JPH0583854A - 負荷電力調整装置 - Google Patents
負荷電力調整装置Info
- Publication number
- JPH0583854A JPH0583854A JP3237816A JP23781691A JPH0583854A JP H0583854 A JPH0583854 A JP H0583854A JP 3237816 A JP3237816 A JP 3237816A JP 23781691 A JP23781691 A JP 23781691A JP H0583854 A JPH0583854 A JP H0583854A
- Authority
- JP
- Japan
- Prior art keywords
- power
- load
- power supply
- supply
- adjusting device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/12—Arrangements for adjusting voltage in AC networks by changing a characteristic of the network load
- H02J3/14—Arrangements for adjusting voltage in AC networks by changing a characteristic of the network load by switching loads on to, or off from, the networks, e.g. progressively balanced loading
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2105/00—Networks for supplying or distributing electric power characterised by their spatial reach or by the load
- H02J2105/50—Networks for supplying or distributing electric power characterised by their spatial reach or by the load for selectively controlling the operation of the loads
- H02J2105/51—Networks for supplying or distributing electric power characterised by their spatial reach or by the load for selectively controlling the operation of the loads according to a condition being electrical
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
電力系統の運転状況を考慮して自己の消費する電力を調
整することのできる負荷電力調整装置を提供することを
目的とする。 【構成】需要家に設置される負荷電力調整装置は、複数
に区分された負荷を有しそのうちの一つの負荷は電力供
給側の電力系統運用状況に応じて制御され、供給予備率
低下の条件によって適宜開放されうる。 【効果】需要家は、需要家が電力会社と負荷の性質に応
じた質の異なる電力供給ラインに対して契約することで
割安な電力を得ることができ、電力会社側は、自己の都
合で電力供給の一部を制限することができ電力需給バラ
ンスに貢献させることができる。
Description
けられる負荷電力調整装置に係り、特に電力系統の需給
バランスに貢献することのできる負荷電力調整装置に関
する。
成立するシステムであり、通常は電力会社が電力を供給
していわゆる需要家(例えば工場,ビル,家庭等)がこ
れを消費する。この需給バランスが崩れると、電圧,周
波数の不安定を生じ、各種電気機器に悪影響を与えるた
め極力安定すべく制御される。
側にあり、需要家はその時点における電力系統の需給バ
ランスとは無関係に自己に必要な電力を消費するという
のが一般的である。電力会社はこのために、多大の設備
費を投じて需給バランスを図っている。
する電力を制限する設備が設けられる。特開昭55−4993
3 号の「デマンドコントロール装置」等がその一例であ
る。
季に負荷が増大し電力の供給予備率が低下する傾向にあ
り、供給予備率が低下した状態においては電力会社にお
ける需給バランス制御が不能となる恐れがある。
は、電力会社の責務において行われるのが通常であり、
需要家は需給のアンバランス、供給予備率の低下という
問題に殆ど関与せずに自己に必要な電力を消費する。こ
の点に関し、前記のデマンドコントロール装置は、その
需要家に予め約束された電力量を超過したときに電力供
給を制限するというにすぎず、この時点における需給の
バランス、供給予備率の大きさと云ったことを全く考慮
していない。
の需給バランス、供給予備率と云ったことを全く考慮せ
ずともよいというわけにはいかなくなってきた。
統の需給バランス、供給予備率といった電力系統の運転
状況を考慮して自己の消費する電力を調整する負荷電力
調整装置を提供することを目的とする。
電力調整装置は、複数に区分された負荷を有しそのうち
の一つの負荷は電力供給側のの電力系統運用状況に応じ
て制御され、供給予備率低下の条件によって適宜開放さ
れうる。
じた質の異なる電力供給ラインに対して契約することで
割安な電力を得ることができ、電力会社側は、自己の都
合で電力供給の一部を制限することができ電力需給バラ
ンスに貢献させることができる。
る。需要家Lには配電線6a,変圧器5,配電線6bを
介して電力系統から電力が送られ、需要家L内の負荷4
a,4bに供給されて消費される。本発明の場合、負荷
4は幾つかに区分され少なくとも負荷4aと4bでは電
力供給のされかたが異なる。つまり、配電線7bに接続
された負荷4bは基本的にはいかなるときでも自由に必
要なだけ電力消費することが許されるが、配電線7aに
接続された負荷4aへの電力供給は電力供給側の事情に
より制限される。
中央給電指令所からの負荷運用信号8に基づいて負荷4
の開閉を制御する。電力需給調整装置1は需給バランス
