JPH0610358A - Caisson construction method and caisson construction form device - Google Patents
Caisson construction method and caisson construction form deviceInfo
- Publication number
- JPH0610358A JPH0610358A JP17115492A JP17115492A JPH0610358A JP H0610358 A JPH0610358 A JP H0610358A JP 17115492 A JP17115492 A JP 17115492A JP 17115492 A JP17115492 A JP 17115492A JP H0610358 A JPH0610358 A JP H0610358A
- Authority
- JP
- Japan
- Prior art keywords
- partition wall
- support frame
- molds
- formwork
- bottom slab
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims description 24
- 238000000638 solvent extraction Methods 0.000 claims abstract description 5
- 238000005192 partition Methods 0.000 claims description 44
- 238000009415 formwork Methods 0.000 claims description 43
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 18
- 230000003028 elevating effect Effects 0.000 claims description 7
- 230000009194 climbing Effects 0.000 claims description 2
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 claims 1
- 238000000034 method Methods 0.000 description 7
- 230000003014 reinforcing effect Effects 0.000 description 4
- 238000005266 casting Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000002184 metal Substances 0.000 description 2
- 241000258937 Hemiptera Species 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000005304 joining Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000008707 rearrangement Effects 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】この発明は、大型のコンクリート
製ケーソンの構築方法およびこの構築方法に好適な型枠
装置に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a large-scale concrete caisson and a formwork apparatus suitable for this method.
【0002】[0002]
【従来の技術】大型のコンクリート製ケーソンは、底版
の上部にあって、外壁で囲われた内部をさらに仕切り壁
により水平断面を多数の矩形状の区画室に仕切った構造
を有している。この構造のケーソンを構築するには、最
初に地上部にて底版を構築し、次いでこの底版の上部に
外壁とともに前記仕切り壁を同時に構築している。2. Description of the Related Art A large caisson made of concrete has a structure in which the inside surrounded by an outer wall is further divided by a partition wall into a number of rectangular compartments at the upper part of a bottom slab. In order to construct a caisson of this structure, a bottom slab is first constructed in the above-ground part, and then the partition wall is constructed simultaneously with the outer wall on the top of this bottom slab.
【0003】また、この種の大型ケーソンの高さは比較
的高いため、仕切り壁を構築するに当たってはその高さ
分の型枠を一度に配置することが出来ず、まず底版の底
版ロッド上に最初の型枠を配置し、コンクリートを打設
することによって下部側仕切り壁を構築した後、この下
部側仕切り壁を基準としてさらにその上部に型枠を組
み、上部側仕切り壁を打ち継ぐことを所望の高さまで繰
返している。Also, since the height of this type of large caisson is relatively high, when constructing the partition wall, it is not possible to dispose the formwork of that height at a time, and first, on the bottom plate rod of the bottom plate. After arranging the first formwork and constructing the lower side partition wall by pouring concrete, form the formwork further on top of this lower side partition wall as a reference, and join the upper side partition wall. Repeat to the desired height.
【0004】[0004]
【発明が解決しようとする課題】しかしながら従来で
は、前記型枠を製作する際に、堰板を縦横の端太角で組
み、矩形状に形成した後、クレーンで現場に搬送し、現
場においてさらに腹起こし、支持梁を架けているため、
組立て精度を出すのに非常に多くの人出および手間を必
要とする。しかも、型枠の組上げや再組上げに際しては
これらの配置および撤去の全てが人力に頼り、また重量
も重いため多大な手数を要していた。However, in the prior art, when manufacturing the above-mentioned mold, after the weir plates were assembled with vertical and horizontal edges with thick corners and formed into a rectangular shape, they were transported to the site by a crane and further I'm angry and I'm hanging a support beam,
It requires a great deal of labor and effort to obtain the assembly accuracy. Moreover, when assembling and reassembling the formwork, all of these arrangements and removals depend on human power, and the weight is heavy, which requires a great deal of work.
【0005】また、従来ではコンクリート打設の際にか
かる型枠の側圧による変形防止のために、型枠を設置し
た後は全体の変形を防止するために複数本のタイロッド
によって型枠を張設支持していたが、実際にはタイロッ
ドの軸方向,すなわち張力方向には効果があるものの、
全体の歪みに対する効果は期待できなかった。Further, in the past, in order to prevent the deformation of the formwork due to the lateral pressure applied at the time of placing concrete, after the formwork is installed, the formwork is stretched by a plurality of tie rods to prevent the entire form from being deformed. I supported it, but although it is actually effective in the axial direction of the tie rod, that is, the tension direction,
No effect on overall distortion could be expected.
