JPH0579092A - Construction method of pillar RC / beam S structure - Google Patents

Construction method of pillar RC / beam S structure

Info

Publication number
JPH0579092A
JPH0579092A JP23954991A JP23954991A JPH0579092A JP H0579092 A JPH0579092 A JP H0579092A JP 23954991 A JP23954991 A JP 23954991A JP 23954991 A JP23954991 A JP 23954991A JP H0579092 A JPH0579092 A JP H0579092A
Authority
JP
Japan
Prior art keywords
pillar
formwork
erection
metal
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP23954991A
Other languages
Japanese (ja)
Other versions
JP2629496B2 (en
Inventor
Koichi Suzuki
宏一 鈴木
Mitsumasa Yamamoto
光政 山本
Yukimasa Ogiwara
行正 荻原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP3239549A priority Critical patent/JP2629496B2/en
Publication of JPH0579092A publication Critical patent/JPH0579092A/en
Application granted granted Critical
Publication of JP2629496B2 publication Critical patent/JP2629496B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

(57)【要約】 【目的】 工期の短縮化、現場施工の省略化、さらに支
保工の低減化を可能にしたSRC構造の構築工法を提供
する。 【構成】 柱型枠3をメタルフォーム3aによって組み立
て、当該柱型枠3の組み立てと鉄骨梁6の架設とを、柱
の主筋に取り付けられた梁接合金物2と前記メタルフォ
ーム3aと鉄骨梁6とを建て方用仮ボルト4によって仮止
めしつつ、複数階の建て方を行い、つづいて、前記柱型
枠3にコンクリートを打設する。
(57) [Summary] [Purpose] To provide a construction method for an SRC structure that makes it possible to shorten the construction period, omit on-site construction, and reduce support work. [Structure] The pillar form 3 is assembled by a metal foam 3a, and the assembly of the pillar form 3 and the erection of the steel frame beam 6 are performed by connecting the beam joining metal fitting 2 attached to the main bar of the pillar, the metal form 3a and the steel frame beam 6 to each other. While temporarily fixing and with temporary bolts 4 for erection, a plurality of stories are erected, and then concrete is placed on the pillar formwork 3.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は柱が鉄筋コンクリート
より構成され、梁が鉄骨より構成される柱RC・梁S構
造物の構築工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of constructing a column RC / beam S structure in which columns are made of reinforced concrete and beams are made of steel frame.

【0002】[0002]

【従来の技術】最近のオフィスビルなどの建物は、高層
化に伴って柱を鉄骨鉄筋コンクリート構造、梁を鉄骨と
する複合構造とする場合が多い。また、建設コストの低
減化を図るため、柱を鉄筋コンクリート構造とし、梁を
鉄骨構造とする方法がよく行われ、その構築工法は、柱
の構築と梁の架設とを一層階毎に交互に繰り返し行って
建物の全階を構築する。
2. Description of the Related Art In recent years, buildings such as office buildings often have a composite structure in which columns are steel-framed reinforced concrete structures and beams are steel frames as they become taller. In addition, in order to reduce the construction cost, it is often the case that the columns have a reinforced concrete structure and the beams have a steel frame structure.The construction method is that the construction of columns and the construction of beams are alternately repeated for each floor. Go and build all the floors of the building.

【0003】[0003]

【発明が解決しようとする課題】しかし、このような構
築工法では、柱の施工が終了し、コンクリートが充分な
強度を発現してからでないと、梁を架設することができ
ないため、工期の長期化が免れないとう課題があった。
また、工期の短縮化を図るために柱のコンクリートが充
分な強度を発現する前に梁を架設するとすると、梁を支
える支保工を多く必要とし、支保工の組み立てに多大な
労力を費やすという課題があった。
However, in such a construction method, since the construction of the column is completed and the concrete has developed sufficient strength, the beam cannot be erected and the construction period is long. There was a problem inevitable.
In addition, if the beam is erected before the concrete of the column develops sufficient strength in order to shorten the construction period, a large amount of support work is required to support the beam, and a great deal of labor is required to assemble the support work. was there.

【0004】この発明はこのような前記従来の課題を解
決するために提案されたもので、工期の短縮化、現場施
工の省略化、さらに支保工の低減化を可能にした柱RC
・梁S構造物の構築工法を提供することを目的とする。
The present invention has been proposed in order to solve the above-mentioned conventional problems, and is a column RC which makes it possible to shorten the construction period, omit the on-site construction, and further reduce the support work.
-The purpose is to provide a construction method for a beam S structure.