設定部2と負荷開閉調整部3とから構成される。
うに構成される。この需給バランス設定部2には中央給
電指令所から負荷運用信号8が与えられている。負荷運
用信号8は、負荷に対する電力供給を許容するか否かに
ついての電力供給許可(阻止)信号8aと、負荷に対する
電力供給を許容する時間帯を設定する電力供給許容時間
帯設定信号8bと、負荷4aと4bでは電力供給のされ
かたが異なることから異なる電力料金を設定するための
電力料金設定信号8cを含む。電力供給許容時間帯設定
信号8bは許容時間メモリ10に記憶され、電力料金設
定信号8cは料金メモリ11に記憶される。
9b,12(電力供給許可(阻止)信号8aは需給バラ
ンス設定部2において特に処理されることなく出力され
るが、ここではその信号を9aとして区別する。)は、
その詳細を図3に示した負荷開閉調整部3に入力され
る。負荷開閉調整部3には変圧器5から配電線6bが導
かれており、この配電線6bは自由な消費の許される負
荷4bに給電する配電線7bと、消費の制限される負荷
4aに給電する配電線7aとに分岐する。分岐部にはそ
れぞれしゃ断器21,30が設置される。いずれのしゃ
断器も、図3には図示せぬ保護継電装置によって配電線
7の事故時に開放制御されるが、消費の制限される負荷
4aに給電する配電線7aのしゃ断器21は負荷開閉イ
ンターロック部20によっても別途開閉制御される。
する。この図で25は配電線7aの事故を検出する保護
継電装置であって、その動作時には他の条件に拘らずオ
ア回路27,記憶回路28を介して開放指令信号22a
が与えられ、しゃ断器21を開放する。23は判断回路
であって、電力供給許可(阻止)信号9aが電力供給阻
止を示すものであるとき出力する。また判断回路24
は、電力供給許容時間帯設定信号9bが電力供給を許容
しない時間帯であるときに出力する。従って、アンド回
路26は、電力供給を許容しない時間帯であってかつ電
力供給阻止が指令されているときにオア回路26,記憶
回路28を介して開放指令信号22aを発し、しゃ断器
21を開放する。この論理回路から推測できるように、
電力供給を許容しない時間帯であってかつ電力供給阻止
が指令されているとき以外の条件のもとでは、オア回路
27の出力はされず、否定回路29の出力が成立してし
ゃ断器21の投入指令22bによりしゃ断器は投入状態
にある(保護継電装置25が出力していないことを前提
とする)。なお、投入指令22bの成立により、記憶回
路28はリセットされ、しゃ断器の投入指令22aは解
除される。
れた信号12は、図1に示すように電力積算計15に与
えられ、配電線7aと7bごとに異なる使用料金が設定
される。つまり、消費の制限される負荷4aに対する電
力料金は、自由な消費の許される負荷4bに対する電力
料金よりも割安とされる。
から与えられている負荷運用信号8(電力供給許可(阻
止)信号8aと、電力供給許容時間帯設定信号8bと、
電力料金設定信号8cからなる)によって、その運用が
制御されているが、この負荷運用信号8は例えば中央給
電指令所において図5の考えに則り作成されて伝送され
てくる。
り、一日24時間(横軸)の各時刻の電力(縦軸)を示
している。この図で30aは典型的な夏季の日負荷曲線
を示し、30bは典型的な冬期の日負荷曲線を示す。3
1aは電力会社の所有する全ての運転可能な発電所によ
って供給可能な最大供給電力(夏季)であり、31bは
冬期の最大供給電力である。この最大供給電力は、中央
給電指令所において作成される。なお、最大供給電力が
夏季と冬期において異なるのは、電力需要の大きい夏季
に備えて、電力需要の少ない冬期に発電所の定期検査を
行う等の理由による。これにより年間を通じての電力供
給予備率はほぼ均等に維持される。
4aと電力供給許可(阻止)信号35aを示す。図5
(c)は冬期の電力供給許容時間帯34bと電力供給許
可(阻止)信号35bを示す。それぞれの図で横軸は時
間を示す。ここで、この日負荷曲線は、過去の経験例え
ば去年の同季節の負荷変動の平均値や前日の実績に基づ
いて定められることから、電力供給許容時間帯34は、
最大供給電力31と各時刻での負荷の大きさに応じて任
意に設定してよく、例えば供給予備率が10%以下にな
ると予想される期間がこれに指定される。図5(b),
(c)において、斜線部が電力供給阻止の対象となりう
る時間帯である。これに対し、このように過去の経験か
ら設定したとしても当日の負荷が過去の経験どおりに推
移するとの補償はなく、当日の電力需給が推測を越えて
最大供給電力に近づいた時(図5で点線が当日の負荷変
動を示す)に、電力供給阻止信号35が発動される。
の電力急増時に図1の負荷4aを切ることによって、通
常の電力供給系統としての負荷4bへの電力供給安定性
を確保することが出来、また不測の電力需要増加時に電
力供給側から個々の大口需要家に対して負荷のしぼり込
みを依頼するといった手続を簡略化できる。逆に電力需
要側でも電力供給安定性に関してさほど重要度の高くな
い負荷に対しては負荷4aに対応した契約をすることで
電力料金を割安にできる等のメリットがある。
は、需要家が電力会社と負荷の性質に応じた質の異なる
電力供給ライン7a,7bに対して契約することで割安
な電力を得ることができる。これに対し電力会社側は、
自己の都合で電力供給の一部を制限することができ電力
需給バランスに貢献させることができる。
図。
構成を示す図。
成を示す図。
の具体的構成を示す図。
を示す図。
負荷開閉調整部、4…負荷、5…変圧器、6,7…配電
線、8…負荷運用信号、15…電力積算部、L…需要
家。
Claims (7)
- 【請求項1】電力系統に接続されて給電される需要家に
設けられる負荷電力調整装置であって、区分された負荷
と、これらに給電する配電線と、各配電線上に設けられ
たしゃ断器と、電力供給者からの指令信号により、区分
された負荷の一部についての配電線上に設けられたしゃ
断器を開閉制御する制御装置とを備えたことを特徴とす
る負荷電力調整装置。 - 【請求項2】第1項記載の負荷電力調整装置において、
制御装置は前記指令信号が予め定められた時間帯に与え
られたしゃ断信号のときに当該のしゃ断器を開放するこ
とを特徴とする負荷電力調整装置。 - 【請求項3】電力系統に接続されて給電される需要家に
設けられる負荷電力調整装置であって、保護継電装置の
動作信号と電力供給者からの指令信号により自動しゃ断