【0006】さらに、前記型枠を次工程に設置するにあ
たり、その上端を規制し、固定する構造がないため、据
付精度を確保するのに全体的な調整が必要であり、調整
のために時間を多くとられるという欠点があった。Further, when the formwork is installed in the next step, since there is no structure for restricting and fixing the upper end of the formwork, it is necessary to make an overall adjustment in order to secure the installation accuracy, and it takes time for the adjustment. There was a drawback that many could be taken.
【0007】この発明は以上の問題を解決するものであ
って、その目的は、型枠の配置や再配置を迅速に行え、
コンクリート打設時の変形がなく、しかも据付が簡単に
行えるとともに、据付精度が高いケーソンの構築方法お
よびケーソン構築用型枠装置を提供するものである。The present invention is intended to solve the above problems, and an object of the invention is to quickly arrange and rearrange formwork,
(EN) Provided are a caisson construction method and a caisson construction formwork device which are not deformed during concrete pouring and can be easily installed and have high installation accuracy.
【0008】[0008]
【課題を解決するための手段】前記目的を達成するた
め、この発明に係るケーソン構築方法は、底版の上部
に、水平断面を格子状に仕切る仕切り壁を構築すること
により複数の区画室を形成してなるケーソン構築方法で
あって、前記各区画毎に、側部四面に型枠を配置した複
数のクライミング式型枠装置を整列配置し、前記各型枠
の下端を底版上に仮固定するとともに、前記型枠の上部
に格子状の支持フレームを配置し、該支持フレームに前
記各型枠の上端を仮固定する第1の工程と、前記底版の
直上において前記各型枠同士を対面させた内部にコンク
リートを打設し、前記底版の上部に下部仕切り壁を一体
に打ち継ぐ第2の工程と、各部の仮固定を解除し、前記
各型枠を脱型した後、前記型枠装置および支持フレーム
を上昇させて仮固定し、次いで前記各型枠の下端を下部
仕切り壁の上端に仮固定し、上端を前記支持フレームに
仮固定する第3の工程と、前記下部仕切り壁の直上にお
いて、前記各型枠同士を対面させた内部にコンクリート
を打設して下部仕切り壁の上部に上部仕切り壁を一体に
打ち継ぐ第4の工程とを含み、前記第1の工程および第
2の工程の終了後、前記第3の工程および第4の工程を
繰返すことにより所望の高さの仕切り壁を一体に構築す
ることを特徴とする。In order to achieve the above-mentioned object, a caisson construction method according to the present invention forms a plurality of compartments by constructing a partition wall for partitioning a horizontal cross section into a lattice shape in the upper part of a bottom plate. In the caisson construction method as described above, a plurality of climbing type formwork devices in which formwork is arranged on the four side surfaces are arranged in line for each of the sections, and the lower end of each formwork is temporarily fixed on the bottom plate. At the same time, a first step of disposing a grid-shaped support frame on the upper part of the mold and temporarily fixing the upper ends of the molds to the support frame, and making the molds face each other directly above the bottom plate. The second step in which concrete is poured inside and the lower partition wall is integrally joined to the upper part of the bottom plate, and the temporary fixing of each part is released, and each mold is released from the mold, and then the mold device And raise the support frame to temporarily fix Next, a third step of temporarily fixing the lower end of each of the molds to the upper end of the lower partition wall and temporarily fixing the upper end of the mold to the support frame and the molds directly above the lower partition wall were made to face each other. A fourth step of casting concrete inside and integrally joining the upper partition wall to the upper part of the lower partition wall, and after the completion of the first step and the second step, the third step and It is characterized in that a partition wall having a desired height is integrally constructed by repeating the fourth step.
【0009】また、この発明に係るケーソン構築方法
は、前記支持フレームは、前記底版上部の適宣位置また
は底版の外部に立設されたガイドポストを水平方向の基
準点としていることを特徴とする。Further, the caisson construction method according to the present invention is characterized in that the support frame uses a guide position which is provided at an appropriate position on the upper portion of the bottom slab or which is erected outside the bottom slab as a horizontal reference point. .
【0010】さらに、この発明に係るケーソン構築用型
枠装置は、区画室内にあって仕切り壁に四面を接する台
座と、該台座上に昇降用ジャッキを介して昇降かつ着脱
可能に連結される昇降フレームと、該昇降フレームの側
部四面に進退用ジャッキを介して進退可能に垂直支持さ
れた型枠とからなることを特徴とする。Further, the caisson construction formwork apparatus according to the present invention comprises a pedestal in the compartment which is in contact with the partition wall on four sides, and an elevating and detachably connected to the pedestal via an elevating jack. It is characterized in that it comprises a frame and a form frame vertically supported on the four side surfaces of the elevating frame so as to be capable of advancing and retracting via jacks for advancing and retracting.
