JPH0612101A - Control device of equipment - Google Patents

Control device of equipment

Info

Publication number
JPH0612101A
JPH0612101A JP4169197A JP16919792A JPH0612101A JP H0612101 A JPH0612101 A JP H0612101A JP 4169197 A JP4169197 A JP 4169197A JP 16919792 A JP16919792 A JP 16919792A JP H0612101 A JPH0612101 A JP H0612101A
Authority
JP
Japan
Prior art keywords
time
time data
day
days
mode
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP4169197A
Other languages
Japanese (ja)
Inventor
Katsumi Morito
克美 森戸
Yuichi Yoshizawa
勇一 吉澤
Tadashi Yamaguchi
正 山口
Hiroshi Ito
博司 伊藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sanyo Electric Co Ltd
Original Assignee
Sanyo Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sanyo Electric Co Ltd filed Critical Sanyo Electric Co Ltd
Priority to JP4169197A priority Critical patent/JPH0612101A/en
Publication of JPH0612101A publication Critical patent/JPH0612101A/en
Pending legal-status Critical Current

Links

Landscapes

  • Feedback Control In General (AREA)

Abstract

PURPOSE:To reduce the power consumption for a preparation operation by performing the preparation operation according to the using state of a user and further to prevent the handleability of the user from being impaired by enabling the coping with a sudden use, in an equipment performing the preparation operation for an ON mode when an on and off switch is turned on during an OFF mode when the on and off switch such as an operation switch, etc., is turned off. CONSTITUTION:In a microcomputer 15, a data preservation means 23 preserving the operation time data of plural days and a control means 24 controlling the preparation operation in the OFF mode of required time by defining these time data as a reference are incorporated. The control means 24 is constituted to process the time data of new days by regarding it as more important than the time data of old days, of the time data of plural days in the data preservation means.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、入切スイッチが
「切」のときのオフモード中に入切スイッチが「入」の
ときのオンモードのための準備動作を行う機器、例え
ば、液体燃料を電気ヒータで気化する気化器を有し、こ
の気化器をオフモード中に予熱する温風暖房機、給湯機
等の燃焼機器や、運転停止中に圧縮機を低回転数で運転
させたり、冷媒を電気ヒータで予熱することにより運転
開始と同時に冷風や温風を出せるようにした空気調和機
や、オフモード中にブラウン管を予熱しておき、スイッ
チの投入と同時に画像が見られるようにしたテレビジョ
ン機器などに利用される機器の制御装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a device for performing a preparatory operation for an on mode when an on / off switch is "on" during an off mode when the on / off switch is "off". Has a vaporizer for vaporizing with an electric heater, a hot air heater that preheats the vaporizer during the off mode, a combustion device such as a water heater, or operating the compressor at a low rotation speed during an operation stop, An air conditioner that can generate cold air or warm air at the same time as starting operation by preheating the refrigerant with an electric heater, or preheat the cathode ray tube during the off mode so that the image can be viewed at the same time as the switch is turned on. The present invention relates to a control device for equipment used in television equipment and the like.

【0002】[0002]

【従来の技術】従来、燃焼機器では、例えば特開昭62
−46124号公報に記載されているように、燃焼中は
気化器の温度が液体燃料の気化温度以上になるように電
気ヒータを通電制御し、ガス化燃焼を行えるようにして
いる。また、燃焼停止中も、予熱スイッチを投入すれ
ば、気化器の温度を燃焼時の温度よりも低い温度に維持
し、運転スイッチの投入後、速やかにガス化燃焼を行え
るようにした制御装置を備えている。
2. Description of the Related Art Conventionally, for example, Japanese Patent Application Laid-Open No. Sho 62-62
As described in JP-A-46124, the electric heater is energized and controlled so that the temperature of the vaporizer becomes equal to or higher than the vaporization temperature of the liquid fuel during the combustion, so that the gasification combustion can be performed. Also, even when combustion is stopped, if the preheat switch is turned on, the temperature of the carburetor will be maintained at a temperature lower than the temperature at the time of combustion, and after the operation switch is turned on, a control device that can quickly perform gasification combustion can be installed. I have it.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、上述し
た燃焼機器の制御装置では、運転スイッチがオフとなる
運転停止中(オフモード中)に、予熱スイッチを投入す
ると、気化器が常に所定の温度で加熱されるため、次の
燃焼開始までに時間がある場合には、電力が無駄に消費
され、大変不経済であった。
However, in the above-described control device for the combustion equipment, when the preheat switch is turned on while the operation switch is off (in the off mode), the carburetor always keeps a predetermined temperature. Since it is heated, if there is a time until the start of the next combustion, electric power is wasted, which is very uneconomical.

