JPH055985B2 - - Google Patents
Info
- Publication number
- JPH055985B2 JPH055985B2 JP62304763A JP30476387A JPH055985B2 JP H055985 B2 JPH055985 B2 JP H055985B2 JP 62304763 A JP62304763 A JP 62304763A JP 30476387 A JP30476387 A JP 30476387A JP H055985 B2 JPH055985 B2 JP H055985B2
- Authority
- JP
- Japan
- Prior art keywords
- side frame
- building
- frame
- net
- scaffolding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Movable Scaffolding (AREA)
Description
〔産業上の利用分野〕
この発明は、建造物等の外壁面に沿つて仮設さ
れる枠組足場に係り、とくに組払しが合理的かつ
安全容易に行うことが出来る枠組足場に関する。
〔従来の技術〕
この種の枠組足場としては、現在第7図のよう
なものが汎用されている。すなわち、図のものは
鳥居型の建枠90が所定の間隔で複数並置される
とともに、上下方向に所要数が連結され、相隣れ
る建枠と建枠との間に交叉筋違91が取付けられ
る。そしてその隣り合う建枠の横地90a,90
a間には足場板2がかけ渡され、作業床A1,A2
…が確保される。最上段の建枠90には支柱92
を立てて手摺93がセツトされる。
〔発明が解決しようとする問題点〕
ところが、上記公知の枠組足場には次のような
問題がある。
組立或いは解体(組払し)作業途中におい
て、各段の足場板2の上に立つ作業者に対し安
全確保のための手摺がなく、甚だ危険な作業を
余儀なくされる。
枠組足場は通常、落下物の養生を目的として
その外側面に養生枠(枠付金属網)または養生
ネツト(メツシユシート)が張られる。
かかる養生は、足場全段を組上げた後に実施さ
れるが、実際には組上げ時においても落下物の事
故がおこる危険があり、十分な対策とは言い難
い。
また、養生枠、ネツトとも取付けが面倒で、相
当の手間を必要とする。ネツトの方は、一般に長
さ5100mmのものが使用され、建枠3段分を1枚で
覆うようになつているが、建枠への取付けはその
建地にひもでくくりつけるという面倒なものであ
る。養生枠については、建枠、建地の2ケ所に養
生クランプを取付け、これに備わるジヨイント部
に養生枠の孔部を嵌込む構造になつており、やは
りその取付けには手間のかかる作業が必要とな
る。
その上ネツトについては、建地への固定を確実
にしておかないと、風に煽られてバタつき、また
騒音の発生源ともなる。また一個所破損しただけ
でも大きな一枚全体を取替える必要があり、コス
ト的にも不利であるばかりか、1枚のサイズが大
きいことは、取付け、取外し、保管や清掃等に際
しての取扱いをも困難にしている。
本発明は、上記従来の足場の問題点を解決した
枠組足場の提供を目的とする。
〔問題点を解決するための手段〕
本発明の枠組足場は、第1図に示す如く、一対
の建地10,10の略中位部位間に横地11を配
したH型建枠1が並列状に配置されかつ複数段に
組上げられ、その各段の隣接横地11,11間に
足場板2が架け渡される一方、各段の外側面側お
よび内側面側の隣接建地10,10間に側枠が取
付けられる。
そして、足場板2レベルの上方側および下方側
に取付けられる外側面側の側枠3は、第3図およ
び第4図に詳示されるように、方形状で剛性を有
する側枠本体30と、同じく方形状で側枠本体3
0とほぼ同じ大きさのネツト31との組合せから
なり、側枠本体30は前記隣接建地10,10間
の内のりW寸法に略一致する外巾W2寸法を有し、
側枠本体30の四隅付近に付設された取合片30
2…によつて前記隣接建地10,10間に隙間な
く納まる状態で支持され、ネツト31は側枠本体
30に付設されたネツト31との係合手段32に
よつて側枠本体30に脱着可能に装着されてい
る。
〔作用〕
本発明の枠組足場では、ネツト31を備えた側
枠3が足場の外側面全体に建込まれた形になつて
いる。
この側枠3は、自身の枠剛性により水平力に対
する強度を足場に与える、つまり筋違に代わる機
能を担う。そしてこの場合ネツト31は、足場の
外側面側の開口の全面を塞ぎ、落下物に対する養
生の機能を果たすことになる。
側枠3は、隣接建地10,10間に完全に嵌り
込む状態に取付けられ、側枠本体30は隣接建地
間の内のりWに略一致する外巾W2を有するため
に、各建地との間に隙間ができずネツト31を備
えることとあいまつて確実な養生を達成するので
ある。
また側枠3は、枠組足場組上げ時、建枠1の組
み上げと並行して各段積み上げ毎にセツトしてゆ
くもので、これにより足場組上時においても落下
物の養生が可能となる。しかも、足場が組上ると
同時に落下物養生対策の実施が完了することにな
り、従来の養生ネツト等のように足場を組上げて
から養生対策を別の作業として実施する必要がな
く、足場架設に要する手間、時間が節減できる。
のみならず、枠体3そのものが手摺になり、H
型建枠1の使用と関連して足場組払しの過程にお
いても作業者の安全が確保されることになる。
更にまた、ネツト31は1枚当りのサイズが小
さいので、養生ネツトのようにバタついたり騒音
を発するようなことがない上、側枠本体30に着
脱可能に構成され、清掃に当たつては本体30か
ら取外し作業すればよい。また運搬、保管時等に
は、側枠本体に取付けたまま扱うことができ、嵩
ばらず扱い易いものである。
〔実施例〕
前出第1図は本発明の一実施例を示している。
