JPH057804U - Weldite steel panel zone reinforcement structure - Google Patents

Weldite steel panel zone reinforcement structure

Info

Publication number
JPH057804U
JPH057804U JP5552891U JP5552891U JPH057804U JP H057804 U JPH057804 U JP H057804U JP 5552891 U JP5552891 U JP 5552891U JP 5552891 U JP5552891 U JP 5552891U JP H057804 U JPH057804 U JP H057804U
Authority
JP
Japan
Prior art keywords
panel zone
welded
reinforcement structure
column
reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP5552891U
Other languages
Japanese (ja)
Inventor
康志 鈴木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP5552891U priority Critical patent/JPH057804U/en
Publication of JPH057804U publication Critical patent/JPH057804U/en
Pending legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

(57)【要約】 【目的】 作業性が向上され、構造上の信頼性が高いウ
エルサイト鉄骨のパネルゾーン配筋構造を提供する。 【構成】 SRC柱Aに接合される鉄骨大梁Bの上下フ
ランジ1におけるパネルゾーンに受けプレート2を予め
溶着し、同上下受けプレート2に補強筋3の両端ねじ部
を貫挿し、ナツト4を螺着緊締した。
(57) [Summary] [Purpose] To provide a panel zone reinforcement structure of welded steel with improved workability and high structural reliability. [Structure] A receiving plate 2 is previously welded to a panel zone of the upper and lower flanges 1 of a steel frame girder B to be joined to an SRC column A, and both end screw portions of a reinforcing bar 3 are inserted into the upper and lower receiving plate 2 and a nut 4 is screwed. I'm wearing tight.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial applications]

本考案はウエルサイト鉄骨(現場仕口溶接の鉄骨)のパネルゾーンにおける配 筋構造に係るものである。 The present invention relates to a reinforcing structure in a panel zone of a welded steel frame (a steel frame welded at a site joint).

【0002】[0002]

【従来の技術】[Prior Art]

図3及び図4は部材サイズが大で、ウエルサイト工法を採用したSRC柱Aと 鉄骨大梁Bとのパネルゾーンを示し、大梁Bのフランジaが現場溶接で柱Aの鉄 骨に接合され、大梁Bのウエブbがガセツトプレートc高力ボルトdを介して接 合されている。 3 and 4 show the panel zones of the SRC column A and the steel frame girder B, which have a large member size and adopt the Welsite method, and the flange a of the girder B is joined to the steel frame of the column A by in-situ welding. The web b of the girder B is joined via a gusset plate c and a high-strength bolt d.

【0003】 この場合、大梁接合用ガセツトプレートc及び高力ボルトdと柱の鉄筋コンク リート部のフープ筋eとが同一位置を占め、互いに干渉し、高力ボルト部によっ てフープ筋eを溶接することができない。なお図中、fは柱主筋である。 このため、図5及び図6並に図7に示すようにパネルゾーンのフープ筋eとし て割フープ筋e′を使用するとともに、前記大梁Bの上下フランジa間に亘って 補強筋gを配筋し、同補強筋gの上下折曲端部g1 、g2 を大梁Bの上下フラン ジaに溶着する方法が提案された。In this case, the girder plate c for high beam connection and the high-strength bolt d occupy the same position as the hoop reinforcement e of the concrete reinforcement portion of the column, and they interfere with each other, and the hoop reinforcement e is formed by the high-strength bolt portion. Can not be welded. In addition, in the figure, f is the main pillar. For this reason, as shown in FIG. 5 and FIG. 6 as well as FIG. 7, the split hoop reinforcement e ′ is used as the hoop reinforcement e of the panel zone, and the reinforcement reinforcement g is arranged between the upper and lower flanges a of the girder B. A method has been proposed in which the upper and lower bent ends g 1 and g 2 of the reinforcing bar g are welded to the upper and lower flanges a of the girder B.

【0004】[0004]

【考案が解決しようとする課題】[Problems to be solved by the device]

この場合、SRC柱のフープ筋を割フープ筋とすることによって、フープ筋と 鉄骨との干渉は回避されるが、パネルゾーンのせん断補強鉄筋の配筋に問題が生 じる。 即ち前記せん断補強鉄筋gを構成する太径の鉄筋の上下端部を折曲げ加工する ため、大梁とのなじみが悪く、間隙が生じ、良好な溶接ができず、また溶接時間 がかかるという問題点がある。 In this case, by using the hoop reinforcement of the SRC column as the split hoop reinforcement, the interference between the hoop reinforcement and the steel frame can be avoided, but a problem occurs in the reinforcement of the shear reinforcement of the panel zone. That is, since the upper and lower end portions of the large-diameter reinforcing bar that constitutes the shear reinforcing bar g are bent, the compatibility with the large beam is poor, a gap occurs, good welding cannot be performed, and welding time is long. There is.