【0004】そこで、機器の複数日の運転時間データを
保存しておき、これらの時間データを基準として所要時
間オフモードでの準備動作を制御するようにすれば、機
器が良く使われる時間帯に準備動作を行わせることがで
きる。ところが、この場合、ある日、突発的にある時間
帯に機器を使用し、次の日、同じ時間帯に機器を使用し
ようとしても、前日のその時間データは然程重要視され
ないため、その時間帯に準備動作が行うことができなか
った。すなわち、その時間帯のデータが何日分か蓄積さ
れないと、準備動作が行われない欠点があった。
Therefore, if the operating time data of a plurality of days of the equipment is stored and the preparatory operation in the required time off mode is controlled on the basis of these time data, the equipment can be used in a time zone in which it is often used. A preparatory operation can be performed. However, in this case, even if you try to use the device suddenly on a certain time zone on one day and try to use the device on the same day on the next day, the time data of the previous day is not so important, so that time The preparatory action on the belt could not be performed. That is, there is a drawback that the preparatory operation is not performed unless the data for that time period is accumulated for several days.

【0005】この発明は上述した事実に鑑みてなされた
ものであり、運転スイッチ等の入切スイッチが「切」の
ときのオフモード中に入切スイッチが「入」のときのオ
ンモードのための準備動作を行う機器において、使用者
の使用状況に応じて準備動作が行われるようにして準備
動作のための電力消費を低減させるようにし、さらに
は、突発的な使用にも対応できるようして使用者の使い
勝手を損わないようにすることを目的とする。
The present invention has been made in view of the above-mentioned fact, and is for the on mode when the on / off switch is "on" during the off mode when the on / off switch such as the operation switch is "off". In the equipment that performs the preparatory action, the preparatory action is performed according to the user's usage situation so that the power consumption for the preparatory action is reduced, and further, it is possible to cope with sudden use. It is intended to prevent the user's usability from being deteriorated.

【0006】[0006]

【課題を解決するための手段】この発明では、入切スイ
ッチが「切」のときのオフモード中に入切スイッチが
「入」のときのオンモードのための準備動作を行う機器
において、機器の複数日の運転時間データを保存するデ
ータ保存手段と、これらの時間データを基準として所要
時間オフモードでの準備動作を制御する制御手段とを備
え、この制御手段がデータ保存手段の複数日の時間デー
タのうち、新しい日の時間データを古い日の時間データ
よりも重要視して処理するように構成されている。
According to the present invention, there is provided a device for performing a preparatory operation for an on mode when an on / off switch is "on" during an off mode when the on / off switch is "off". Data storage means for storing the operating time data of a plurality of days, and control means for controlling the preparatory operation in the required time off mode on the basis of these time data. Of the time data, the time data of the new day is configured to be processed with a higher priority than the time data of the old day.

【0007】また、この発明では、入切スイッチが
「切」のときのオフモード中に入切スイッチが「入」の
ときのオンモードのための準備動作を行う機器におい
て、機器の複数日の運転時間データを保存するデータ保
存手段と、これらの時間データを基準として所要時間オ
フモードでの準備動作を制御する制御手段とを備え、デ
ータ保存手段の複数日の時間データのうち、新しい日の
時間データには古い日の時間データよりも大きな重みが
付与されている構成である。
Further, according to the present invention, in a device that performs a preparatory operation for an on mode when the on / off switch is "on" during an off mode when the on / off switch is "off", The data storage means for storing the operating time data and the control means for controlling the preparation operation in the required time off mode on the basis of these time data are provided. The time data is given a greater weight than the time data of the old days.