【0005】[0005]

【課題を解決するための手段】この発明にかかる柱RC
・梁S構造物の構築工法においては、柱のコンクリート
型枠をメタルフォームによって組み立て、この柱型枠の
組み立てと鉄骨梁の架設とを、前記柱の主筋に取り付け
られた梁接合金物と前記メタルフォームと鉄骨梁とを建
て方用仮ボルトによって仮止めしつつ、複数階の建て方
を行い、つづいて柱型枠にコンクリートを打設する。
A pillar RC according to the present invention
In the construction method of the beam S structure, the concrete formwork of the column is assembled by metal foam, and the assembling of this column formwork and the erection of the steel beam are carried out by the beam joint metal and the metal attached to the main bar of the column. While temporarily fixing the form and the steel beam with temporary bolts for building, building on multiple floors is performed, and then concrete is placed on the pillar formwork.

【0006】[0006]

【実施例】以下、この発明にかかる柱RC・梁S構造物
の構築工法の一実施例を順をおって説明する。
EXAMPLE An example of a method of constructing a column RC / beam S structure according to the present invention will be described below in order.

【0007】 柱の主筋1aおよびフープ筋1bを組み立
て、梁接合部に梁接合金物2を取り付ける(図1参
照)。梁接合金物2は主筋1aに結束若しくは固定ナット
などによって水平に固定する。
The main bar 1a and the hoop bar 1b of the column are assembled, and the beam joint metal 2 is attached to the beam joint (see FIG. 1). The beam joining hardware 2 is horizontally fixed to the main bar 1a by binding or a fixing nut.

【0008】 つづいて、主筋1aおよびフープ筋1bの
回りに柱型枠3を矩形断面形に組み立てる。柱型枠3に
はメタルフォーム3a( 鋼製型枠) を使用し、メタルフォ
ーム3aは建て方用仮ボルト4およびクリップ5によって
上下および左右にとなり合うものどうしを自立できるよ
うに一体的にそれぞれ連結する(図4参照)。
Subsequently, the column form 3 is assembled into a rectangular cross section around the main bar 1a and the hoop bar 1b. The metal form 3a (steel form) is used for the pillar form 3, and the metal form 3a is integrated with each other by the temporary bolts 4 and clips 5 for erection so that they can stand vertically and horizontally. Connect (see Figure 4).

【0009】また、メタルフォーム3aの梁接合部には後
述する梁6の端部を挿入できるような開口部7を設け、
この開口部7より梁接合金物2のブラケット2a,2a を水
平に突出する(図3参照)。
Further, an opening 7 is formed in the beam joint portion of the metal foam 3a so that an end portion of a beam 6 which will be described later can be inserted,
The brackets 2a, 2a of the beam joint metal 2 are horizontally projected from the opening 7 (see FIG. 3).

【0010】なお、後でメタルフォーム3aを後ろに引き
倒して脱型をし易くするために柱型枠3の組み立てに際
し、上下メタルフォーム3a,3aの連結部にスペーサ11な
どを介在しておく(図5参照)。
Incidentally, in order to facilitate the demolding by pulling back the metal foam 3a to the rear, a spacer 11 or the like is interposed at the connecting portion of the upper and lower metal foams 3a, 3a when assembling the column form 3. (See Figure 5).

【0011】 つづいて、柱型枠3,3 間にH形鋼など
からなる鉄骨梁6を架け渡し、鉄骨梁6の端部は開口部
7の上下梁接合金物2のブラケット2a,2a 間に挿入す
る。
Next, a steel frame beam 6 made of H-shaped steel or the like is bridged between the column formwork 3, 3 and the end of the steel frame beam 6 is between the brackets 2 a, 2 a of the upper and lower beam joint hardware 2 of the opening 7. insert.

【0012】そして、鉄骨梁6の上下フランジ6aと梁接
合金物2のブラケット2aとを本設ボルト4aによって一体
的に接合し、また、鉄骨梁6の上下フランジ6aと接合金
物2のブラケット2aとメタルフォーム3とを建て方用仮
ボルト4aによって一体的に連結する。
Then, the upper and lower flanges 6a of the steel beam 6 and the bracket 2a of the beam joint metal 2 are integrally joined by the main bolt 4a, and the upper and lower flanges 6a of the steel frame beam 6 and the bracket 2a of the joint metal 2 are joined together. The metal foam 3 and the metal foam 3 are integrally connected by a temporary bolt 4a for erection.