【0005】 本考案は前記従来技術の有する問題点に鑑みて提案されたもので、その目的と する処は、作業性が向上され、構造上の信頼性が高いウエルサイト鉄骨のパネル ゾーン配筋構造を提供する点にある。The present invention has been proposed in view of the above problems of the prior art, and an object of the present invention is to improve the workability and the structural reliability of the panel zone reinforcement of the Welsite steel frame. The point is to provide the structure.

【0006】[0006]

【課題を解決するための手段】[Means for Solving the Problems]

前記の目的を達成するため、本考案に係るウエルサイト鉄骨のパネルゾーン配 筋構造は、SRC柱に接合される鉄骨梁の上下フランジに予め溶着された受けプ レートに、前記柱梁のパネルゾーンのせん断補強鉄筋の両端ねじ部を挿貫すると ともに、ナツトを螺着、緊締して構成されている。 In order to achieve the above-mentioned object, the panel zone reinforcing structure of the welded steel according to the present invention comprises a panel plate of the column beam on a receiving plate pre-welded to the upper and lower flanges of the steel beam to be joined to the SRC column. It is constructed by inserting both ends of the shear-reinforced reinforcing bars and screwing and tightening nuts.

【0007】[0007]

【作用】[Action]

本考案によれば前記したように、SRC柱に接合される鉄骨梁の上下各フラン ジに、予め工場等で受プレートを溶接し、両端にねじ加工したパネルゾーンのせ ん断補強鉄筋を使用し、SRC柱の柱鉄骨と鉄骨梁との本締めが終了したのち、 前記補強筋の両端ねじ部を前記鉄骨梁の上下フランジ部に予め溶着された受プレ ートに挿貫し、ナツトを螺着緊締することによって、パネルゾーンのせん断補強 鉄筋を簡単に、しかも確実に取付けることができるものである。 According to the present invention, as described above, the supporting plates are welded to the upper and lower flanges of the steel beam to be joined to the SRC column in advance at a factory, and the shear reinforcing bars of the panel zones are screwed at both ends. After the main fastening of the steel frame and the steel beam of the SRC column is completed, the threaded portions at both ends of the reinforcing bar are inserted into the receiving plates previously welded to the upper and lower flange portions of the steel beam, and the nut is screwed. By tightening and tightening, the shear reinforcement of the panel zone can be installed easily and securely.

【0008】[0008]

【実施例】【Example】

図1及び図2は本考案の実施例を示し、AはSRC柱、Bは鉄骨大梁で、同大 梁Bのパネルゾーンに位置する上下フランジ1に受けプレート2が工場等におい て予め溶接されている。 而して前記鉄骨大梁Bのフランジ部を柱Aのフランジに溶接し、同大梁Bのウ エブ部を柱Aのガセツトプレートに高力ボルトで締結し、本締め終了後、せん断 補強鉄筋3の両端ねじ部を前記各受プレート2に貫挿し、ナツト4を螺着、緊締 して、前記柱梁のパネルゾーンにおけるせん断補強鉄筋の配筋を行うものである 。 1 and 2 show an embodiment of the present invention, in which A is an SRC column, B is a steel frame girder, and a receiving plate 2 is pre-welded to the upper and lower flanges 1 located in the panel zone of the girder B in a factory or the like. ing. Then, the flange portion of the steel frame girder B is welded to the flange of the column A, the web part of the girder B is fastened to the gusset plate of the column A with high-strength bolts, and after the main tightening, the shear reinforcing bar 3 The threaded portions at both ends are inserted into the receiving plates 2 and the nuts 4 are screwed and tightened to arrange the shear reinforcing bar in the panel zone of the column beam.

【0009】 図中5は柱主筋、6は柱帯筋である。In the figure, 5 is a main columnar bar, and 6 is a columnar bar.

【0010】[0010]

【考案の効果】[Effect of the device]

本考案によれば前記したように、鉄骨梁の上下フランジに予め受プレートを溶 着し、両端にねじ加工を施したパネルゾーンのせん断補強鉄筋を使用し、同補強 筋の両端ねじ部を前記各受プレートに挿貫し、ナツトを螺着、緊締したことによ ってパネルゾーンにおけるせん断補強鉄筋の取付に従来の如き曲げ加工を要せず 、鍛冶工が不必要となるのでパネルゾーンの補強鉄筋取付が簡単になり、工程が 減少し、工期が縮減される。 According to the present invention, as described above, the shear plate reinforcing bars of the panel zone, in which the receiving plates are previously welded to the upper and lower flanges of the steel frame beam and the both ends are threaded, are used. By inserting the nuts into each receiving plate and screwing and tightening the nuts, the conventional bending work was not required to attach the shear reinforcement bars in the panel zone, and blacksmithing was unnecessary, so that the panel zone Reinforcing bar installation becomes easier, the process is reduced, and the construction period is shortened.