【0008】[0008]

【作用】このように構成すると、データ保存手段に保存
された複数日の時間データを基準として、所要時間オフ
モードでの準備動作が行われるので、使用者の使用状況
に応じた準備動作が行われるようにしながら、準備動作
のための電力消費を極力低減させることが可能である。
しかも、制御手段では、データ保存手段の複数日の時間
データのうち、新しい日の時間データが古い日の時間デ
ータよりも重要視して処理されるので、ある日、突然に
使用状況が変化しても、翌日、その使用状況にあった準
備動作を行わせることができ、使い勝手に優れている。
請求項2に記載のものについても同様である。
With this configuration, the preparatory operation in the required time off mode is performed on the basis of the time data of a plurality of days stored in the data storage means, so that the preparatory operation according to the usage status of the user is performed. It is possible to reduce the power consumption for the preparatory operation as much as possible.
Moreover, in the control means, the time data of the new day among the time data of the plurality of days of the data storage means is processed more importantly than the time data of the old day, so that the usage status suddenly changes one day. Even so, the next day, it is possible to perform a preparatory operation suitable for the usage situation, which is excellent in usability.
The same applies to the second aspect.

【0009】[0009]

【実施例】以下、この発明を、液体燃料を電気ヒータで
気化して燃焼させるバーナを有し、このバーナの気化部
をオフモード中に予熱する石油ファンヒータに適用した
実施例について、図面を参照して説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of the present invention applied to a petroleum fan heater having a burner for vaporizing and burning liquid fuel with an electric heater and preheating the vaporizing portion of the burner during the off mode are described with reference to the drawings. It will be described with reference to FIG.

【0010】図2及び図3は石油ファンヒータを示すも
のである。図2及び3において、1は石油ファンヒータ
の外装ケースであり、外装ケース1の背面にはエアフィ
ルター2を有する空気吸込口3が設けられ、前面には温
風吹出口4が設けられている。外装ケース1の内部には
空気吸込口3に臨ませた温風用送風機5が設けられると
ともに、カートリッジタンク6、油受けタンク7、燃料
ポンプ8、燃焼用送風機9、バーナ10、燃焼筒11、
送風案内ケース12及び制御装置13等が設けられてい
る。また、14は外装ケース1の上面に設けられた操作
パネルである。
2 and 3 show an oil fan heater. 2 and 3, reference numeral 1 denotes an exterior case of an oil fan heater. The exterior case 1 is provided with an air suction port 3 having an air filter 2 on its rear surface and a warm air outlet 4 on its front surface. A warm air blower 5 facing the air suction port 3 is provided inside the outer case 1, and a cartridge tank 6, an oil receiving tank 7, a fuel pump 8, a combustion blower 9, a burner 10, a combustion cylinder 11,
A blower guide case 12, a control device 13 and the like are provided. Further, 14 is an operation panel provided on the upper surface of the outer case 1.

【0011】図1は上述した制御装置13の基本構成を
示すものである。図1において、15はA/D変換器及
び時計装置を内蔵したマイクロコンピュータ(以下、マ
イコンという)であり、マイコン15の入力側には運転
スイッチ16、温度設定器17、室温センサ18、バー
ナ10の気化部の温度を検出するバーナ温度センサ19
及び炎検知器FLが接続されている。
FIG. 1 shows the basic configuration of the control device 13 described above. In FIG. 1, reference numeral 15 is a microcomputer (hereinafter, referred to as a microcomputer) having an A / D converter and a timepiece device built therein. Burner temperature sensor 19 for detecting the temperature of the vaporization part of
And a flame detector FL are connected.