可能とされた第1の負荷と、保護継電装置の動作信号に
よってのみ自動しゃ断可能とされた第2の負荷とを含む
負荷電力調整装置。 - 【請求項4】電力系統に接続されて給電される需要家に
設けられる負荷電力調整装置であって、事前の契約によ
り電力供給者からの遠方制御による指令信号により自動
しゃ断可能とされた負荷を含む負荷電力調整装置。 - 【請求項5】電力系統に接続されて給電される需要家に
設けられる負荷電力調整装置であって、区分された負荷
と、これらに給電する配電線と、各配電線上に設けられ
たしゃ断器と、電力供給者からの指令信号により、区分
された負荷の一部についての配電線上に設けられたしゃ
断器を開閉制御する制御装置とを備え、制御装置は前記
指令信号が予め定められた時間帯に与えられたしゃ断信
号のときに当該のしゃ断器を開放することを特徴とする
負荷電力調整装置。 - 【請求項6】電力系統に接続された需要家に対してその
負荷の開閉を制御する給電指令所であって、所定の時間
帯に限り、電力供給能力の不足に従って需要家負荷のし
ゃ断指令を与えることを特徴とする給電指令装置。 - 【請求項7】第6項記載の負荷電力調整装置において、
電力供給能力の不足は電力供給予備力の低下、系統周波
数または系統電圧の変動とされることを特徴とされるこ
とを特徴とする給電指令装置。
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP23781691A JP3340452B2 (ja) | 1991-09-18 | 1991-09-18 | 負荷電力調整装置 |
| DE4229277A DE4229277A1 (de) | 1991-09-18 | 1992-09-02 | Stromsteuergeraet fuer eine last und station zum steuern des geraetes |
| US07/946,678 US5436511A (en) | 1991-09-18 | 1992-09-18 | Apparatus for interrupting supply of power from power system to portion of consumer load in response to control signal from power system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP23781691A JP3340452B2 (ja) | 1991-09-18 | 1991-09-18 | 負荷電力調整装置 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH0583854A true JPH0583854A (ja) | 1993-04-02 |
| JP3340452B2 JP3340452B2 (ja) | 2002-11-05 |
Family
ID=17020830
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP23781691A Expired - Lifetime JP3340452B2 (ja) | 1991-09-18 | 1991-09-18 | 負荷電力調整装置 |
Country Status (3)
| Country | Link |
|---|---|
| US (1) | US5436511A (ja) |
| JP (1) | JP3340452B2 (ja) |
| DE (1) | DE4229277A1 (ja) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2013042893A3 (ko) * | 2011-09-19 | 2013-05-30 | Choi Changjoon | 전력수급재난방지시스템 |
| WO2014122929A1 (ja) * | 2013-02-07 | 2014-08-14 | 日本電気株式会社 | 電力制御システム |
| JP2016019427A (ja) * | 2014-07-10 | 2016-02-01 | パナソニックIpマネジメント株式会社 | 電力管理装置、及び、電力監視制御装置 |
| US10048711B2 (en) | 2012-05-31 | 2018-08-14 | Nihon Techno Co., Ltd. | System, method, and program for conserving energy |
| US10170931B2 (en) | 2013-02-07 | 2019-01-01 | Nec Corporation | Electric power control system |
| JP2020072638A (ja) * | 2018-10-25 | 2020-05-07 | 日本水力株式会社 | 電力供給方法及びこれを実現する電力供給システム |
Families Citing this family (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE4334488C2 (de) * | 1993-10-09 | 1996-06-20 | Priesemuth W | Verfahren und Vorrichtung zur Reduzierung der Spitzenbelastung elektrischer Energienetze und Energieerzeuger |
| FR2722042B1 (fr) * | 1994-06-29 | 1996-10-04 | Atral | Dispositif de reception de signaux, notamment de signaux radioelectriques, a deux recepteurs |
| DE19502786C2 (de) * | 1995-01-28 | 1997-02-20 | Daimler Benz Ag | Schaltungsanordnung und Verfahren zur gezielten Spannungsversorgung von an einem Versorgungsnetz angeschlossenen elektrischen Geräten |
