボルトに外嵌状態で取り付いた金具受け止め部材 に載置させる載置部に、ボルトを挿通させた状態で受け入れるための受入部を切 り欠きで形成してあるので、固定用ナット及び金具受け止め部材用を、相互の間 隔を明けてボルトに設置してさえあれば、その両ナット間へ後からでも、受入部 の切り欠きにボルトを受け入れる状態にして吊り金具の載置部を挿入することが 出来る。 According to the characteristic configuration of the present invention, the receiving portion for receiving the bolt in the inserted state is formed by the notch in the mounting portion to be mounted on the metal fitting receiving member attached to the bolt in a fitted state. Therefore, as long as the fixing nut and the metal fitting receiving member are installed on the bolt with a gap between them, the bolt can be inserted into the notch of the receiving part and can be hung even afterwards between both nuts. The mounting part of the metal fitting can be inserted.

【0010】 その結果、ボルトの設置作業とは別に、吊り金具の取り付けを実施できるので 、両手作業が減少すると共に、従来のように、吊り金具を保持しつつ金具受け止 め部材のワッシャとナットを螺進させる複合作業でなくなるので、夫々の作業が しやすくなる。As a result, since the hanging fitting can be mounted separately from the bolt installing work, both-hand work is reduced, and the washer and the nut of the fitting receiving member while holding the hanging fitting are held as in the conventional case. Since it is no longer a complex work of screwing, each work becomes easier.

【0011】 又、受入部にボルトを受け入れた載置部を、金具受け止め部材に載置した状態 で、金具受け止め部材に係合する係合部を、載置部に設けてあるので、上述のよ うにして、両ナット間へ吊り金具の載置部を挿入して、金具受け止め部材のワッ シャに載置部の係合部を係合させるだけで、抜け落ちることが無い状態に吊り金 具を取り付けることが出来る。Further, since the mounting portion that receives the bolt in the receiving portion is mounted on the metal fitting receiving member, the engaging portion that engages with the metal fitting receiving member is provided on the mounting portion. In this way, by inserting the mounting part of the hanging metal fitting between both nuts and engaging the washer of the metal fitting receiving member with the engaging part of the mounting part, the hanging metal fitting can be prevented from falling off. Can be attached.

【0012】 従って、載置部をその上下からナットで、しっかり固定しなくても、吊り金具 が抜け落ちないから、その仮固定状態で長尺体を保持することができ、更に、保 持された長尺体のレベル調整作業も、従来のように一旦ボルトを緩めてから実施 しなくても、仮固定のまま金具受け止め部材のナットを上下させるだけで行える 。そして、このレベル調整を完了してから、ナットを締め付けて、本固定を行え ば、長尺体をレベル調整された状態で、確実に保持することが出来る。[0012] Therefore, even if the mounting portion is not firmly fixed from above and below with the nut, the hanging metal fitting does not fall out, so that the long body can be held in the temporarily fixed state, and further, it is held. Level adjustment work for long objects can be performed by temporarily moving the nut of the metal fitting receiving member up and down without temporarily fixing the bolts as in the past. Then, after this level adjustment is completed, if the nut is tightened and the main fixing is performed, the long body can be securely held in the level adjusted state.

【0013】[0013]

【考案の効果】[Effect of the device]

従って、長尺体吊り金具の取り付けに際し、片手で金具受け止め部材に係合部 を係合させるだけで不用意には外れ無い状態に簡単に仮固定できて、しかも、そ の状態で位置調整が出来るようになったことで、安全を確保しながらも作業効率 を向上させて工期を短縮できるようになり、全体として経済性も向上させること が出来るようになった。 Therefore, when mounting the long-body suspension metal fitting, it is possible to easily and temporarily fix the metal fitting receiving member by engaging the engaging part with the metal fitting receiving member with one hand, and to adjust the position in that condition. By being able to do so, it became possible to improve work efficiency and shorten the construction period while ensuring safety, and it was also possible to improve overall economic efficiency.

【0014】[0014]

【実施例】【Example】

以下に本考案の実施例を図面に基づいて説明する。 An embodiment of the present invention will be described below with reference to the drawings.