【0012】また、マイコン15の出力側にはバーナ1
0の気化部を加熱する電気ヒータ20、点火器21、燃
焼用送風機9を駆動するバーナモータ9M、燃料ポンプ
8、温風用送風機5を駆動するファンモータ5M、及び
室温や設定温度を表示するデジタル表示器22が接続さ
れている。Rはバーナモータ9Mの回転数を検出する回
転数検知器であり、回転数検知器Rの回転数信号はマイ
コン15に入力されている。尚、運転スイッチ16、温
度設定器17、及びデジタル表示器22は操作パネル1
4に設けられている。また、ファンモータ5M及びバー
ナモータ9Mには隈取りモータ等の交流モータを用いて
いる。
A burner 1 is provided on the output side of the microcomputer 15.
An electric heater 20 for heating the vaporization part of 0, an igniter 21, a burner motor 9M for driving the blower 9 for combustion, a fuel pump 8, a fan motor 5M for driving the blower 5 for warm air, and a digital display for displaying the room temperature and the set temperature. The display 22 is connected. R is a rotation speed detector that detects the rotation speed of the burner motor 9M, and the rotation speed signal of the rotation speed detector R is input to the microcomputer 15. The operation switch 16, the temperature setter 17, and the digital display 22 are the operation panel 1
4 is provided. Further, AC motors such as a shading motor are used for the fan motor 5M and the burner motor 9M.

【0013】運転スイッチ16が投入されると、マイコ
ン15は図4に示すように、まず電気ヒータ20に通電
し、バーナ10の気化部を加熱する。そして、バーナ温
度センサ19の検出温度が灯油の気化に適した温度にな
り、予熱が完了すると、マイコン15はバーナモータ9
Mを作動させ、バーナ10のプリパージを行う。プリパ
ージが終了すると、マイコン15は所定時間点火器21
を作動させるとともに、温風用送風機5を駆動するファ
ンモータ5Mと燃料ポンプ8を始動させる。
When the operation switch 16 is turned on, the microcomputer 15 first energizes the electric heater 20 to heat the vaporizing portion of the burner 10, as shown in FIG. Then, when the temperature detected by the burner temperature sensor 19 reaches a temperature suitable for vaporizing kerosene and the preheating is completed, the microcomputer 15 causes the burner motor 9
The burner 10 is pre-purged by operating M. When the prepurge is completed, the microcomputer 15 causes the igniter 21 to perform a predetermined time.
And the fan motor 5M for driving the warm air blower 5 and the fuel pump 8 are started.

【0014】このようにして、バーナ10に燃焼用空気
及び燃料(灯油)が供給されると、燃料は気化され、燃
焼用空気と混合された後、点火器21にて着火される。
マイコン15は炎検知器FLからの信号で着火と判断す
ると、温度設定器17による設定温度と室温センサ18
が検出した室温との温度差に応じてバーナ10での燃焼
量を設定し、この燃焼量が得られるようにバーナモータ
9Mの回転数を制御するとともに、燃料ポンプ8の周波
数を制御する。また、燃焼量に見合った温風量が得られ
るように送風機5(ファンモータ5M)の回転数制御を
行う(図5及び6参照)。
In this way, when the combustion air and the fuel (kerosene) are supplied to the burner 10, the fuel is vaporized, mixed with the combustion air, and then ignited by the igniter 21.
When the microcomputer 15 determines that ignition has occurred with the signal from the flame detector FL, the temperature set by the temperature setter 17 and the room temperature sensor 18
The combustion amount in the burner 10 is set in accordance with the temperature difference from the room temperature detected by, and the rotation speed of the burner motor 9M is controlled so as to obtain this combustion amount, and the frequency of the fuel pump 8 is controlled. In addition, the rotation speed of the blower 5 (fan motor 5M) is controlled so that the amount of warm air corresponding to the amount of combustion is obtained (see FIGS. 5 and 6).

