JPH0544220A - Construction of base for structure such as housing - Google Patents
Construction of base for structure such as housingInfo
- Publication number
- JPH0544220A JPH0544220A JP22471991A JP22471991A JPH0544220A JP H0544220 A JPH0544220 A JP H0544220A JP 22471991 A JP22471991 A JP 22471991A JP 22471991 A JP22471991 A JP 22471991A JP H0544220 A JPH0544220 A JP H0544220A
- Authority
- JP
- Japan
- Prior art keywords
- foundation
- concrete
- construction
- formwork
- base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 26
- 238000009415 formwork Methods 0.000 claims abstract description 28
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 12
- 238000000034 method Methods 0.000 claims description 11
- FBOUIAKEJMZPQG-AWNIVKPZSA-N (1E)-1-(2,4-dichlorophenyl)-4,4-dimethyl-2-(1,2,4-triazol-1-yl)pent-1-en-3-ol Chemical compound C1=NC=NN1/C(C(O)C(C)(C)C)=C/C1=CC=C(Cl)C=C1Cl FBOUIAKEJMZPQG-AWNIVKPZSA-N 0.000 claims description 4
- 239000002699 waste material Substances 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 2
- 238000005056 compaction Methods 0.000 description 2
- 239000004570 mortar (masonry) Substances 0.000 description 2
- 238000005096 rolling process Methods 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 238000009411 base construction Methods 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 230000009193 crawling Effects 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Foundations (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は、住宅などの建造物用で
あるコンクリート基礎の施工方法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a concrete foundation for buildings such as houses.
【0002】[0002]
【従来の技術】現在住宅等用基礎を構築するに際して
は、測量した後、図5に示したように当該現場にあって
地盤aの根掘、つまり住宅用等基礎用溝bを掘削し、こ
れを転圧した後、捨てコンクリートcを打設し、これに
スミ出しを行ない、そのスミ線(図示せず)に合わせて
内型枠dを立込み、鉄筋eを組立て、次いで外型枠fを
立込んだ後、全体の芯出しを行なって内外両型枠d、f
をホームタイと称する型枠保持金具g等で固定し、さら
に、コンクリートhを打設して、バイブルかけ(圧密)
を行なうようにしている。2. Description of the Related Art At present, when constructing a foundation for a house or the like, after surveying, as shown in FIG. 5, a root a is excavated at the site, that is, a groove b for a foundation for a house is excavated, After this is compacted, waste concrete c is poured, and the sumi is made out of it. The inner form d is raised according to the sumi line (not shown), the rebar e is assembled, and then the outer form is formed. After putting in f, the entire centering is performed and both the inner and outer molds d, f
Is fixed with a form holding metal fitting g called home tie, and concrete h is placed and the bible is applied (consolidation).
I am trying to do.
【0003】すなわち、上記従来の基礎施工方法は、す
べて現場における作業であり、しかも、順次、イ 測量、
ロ 根堀(溝掘削)、ハ 転圧、ニ 捨てコンクリート打設、
ホ スミ出し、ヘ 内型枠立込み、ト 鉄筋組立、チ 外型枠立
込み、芯出し後組立固定、リコンクリート打設、ヌ バイ
ブルかけ、ル 型枠解体、オ 埋戻し、ワ 転圧といった13
の工程を施工して行かねばならないこととなる。That is, all of the above-mentioned conventional foundation construction methods are on-site work, and in addition,
Negori (groove excavation), crawling compaction, pouring concrete,
Hosumi out, inner formwork inset, g rebar assembly, c-outer formwork inset, assembly and fixing after centering, reconcrete placement, nubile, le formwork dismantling, backfilling, rolling pressure, etc. Thirteen
You have to carry out the process of.
【0004】[0004]
【発明が解決しようとする課題】しかし、上記従来の施
工方法では、全工程が現場作業となり、かつその作業工
程も多岐にわたっているため、当該作業が天候に左右さ
れ、また、上記各工程の作業は夫々専門の技術者によっ
て遂行されるが、昨今のように、これら専門職の人手不
足もあって工期が長くなり、また、施工コストも高価な
ものとなってしまう等の問題を有している。However, in the above-mentioned conventional construction method, all the steps are on-site work and there are various work steps, so the work is affected by the weather, and the work of each step Each of them is carried out by a professional engineer, but as in recent years, due to the lack of manpower for these professionals, the construction period becomes long and the construction cost becomes expensive. There is.