【0015】 図1に、本考案による長尺体吊り金具1を設置した状況を示しているが、天井 から下げられたアンカーボルト2に外嵌する金具受け止め部材の一例であるワッ シャ3aとナット3bに、長尺体吊り金具1を載置した状態で、その上部を固定 用ナット4で螺着して取り付けてある。FIG. 1 shows a state in which a long body hanging metal fitting 1 according to the present invention is installed. A washer 3a and a nut which are an example of a metal fitting receiving member to be fitted on an anchor bolt 2 lowered from the ceiling. In the state where the long body hanging metal fitting 1 is placed on 3b, the upper part thereof is screwed and fixed by the fixing nut 4.

【0016】 この長尺体吊り金具1(以後、吊り金具という)は、長尺体の一例である8角 ダクト5を受ける受け部材6と、8角ダクト5の外れ止めとなる外れ止め部材7 によって形成してある。The elongated body hanging fitting 1 (hereinafter referred to as a hanging fitting) includes a receiving member 6 that receives an octagonal duct 5 that is an example of the elongated body, and a retaining member 7 that prevents the octagonal duct 5 from coming off. Is formed by.

【0017】 図2に見られるように、前記受け部材6は、その先端6bで、前記外れ止め部 材7と連結してヒンジを構成する突出部8と、基端6aで前記金具受け止め用ワ ッシャ3aに載置する載置部9と、8角ダクト5を受ける受け部6cとで構成さ れる。As shown in FIG. 2, the receiving member 6 has a projecting portion 8 which is connected to the detachment preventing member 7 to form a hinge at a tip 6 b thereof, and a base portion 6 a at which the metal fitting receiving work is received. It comprises a placing portion 9 placed on the washer 3a and a receiving portion 6c for receiving the octagonal duct 5.

【0018】 又、前記外れ止め部材7は、その基端7bに受け部材6の突出部8が係合する ことで、ヒンジを形成する貫通孔10を設け、先端7aには、受け部材6の載置 部9上面に重ね合わせて、載置部9と共に締め付けられる重ね部11を設けてあ る。更に、この重ね部11には、ボルト2受入用の切り欠き11aを、長手方向 に沿って設けてあり、その切り欠き11aの開口側端部は、載置部9側に折曲さ せてある。The retaining member 7 is provided with a through hole 10 that forms a hinge by engaging the protrusion 8 of the receiving member 6 with the base end 7b of the retaining member 7, and the receiving end of the receiving member 6 at the distal end 7a. An overlapping portion 11 is provided which is superposed on the upper surface of the placing portion 9 and is fastened together with the placing portion 9. Further, the overlapping portion 11 is provided with a notch 11a for receiving the bolt 2 along the longitudinal direction, and the opening side end of the notch 11a is bent toward the mounting portion 9 side. is there.

【0019】 一方、前記受け部材6の載置部9にも、ボルト2受入用の受入部として切り欠 き9aを、受け部材6の幅方向に沿って設けてあり、その切り欠き9aの開口側 端縁と、その縁に対向する辺の縁には、載置面側に折曲する爪状の係合部12を 形成してある。この係合部12は、図3(イ)、(ロ)に示すように、爪の板バ ネ作用により、金具受け止め用ワッシャ3a側縁を弾性的に挟持することで係合 できるように形成してある。又、この載置部9の下方に、載置面に対向するよう に吊り金具1の振れ止めのための振れ止め部13を、受け部材6の外周面から突 出する状態に設けてあり、この振れ止め部13にもボルト2を受け入れる切り欠 き13aが形成してある。On the other hand, the mounting portion 9 of the receiving member 6 is also provided with a notch 9a as a receiving portion for receiving the bolt 2 along the width direction of the receiving member 6, and the opening of the notch 9a. A claw-shaped engaging portion 12 that is bent toward the mounting surface is formed on the side edge and the edge of the side facing the edge. As shown in FIGS. 3 (a) and 3 (b), the engaging portion 12 is formed so that it can be engaged by elastically sandwiching the side edge of the metal fitting receiving washer 3a by the plate vane action of the claw. I am doing it. Further, a steady rest 13 for restraining steadying of the hanging fitting 1 is provided below the placing part 9 so as to face the placing face in a state of protruding from the outer peripheral surface of the receiving member 6. This steady rest 13 is also formed with a notch 13a for receiving the bolt 2.