【0013】また、鉄骨梁6端部の上下フランジ6a,6a
間には、この部分の孔を塞ぐとともに梁端部の剛性を確
保するためのエンドプレート8,8を取り付ける。
The upper and lower flanges 6a, 6a at the end of the steel beam 6
In between, end plates 8 are attached to close the hole in this portion and secure the rigidity of the beam end.

【0014】なお、建て方用仮ボルト4aは型枠脱型の際
に取り外し、本設ボルト4bを締め直す。
Incidentally, the temporary erection bolt 4a is removed when the mold is removed from the mold, and the main bolt 4b is retightened.

【0015】このようにして、柱の主筋1a、フープ筋1
b、柱型枠3および鉄骨梁6を2層分乃至3層分組み立
てる。また、各階の鉄骨梁6,6 の上にデッキプレートな
どの床型枠9を敷設するとともに鉄骨梁6に溶接などで
固定する。
In this way, the pillar main muscles 1a and the hoop muscles 1a
b, Assembling the column form 3 and the steel beam 6 for two to three layers. Further, a floor form 9 such as a deck plate is laid on the steel beams 6, 6 on each floor and is fixed to the steel beams 6 by welding or the like.

【0016】 つづいて、柱型枠3の中および床型枠
9の上にコンクリート10を打設し、コンクリート10が充
分な強度を発現したら型枠3を脱型する。
Subsequently, concrete 10 is placed in the pillar formwork 3 and on the floor formwork 9, and when the concrete 10 exhibits sufficient strength, the formwork 3 is demolded.

【0017】以下、同様にして、2層乃至3層分づつ上
階方向に施工して建物全階を構築する。
Thereafter, in the same manner, all the floors of the building are constructed by constructing two to three layers in the upward direction.

【0018】なお、床型枠9は床スラブの一部としてそ
のまま放置するが、柱型枠3のメタルフォーム3aは撤去
し、繰り返し使用する。
The floor form 9 is left as it is as a part of the floor slab, but the metal foam 3a of the column form 3 is removed and repeatedly used.

【0019】[0019]

【発明の効果】この発明は以上説明したように構成され
ているため、以下に記載するような効果を有する。
Since the present invention is constructed as described above, it has the following effects.

【0020】 柱型枠にメタルフォームを使用してい
るため、柱型枠の上に梁端部を直接載せることができ
る。このため、柱型枠の組み立て後、直ぐに梁を架設し
て床型枠を架設するなどのその後の作業を連続して進め
ることができ、工期の大幅な短縮化が図れる。
Since the metal foam is used for the pillar formwork, the beam end can be directly placed on the pillar formwork. For this reason, after the pillar formwork is assembled, the subsequent work, such as erection of beams and erection of the floor formwork, can be continuously performed, and the construction period can be significantly shortened.

【0021】また、メタルフォームは柱の主筋に取り付
けられた梁接合金物および鉄骨梁とともに建て方用仮ボ
ルトによって一体的に固定してしまうため、鉄骨建て方
に似たサイクルで躯体工事を行うことができる。
Further, since the metal foam is integrally fixed together with the beam-joining metal fittings and the steel beam attached to the main bars of the column by the temporary bolts for erection, it is necessary to perform the skeleton work in a cycle similar to the erection of steel framing. You can

【0022】 柱部分のコンクリートと床部分のコン
クリートとを別々に打設することができるため、柱部分
にのみ高強度コンクリートを打設することができ、経済
的施工が図れる。
Since the concrete of the pillar portion and the concrete of the floor portion can be separately poured, high-strength concrete can be poured only in the pillar portion, and economical construction can be achieved.

【図面の簡単な説明】[Brief description of drawings]

【図1】柱RC・梁S構造物の構築工法を示す躯体の正
面図である。
FIG. 1 is a front view of a skeleton showing a construction method of a pillar RC / beam S structure.

【図2】柱RC・梁S構造物の構築工法を示す躯体の正
面図である。
FIG. 2 is a front view of a skeleton showing a construction method of a pillar RC / beam S structure.

【図3】柱・梁接合部の縦断面図である。FIG. 3 is a vertical cross-sectional view of a pillar / beam joint.

【図4】柱・梁接合部の拡大縦断面図である。FIG. 4 is an enlarged vertical sectional view of a column / beam joint.

【図5】上下メタルフォーム連結部の縦断面図である。FIG. 5 is a vertical cross-sectional view of upper and lower metal foam connecting portions.