【0015】マイコン15は、運転スイッチ16がオフ
となる暖房運転停止中に次のような準備動作(バーナ1
0の気化部の予熱制御)を行う。すなわち、マイコン1
5には、機器の例えば、数日間(1例として4日間)の
運転開始時刻、運転停止時刻等の運転時間データを保存
するデータ保存手段23と、その保存時間データを基準
として所要時間オフモードでの準備動作を制御する準備
動作制御手段24とが設けられている。
The microcomputer 15 performs the following preparatory operation (burner 1) during the heating operation stoppage in which the operation switch 16 is turned off.
0 vaporization part preheating control) is performed. That is, the microcomputer 1
Reference numeral 5 denotes a data storage means 23 for storing, for example, operation time data such as operation start time and operation stop time for several days (for example, four days), and a required time off mode based on the storage time data. There is provided a preparatory movement control means 24 for controlling the preparatory movement.

【0016】準備動作制御手段24は、図7ないし図1
0に示すように、データ保存手段23に保存されている
4日間の時間データと現在時刻とを次のように比較し、
現在時刻がこれらの時間データによって決まる予熱制御
時間帯にある場合には、電気ヒータ20に通電を行い、
バーナ10の気化部を所定の温度に予熱しておく。すな
わち、図8の例では、データ保存手段23に4日分の時
間データが保存されており、準備動作制御手段24は、
図9及び図10に示すように、前日の時間データを最重
要視しながら前4日間の時間データを処理することによ
って、当日の運転時間を予想する。
The preparatory movement control means 24 is shown in FIGS.
As shown in 0, the time data for four days stored in the data storage means 23 is compared with the current time as follows,
When the current time is in the preheating control time zone determined by these time data, the electric heater 20 is energized,
The vaporizing part of the burner 10 is preheated to a predetermined temperature. That is, in the example of FIG. 8, the time data for four days is stored in the data storage means 23, and the preparation operation control means 24 is
As shown in FIGS. 9 and 10, the driving time of the day is predicted by processing the time data of the previous four days while giving the most importance to the time data of the previous day.

【0017】例えば、データ保存手段23の(N−3)
日からN日までの時間データが図11の実線で示すよう
になっている場合、準備動作制御手段24は(N−1)
日の7:10の運転開始時間を、その翌日の運転開始時
間が7:00であることから、これを7:00に変更す
る(矢印イ参照)。同様に、(N−1)日の運転停止時
間9:30はN日のそれが10:00であるため、1
0:00に変更される(矢印ロ参照)。(N−2)日の
運転停止時間9:00は(N−1)日のそれが10:0
0に変更されたので、10:00となる。(矢印ハ参
照)。(N−3)日についても同様である。
For example, (N-3) of the data storage means 23
When the time data from the day to the Nth day is as shown by the solid line in FIG. 11, the preparatory movement control means 24 is (N-1).
The operation start time of 7:10 on the day is changed to 7:00 because the operation start time of the next day is 7:00 (see arrow B). Similarly, the operation stop time 9:30 on the (N-1) th day is 10:00 because it is 10:00 on the Nth day.
It is changed to 0:00 (see arrow B). The operation stop time 9:00 on (N-2) days is 10: 0 on the (N-1) days.
Since it was changed to 0, it will be 10:00. (See arrow c). The same applies to the (N-3) day.

【0018】また、(N−3)日〜(N−1)日におい
ては、12:00〜12:30の時間帯の時間データは
ないが、N日に12:00〜12:30の時間データが
あるので、それぞれ12:00〜12:30の時間デー
タがあるものとみなされる(矢印ニ参照)。さらに、
(N−1)日の18:30の時間データはN日の19:
00の時間データより小さいので、そのままとなり、
(N−2)日の18:00の時間データも(N−1)日
の18:30より小さいのでそのままとなり、(N−
3)日についても同様である。このようにすると、図9
及び図10に示すような当日の予想運転時間が決まる。
[0018] In the (N-3) th day to the (N-1) th day, there is no time data for the time zone of 12:00 to 12:30, but the time of 12:00 to 12:30 on the Nth day. Since there is data, it is considered that there is time data of 12:00 to 12:30 (see arrow D). further,
Time data for 18:30 on (N-1) day is 19:
Since it is smaller than the time data of 00, it remains as it is,
Since the time data of 18:00 on the (N-2) day is also smaller than 18:30 on the (N-1) day, it remains unchanged and becomes (N-
3) The same applies to the day. If this is done, FIG.
And the expected operating time of the day as shown in FIG. 10 is determined.