本足場は、全体としては複数段の作業床A1,
A2…を形成する作業床ユニツトU1からなつてい
る。作業床ユニツトU1の基本構成要素は、建枠
1と足場板2と外側面側の側枠3と内側面側(躯
体側)の側枠とである。まず各々の構成を要素毎
に説明する。
○建枠 1
第2図に正面図を示す。
同図によると、建枠1はH型の枠であり、一対
の建地10,10と、その上下2分割点で両建地
間をつなぐ横地11と、該横地11の下側、両建
地10,10間に配された逆U字形の補強材12
とで基本の部分が構成されている。構成部材はす
べて丸鋼管である。
両建地10,10の上端には、建枠どうしを連
結するための連結ピン13が付設されている。ま
た、建地10,10のそれぞれには、バネ式抜止
片150付の係合ピン15が、上端および下端付
近、横地11取付位置を挟んでその直上、直下の
計4個所に設けられている。アームロツク、側枠
を係止するための係合ピン15はすべて枠自身の
内部側に突き出す形になつている。各建地10の
横地11取付位置直下の部位には、横地長手方向
の貫通孔100が設けられている。この貫通孔1
00はアサガオ等の足場付帯設備を設けるときな
どに利用される。
両建地10,10間にまたがる補強材12は、
その中央部において連結プレート120により横
地11につなぎ止められている。連結プレート1
20には透孔120aがあけられているが、これ
は上記貫通孔100を使つてアサガオ等を取付け
るときに、支持補強のためのタイロツドをとる場
合などに利用できる。
なお、建枠巾としては、仮設対象を建築物一般
とするなら、「簡易わく」である900mm未満で十分
である。高さH1については、人の背丈を基準に
作業上必要なスペースを確保する立場から、1700
〜2000mmが適当である。
○足場板 2
足場板2は、通常使用されるもので、両端に建
枠横地11に対する係合爪20,20を具備す
る。
○側枠 3
第3図および第4図にその構造を示す。
第3図の側枠3は、イ図図示の如く全体が方形
で、側枠本体30とネツト31との組合せからな
る。側枠本体30は周囲を巡る丸パイプからな
り、その内部に配された補強材301と、側枠本
体30の四隅付近に設けられた取合片302…と
を備える。
側枠本体30は上述したように丸パイプで構成
され、その内面側には、ネツト31を取付けるた
めの係合手段32…が設けられている。ロ図に拡
大して示される係合手段32は、側枠本体30に
フツクを別途取り付けたものであり、ハ図に拡大
して示される係合手段32は、側枠本体30にス
リツトを入れ、その周囲を嵌没させてフツク部が
側枠本体30の外周面より外側に突出しないよう
に構成したものである。係合手段32はいずれも
枠自身の内部側に外周側へ向けて屈曲するよう形
成されている。
側枠本体30の寸法は、外巾W2が、後述のよ
うに並列する建枠1…の隣接建地(以下、単に隣
接建地という)10,10間の内のり寸法Wに
略々一致している。高さH2は建地10の高さH1
の丁度半分のサイズとなつている。
補強材301は、この側枠本体30内で丁度
「水」の字のような形を形成し、側枠本体30に
高い剛性を与えている。いうまでもないが、補強
材301の取り方はこれに限定されるものではな
く、種々の変形が可能である。バリエーシヨンの
いくつかを第5図に示しておく。
取合片302は、側枠本体30の両縦部材の上
下端部近くに設けられている。この取合片302
により側枠本体30は、隣接建地10,10間に
嵌り込む状態に取付けられる。
ネツト31は、クロスで始末した周縁部311
aにあけた孔311bにひもを通し枠310にく
くりつけて固定してある。ネツト311の取付け
方としてはこの他、孔311bにひもを通し、側
枠本体30にくくりつける方法、ネツト31を一
旦方形状の枠に固定し、この枠を側枠本体30に
取付ける方法等が可能である。
第4図の側枠3は、側枠本体30をアングル材
で構成し、アングル材の立フランジ部内面側に、
ネツト31を取付けるための係合手段32…を設
けたものである。
係合手段32…としては、第3図の側枠3と同
様、側枠本体30にフツクを別途取付けたもの
(同図ロ)、側枠本体30の一部を内側に突出させ
たもの(同図ハ)などが可能である。
この側枠3によると、ネツト31が、側枠本体
30を構成するアングル材の立フランジ部と、立
フランジ部から枠内側に折れる平フランジ部とが
囲む空間内に収容される。
ネツト31は、上記係合手段32に直接取付け
る他、ネツト31を一旦方形状の枠に固定し、こ
の枠を側枠本体30に取付けるものであつてもよ
い。
他の構成は、第3図の側枠3と同じであるの
で、詳しい説明を省略する。
○内側面側(躯体側)の側枠
手摺兼強度部材として、一般に使用されるもの
で、第6図イに示されるような手摺用枠35、あ
るいは同図ロに示されるような手摺材36と斜材
37との組合せ等が用いられる。
各要素の構成は以上のとおりであるが、次にこ
れらの配置組合せ状態を説明する。
まず建枠1は、その所要数が所定間隔lをおい
て並列状に配置され、かつ上下方向にも所要段数
継ぎ足し設置されている。最下段の建枠の建地下
端には、ジヤツキベース8が装着されている。配
置間隔lはインチサイズの場合1829mm、1524mm、
1219mm、914mm程度に設定される。上下方向の連
結は、前記した建地10上端の連結ピン13によ
り、ロツクはアームロツク等で行われる。
足場板2は、このような建枠1…各段の、互い
に隣り合う横地11,11間に接続してかけ渡さ
れ、建枠の組上げ段数分の作業床A1,A2…を形
成している。
横地11との取合は、足場板2両端の係合片2
0,20による。
側枠3は、上記建枠1…の各段において、外側
面側の各隣接建地10,10間に設けられてい
る。側枠3の高さH2は建枠一つの高さH1の略々
半分であり、側枠3は各段において、作業床Aレ