【0011】[0011]
【作用】以上の構成によれば、支持フレームは型枠の上
端位置を位置決め固定するための格子状の治具として機
能する。従って、各型枠の下端を既に構築された下部側
仕切り壁上部側面に仮固定し、上端を支持フレームに仮
固定すれば、各型枠は上下左右とも精度よく据え付けら
れる。型枠に対するコンクリート打設時の側圧は前記上
下の仮固定部分および進退用ジャッキによって支えら
れ、変形も防止される。コンクリート固化後に仮固定を
外し、進退用ジャッキを後退させれば型枠はコンクリー
ト打設面より離間し、脱型される。According to the above construction, the support frame functions as a lattice-shaped jig for positioning and fixing the upper end position of the mold. Therefore, if the lower end of each formwork is temporarily fixed to the upper side surface of the already constructed lower partition wall and the upper end is temporarily fixed to the support frame, each formwork can be accurately installed in the vertical and horizontal directions. Lateral pressure at the time of placing concrete on the form is supported by the upper and lower temporarily fixed portions and the advancing / retreating jacks, and deformation is prevented. If the temporary fixing is removed after the concrete is solidified and the advancing / retreating jack is retracted, the mold is separated from the concrete placing surface and is removed from the concrete.
【0012】支持フレームの水平度合は、ガイドポスト
を水平方向の基準点とすることによって安定して出され
る。The horizontal degree of the support frame can be stably obtained by using the guide post as a horizontal reference point.
【0013】型枠装置本体の上昇および再据付作業は、
最初に底版面に反力を取って昇降用ジャッキを伸長すれ
ば、各型枠は上昇する。上昇位置で各型枠の上下を仮固
定した後、昇降用ジャッキを縮めてこれの下端に台座を
連結し、これを既設の仕切り壁に仮固定する。この後は
台座に反力を取り、昇降用ジャッキの伸縮と型枠および
台座の仮固定およびその取り外しを交互に行えば、尺取
り虫状に上昇させることができる。The work of raising and re-installing the formwork apparatus main body is
First, a reaction force is applied to the bottom slab surface to extend the lifting jack, and each form is raised. After temporarily fixing the top and bottom of each formwork at the raised position, the lifting jack is contracted to connect the pedestal to the lower end of the jack, and this is temporarily fixed to the existing partition wall. After that, a reaction force is applied to the pedestal, and the extension and contraction of the lifting jack and the temporary fixing and removal of the form and the pedestal are alternately performed, so that the pedestal can be lifted up.
【0014】[0014]
【実施例】以下、この発明の一実施例を図面を用いて詳
細に説明する。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described in detail below with reference to the drawings.
【0015】図1,2はこの発明によって構築される大
型ケーソンを示し、図1は平面図、図2は一部断面図で
ある。図に示されるケーソンは、地上部に構築された底
版1上の外周に一体に立設される外壁2と、外壁2の内
側にあって底版1上に一体に構築され、平面的に見て縦
4列,横6列の正方形状の区画室A−1〜A−6,〜D
−1〜D−6(図1に縦A…D、横1…6の番号を付し
て示す)に区画する格子状の仕切り壁4とからなってい
る。1 and 2 show a large caisson constructed according to the present invention. FIG. 1 is a plan view and FIG. 2 is a partial sectional view. The caisson shown in the figure has an outer wall 2 that is integrally erected on the outer periphery of a bottom slab 1 that is constructed above the ground, and an inner wall that is inside the outer wall 2 and that is integrally constructed on the bottom slab 1, Square-shaped compartments A-1 to A-6, to D with 4 rows and 6 rows
-1 to D-6 (indicated by numbers A to D in the vertical direction and 1 to 6 in the horizontal direction in FIG. 1) to form a grid-like partition wall 4.
【0016】区画室A−2,D−5を除く全ての区画室
内部にはそれぞれ型枠装置5が配置されている。また、
区画室A−2,D−5のそれぞれにはガイドポスト6が
鉛直方向に立設されている。さらに、前記型枠装置5上
にして区画室A−1〜A−6,〜D−1〜D−6の全体
には、支持フレーム7が前記外壁2および仕切り壁4の
側面に対応して格子状に配列され、支持フレーム7は前
記外壁2に仮固定されている。Formwork devices 5 are arranged in all the compartments inside the compartments except the compartments A-2 and D-5. Also,
A guide post 6 is erected vertically in each of the compartments A-2 and D-5. Further, the support frame 7 corresponds to the side surfaces of the outer wall 2 and the partition wall 4 in the whole of the compartments A-1 to A-6, to D-1 to D-6 on the formwork device 5. The support frames 7 are arranged in a lattice pattern and are temporarily fixed to the outer wall 2.