【0019】このような処理を具体的に行うには、図1
2に示すように、当日、例えば、(N+1)日の現在時
刻とN日〜(N−3)日の各時間データとの偏差を用い
る。まず、時刻A(5時)において、N日の時間データ
(運転開始時刻及び運転停止時刻)との偏差ΔTを求
め、さらに、それらの最小偏差MINΔTを求めると、
数1のように2時間となる。
To concretely perform such processing, FIG.
As shown in 2, the deviation between the current time, for example, the current time on the (N + 1) th day and each time data on the Nth day to the (N-3) th day is used. First, at time A (5 o'clock), the deviation ΔT from the time data of N days (operation start time and operation stop time) is obtained, and further, the minimum deviation MINΔT thereof is obtained.
It will be 2 hours like the number 1.

【0020】[0020]

【数1】 [Equation 1]

【0021】次に、(N−1)日についての最小偏差M
INΔTを求めると、数2のように2.1時間となる。
ところが、(N−1)日の最小偏差2.1時間はN日の
2時間よりも大きいので、N日、(N−1)日両日の最
小偏差は2時間のままとなる。
Next, the minimum deviation M for (N-1) days
When INΔT is calculated, it becomes 2.1 hours as shown in Equation 2.
However, since the minimum deviation of 2.1 hours on (N-1) days is larger than 2 hours on N days, the minimum deviation on both N days and (N-1) days remains 2 hours.

【0022】[0022]

【数2】 [Equation 2]

【0023】次に、(N−2)日、(N−3)日につい
ても、同様に最小偏差MINΔTを求め、翌日の最小偏
差MINΔTと比較し、小さい最小偏差MINΔTを採
用していくと、時刻AにおけるN日〜(N−3)日の各
時間データとの最小偏差MINΔTはN日のデータが重
要視され、2時間となる。
Next, on the (N-2) th day and the (N-3) th day, the minimum deviation MINΔT is similarly obtained, and compared with the minimum deviation MINΔT of the next day, and the smaller minimum deviation MINΔT is adopted. The minimum deviation MINΔT from the time data of N days to (N−3) days at time A is 2 hours because the data of N days is considered important.

【0024】また、時刻B(11時)において、N日と
(N−1)日の最小偏差MINΔTは数3、数4で求め
られ、両日の最小偏差MINΔTが1時間となる。
Further, at time B (11:00), the minimum deviation MINΔT on the Nth day and the (N-1) th day is obtained by the equations 3 and 4, and the minimum deviation MINΔT on both days is 1 hour.

【0025】[0025]

【数3】 [Equation 3]

【0026】[0026]

【数4】 [Equation 4]

【0027】次に、(N−2)日、(N−3)日につい
ても、同様に最小偏差MINΔTを求め、翌日の最小偏
差MINΔTと比較し、小さい最小偏差MINΔTを採
用していくと、時刻AにおけるN日〜(N−3)日の各
時間データとの最小偏差MINΔTはN日のデータが重
要視され、1時間となる。
Next, on the (N-2) th day and the (N-3) th day, the minimum deviation MINΔT is similarly obtained, compared with the minimum deviation MINΔT on the next day, and the smaller minimum deviation MINΔT is adopted. The minimum deviation MINΔT from the time data of N days to (N−3) days at time A is one hour because the data of N days is considered important.