ベルを境にその上方側と下方側に一枚ずつ建込ま
れている。第1図では表示の都合上一部省略され
ているが、側枠3は外側面全体を覆うように設け
られるものである。
側枠3の固定は、側枠の4つの取合片302…
を建地10,10の抜止片付係合ピン15…に嵌
着させることによる。
各側枠3は、上記取付状態において、両側の建
地10,10の間に嵌め込んで建込まれた形とな
り、かつその各建地との間にほとんど隙間を生じ
ない。
内側面側(躯体側)の側枠は第1図には図示さ
れていないが、その高さは建枠一つの高さH1の
略々半分で、建枠1…の各段に対し1ユニツトが
作業床Aレベルの上方側に建込まれる。
なお、図の例では最下段の作業床A1の下側に
ついては、斜材5が側枠に代えて取付けられてい
る。
以上のような構成になる足場は、作業床ユニツ
トU1の各段に配された側枠3…が自身の段を水
平方向に固める機能を果たし、結果として全体を
堅牢にする。
また、各側枠3は隣接建地10,10間に嵌り
込み、各建地10,10との間に実質的に隙間を
生じない。このため側枠に備わるネツト31によ
り落下物の養生が確実に行われることになる。
次に、上記足場の組払しは以下のように行われ
る。
まず、作業床ユニツトU1の最下段の建枠1…
を設置し、その各建枠間の下方側に斜材5をセツ
トするとともに、隣接横地11,11間に足場板
2をかけ渡す。このようにしたのち、ユニツト
U1の足場板2上にあがつて最下段上側の外側面
側側枠3および内側面側側枠を取付ける。
こうして最下段ができれば、この上に第2段目
の建枠1…を継ぎ足し、2段目の下側側枠3を取
付けて、足場板2をかける。このような要領で作
業ユニツトU1を並行して下方から一段ずつ順に
組上げてゆく。解体するときは、これと全く逆の
手順を踏んで最上段から順次下方へ作業を進め
る。
このような組立て、解体の作業は、作業者が各
段毎に足場板2の上に立つて、当該段建枠1へ
の上側外側面側側枠3および内側面側側枠の取付
け→直上段の建枠1の継ぎ足し→建枠1への
下側外側面側側枠3および足場板2の設置を順に
行うことにより進められるが、この場合、以降
の作業は、つねにその作業中の段に外側面側、内
側面側とも側枠がある状態で行われることにな
り、安全に作業ができる。
〔発明の効果〕
以上に説明した本発明の枠組足場は、次のよう
な特徴・利点を有している。
○ 足場に組込まれた外側面側の側枠3は、その
枠剛性により水平力に対し抵抗し、足場全体に
高い強度を保有させることになる。
○ 側枠3はまた、隣接建地10,10間に隙間
なく嵌り込む状態で建て込まれ、それに備わる
ネツト31が全体として足場外側面全体を隙間
なく覆い、落下物の養生を確実に達成すること
になる。
○ そして側枠3は、足場組上げ時、建枠の組上
げと並行して各段毎にセツトしてゆくから、足
場組上の過程においても落下物養生対策として
有効に機能する。のみならず、足場が組あがる
と同時に全体に対する落下物養生対策が完了す
るという合理性があり、足場仮設に要する手
間、時間が大巾に節減できる。
○ 更にまたH型建枠1の採用と関連して側枠3
は、足場組払し時に作業者の安全を守る有効な
手立てとなる。
○ かつまた、ネツト31は1枚当りのサイズが
小さいことから、従来の養生ネツトのように大
きくバタついたり、騒音を発したりするような
ことがない。その上、側枠本体30に着脱可能
に構成され、清掃に当たつては本体30から取
外して作業すれば楽であり、運搬、保管に際し
ては、本体30に取付けたまま扱うようにすれ
ば嵩ばらず取扱い易いものとなる。
[Industrial Application Field] The present invention relates to a frame scaffold that is temporarily installed along the outer wall surface of a building, etc., and particularly relates to a frame scaffold that can be dismantled rationally, safely and easily. [Prior Art] As this type of framework scaffold, the one shown in FIG. 7 is currently in general use. That is, in the figure, a plurality of torii-shaped building frames 90 are arranged side by side at predetermined intervals, and the required number are connected in the vertical direction, and intersecting braces 91 are installed between adjacent building frames. It will be done. And the horizontal land 90a, 90 of the adjacent building frame
Scaffolding board 2 is spanned between a and work floors A 1 and A 2
... will be ensured. Supports 92 are installed on the top building frame 90.