【0017】これら支持フレーム7は、例えば仕切り壁
4の両側に位置する断面C字状のチャンネル材7Aと、
区画室上にあってチャンネル材7A,7A間に架設され
る断面L字状のアングル材7B,7Bとから構成されて
おり、図2に示すようにその下部に型枠支持金具7aを
一体に設けたもので、前記一対のガイドポスト6の側部
にガイドローラ8を当接させることにより該ガイドポス
ト6を水平方向の基準点としている。さらに、この支持
フレーム7間には作業足場が組まれており、施工現場の
上面全体を覆っている。ここで、支持フレーム7は、所
定長さに分割されたチャンネル材またはアングル材を組
合わせて形成してもよいし、構築されるケーソンの平面
を複数領域に分割した平面状に予め組合わせてもおいて
もよい。なお、図1における符号7bは、支持フレーム
7の間に縦横に配置された補強ビームである。These support frames 7 are, for example, channel members 7A having a C-shaped cross section located on both sides of the partition wall 4,
It is composed of angle members 7B and 7B having an L-shaped cross section, which are installed on the compartments and between the channel members 7A and 7A. As shown in FIG. By providing the guide rollers 8 to the side portions of the pair of guide posts 6, the guide posts 6 are used as horizontal reference points. Further, a work scaffold is assembled between the support frames 7 and covers the entire top surface of the construction site. Here, the support frame 7 may be formed by combining the channel material or the angle material divided into a predetermined length, or by combining the plane of the caisson to be constructed into a plane shape divided into a plurality of areas in advance. You can leave it. In addition, reference numeral 7 b in FIG. 1 is a reinforcing beam arranged vertically and horizontally between the support frames 7.
【0018】型枠装置5は、図2および図3に詳細に示
すように、台座9と、台座9の中心上部に昇降用ジャッ
キ10を介して昇降かつ着脱可能に連結されるボックス
状の昇降フレーム11と、昇降フレーム11の側部四面
にそれぞれ平行な一対の進退用ジャッキ12を介して進
退可能に垂直支持された型枠14および昇降フレーム1
1の上部と下部外周を包囲した状態に固定配置された作
業足場15,16と、作業足場15,16間を作業員が
行き来するための階段(図示しない)とを備えている。As shown in detail in FIGS. 2 and 3, the formwork apparatus 5 is a box-shaped lifting unit which is detachably connected to a pedestal 9 and a central upper portion of the pedestal 9 via a lifting jack 10. A frame 11 and a frame 14 and a lifting frame 1 vertically supported so as to be able to move forward and backward through a pair of advancing and retracting jacks 12 that are parallel to the four side surfaces of the lifting frame 11.
Work scaffolds 15 and 16 fixedly arranged so as to surround the upper and lower outer peripheries of 1 and stairs (not shown) for workers to move between the work scaffolds 15 and 16 are provided.
【0019】台座9は型枠装置5が上昇位置にあるとき
に昇降用ジャッキ10の下端に上部中心を連結されるも
ので、中心である座板9aから四方に伸び、その端部を
前記仕切り壁4の四面に当接して仕切り壁4に仮固定さ
れる連結部9bを形成したものである。The pedestal 9 has its upper center connected to the lower end of the lifting jack 10 when the formwork device 5 is in the raised position. The pedestal 9 extends in four directions from the seat plate 9a, which is the center of the pedestal 9. A connecting portion 9b is formed which is in contact with the four surfaces of the wall 4 and is temporarily fixed to the partition wall 4.
【0020】昇降用ジャッキ10のストロークは一回の
施工高さ間隔に対応し、かつ型枠14の高さに応じて設
定されている。また、進退用ジャッキ12のストローク
は型枠14の脱型時における離間分であり、比較的動き
は小さくてもよい。The stroke of the lifting jack 10 corresponds to one working height interval and is set in accordance with the height of the formwork 14. Further, the stroke of the advancing / retreating jack 12 is the amount of separation when the mold 14 is released from the mold, and the movement may be relatively small.
【0021】各型枠14は、図4(a),(b)に示す
ように、軽量パネル14aの裏面に複数の補強リブ14
bを一体化したもので、パネル14aの下端が施工済み
の外壁2または仕切り壁4bに仮固定され、パネル14
aの上端が前記支持フレーム7の下部に垂設された型枠
支持金具7aの対向面に仮固定される。このように型枠
14を軽量パネル14aによって構成しても、その下端
および上端が仮固定されるため、剛性を十分に得ること
ができる。As shown in FIGS. 4A and 4B, each form 14 has a plurality of reinforcing ribs 14 on the back surface of the lightweight panel 14a.
b is integrated, and the lower end of the panel 14a is temporarily fixed to the constructed outer wall 2 or partition wall 4b.
The upper end of a is temporarily fixed to the facing surface of the form support metal fitting 7a which is vertically provided on the lower portion of the support frame 7. Even if the mold frame 14 is configured by the lightweight panel 14a as described above, since the lower end and the upper end thereof are temporarily fixed, sufficient rigidity can be obtained.