【0020】 この吊り金具1の設置手順を説明すると以下の通りである。 〈1〉アンカーボルト2に、固定用ナット4と金具受け止め用ワッシャ3aと金 具受け止め用ナット3bを設置する。 〈2〉金具受け止め用ワッシャ3aに対して受け部材6をはめて取り付ける。 〈3〉8角ダクト5を受け部材6の受け部6cに載せる。 〈4〉受け部材6に外れ止め部材7を取り付ける。 〈5〉8角ダクト5のレベル調整を行う。 〈6〉固定用ナット4を金具受け止め用ナット3b側に螺進させて、吊り金具1 をボルト2に固定する。The procedure for installing the hanging fitting 1 will be described below. <1> The anchor bolt 2, the fixing nut 4, the metal fitting receiving washer 3a, and the metal fitting receiving nut 3b are installed. <2> Attach the receiving member 6 to the metal fitting receiving washer 3a. <3> Place the octagonal duct 5 on the receiving portion 6c of the receiving member 6. <4> Attach the retaining member 7 to the receiving member 6. <5> Adjust the level of the octagonal duct 5. <6> Screw the fixing nut 4 to the metal fitting receiving nut 3b side to fix the hanging metal fitting 1 to the bolt 2.

【0021】 上述の手順〈1〉については、吊り金具1の取り付け位置に、金具受け止め用 ワッシャ3aを載置した状態で、金具受け止め用ナット3bを設置し、固定用ナ ット4は、後で吊り金具1の取り付けが出来る程度に間隔を空けて、上方に設置 しておく。In the above procedure <1>, the metal fitting receiving washer 3a is placed at the mounting position of the hanging metal fitting 1, the metal fitting receiving nut 3b is installed, and the fixing nut 4 is attached to the rear. Install so that the hanging metal fitting 1 can be attached with a space between them.

【0022】 上述の手順〈2〉については、載置部9の切り欠き9aと、振れ止め部13の 切り欠き13aが、共にボルト2を受け入れた状態で、載置部9の係合部12が 、金具受け止め用ワッシャ3aに係合するように載置して取り付ける。Regarding the procedure <2> described above, the engaging portion 12 of the mounting portion 9 with the notch 9a of the mounting portion 9 and the notch 13a of the steady portion 13 both receiving the bolt 2 However, it is mounted and attached so as to engage with the metal fitting receiving washer 3a.

【0023】 上述の手順〈4〉については、受け部材6先端6bの突出部8に、外れ止め部 材7基端7bの貫通孔10を係合させてヒンジを形成し、そのヒンジを回転軸と して、外れ止め部材7先端7bの重ね部11が受け部材6の載置部9上に重なる ように、外れ止め部材7を回転させて取り付ける。In the above procedure <4>, the projection 8 of the tip 6b of the receiving member 6 is engaged with the through hole 10 of the base 7b of the retaining member 7 to form a hinge, and the hinge is used as a rotary shaft. Then, the retaining member 7 is rotated and attached so that the overlapping portion 11 of the tip 7b of the retaining member 7 overlaps the mounting portion 9 of the receiving member 6.

【0024】 上述の手順〈5〉については、金具受け止め用ナット3bを上下方向に螺進さ せることで、その上に載った吊り金具1や8角ダクト5も上下し、レベルを調整 できる。In the above procedure <5>, the metal fitting receiving nut 3b is screwed in the vertical direction, so that the hanging metal fitting 1 and the octagonal duct 5 placed on the metal fitting receiving nut 3b are also vertically moved to adjust the level.