is erected and the handrail 93 is set. [Problems to be Solved by the Invention] However, the above-mentioned known framework scaffolds have the following problems. During assembly or disassembly (reassembly), workers standing on the scaffolding boards 2 at each stage are not provided with handrails to ensure their safety, and are forced to perform extremely dangerous work. Frame scaffolding usually has a curing frame (framed metal mesh) or curing net (mesh sheet) stretched on its outer surface for the purpose of curing fallen objects. Such curing is carried out after all stages of scaffolding have been erected, but in reality there is a risk of accidents caused by falling objects even during erecting, and it cannot be said to be a sufficient measure. Furthermore, both the curing frame and the net are troublesome to install and require considerable effort. Nets are generally 5100mm long and are designed to cover three levels of the building frame with one piece, but attaching to the building frame is a hassle as it requires tying it to the building site with a string. It is. The curing frame has a structure in which curing clamps are attached to two places, the building frame and the building site, and the holes in the curing frame are fitted into the joints provided on these clamps, which requires time-consuming work to install. becomes. Furthermore, if the net is not securely fixed to the building site, it will flap around in the wind and become a source of noise. Furthermore, even if only one part is damaged, the entire large piece needs to be replaced, which is not only disadvantageous in terms of cost, but the large size of each piece also makes it difficult to handle when installing, removing, storing, cleaning, etc. I have to. The present invention aims to provide a framework scaffold that solves the problems of the conventional scaffolds described above. [Means for Solving the Problems] As shown in FIG. 1, the framework scaffolding of the present invention consists of a pair of building lots 10, 10, in which H-shaped building frames 1 are arranged in parallel, with a horizontal lot 11 arranged between approximately the middle part of the pair of building lots 10, 10. The scaffolding boards 2 are placed between the adjacent horizontal lots 11, 11 of each tier, while the scaffolding boards 2 are spanned between the adjacent building lots 10, 10 on the outside and inside sides of each tier. The side frame is installed. The outer side frame 3 attached to the upper and lower sides of the scaffold board 2 level has a rectangular and rigid side frame main body 30, as shown in detail in FIGS. 3 and 4. The side frame body 3 is also square shaped.