【0022】以上の構成において、構築の当初、外壁2
の外面および区画室A−2,D−5では在来の型枠工法
が採用される以外は、この発明にかかる構築方法が採用
される。図5〜7はその構築手順を示している。In the above structure, the outer wall 2 is initially formed.
The construction method according to the present invention is adopted, except that the conventional formwork method is adopted on the outer surface and the compartments A-2 and D-5. 5 to 7 show the construction procedure.
【0023】まず最初に、図5に示すように地上部GL
に底版1が切り離し可能に構築され、次いで外壁2の基
礎壁2aおよび各仕切り壁4の基礎壁4aが構築され
る。各基礎壁2a,4aは型枠14の下部の基準となる
もので在来工法によって精度よく製作される。First of all, as shown in FIG.
The bottom slab 1 is detachably constructed, and then the foundation wall 2a of the outer wall 2 and the foundation wall 4a of each partition wall 4 are constructed. Each of the foundation walls 2a and 4a serves as a reference for the lower part of the mold 14 and is manufactured accurately by the conventional method.
【0024】次に、基礎壁2a,4a上に次のロッド分
の鉄筋が配筋され、図6(a)に示すように各区画室に
型枠装置5が組立配置され、各型枠14の下端は基礎壁
2a,4aの上部に仮固定される。なお、この段階では
台座9は型枠装置5に取付けられておらず、昇降用ジャ
ッキ10の下端が直接底版1の上面に当接している。こ
れと平行して図1,2に示されているように区画室A−
2,D−5ではガイドポスト6が設置される。Next, reinforcing rods for the following rods are laid on the foundation walls 2a and 4a, and as shown in FIG. 6 (a), the formwork device 5 is assembled and arranged in each compartment, and The lower ends are temporarily fixed to the upper portions of the base walls 2a and 4a. At this stage, the pedestal 9 is not attached to the formwork device 5, and the lower end of the lifting jack 10 is in direct contact with the upper surface of the bottom plate 1. In parallel with this, as shown in FIGS.
In 2 and D-5, the guide post 6 is installed.
【0025】その後、予め用意された支持フレーム7が
ガイドポスト6を基準として型枠14の上部に格子状に
組立て配置され、その型枠支持金具7aに型枠14の上
端が仮固定される(図4参照)。支持フレーム7はガイ
ドポスト6に対して水平および位置決め基準を取られ、
前記型枠14の上端を位置決め固定するための治具とし
ての機能を持ち、基礎壁2a,4aと協働して現場打ち
施工における施工精度が決定される。Thereafter, the support frame 7 prepared in advance is assembled and arranged in a lattice pattern on the upper portion of the mold 14 with the guide post 6 as a reference, and the upper end of the mold 14 is temporarily fixed to the mold support fitting 7a ( (See FIG. 4). The support frame 7 is horizontal with respect to the guide post 6 and has a positioning reference,
It has a function as a jig for positioning and fixing the upper end of the mold 14 and cooperates with the foundation walls 2a and 4a to determine the construction accuracy in the in-situ construction.
【0026】以上の準備作業後、対向する型枠14間に
コンクリートが打設され、基礎壁4a上にの第一ロッド
分の仕切り壁4bが連続して打ち継がれる。なお、外壁
2側に付いては省略するが、外壁2の内面側については
同様の手法が取られる。コンクリート固化後、前記型枠
14の上下の仮固定を外し、支持フレーム7を型枠14
上から撤去した状態で進退用ジャッキ12を後退すれ
ば、第一ロッド分の仕切り壁4bから型枠14が脱型す
る。After the above preparatory work, concrete is poured between the facing molds 14, and the partition wall 4b for the first rod is continuously spliced on the foundation wall 4a. Although not described for the outer wall 2 side, the same method is used for the inner surface side of the outer wall 2. After the concrete is solidified, the upper and lower temporary fixings of the mold 14 are removed, and the support frame 7 is fixed to the mold 14
When the advancing / retreating jack 12 is retracted in the state of being removed from above, the mold 14 is removed from the partition wall 4b for the first rod.
【0027】以上の作業の後、同様に第一ロッド分の仕
切り壁4b上に鉄筋を配筋し、昇降用ジャッキ10を伸
長すれば、図6(b)に示すように型枠装置5は底版1
に反力を取った状態で上昇し、型枠14の下部は仕切り
壁4bの上部に位置する。この状態で進退用ジャッキ1
2を前進させて、型枠を仕切り壁4bの上部に当接さ
せ、次いで支持フレーム7を再配置しその金具7aに型
枠14の上端を仮固定すれば、コンクリート打設準備が
完了し、コンクリートの打設により第二ロッド分の仕切
り壁4cが形成される。After the above work, if reinforcing bars are similarly arranged on the partition wall 4b for the first rod and the elevating jack 10 is extended, as shown in FIG. Bottom plate 1
When the reaction force is applied to the partition wall 4a, it rises, and the lower portion of the mold 14 is located above the partition wall 4b. Jack 1 for retreat in this state
2 is moved forward, the mold is brought into contact with the upper part of the partition wall 4b, then the support frame 7 is rearranged, and the upper end of the mold 14 is temporarily fixed to the metal fitting 7a. The partition wall 4c for the second rod is formed by casting concrete.