【0025】 上述の手順〈6〉については、下部の金具受け止め用ナット3bと、上部の固 定用ナット4との間に、金具受け止め用ワッシャ3aと、受け部材6の載置部9 と、外れ止め部材7の重ね部11を挟持した状態で固定される。In the above procedure <6>, the metal fitting receiving washer 3 a, the mounting portion 9 of the receiving member 6, and the metal fitting receiving washer 3 a are provided between the lower metal fitting receiving nut 3 b and the upper fixing nut 4. It is fixed in a state in which the overlapping portion 11 of the retaining member 7 is sandwiched.

【0026】 〔別実施例〕 以下に別実施例を説明する。Another Embodiment Another embodiment will be described below.

【0027】 先の実施例による受け部材6・外れ止め部材7の形状は、8角ダクト5を対象 としたものに限らず、長尺体5の形状や吊り本数等によって、様々なものが考え られ、例えば、円形や楕円形等でもよく、更に受け部材6単独で用いる場合には 、馬蹄形をした形状も考えられる。The shapes of the receiving member 6 and the retaining member 7 according to the above-described embodiment are not limited to those intended for the octagonal duct 5, but various shapes are conceivable depending on the shape of the elongated body 5 and the number of hanging pieces. For example, the shape may be circular or elliptical, and when the receiving member 6 is used alone, a horseshoe-shaped shape is also conceivable.

【0028】 又、前記金具受け止め部材3としては、先の実施例のワッシャ3aとナット3 bの組合せに限るものではなく、例えば、ナット3bだけでもよい。但し、その 場合は、係合部12を金具受け止め部材3に対応した係合部12形状に、変形す る必要がある。Further, the metal fitting receiving member 3 is not limited to the combination of the washer 3a and the nut 3b of the previous embodiment, but may be, for example, only the nut 3b. However, in that case, it is necessary to transform the engaging portion 12 into the shape of the engaging portion 12 corresponding to the metal fitting receiving member 3.

【0029】 次に、載置部9における係合部12の設置位置については、先の実施例の位置 に限らず、一例として、切り欠き9a部分を除く載置部9の全縁に、それぞれ対 向するように設けてもよく、更に他の例として、切り欠き9aの開口端側の縁だ けに設けてもよい。要するに、吊り金具1の仮固定時に、金具受け止め部材3か ら吊り金具1が外れる事を、防止できるものであればよい。Next, the installation position of the engaging portion 12 in the mounting portion 9 is not limited to the position of the previous embodiment, and as an example, the entire position of the mounting portion 9 excluding the cutout 9a is They may be provided so as to face each other, and as still another example, they may be provided only at the edge of the notch 9a on the opening end side. In short, what is necessary is just to prevent the hanging metal fitting 1 from coming off from the metal fitting receiving member 3 when the hanging metal fitting 1 is temporarily fixed.

【0030】 又、前記載置部9・振れ止め部13・重ね部11に設けた切り欠きについては 、その形成方向を、先の実施例のものに限るものではなく、吊り金具1設置に当 たり、切り欠きへのボルト2受入が、スムースに実施でき、且つ、ボルト2受入 方向に交差する方向への吊り金具1移動を許さない利点を生かして、独特の作用 をするような方向に設けてあればよい。Further, the notch provided in the placing portion 9, the steady rest portion 13, and the overlapping portion 11 is not limited to the forming direction of that of the above-described embodiment, and may be used when installing the hanging metal fitting 1. Or, the bolt 2 can be smoothly received in the notch, and it can be installed in a direction that provides a unique function by taking advantage of the fact that the suspension fitting 1 cannot be moved in the direction intersecting the bolt 2 receiving direction. If there is.

【0031】 尚、実用新案登録請求の範囲の項に、図面との対照を便利にするために符号を 記すが、該記入により本考案は添付図面の構成に限定されるものではない。In the claims of utility model registration, reference numerals are given for convenience of comparison with the drawings, but the present invention is not limited to the configurations of the accompanying drawings by the entry.

【図面の簡単な説明】[Brief description of drawings]

【図1】設置状況を表す図[Figure 1] Diagram showing the installation status

【図2】実施例の斜視図FIG. 2 is a perspective view of an embodiment.