0 and a net 31 of approximately the same size, the side frame main body 30 has an outer width W2 dimension that substantially matches the inner width W dimension between the adjacent building lots 10, 10,
Connecting pieces 30 attached near the four corners of the side frame body 30
2, the net 31 is supported in a state that it fits between the adjacent building lots 10, 10 without a gap, and the net 31 is attached to and detached from the side frame body 30 by means of engagement means 32 attached to the side frame body 30. Possibly installed. [Function] In the framework scaffold of the present invention, the side frame 3 provided with the net 31 is built over the entire outer surface of the scaffold. This side frame 3 provides the scaffold with strength against horizontal forces by its own frame rigidity, that is, it has the function of replacing braces. In this case, the net 31 closes the entire surface of the opening on the outer side of the scaffold and functions to protect against falling objects. The side frame 3 is attached to fit completely between the adjacent building lots 10, 10, and since the side frame body 30 has an outer width W2 that approximately matches the inner width W between the adjacent building lots, This, together with the provision of the net 31, ensures that there is no gap between the two and achieves reliable curing. In addition, the side frames 3 are set for each tier in parallel with the assembling of the building frame 1 when the scaffolding is being erected, and this makes it possible to protect fallen objects even when the scaffolding is being erected. Moreover, the implementation of falling object protection measures is completed at the same time as the scaffolding is erected, so there is no need to carry out protection measures as a separate task after the scaffolding is erected, unlike with conventional curing nets. The required effort and time can be saved. Not only that, but the frame 3 itself becomes a handrail, and H
In connection with the use of the form building frame 1, the safety of workers is also ensured during the process of demolishing the scaffolding. Furthermore, since each net 31 is small in size, it does not flap or make noise unlike a curing net, and is configured to be removable from the side frame body 30, making it easy to clean. All you have to do is remove it from the main body 30. Furthermore, during transportation, storage, etc., it can be handled while attached to the main body of the side frame, and is not bulky and easy to handle. [Embodiment] FIG. 1 above shows an embodiment of the present invention. This scaffold as a whole has a multi-tiered work floor A 1 ,
It consists of a working floor unit U 1 forming A 2 . The basic components of the work floor unit U1 are a building frame 1, a scaffold board 2, a side frame 3 on the outside side, and a side frame on the inside side (frame side). First, each configuration will be explained element by element. ○Building frame 1 Figure 2 shows the front view. According to the figure, the building frame 1 is an H-shaped frame, and includes a pair of building lots 10, 10, a horizontal lot 11 that connects the two building lots at the upper and lower division points, and a horizontal lot 11 on the lower side of the horizontal lot 11, Inverted U-shaped reinforcing material 12 placed between the bases 10 and 10
The basic parts are made up of. All structural members are round steel tubes. A connecting pin 13 for connecting the building frames to each other is attached to the upper ends of both building sites 10, 10. Furthermore, on each of the building lots 10, 10, engagement pins 15 with spring-type retaining pieces 150 are provided at a total of four locations near the upper and lower ends, directly above and directly below the mounting position of the horizontal lot 11. . The arm lock and the engagement pin 15 for locking the side frame are all shaped to protrude into the interior of the frame itself. A through hole 100 extending in the longitudinal direction of the horizontal lot is provided in a portion of each building site 10 directly below the attachment position of the horizontal lot 11. This through hole 1
00 is used when installing scaffolding equipment such as morning glory. The reinforcing material 12 spanning both building lots 10, 10 is
It is connected to the horizontal floor 11 by a connecting plate 120 at its center. Connection plate 1
A through hole 120a is drilled in the through hole 120, which can be used when attaching a tie rod for support and reinforcement when attaching a morning glory or the like using the through hole 100. Furthermore, if the temporary construction is intended for buildings in general, a frame width of less than 900 mm, which is the ``simple frame'' width, is sufficient. Regarding the height H1 , from the standpoint of securing the necessary space for work based on the height of the person, 1700