【0028】なお、この段階では昇降用ジャッキ10は
伸び切った状態なので型枠14を固定状態のまま昇降用
ジャッキ10を引上げ、その下端に台座9を連結し、台
座9の連結部9bを基礎壁4aに仮固定すれば、図6
(c)に示すように、この台座9に反力を取った状態で
型枠装置5の上昇を行うことができ第三ロッド分の仕切
り壁4dの構築が準備される。At this stage, since the lifting jack 10 is fully extended, the lifting jack 10 is pulled up while the mold 14 is fixed, and the pedestal 9 is connected to the lower end of the lifting jack 10, and the connecting portion 9b of the pedestal 9 is used as a base. If temporarily fixed to the wall 4a, FIG.
As shown in (c), the mold frame device 5 can be raised while the reaction force is applied to the pedestal 9, and the construction of the partition wall 4d for the third rod is prepared.
【0029】以上の尺取り虫状の上昇作業および型枠1
4の上下の仮固定作業,撤去作業を交互に繰返しつつコ
ンクリートを打設していけば、図7に示すように所望の
高さまで外壁2および多数の仕切り壁4を内部に一体化
したコンクリート製ケーソンが得られることになる。同
図には、最初のコンクリート打設による外壁の基礎壁2
b,仕切り壁の基礎壁4bから数えて7ロッドの作業を
繰返し、最上部の外壁2h,仕切り壁4hまでの高さま
で構築を行ったことが示されている。The above scale-like insect-like raising work and the formwork 1
If the concrete is placed while alternately repeating the temporary fixing work and the removing work of the upper and lower parts of 4, the outer wall 2 and a large number of partition walls 4 are integrated to the desired height as shown in FIG. The caisson will be obtained. In the figure, the foundation wall 2 of the outer wall by the first concrete placement
b, the work of 7 rods counting from the base wall 4b of the partition wall is repeated, and the construction is performed up to the height of the outermost wall 2h and the partition wall 4h.
【0030】なお、実施例では一対のガイドポスト6を
所定の区画室の内部に配置した場合を示したが、このよ
うな場合にはこの区画室内部のみは在来工法を採用する
必要があるため、外部にガイドポスト6を配置しておけ
ば各区画室全てにこの発明の方法を採用できることにな
る。また、支持フレーム7の撤去および再配置作業は構
造物が大型である場合には解体,再組立て式とならざる
を得ないが、ガイドポスト6に沿ってスライド式に一体
に昇降させれば、さらに作業が簡単になる。Although the pair of guide posts 6 are arranged inside a predetermined compartment in the embodiment, in such a case, it is necessary to adopt the conventional construction method only inside the compartment. Therefore, if the guide post 6 is arranged outside, the method of the present invention can be applied to all the compartments. Further, the removal and rearrangement work of the support frame 7 must be disassembled and reassembled when the structure is large, but if it is slid up and down along the guide post 6, Furthermore, the work becomes easier.
【0031】[0031]
【発明の効果】以上実施例によって詳細に説明したよう
に、この発明にかかるケーソン構築方法およびケーソン
構築用型枠装置にあっては、各型枠の下端を既に構築さ
れた下部側仕切り壁に仮固定し、上端を支持フレームに
仮固定すれば、各型枠は上下左右とも精度よく据え付け
られ、調整の手間も簡略化される。As described above in detail with reference to the embodiments, in the caisson construction method and the caisson construction formwork apparatus according to the present invention, the lower end of each formwork is connected to the already constructed lower partition wall. If temporarily fixed and the upper end is temporarily fixed to the support frame, each formwork can be accurately installed both vertically and horizontally, and the labor of adjustment can be simplified.
【0032】また型枠に対するコンクリート打設時の側
圧も十分に支えられるため、変形も防止される。さら
に、型枠装置の上昇および再据付作業は、昇降用ジャッ
キの伸縮と型枠および台座の仮固定およびその取外しを
交互に行えば、尺取り虫状に上昇させつつ型枠を配置で
きるので、従来に比べて腹起こし、支持梁などの人力を
要する配置作業がなく省力化できる。Further, since the lateral pressure at the time of placing concrete on the formwork is sufficiently supported, the deformation is prevented. Furthermore, when raising and re-installing the formwork device, by alternately extending and retracting the lifting jack and temporarily fixing and removing the formwork and pedestal, the formwork can be arranged while raising it like a scale insect. Compared with this, it is possible to save labor because there is no need for laying up the support beam and arranging the supporting beam and the like requiring human power.