【0005】本発明は、上記従来の施工方法の有するこ
のような問題点にかんがみてなされたもので、その目的
とするところは、現場作業を少なくすることで、工期を
大幅に短縮できて施工費を低減できると共に、強度及び
外観ともに良好な構築基礎を得ようとするのが、その目
的である。The present invention has been made in view of the above problems of the above-mentioned conventional construction method. The purpose of the present invention is to shorten the construction period by reducing the on-site work. The purpose is to reduce the cost and to obtain a building foundation that has good strength and appearance.
【0006】[0006]
【課題を解決するための手段】本発明は、上記目的を達
成するため、予め地盤に掘削した基礎構築用溝に捨てコ
ンクリートを打設して基礎を構築する住宅等建造物用基
礎の施工方法において、所要単位量の基礎構築物を工場
生産し、これらをスミ線に合わせて捨てコンクリート上
に設置し、各基礎構築物の接続側端面から突出させてあ
る夫々の鉄筋を互いに締結した後、その接続箇所に型枠
を組立ててコンクリートを打ち継ぎすることで基礎の構
築を完成させるようにしたことを特徴とする住宅等建造
物用基礎の施工方法を提供するものである。SUMMARY OF THE INVENTION In order to achieve the above object, the present invention is a method for constructing a foundation for a building such as a house, in which a concrete is placed in a groove for foundation construction excavated in the ground in advance to construct a foundation. In the above, in the factory, the required amount of basic structure was produced at the factory, these were installed on the concrete in line with the sumi line, and after connecting the respective reinforcing bars projecting from the connection side end face of each basic structure to each other, the connection The present invention provides a method for constructing a foundation for a building such as a house, characterized in that the construction of the foundation is completed by assembling a formwork at a location and splicing concrete.
【0007】[0007]
【作用】捨てコンクリート上に、工場生産した所要単位
量の基礎構築物を配置し、それらの端部から突出させて
ある鉄筋を互いに締結した後、また基礎構築物相互の接
続箇所に型枠を組立固定するが、この型枠を隣接の両基
礎構築物の内外両側面に突き合わせることで、所定の間
隔に保持されるから、当該両型枠は、公知のピン方式や
ボルト等の簡単な保持具を用いて組立てることができ、
従って、型枠の解体も容易となる。[Function] After disposing the required amount of the basic structure produced in the factory on the discarded concrete and fastening the reinforcing bars protruding from their ends to each other, assemble and fix the formwork at the connection points between the basic structures. However, since the formwork is held at a predetermined interval by abutting the inner and outer side surfaces of the adjacent base constructions, the formwork is a known pin system or a simple holder such as a bolt. Can be assembled using
Therefore, the dismantling of the formwork becomes easy.
【0008】型枠を組立てたら、これにコンクリートを
打ち継ぎ、コンクリート固化後、型枠を解体して、基礎
の構築を完成する。このようにして構築された基礎は、
各基礎構築物が型枠で工場生産されており、また、各基
礎構築物相互は、型枠を使用してコンクリートで打継ぎ
されるので、表面平滑で外観が美しい。従って、腰モル
タルやハッリ作業が不要となる。After assembling the formwork, concrete is spliced into the formwork, and after the concrete is solidified, the formwork is disassembled to complete the construction of the foundation. The foundation thus constructed is
Each foundation structure is factory-manufactured with a formwork, and since each foundation structure is spliced with concrete using a formwork, the surface is smooth and the appearance is beautiful. Therefore, waist mortar and hali work are unnecessary.
【0009】また、各基礎構築物に配筋した鉄筋の両端
部が、基礎構築物の接続側端面から外側へ延出させてあ
り、コンクリート打継ぎ部分で互いに締結されるため、
強度、外観ともに良好な基礎を短期間内に構築できるこ
ととなる。Further, since both ends of the reinforcing bar arranged in each foundation structure are extended outward from the connection-side end surface of the foundation structure and are fastened to each other at the concrete joint portion,
It will be possible to build a foundation with good strength and appearance in a short period of time.