~2000mm is appropriate. ○Scaffolding board 2 The scaffolding board 2 is normally used, and is provided with engagement claws 20, 20 for engaging the building frame horizontal area 11 at both ends. ○Side frame 3 Its structure is shown in Figures 3 and 4. The side frame 3 in FIG. 3 is rectangular in its entirety as shown in FIG. 3, and consists of a side frame main body 30 and a net 31. The side frame main body 30 is made of a round pipe that goes around the circumference, and includes a reinforcing member 301 arranged inside the side frame main body 30, and connecting pieces 302 provided near the four corners of the side frame main body 30. As described above, the side frame main body 30 is constituted by a round pipe, and on its inner surface, engaging means 32 for attaching the net 31 are provided. The engaging means 32 shown enlarged in FIG. , so that the hook portion does not protrude outward from the outer circumferential surface of the side frame main body 30 by fitting the periphery thereof. Each of the engaging means 32 is formed inside the frame itself so as to be bent toward the outer periphery. The dimensions of the side frame body 30 are such that the outer width W 2 approximately matches the inner dimension W between the adjacent building lots (hereinafter simply referred to as adjacent building lots) 10, 10 of the building frames 1 that are arranged in parallel as described below. ing. Height H 2 is the height H 1 of building lot 10
It is exactly half the size of the original. The reinforcing material 301 forms a water-like shape within the side frame body 30 and provides high rigidity to the side frame body 30. Needless to say, the method of taking the reinforcing material 301 is not limited to this, and various modifications are possible. Some of the variations are shown in Figure 5. The connecting pieces 302 are provided near the upper and lower ends of both vertical members of the side frame main body 30. This connecting piece 302
As a result, the side frame main body 30 is attached so as to fit between the adjacent buildings 10, 10. The net 31 is a peripheral portion 311 that is finished with a cloth.
A string is passed through a hole 311b drilled in a and fixed to the frame 310. Other methods of attaching the net 311 include passing a string through the hole 311b and attaching it to the side frame body 30, and fixing the net 31 to a rectangular frame and then attaching this frame to the side frame body 30. It is possible. In the side frame 3 shown in FIG. 4, the side frame main body 30 is made of angle material, and on the inner surface of the vertical flange of the angle material,
Engaging means 32 for attaching the net 31 are provided. As for the engaging means 32..., similar to the side frame 3 in Fig. 3, a hook is separately attached to the side frame main body 30 (Fig. (C) in the same figure is possible. According to this side frame 3, the net 31 is housed in a space surrounded by the vertical flange portion of the angle member constituting the side frame body 30 and the flat flange portion bent from the vertical flange portion toward the inside of the frame. The net 31 may be attached directly to the engaging means 32, or the net 31 may be temporarily fixed to a rectangular frame, and this frame may be attached to the side frame body 30. The other configurations are the same as the side frame 3 in FIG. 3, so detailed explanation will be omitted. ○ Side frame on the inner side (body side) This is generally used as a handrail and strength member, such as a handrail frame 35 as shown in Figure 6A, or a handrail material 36 as shown in Figure 6B. A combination of the diagonal member 37 and the diagonal member 37 is used. Although the configuration of each element is as described above, the arrangement and combination of these elements will be explained next. First, the required number of building frames 1 are arranged in parallel at a predetermined interval l, and the required number of stages are added in the vertical direction as well. A jack base 8 is attached to the bottom end of the lowest building frame. The placement interval l is 1829mm, 1524mm for inch size,
It will be set at around 1219mm and 914mm. The connection in the vertical direction is performed by the above-mentioned connection pin 13 at the upper end of the building site 10, and the locking is performed by an arm lock or the like. Scaffolding boards 2 are connected and spanned between adjacent horizontal lots 11, 11 of each tier of such a building frame 1, forming working floors A1 , A2 ... for the number of erected tiers of the building frame. ing. The engagement with the horizontal ground 11 is done using the engagement pieces 2 on both ends of the scaffolding board 2.