【図1】この発明方法が適用されるケーソンの平面図で
ある。FIG. 1 is a plan view of a caisson to which the method of the present invention is applied.
【図2】同ケーソンの施工状態を示す一部断面図であ
る。FIG. 2 is a partial cross-sectional view showing a construction state of the caisson.
【図3】型枠装置本体の分解斜視図である。FIG. 3 is an exploded perspective view of the main body of the formwork apparatus.
【図4】支持フレームに対する型枠上端の固定状態を示
し、(a)は断面図、(b)は側面図である。FIG. 4 shows a fixed state of the upper end of the mold with respect to the support frame, (a) is a sectional view, and (b) is a side view.
【図5】底版および外壁と仕切り壁の基礎壁の構築状態
を示す断面図である。FIG. 5 is a cross-sectional view showing a bottom plate and an outer wall and a foundation wall of a partition wall in a built state.
【図6】(a)は型枠装置本体を底版上に設置した状態
を示す部分断面図である。(b)は同装置本体を上昇さ
せた状態を示す部分断面図である。(c)は同装置本体
をさらに上昇させた状態を示す部分断面図である。FIG. 6A is a partial cross-sectional view showing a state in which the formwork apparatus main body is installed on the bottom plate. (B) is a partial cross-sectional view showing a state in which the apparatus body is raised. (C) is a partial cross-sectional view showing a state where the apparatus body is further raised.
【図7】同ケーソンの完成状態を示す断面図である。FIG. 7 is a sectional view showing a completed state of the caisson.
1 底版 2 外壁 4 仕切り壁 A−1〜A−6〜D−1〜D−6 区画室 5 型枠装置 6 ガイドポスト 7 支持フレーム 7a 型枠取付け金具 A−1〜A−6〜D−1〜D−6 区画室 9 台座 10 昇降用ジャッキ 11 昇降フレーム 12 進退用ジャッキ 14 型枠 1 Bottom plate 2 Outer wall 4 Partition wall A-1 to A-6 to D-1 to D-6 Compartment 5 Formwork device 6 Guide post 7 Support frame 7a Formwork mounting bracket A-1 to A-6 to D-1 ~ D-6 Compartment 9 Base 10 Lifting jack 11 Lifting frame 12 Forward / backward jack 14 Formwork
Claims (3)
る仕切り壁を構築することにより複数の区画室を形成し
てなるケーソン構築方法であって、 前記各区画毎に、側部四面に型枠を配置した複数のクラ
イミング式型枠装置を整列配置し、前記各型枠の下端を
底版上に仮固定するとともに、前記型枠の上部に格子状
の支持フレームを配置し、該支持フレームに前記各型枠
の上端を仮固定する第1の工程と、 前記底版の直上において前記各型枠同士を対面させた内
部にコンクリートを打設し、前記底版の上部に下部仕切
り壁を一体に打ち継ぐ第2の工程と、 各部の仮固定を解除し、前記各型枠を脱型した後、前記
型枠装置および支持フレームを上昇させて仮固定し、次
いで前記各型枠の下端を下部仕切り壁の上端に仮固定
し、上端を前記支持フレームに仮固定する第3の工程
と、 前記下部仕切り壁の直上において、前記各型枠同士を対
面させた内部にコンクリートを打設して下部仕切り壁の
上部に上部仕切り壁を一体に打ち継ぐ第4の工程とを含
み、 前記第1の工程および第2の工程の終了後、前記第3の
工程および第4の工程を繰返すことにより所望の高さの
仕切り壁を一体に構築することを特徴とするケーソン構
築方法。1. A caisson construction method in which a plurality of compartments are formed by constructing a partition wall for partitioning a horizontal cross section into a lattice shape on the top of a bottom slab, wherein each of the compartments has four side surfaces. A plurality of climbing type mold devices in which the molds are arranged are aligned, the lower ends of the respective molds are temporarily fixed on the bottom slab, and a grid-like support frame is arranged on the upper part of the molds. In the first step of temporarily fixing the upper end of each of the molds, concrete is placed inside the molds facing each other directly above the bottom slab, and the lower partition wall is integrally formed on the top of the bottom slab. Second step of striking together, after releasing the temporary fixing of each part, releasing each of the molds, raising the mold device and the support frame to temporarily fix, and then lowering the lower end of each mold to the lower part. Temporarily fix it to the upper end of the partition wall, and The third step of temporarily fixing to the rame, and immediately above the lower partition wall, concrete is placed inside the molds facing each other to integrally join the upper partition wall to the upper part of the lower partition wall. A fourth step, and after the completion of the first step and the second step, repeating the third step and the fourth step to integrally construct a partition wall having a desired height. Characteristic caisson construction method.