【0010】[0010]
【実施例】以下、本発明の実施例について図面を参照し
て説明する。図1(A)(B)は、夫々本発明の方法を
実施するのに用いられる所要単位量とした基礎構築物1
の斜視図と、これら基礎構築物1相互を鋼製等による型
枠2、3‥‥‥の使用により、コンクリートで打継ぎす
る状態を示した平面図であり、この図 1(B)に示した
工程段階に至るまでには、基礎施工方法における前記公
知の手順と同じく順次、測量地盤に基礎用溝4を掘削す
る根掘、同溝4の底部を転圧、そして、図示しない捨て
コンクリートの打設工程が遂行されていることとなる。Embodiments of the present invention will be described below with reference to the drawings. 1 (A) and 1 (B) respectively show the substructure 1 with the required unit quantity used for carrying out the method of the present invention.
Fig. 1 (B) is a perspective view of Fig. 1 and a plan view showing a state in which the foundation structures 1 are jointed to each other by using the molds 2, 3 ... made of steel or the like, as shown in Fig. 1 (B). By the same time as the above-mentioned known procedure in the foundation construction method, until the process step, root excavation for excavating the trench 4 for foundation in the surveying ground, compaction of the bottom of the trench 4 and pouring of waste concrete not shown. This means that the installation process is being performed.
【0011】基礎構築物1は、予め工場生産しておくの
であり、当該生産には、図示しない鋼製型枠を枠組み固
定し、所要複数本の鉄筋5‥‥‥を配筋し、その両端部
を当該基礎構築物1の端面1a、1bから長さ方向へ所
要長さだけ突出させた状態で、コンクリート1cを打設
することで、基礎として適する形状、例えば側面略T字
状等に形成される。The basic structure 1 is manufactured in advance in a factory. For this production, a steel formwork (not shown) is fixed to the frame, a plurality of required reinforcing bars 5 ... The concrete 1c is placed in a state in which the required length is projected from the end faces 1a, 1b of the foundation structure 1 in the length direction, so that the concrete 1c is formed into a shape suitable for a foundation, for example, a substantially T-shaped side surface. ..
【0012】上記基礎構築物1は、図2に示したよう
に、基礎用溝4の底部に施した捨てコンクリート6上に
調整モルタル6aを塗布し、これに予めスミ出しにより
形成してある図示しないスミ線に合わせて図1(B)に
示すように配置する。各基礎構築物1、1‥‥‥を、そ
の長さ方法へスミ線に合わせて直線状に配置する場合に
は、図1(B)の右側に示した如く、直線状となるよう
各端線1a、1bを対向させ、かつ、その端線1a、1
bから突出させてある鉄筋5‥‥‥の各突出端部5a、
5bの長さだけ基礎構築物相互の間隔を離間して配置
し、鉄筋5‥‥‥の両突出端部5a、5bを針金6や溶
接等で締結させ、これに所要複数本の縦筋7‥‥‥を組
込み固定する。As shown in FIG. 2, the foundation structure 1 is prepared by applying adjustment mortar 6a on the waste concrete 6 applied to the bottom of the groove 4 for foundation, and forming it beforehand by smeating (not shown). Arrange as shown in FIG. When arranging each of the substructures 1, 1, ... In a straight line according to the length method, each end line should be straight as shown on the right side of FIG. 1 (B). 1a and 1b are opposed to each other, and their end lines 1a and 1b
Each protruding end portion 5a of the reinforcing bar 5 ...
The base structures are spaced apart by a length of 5b, and the projecting end portions 5a and 5b of the reinforcing bars 5 are fastened with a wire 6 or welding, and a plurality of required vertical streaks 7 are connected thereto. Assemble and fix.