According to 0.20. The side frame 3 is provided between each adjacent building site 10, 10 on the outer surface side in each stage of the building frames 1. The height H 2 of the side frame 3 is approximately half the height H 1 of one building frame, and the side frame 3 has one frame above and below the work floor A level at each level. It's included. Although a portion is omitted in FIG. 1 for convenience of illustration, the side frame 3 is provided so as to cover the entire outer surface. The side frame 3 is fixed using the four connecting pieces 302 of the side frame...
is fitted into the engagement pins 15 with retaining pieces of the building lots 10, 10. In the above-mentioned attached state, each side frame 3 is fitted into and built between the buildings 10, 10 on both sides, and there is almost no gap between the side frames 3 and each of the buildings. Although the side frames on the inner side (framework side) are not shown in Figure 1, their height is approximately half of the height H1 of one building frame, and 1 for each level of building frame 1... The unit is built above the work floor A level. In the illustrated example, a diagonal member 5 is attached to the lower side of the lowermost work floor A1 instead of the side frame. In the scaffold constructed as described above, the side frames 3 placed on each tier of the work floor unit U 1 function to horizontally solidify its own tier, and as a result, the whole becomes solid. Moreover, each side frame 3 fits between the adjacent building lots 10, 10, and substantially does not create a gap between each of the building lots 10, 10. Therefore, the nets 31 provided on the side frames ensure that fallen objects are protected. Next, the scaffolding is removed as follows. First, the lowest building frame 1 of work floor unit U 1 ...
are installed, diagonal members 5 are set on the lower side between each building frame, and scaffolding boards 2 are stretched between adjacent horizontal lots 11, 11. After doing this, the unit
Go up onto the scaffolding board 2 of U1 and attach the outer side frame 3 and the inner side frame on the lowermost side. Once the bottom tier is completed in this way, the building frame 1 of the second tier is added on top of it, the lower side frame 3 of the second tier is attached, and the scaffold board 2 is hung. In this manner, the work unit U1 is assembled step by step in parallel from the bottom. When dismantling, follow the exact opposite procedure and work your way down from the top. In such assembly and disassembly work, the worker stands on the scaffolding board 2 for each tier and attaches the upper outer side frame 3 and the inner side frame 3 to the tiered building frame 1 and then directly. The process proceeds by adding the upper building frame 1 → installing the lower outer side frame 3 and the scaffolding board 2 to the building frame 1 in this order, but in this case, the subsequent work is always performed on the step being worked on. The work will be carried out with side frames on both the outside and inside sides, allowing for safe work. [Effects of the Invention] The framework scaffold of the present invention described above has the following features and advantages. ○ The side frame 3 on the outer surface side incorporated into the scaffold resists horizontal force due to its frame rigidity, and the entire scaffold has high strength. ○ The side frame 3 is also built so that it fits between the adjacent buildings 10 and 10 without any gaps, and the net 31 provided thereon covers the entire outer surface of the scaffold without any gaps, ensuring the protection of fallen objects. It turns out. ○ And since the side frames 3 are set step by step in parallel with the erection of the building frame when the scaffolding is being erected, they function effectively as a countermeasure against falling objects during the scaffolding erecting process. In addition, it is reasonable to complete measures to prevent falling objects from occurring as soon as the scaffolding is erected, and the time and effort required for temporary scaffolding can be greatly reduced. ○ Furthermore, in connection with the adoption of H-shaped building frame 1, side frame 3
This is an effective means to protect the safety of workers when assembling scaffolding. In addition, since each net 31 is small in size, it does not flap or make noise unlike conventional curing nets. Moreover, it is configured to be detachable from the side frame main body 30, so cleaning can be done easily by removing it from the main body 30, and when transporting or storing it, it can be handled while attached to the main body 30, which reduces the bulk. It becomes easy to handle without falling apart.
第1図は本発明の一実施例に係る枠組足場を示
す斜視図、第2図は同上枠組足場に使用する建枠
を示す正面図、第3図イおよび第4図イは同じく
外側面側の側枠を示す分解斜視図、両図ロ,ハは
その側枠の部分詳細図、第5図は同側枠について
補強材の取り方のバリエーシヨンを示す模式図、
第6図イ,ロは内側面側の側枠を示す正面図、第
7図は従来の枠組足場を示す模式説明図である。
図中、1……建枠、2……足場板、3……側
枠。
Fig. 1 is a perspective view showing a framework scaffolding according to an embodiment of the present invention, Fig. 2 is a front view showing a building frame used in the above-mentioned framework scaffolding, and Figs. An exploded perspective view showing the side frame of , both figures B and C are partial detailed views of the side frame, and Fig. 5 is a schematic diagram showing variations in how to take the reinforcing material for the same side frame.