| EP0750383A1 (en) * | 1995-06-20 | 1996-12-27 | Arnaldo Spena | Automatic user load selection and reset in a "total electric power load management system" |
| US5753980A (en) * | 1996-04-25 | 1998-05-19 | Thomson Consumer Electronics, Inc. | Automatic prevention of inadvertent operation of electronic devices |
| US5747973A (en) * | 1996-12-11 | 1998-05-05 | Shop Vac Corporation | Current regulating switch circuit |
| EP1032107A1 (de) * | 1999-02-26 | 2000-08-30 | Siemens Building Technologies AG | Einrichtung zur Begrenzung der Leistungsaufnahme in einem Verbrauchernetz |
| US6172432B1 (en) | 1999-06-18 | 2001-01-09 | Gen-Tran Corporation | Automatic transfer switch |
| US6879059B2 (en) * | 2001-07-05 | 2005-04-12 | Sleva Associates, Inc. | Interruptible power supply module |
| US20100019574A1 (en) * | 2008-07-24 | 2010-01-28 | John Baldassarre | Energy management system for auxiliary power source |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4456832A (en) * | 1979-01-08 | 1984-06-26 | Southern California Edison Company | Circuit breaker control device |
| JPS55155523A (en) * | 1979-05-23 | 1980-12-03 | Nippon Electric Co | Power distribution system |
| DE3426542A1 (de) * | 1984-07-16 | 1986-01-16 | Heliowatt Werke Elektrizitäts- Gesellschaft mbH, 1000 Berlin | Einrichtung zur lastbegrenzung in niederspannungsnetzen |
| US4644320A (en) * | 1984-09-14 | 1987-02-17 | Carr R Stephen | Home energy monitoring and control system |
| US4903160A (en) * | 1985-02-25 | 1990-02-20 | Westinghouse Electric Corp. | Sudden, pressure relay supervisory apparatus |
| US4695738A (en) * | 1985-09-30 | 1987-09-22 | Daniel Wilmot | Energy management system |
| US4819180A (en) * | 1987-02-13 | 1989-04-04 | Dencor Energy Cost Controls, Inc. | Variable-limit demand controller for metering electrical energy |
-
1991
- 1991-09-18 JP JP23781691A patent/JP3340452B2/ja not_active Expired - Lifetime
-
1992
- 1992-09-02 DE DE4229277A patent/DE4229277A1/de not_active Ceased
- 1992-09-18 US US07/946,678 patent/US5436511A/en not_active Expired - Lifetime
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2013042893A3 (ko) * | 2011-09-19 | 2013-05-30 | Choi Changjoon | 전력수급재난방지시스템 |
| CN103814494A (zh) * | 2011-09-19 | 2014-05-21 | 崔创骏 | 电力供需灾难防止系统 |
| US10048711B2 (en) | 2012-05-31 | 2018-08-14 | Nihon Techno Co., Ltd. | System, method, and program for conserving energy |
| WO2014122929A1 (ja) * | 2013-02-07 | 2014-08-14 | 日本電気株式会社 | 電力制御システム |
| JPWO2014122929A1 (ja) * | 2013-02-07 | 2017-01-26 | 日本電気株式会社 | 電力制御システム |
| US10170931B2 (en) | 2013-02-07 | 2019-01-01 | Nec Corporation | Electric power control system |
| JP2016019427A (ja) * | 2014-07-10 | 2016-02-01 | パナソニックIpマネジメント株式会社 | 電力管理装置、及び、電力監視制御装置 |
| JP2020072638A (ja) * | 2018-10-25 | 2020-05-07 | 日本水力株式会社 | 電力供給方法及びこれを実現する電力供給システム |
Also Published As