【符号の説明】[Explanation of symbols]

1a…主筋、1b…フープ筋、2…梁接合金物、3…柱型
枠、3a…メタルフォーム( 鋼製型枠) 、4a…建て方用仮
ボルト、4b…本設ボルト、5…クリップ、6…梁、6a…
上下フランジ、7…開口部、8…エンドプレート、9…
床型枠、10…コンクリート、11…スペーサ。
1a ... Main bar, 1b ... Hoop bar, 2 ... Beam joint metal fittings, 3 ... Column formwork, 3a ... Metal foam (steel formwork), 4a ... Temporary bolts for erection, 4b ... Main bolt, 5 ... Clip, 6 ... Beam, 6a ...
Upper and lower flanges, 7 ... Openings, 8 ... End plates, 9 ...
Floor formwork, 10… Concrete, 11… Spacer.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 柱が鉄筋コンクリート、梁が鉄骨よりそ
れぞれ構成される柱RC・梁S構造物の構築工法におい
て、柱型枠をメタルフォームにより組み立て、当該柱型
枠の組み立てと梁の架設とを、前記柱の主筋に取り付け
られた梁接合金物と前記メタルフォームと梁とを建て方
用仮ボルトによって仮固定しつつ、複数階の建て方を行
い、つづいて前記柱型枠にコンクリートを打設すること
を特徴とする柱RC・梁S構造物の構築工法。
1. In a method of constructing a pillar RC / beam S structure in which a pillar is made of reinforced concrete and a beam is made of steel frame, a pillar formwork is assembled from metal foam, and the pillar formwork is assembled and the beam is erected. While temporarily fixing the beam-joining metal fittings attached to the main bars of the columns, the metal foam and the beams with temporary bolts for erection, a plurality of floors are erected, and then concrete is placed on the column formwork. A construction method of a pillar RC / beam S structure characterized by:
JP3239549A 1991-09-19 1991-09-19 Construction method of structure Expired - Lifetime JP2629496B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3239549A JP2629496B2 (en) 1991-09-19 1991-09-19 Construction method of structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3239549A JP2629496B2 (en) 1991-09-19 1991-09-19 Construction method of structure

Publications (2)

Publication Number Publication Date
JPH0579092A true JPH0579092A (en) 1993-03-30
JP2629496B2 JP2629496B2 (en) 1997-07-09

Family

ID=17046465

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3239549A Expired - Lifetime JP2629496B2 (en) 1991-09-19 1991-09-19 Construction method of structure

Country Status (1)

Country Link
JP (1) JP2629496B2 (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01190842A (en) * 1988-01-27 1989-07-31 Kajima Corp Method for constructing reinforced concrete column and steel girder structure

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01190842A (en) * 1988-01-27 1989-07-31 Kajima Corp Method for constructing reinforced concrete column and steel girder structure

Also Published As

Publication number Publication date
JP2629496B2 (en) 1997-07-09

Similar Documents

Publication Publication Date Title
JP2003313951A (en) Column and beam joint structure in composite structure building
JPH0579092A (en) Construction method of pillar RC / beam S structure
JP3284383B2 (en) Support hardware for SRC beam construction
US1099953A (en) Fireproof-building construction.
JP2797023B2 (en) Construction method of beam
JP3830062B2 (en) Seismic reinforcement method for reinforced concrete buildings
JP2645329B2 (en) Pillar construction method
JP2696196B2 (en) Construction method of concrete building
JPH06317015A (en) Method of assembling beam formwork
JPH06306951A (en) High-rise building frame
JPH08158695A (en) Seismic tube structure and frame structure of high-rise office building
JPH06299718A (en) Construction of wall, floor in atomic power plant and wall slab thereof
JPH06306931A (en) Construction of steel frame reinforced concrete structure
JPH02167937A (en) Connecting work of steel plate-concrete structure
JP3122739B2 (en) Frame consisting of precast RC columns and precast RC beams
JP2814873B2 (en) How to build a reinforced concrete building
JP2578671B2 (en) Column and beam construction method
JPH07127261A (en) Construction method of steel frame reinforced concrete building
JPH0617482A (en) Permanent form made of steel plate for construction
JPH09256631A (en) Construction method of reinforced concrete wall
JPH01190842A (en) Method for constructing reinforced concrete column and steel girder structure
JPS58117153A (en) Construction of simple building
JPH0234353Y2 (en)
JP2709155B2 (en) ALC floor panel mounting method
JPH04309630A (en) Skeleton construction method using pc member

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19970225