【0011】 また前記受けプレートは工場溶接のため、品質が向上され、施工が確実に行な われ、構造上の信頼性が向上される。Further, since the receiving plate is factory welded, the quality is improved, the construction is surely performed, and the structural reliability is improved.

【図面の簡単な説明】[Brief description of drawings]

【図1】本考案に係るウエルサイト鉄骨のパネルゾーン
配筋構造の一実施例を示す縦断面図である。
FIG. 1 is a longitudinal sectional view showing an embodiment of a panel zone reinforcement structure of a welded steel frame according to the present invention.

【図2】図1の横断平面図である。2 is a cross-sectional plan view of FIG.

【図3】従来構造の一例を示す縦断面図である。FIG. 3 is a vertical sectional view showing an example of a conventional structure.

【図4】図3の横断平面図である。4 is a cross-sectional plan view of FIG.

【図5】従来構造の他の例を示す縦断面図である。FIG. 5 is a vertical cross-sectional view showing another example of the conventional structure.

【図6】図5の横断平面図である。6 is a cross-sectional plan view of FIG.

【図7】図6におけるパネルゾーンのせん断補強鉄筋取
付部の詳細を示す斜視図である。
FIG. 7 is a perspective view showing details of a shear reinforcement reinforcing bar attachment portion of the panel zone in FIG. 6;

【符号の説明】[Explanation of symbols]

A SRC柱 B 鉄骨大梁 1 鉄骨大梁の上下フランジ 2 受けプレート 3 パネルゾーンのせん断補強鉄筋 4 ナツト A SRC column B Steel girder 1 Upper and lower flanges of steel girder 2 Support plate 3 Shear reinforcement of panel zone 4 Nuts

Claims (1)

【実用新案登録請求の範囲】 【請求項1】 SRC柱に接合される鉄骨梁の上下フラ
ンジに予め溶着された受けプレートに、前記柱梁のパネ
ルゾーンのせん断補強鉄筋の両端ねじ部を挿貫するとと
もに、ナツトを螺着、緊締してなることを特徴とするウ
エルサイト鉄骨のパネルゾーン配筋構造。
[Claims for utility model registration] [Claim 1] A threaded portion at both ends of a shear reinforcing bar in the panel zone of the column beam is inserted into a receiving plate previously welded to the upper and lower flanges of the steel beam joined to the SRC column. In addition, the panel zone reinforcement structure of the welded steel frame is characterized in that the nut is screwed and tightened.
JP5552891U 1991-07-17 1991-07-17 Weldite steel panel zone reinforcement structure Pending JPH057804U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5552891U JPH057804U (en) 1991-07-17 1991-07-17 Weldite steel panel zone reinforcement structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5552891U JPH057804U (en) 1991-07-17 1991-07-17 Weldite steel panel zone reinforcement structure

Publications (1)

Publication Number Publication Date
JPH057804U true JPH057804U (en) 1993-02-02

Family

ID=13001232

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5552891U Pending JPH057804U (en) 1991-07-17 1991-07-17 Weldite steel panel zone reinforcement structure

Country Status (1)

Country Link
JP (1) JPH057804U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS53156941U (en) * 1977-05-16 1978-12-09

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS53156941U (en) * 1977-05-16 1978-12-09

Similar Documents

Publication Publication Date Title
JP2645365B2 (en) Beam-column joint
JPH0581403U (en) Joint structure of reinforced concrete columns and steel beams
JPS61225437A (en) Apparatus for connecting pillar and beam
JPH06313334A (en) Steel column and connection structure of beam
JP3156014B2 (en) Precast reinforced concrete frame with end steel joints
JP2023149165A (en) Connection structure for reinforcing existing frame members
JPH11117392A (en) Column-to-beam joints between steel pipe structure or filled steel pipe concrete structure column and SRC structure beam
JPH07113260A (en) How to join columns and beams
JPH0972033A (en) Deck plate for preceding engineering method in steel framed reinforced concrete(src) structure
JP7565121B1 (en) Connecting fitting set and connecting method
JPS6055144A (en) Iron skeletal column and beam connecting apparatus
JPS6020755Y2 (en) Rebar anchoring structure
JPH07116755B2 (en) Joint structure of steel column and beam with closed section
JPH06240749A (en) Connection between square steel tube columns or square steel tube concrete columns and beams
JP2749491B2 (en) Temporary beam mounting structure of building unit
JPH08144508A (en) Wall connecting device of scaffold
JP3096724B2 (en) Column / beam joining equipment
JP2606250B2 (en) Joint structure between reinforced concrete column and steel beam
JPS625460Y2 (en)
JP3096723B2 (en) Column / beam joining equipment
JPS6321604Y2 (en)
JPS61179936A (en) Pillar and beam connection apparatus in steel pipe concrete pillar
JPS6214241Y2 (en)
JPH031565Y2 (en)
JP2026081012A (en) Separator mounting hardware and formwork support structure