【0013】また、二個の各基礎構築物1、1‥‥‥を
平面略T字状に配置した場合は、図1(B)の左側に示
したように、左右の基礎構築物1、1を、上記した直線
打継ぎの場合と同様に配置して鉄筋5、5の両突出端部
5a、5bを締結し、縦筋7‥‥‥を組立てた後、この
打継ぎ箇所に直交状にて他の基礎構築物1を配置し、そ
の鉄筋5‥‥‥の突出端部5a‥‥‥を、上記した各突
出端部5a、5bと締結する。Further, when the two respective substructures 1, 1 ... Are arranged in a substantially T-shape in a plane, the left and right substructures 1, 1 are arranged as shown on the left side of FIG. 1 (B). After arranging in the same manner as in the case of the above-mentioned straight splicing, fastening both projecting end portions 5a and 5b of the reinforcing bars 5 and 5 and assembling the longitudinal bars 7, ... Another foundation structure 1 is arranged, and the protruding ends 5a of the reinforcing bars 5 are fastened to the protruding ends 5a and 5b described above.
【0014】図1(B)の右側に示した直線打継ぎ箇所
Aにあっては、基礎構築物1の外側面形状に適合する内
面形状となるように形成した図3(A)に示す如き同一
形状の型枠2、2を、上記打継ぎ箇所Aの内側及び外側
に配置し、該両型枠2、2の端部を両基礎構築物1、1
の端部側面に重合状態に突き合わせ、両者をボルトや公
知の図示しないピン方式等の保持具8、8‥‥‥で組立
て固定する。これによって、両基礎構築物1、1の各端
面1a、1bと、両型枠2、2の内面とで、断面が基礎
構築物1のそれと同一形状を有するコンクリート打設空
間9が形成される。At the straight joint splicing point A shown on the right side of FIG. 1 (B), the same as shown in FIG. 3 (A) formed so as to have an inner surface shape conforming to the outer surface shape of the foundation structure 1. Forming molds 2 and 2 are arranged inside and outside of the splicing point A, and the ends of the forming molds 2 and 2 are connected to both foundation structures 1 and 1.
The side surfaces of the end portions of the above are abutted in a superposed state, and the both are assembled and fixed by bolts or holding members 8, 8 ... As a result, a concrete pouring space 9 having a cross section having the same shape as that of the foundation structure 1 is formed by the respective end surfaces 1a, 1b of both foundation structures 1, 1 and the inner surfaces of both formwork 2, 2.
【0015】図1(B)の左側に示した平面略T字形状
の打継ぎ箇所Bでは、その外側に上記したと同様の型枠
2を配置し、その内側の左右両入隅部には、図3(B)
に示した如く、内面を直角に形成してある一対の型枠
3、3を配置し、上記した保持具8‥‥‥で、上記各型
枠2、3、3を組立て固定する。At the splicing point B having a substantially T-shaped plane as shown on the left side of FIG. 1 (B), a mold 2 similar to the one described above is arranged on the outside thereof, and the left and right corners inside the frame 2 are arranged. , Fig. 3 (B)
As shown in FIG. 5, a pair of molds 3 and 3 whose inner surfaces are formed at right angles are arranged, and the respective molds 2, 3 and 3 are assembled and fixed by the holders 8 ...
【0016】従って、図1(B)において、左右の両基
礎構築物1、1の各端面1b、1a及び下方の基礎構築
物1の各端面1a並びに上記各型枠2、3、3の内面に
より、平面略T字形状にして、断面が基礎構築物1のそ
れと同一形状を有するコンクリート打設空間10が形成
される。Therefore, in FIG. 1 (B), by the respective end faces 1b, 1a of the left and right foundation structures 1, 1 and the respective end faces 1a of the lower foundation structure 1 and the inner faces of the respective molds 2, 3, 3 described above, A concrete pouring space 10 having a substantially T-shaped plan and a cross section having the same shape as that of the foundation structure 1 is formed.
【0017】次いで、上記型枠2、2及び2、3、3内
の各コンクリート打設空間9、10にコンクリート12
を打設すれば、各基礎構築物1、1‥‥‥は打継がれ、
図4に例示したようなベタ基礎11の構築を完成するこ
とができる。さらに、打設したコンクリートの固化をま
ち、各型枠2、3を解体して、これを取外し、基礎11
両側の基礎用溝4を埋戻し、転圧して全作業は完了す
る。Next, concrete 12 is placed in each of the concrete placing spaces 9 and 10 in the formwork 2, 2 and 2, 3 and 3.