宣位置または底版の外部に立設されたガイドポストを水
平方向の基準点としていることを特徴とする請求項1に
記載のケーソン構築方法。2. The caisson construction method according to claim 1, wherein the support frame uses a guide position in an upper portion of the bottom slab or a guide post standing outside the bottom slab as a horizontal reference point. .
る台座と、該台座上に昇降用ジャッキを介して昇降かつ
着脱可能に連結される昇降フレームと、該昇降フレーム
の側部四面に進退用ジャッキを介して進退可能に垂直支
持された型枠とからなることを特徴とするケーソン構築
用型枠装置。3. A pedestal that is in contact with a partition wall on four sides in a compartment, an elevating frame that is connected to the pedestal via an elevating jack so as to be able to move up and down and detachably, and forwards and backwards to and from four side faces of the elevating frame. A formwork device for constructing a caisson, which comprises a formwork vertically supported so as to be able to move forward and backward through a jack for use in construction.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP4171154A JP3000790B2 (en) | 1992-06-29 | 1992-06-29 | Caisson construction method and caisson construction formwork device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP4171154A JP3000790B2 (en) | 1992-06-29 | 1992-06-29 | Caisson construction method and caisson construction formwork device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH0610358A true JPH0610358A (en) | 1994-01-18 |
| JP3000790B2 JP3000790B2 (en) | 2000-01-17 |
Family
ID=15917995
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP4171154A Expired - Fee Related JP3000790B2 (en) | 1992-06-29 | 1992-06-29 | Caisson construction method and caisson construction formwork device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3000790B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0931997A (en) * | 1995-07-18 | 1997-02-04 | Akito Nagano | Inner form device for form for caisson |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS6444681U (en) * | 1987-09-09 | 1989-03-16 | ||
| JPH045367A (en) * | 1990-04-20 | 1992-01-09 | Shimizu Corp | Lift type formwork and forming method using same |
| JPH05124023A (en) * | 1991-08-07 | 1993-05-21 | Mitsubishi Heavy Ind Ltd | Formwork device |
-
1992
- 1992-06-29 JP JP4171154A patent/JP3000790B2/en not_active Expired - Fee Related
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS6444681U (en) * | 1987-09-09 | 1989-03-16 | ||
| JPH045367A (en) * | 1990-04-20 | 1992-01-09 | Shimizu Corp | Lift type formwork and forming method using same |
| JPH05124023A (en) * | 1991-08-07 | 1993-05-21 | Mitsubishi Heavy Ind Ltd | Formwork device |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0931997A (en) * | 1995-07-18 | 1997-02-04 | Akito Nagano | Inner form device for form for caisson |
Also Published As
| Publication number | Publication date |
|---|---|
| JP3000790B2 (en) | 2000-01-17 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN115182269A (en) | Method for assembling ultrahigh pier large-section heavy hydraulic creeping formwork in multiple times | |
| CN118815132B (en) | Light steel platform formwork and construction method thereof | |
| JP5003253B2 (en) | RC beam construction method | |
| JPH0610358A (en) | Caisson construction method and caisson construction form device | |
| KR101748781B1 (en) | Precast wall structure construction method | |
| JPH06129108A (en) | Formwork assembly equipment | |
| JP2829363B2 (en) | Formwork equipment for pillar construction | |
| JP3425352B2 (en) | Self-elevating formwork device | |
| JP2620687B2 (en) | Construction method of culvert by movable formwork | |
| JPH1018296A (en) | Inner formwork for caisson construction and its lift-up device | |
| JP2997843B2 (en) | Construction method | |
| JPH0657710A (en) | Construction of concrete main tower | |
| CN223135660U (en) | A flat floor forming structure that is easy to disassemble and assemble | |
| JP2777516B2 (en) | Construction method of high-rise structure | |
| JP3985212B2 (en) | Transportation scaffold and caisson construction method | |
| JPH08105229A (en) | How to build a building | |
| CN223115500U (en) | Water treatment filter plate batch prefabrication device | |
| JPS6347244Y2 (en) | ||
| JP3225455B2 (en) | How to build a building | |
| JP3125205B2 (en) | Construction method of temporary side wall | |
| JPH0533628Y2 (en) | ||
| JPH02157325A (en) | Construction of continuous footing concrete with footing part and sacrificial formwork used therefor | |
| JPH046449Y2 (en) | ||
| JPH01190877A (en) | Concrete column forming method | |
| JP4185229B2 (en) | Concrete stand |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| LAPS | Cancellation because of no payment of annual fees |