| Publication number | Publication date |
|---|---|
| JP3340452B2 (ja) | 2002-11-05 |
| DE4229277A1 (de) | 1993-04-01 |
| US5436511A (en) | 1995-07-25 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH0583854A (ja) | 負荷電力調整装置 | |
| US11811234B2 (en) | Techniques for electric power distribution and a system implementing the same | |
| US4694192A (en) | Simplified demand limit control | |
| US7069117B2 (en) | Electrical power distribution control systems and processes | |
| Baran et al. | Volt/var control at distribution substations | |
| EP3028358B1 (en) | Microgrid energy management system and method for controlling operation of a microgrid | |
| US6222714B1 (en) | Microprocessor based setting group controller for protective relay operations | |
| AU2013101461A4 (en) | Grid stability control system and method | |
| Al-Hinai et al. | Coordinated intelligent frequency control incorporating battery energy storage system, minimum variable contribution of demand response, and variable load damping coefficient in isolated power systems | |
| CN102356532B (zh) | 用于限制在不间断电源中的损耗的系统和方法 | |
| JPH09135536A (ja) | 系統連系システム | |
| JP2009033967A (ja) | 電力系統保護装置 | |
| US5466973A (en) | Delivery point voltage regulation in electric energy distribution networks | |
| DE102013217743B4 (de) | Verfahren und Steuergerät zum Begrenzen einer elektrischen Belastung in einem Netzzweig eines elektrischen Netzes | |
| US12283814B2 (en) | Circuit management system | |
| US3858110A (en) | Method and means for continuous distribution of electrical energy | |
| JPH09200963A (ja) | 負荷選択遮断装置 | |
| EP3284154B1 (de) | Steuerung einer mit einer sicherung geschützten energieübertragung zwischen energieversorgungsnetz und endnutzereinrichtungen | |
| JP2006288079A (ja) | 電力設備接続装置、電力供給システム、電力設備接続方法および電力系統運用方法。 | |
| CN209150725U (zh) | 一种0.4kV交流接触器调挡开关线路串连自动调压装置 | |
| JP2019071704A (ja) | 分散型電源管理システム | |
| US20220014025A1 (en) | Feed-in method for a wind power system, and wind power system | |
| Yalla | Design of a new operating mode for voltage regulator controls in a smart distribution system | |
| JPH04289732A (ja) | 無効電力補償装置 | |
| JPH0317567Y2 (ja) |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20070816 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080816 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080816 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090816 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100816 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100816 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110816 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120816 Year of fee payment: 10 |
|
| EXPY | Cancellation because of completion of term | ||
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120816 Year of fee payment: 10 |