If you set up, each foundation structure 1, 1, ...
Construction of the solid foundation 11 as illustrated in FIG. 4 can be completed. Further, the cast concrete is solidified, each formwork 2, 3 is dismantled, and this is removed to form the foundation 11
The entire work is completed by backfilling the foundation grooves 4 on both sides and rolling.
【0018】図4において、Cは基礎構築物1、1を平
面略L字状の直角に打継いだ箇所を示す。このように基
礎構築物1、1を、それら端部で直角に打継ぐ場合の型
枠は、内側には図3(B)に示したものが使用される
が、外側には、両面が直角で、かつ、両基礎構築物1、
1の端部外側面に適合する形状に形成したものが使用さ
れる。この際両基礎構築物1、1の鉄筋5における突出
端部5a、5bは、互いに直交状態にて締結し、縦筋を
組立てることとなる。In FIG. 4, C indicates a portion where the foundation structures 1 and 1 are spliced at a right angle in a substantially L-shaped plane. As shown in FIG. 3 (B), the inside of the formwork for connecting the foundation structures 1 and 1 at their ends at a right angle is used on the inside, but on both sides at a right angle. , And both foundation structures 1,
The one formed in a shape that fits the outer surface of one end is used. At this time, the projecting end portions 5a and 5b of the reinforcing bars 5 of the two foundation structures 1 and 1 are fastened in a mutually orthogonal state to assemble the vertical bars.
【0019】[0019]
【発明の効果】以上説明したように、本発明に係る住宅
用基礎の施行方法によれば、所要単位量の基礎構築物を
工場で生産してしまい、これらを現場でコンクリートに
より打継ぐので、現場作業が在来工法に比べて非常に少
なくなると共に、各基礎構築物の打継ぎ箇所だけに型枠
を組立てればよくなるので、その数が少なくなり、しか
も基礎構築物が型枠の内側保持部材として活用できるか
ら、型枠保持具に簡単なピン方式やボルト等を使用して
何人にも容易に、かつ高精度に組立て得るので、在来工
法に比べて工期を大幅に短縮できると共にコストを低減
できる。また、型枠の組立が容易であることから型枠大
工が不要となり、人手不足の解消にもなる。As described above, according to the method of enforcing a residential foundation according to the present invention, the required amount of basic structure is produced in the factory and these are spliced with concrete on site, so The work is much less than the conventional construction method, and it is sufficient to assemble the formwork only at the joints of each foundation structure, so the number is reduced, and the foundation structure is used as an inner holding member of the formwork. Because it is possible, it can be assembled easily and with high accuracy by using a simple pin system or bolts on the form holder, so the construction period can be greatly shortened and the cost can be reduced compared to the conventional construction method. . Further, since the mold frame is easily assembled, the carpenter's carpenter is not required, and the labor shortage can be solved.
【図1】(A)(B)は夫々本発明によって住宅等建造
物用基礎を構築するための所要単位量の基礎構築物を一
部切欠して示した斜視図と、住宅等建造物用基礎の構築
施工途上状態を示した平面図である。1 (A) and 1 (B) are perspective views each showing a partial cutout of a basic structure of a required unit amount for constructing a basic structure for a residential structure according to the present invention, and a basic structure for a residential structure, etc. FIG. 3 is a plan view showing a state in which the construction and construction of is being performed.
【図2】図1(B)におけるA−A線矢視断面図であ
る。FIG. 2 is a cross-sectional view taken along the line AA in FIG.
【図3】(A)(B)は夫々基礎構築物相互を直線状に
打継ぎする場合に使用する型枠の斜視図と、基礎構築物
を平面略T字形状及び平面略L字状に打継ぎする場合の
内枠として使用する型枠の斜視図である。3 (A) and 3 (B) are perspective views of a formwork used when the foundation constructions are spliced in a straight line, and the foundation constructions are spliced in a substantially planar T shape and a substantially planar L shape. It is a perspective view of a formwork used as an inner frame in the case of doing.
【図4】本発明の施工方法によって構築した住宅等建造
物用基礎の一例を示す平面図である。FIG. 4 is a plan view showing an example of a foundation for a building such as a house constructed by the construction method of the present invention.