6A and 6B are front views showing the side frame on the inner side, and FIG. 7 is a schematic explanatory view showing a conventional framework scaffold. In the diagram, 1...building frame, 2...scaffolding board, 3...side frame.
Claims (1)
11を配したH型建枠1が並列状に配置されかつ
複数段に組上げられ、その各段の隣接横地11,
11間に足場板2が架け渡される一方、各段の外
側面側および内側面側の隣接建地10,10間に
側枠が取付けられ、足場板2レベルの上方側およ
び下方側に取付けられる外側面側の側枠3は方形
状で剛性を有する側枠本体30と、同じく方形状
で側枠本体30とほぼ同じ大きさのネツト31と
の組合せからなり、側枠本体30は前記隣接建地
10,10間の内のりW寸法に略一致する外巾
W2寸法を有し、側枠本体30の四隅付近に付設
された取合片302…によつて前記隣接建地1
0,10間に隙間なく納まる状態で支持され、ネ
ツト31は側枠本体30に付設されたネツト31
との係合手段32によつて側枠本体30に脱着可
能に装着されていることを特徴とする枠組足場。1 H-shaped building frames 1 with a horizontal lot 11 arranged between approximately the middle part of a pair of building lots 10, 10 are arranged in parallel and assembled into multiple tiers, and each tier has an adjacent horizontal lot 11,
Scaffolding board 2 is spanned between 11, while side frames are installed between adjacent buildings 10 and 10 on the outside and inside sides of each tier, and are installed on the upper and lower sides of the scaffolding board 2 level. The side frame 3 on the outer surface side consists of a combination of a side frame main body 30 having a rectangular shape and having rigidity, and a net 31 which is also rectangular and has approximately the same size as the side frame main body 30. Outer width that approximately matches the inner W dimension between bases 10 and 10
The adjacent building 1 is connected to the adjacent building 1 by the connecting pieces 302 attached near the four corners of the side frame body 30.
The net 31 is supported so that it fits between 0 and 10 without a gap, and the net 31 is attached to the side frame main body 30.
A frame scaffolding characterized in that it is removably attached to a side frame body 30 by means of engagement means 32 with.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP30476387A JPH01146058A (en) | 1987-12-02 | 1987-12-02 | Framework scaffold |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP30476387A JPH01146058A (en) | 1987-12-02 | 1987-12-02 | Framework scaffold |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH01146058A JPH01146058A (en) | 1989-06-08 |
| JPH055985B2 true JPH055985B2 (en) | 1993-01-25 |
Family
ID=17936935
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP30476387A Granted JPH01146058A (en) | 1987-12-02 | 1987-12-02 | Framework scaffold |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH01146058A (en) |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS443471Y1 (en) * | 1965-07-01 | 1969-02-07 | ||
| JPS60115331U (en) * | 1984-01-10 | 1985-08-05 | 住金鋼材工業株式会社 | Side frames for temporary scaffolding |
-
1987
- 1987-12-02 JP JP30476387A patent/JPH01146058A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPH01146058A (en) | 1989-06-08 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH10280669A (en) | Scaffolding unit | |
| JPH055984B2 (en) | ||
| JPH01146059A (en) | Side frame for framework scaffold | |
| JPH01146058A (en) | Framework scaffold | |
| JP3854123B2 (en) | Frame scaffolding | |
| JP2000179187A (en) | Building material storage tent | |
| JPH0458866B2 (en) | ||
| JPH0694722B2 (en) | Side frame for frame scaffolding | |
| JP2558742Y2 (en) | Curing device for floor openings | |
| JP2996385B2 (en) | Assembling scaffold | |
| JPH0557218U (en) | Assembled handrail | |
| JPH047317Y2 (en) | ||
| JP3538511B2 (en) | Temporary handrail for temporary scaffolding and method of assembling and disassembling temporary scaffolding | |
| JP2575796Y2 (en) | External curing frame | |
| JP2002227404A (en) | Scaffolding equipment for mold steel | |
| JP2011038306A (en) | Fall prevention implement of building scaffold | |
| JPH0683841U (en) | Structure of doorway frame scaffolding | |
| JP2626960B2 (en) | Framework scaffolding | |
| JPH0118753Y2 (en) | ||
| JPH0446441Y2 (en) | ||
| JP2595922Y2 (en) | Curing sheet for scaffold | |
| JPH0624134U (en) | Scaffolding equipment | |
| JP3078389B2 (en) | Temporary scaffolding method | |
| JPH0425877Y2 (en) | ||
| JPS6137722Y2 (en) |