【図3】載置部詳細図[Fig. 3] Detailed view of mounting section

【符号の説明】[Explanation of symbols]

2 ボルト 3 金具受け止め部材 5 長尺体 6c 受け部 9 載置部 9a 受入部 12 突起 2 bolt 3 metal fitting receiving member 5 elongated body 6c receiving portion 9 mounting portion 9a receiving portion 12 protrusion

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 長尺体(5)支持用の受け部(6c)の
一端に、ボルト(2)に外嵌状態で取り付いた金具受け
止め部材(3)に載置可能な載置部(9)を連設し、そ
の載置部(9)にボルト(2)を挿通させた状態で受け
入れるための受入部(9a)を設けた長尺体吊り金具で
あって、 前記受入部(9a)を切り欠きで形成すると共に、前記
受入部(9a)にボルト(2)を受け入れた前記載置部
(9)を前記金具受け止め部材(3)に載置した状態
で、前記金具受け止め部材(3)に係合する係合部(1
2)を、前記載置部(9)に設けた長尺体吊り金具。
1. A mounting part (9) which can be mounted on a metal fitting receiving member (3) attached to a bolt (2) in an externally fitted state, at one end of a receiving part (6c) for supporting an elongated body (5). ) Is provided continuously, and a receiving part (9a) for receiving the bolt (2) inserted in the mounting part (9) is provided in the elongated body hanging metal fitting, the receiving part (9a) Is formed by a cutout, and the mounting portion (9) having the bolt (2) received in the receiving portion (9a) is mounted on the metal fitting receiving member (3), the metal fitting receiving member (3). ) Engaging part (1
2) A long body hanging metal fitting provided on the placing part (9).
JP8598191U 1991-10-22 1991-10-22 Long body hanging bracket Expired - Lifetime JPH083687Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8598191U JPH083687Y2 (en) 1991-10-22 1991-10-22 Long body hanging bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8598191U JPH083687Y2 (en) 1991-10-22 1991-10-22 Long body hanging bracket

Publications (2)

Publication Number Publication Date
JPH0536111U true JPH0536111U (en) 1993-05-18
JPH083687Y2 JPH083687Y2 (en) 1996-01-31

Family

ID=13873884

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8598191U Expired - Lifetime JPH083687Y2 (en) 1991-10-22 1991-10-22 Long body hanging bracket

Country Status (1)

Country Link
JP (1) JPH083687Y2 (en)

Also Published As

Publication number Publication date
JPH083687Y2 (en) 1996-01-31

Similar Documents

Publication Publication Date Title
JP2005312164A (en) Oblique hanging bolt mounting device
JPH083686Y2 (en) Long body hanging bracket
JPH083687Y2 (en) Long body hanging bracket
US7243891B2 (en) Mounting bracket, and method therefor
JPH10234124A (en) Fastener
JP2004244953A (en) Ceiling panel fixture
JP2001098718A (en) Gutter suspension for folded roof
JPH11218108A (en) Mounting bracket for pole
JP2599019Y2 (en) Lighting fixture mounting structure
JP2001152674A (en) Panel mounting bracket for temporary enclosure
JP3734749B2 (en) Hanging bolt mounting device
JPS603464Y2 (en) Cutout mounting bracket
JPH0559127U (en) Air conditioner mounting device
JP2730008B2 (en) Parapet plate mounting structure
JPS5815272Y2 (en) Height adjustable and detachable beam device
JP3734748B2 (en) Mounting device
JP2595997Y2 (en) Eave gutter fixture
JP3333796B2 (en) Wire mesh Fuens
JPH0331775Y2 (en)
JPH07305398A (en) Urinal mounting structure
JPH0633542A (en) Ceiling mount
JPH0583630U (en) Ceiling-mounted air conditioner
JPH0612098Y2 (en) Suspension
JP3043452U (en) Hanging type installation stand for air conditioner outdoor unit
JP2524614Y2 (en) Handrail mounting jig to prevent falling at wall opening

Legal Events

Date Code Title Description
EXPY Cancellation because of completion of term