【図5】従来の施工方法によって住宅等建造物用基礎の
構築途上を示す縦断側面図である。FIG. 5 is a vertical cross-sectional side view showing a process of constructing a foundation for a building such as a house by a conventional construction method.
1 基礎構築物 2 型枠 3 型枠 4 基礎用溝 5 鉄筋 12 コンクリート 1 Foundation structure 2 Formwork 3 Formwork 4 Groove for foundation 5 Reinforcing bar 12 Concrete
Claims (1)
コンクリートを打設して基礎を構築する住宅等建造物用
基礎の施工方法において、所要単位量の基礎構築物を工
場生産し、これらをスミ線に合わせて捨てコンクリート
上に設置し、各基礎構築物の接続側端面から突出させて
ある夫々の鉄筋を互いに締結した後、その接続箇所に型
枠を組立ててコンクリートを打ち継ぎすることで基礎の
構築を完成させるようにしたことを特徴とする住宅等建
造物用基礎の施工方法。1. A method of constructing a foundation for a building such as a house, in which a concrete is disposed in a trench for foundation construction excavated in the ground in advance to construct the foundation, and a required amount of the foundation structure is produced at a factory. Installed on the concrete in line with the sumi line, fastened each reinforcing bar projecting from the end face of the connection side of each foundation structure to each other, then assemble the formwork at the connection point and pour the concrete A construction method for a foundation for a building such as a house, characterized in that the construction of the building is completed.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP22471991A JPH0544220A (en) | 1991-08-09 | 1991-08-09 | Construction of base for structure such as housing |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP22471991A JPH0544220A (en) | 1991-08-09 | 1991-08-09 | Construction of base for structure such as housing |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH0544220A true JPH0544220A (en) | 1993-02-23 |
Family
ID=16818179
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP22471991A Pending JPH0544220A (en) | 1991-08-09 | 1991-08-09 | Construction of base for structure such as housing |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0544220A (en) |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0359224A (en) * | 1989-07-27 | 1991-03-14 | Natl House Ind Co Ltd | Constructing method for continuous footing |
-
1991
- 1991-08-09 JP JP22471991A patent/JPH0544220A/en active Pending
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0359224A (en) * | 1989-07-27 | 1991-03-14 | Natl House Ind Co Ltd | Constructing method for continuous footing |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US6223480B1 (en) | Pre-cast concrete panels for construction of a building | |
| US3848377A (en) | Mat foundation | |
| JPH0544220A (en) | Construction of base for structure such as housing | |
| JPH0480444A (en) | Connection unit of reinforced concrete pole and steel framed beam | |
| JPH03199528A (en) | Steel frame foundation of construction | |
| JP2785063B2 (en) | Joint construction method for all PC foundations | |
| JPH09273245A (en) | Block joint, grooved hollow block and block base | |
| JP2781641B2 (en) | Construction method of concrete basement | |
| JP2757032B2 (en) | Construction method of underground building with pillars with capital by reverse hitting method | |
| JPH07247610A (en) | Beam for building using pc wall | |
| JPH11323958A (en) | Execution method of building and concrete product used therefor | |
| JPH0612010B2 (en) | Construction method of housing foundation structure | |
| JPS61277721A (en) | Method of building foundation for construction | |
| JP3039260B2 (en) | Building method using PC members | |
| JPH01111923A (en) | Construction of concrete foundation | |
| JP3088566B2 (en) | Basic structure of building | |
| JP3023266B2 (en) | Precast concrete foundation and foundation structure | |
| JP2796223B2 (en) | Folded PC base formwork and construction method using the base formwork | |
| JPS6029292Y2 (en) | Semi-prefabricated conduit for underground cable pipes | |
| JPH08269979A (en) | Single-side precast concrete underground beam and its constituent member | |
| JPH02120441A (en) | PC load-bearing wall | |
| JPH0874381A (en) | Reinforcement unit and construction method of reinforced concrete building using the unit | |
| JP2836409B2 (en) | Construction method of reinforced concrete wall using PC version | |
| JPH0462232A (en) | Continuous footing and its constructing method | |
| JPS6138028A (en) | Construction of foundation |