【0028】このようにすると、図11の実線で示す時
間データがあたかも破線で示す時間データに書き換えら
れたようになり、新しい日の時間データが古い日の時間
データよりも重要視されながら、当日の予想運転時間が
決定され、予熱制御時間帯が設定される。
In this way, the time data shown by the solid line in FIG. 11 is rewritten to the time data shown by the broken line, and the time data of the new day is regarded as more important than the time data of the old day, The expected operating time of is determined and the preheating control time zone is set.

【0029】準備動作制御手段24は現在時刻がこの予
想運転時間内にあるとき、若しくは、図13に示すよう
に、現在時刻が予想運転開始時刻の所定時間α(例えば
1時間)前から予想運転停止時刻の所定時間β(例えば
1時間)後までの予熱制御時間帯にあるときに、機器の
準備動作(バーナ10の気化部の予熱制御)を行う。例
えば、上述した時刻Aでは、予想運転開始時刻の2時間
前であるから、予熱運転は行われず、1時間後の時刻A
´に予熱運転が開始する。また、時刻Bでは、次の予想
運転開始時刻の1時間前であるから、予熱運転が行われ
ることになる。所定時間α,βは0.5時間、1時間、
または1.5時間等、適宜選択可能にしても良く、その
値を室温、外気温度、時間帯、季節等に応じて自動的に
変化させても良い。
The preparatory operation control means 24 determines whether the present time is within the expected operation time, or as shown in FIG. The preparatory operation of the equipment (preheating control of the vaporization section of the burner 10) is performed during the preheating control time period up to a predetermined time β (for example, 1 hour) after the stop time. For example, at the above-mentioned time A, since it is two hours before the expected operation start time, the preheating operation is not performed, and the time A is one hour later.
The preheating operation starts in ´. Further, at time B, since it is one hour before the next predicted operation start time, the preheating operation is performed. Predetermined time α, β is 0.5 hours, 1 hour,
Alternatively, it may be appropriately selectable such as 1.5 hours, and the value may be automatically changed according to room temperature, outside air temperature, time zone, season and the like.

【0030】なお、上述した予想運転時間の決定に当っ
て各日の最小偏差MINΔTに重み付けし、それらの加
重平均値を取ることによってある時刻におけるN日〜
(N−3)日間の偏差時間を求め、この偏差時間に応じ
て予想運転時間を決定し、予熱制御時間帯を設定しても
よい。例えば、上述した時刻Bの場合には、各日の重み
を表1のように設定すると、加重平均値は数5に示すよ
うに1.5時間となり、重み付けしない単純平均値の
1.625時間より小さくなる。このことは、新しい日
の時間データが古い日の時間データよりも重要視されて
予想運転時間が決定され、予熱制御時間帯が設定される
ことを意味している。
In determining the expected operating time, the minimum deviation MINΔT of each day is weighted, and the weighted average value thereof is taken to calculate N days at a certain time.
The deviation time for (N-3) days may be obtained, the expected operating time may be determined according to the deviation time, and the preheating control time zone may be set. For example, in the case of the above-mentioned time B, if the weight of each day is set as shown in Table 1, the weighted average value becomes 1.5 hours as shown in Formula 5, and the weighted average value is 1.625 hours of the simple average value. It gets smaller. This means that the time data of the new day is more important than the time data of the old day to determine the expected operation time, and the preheat control time zone is set.

【0031】[0031]

【表1】 [Table 1]

【0032】[0032]

【数5】 [Equation 5]

【0033】[0033]

【数6】 [Equation 6]

【0034】また、マイコン15の入力側に指示スイッ
チ(図示せず)を設け、この指示スイッチが投入されて
いないときは準備動作制御手段24がデータ保存手段2
3の複数日の時間データを同等の重みで扱って予熱制御
時間帯を設定するようにし、指示スイッチが投入されて
いるときは上述したような重み付けをして予熱制御時間
帯を設定するか、あるいは、最も新しい日の時間データ
のみを基準にして予熱制御時間帯を設定するようにして
も良い。
An instruction switch (not shown) is provided on the input side of the microcomputer 15, and when this instruction switch is not turned on, the preparatory operation control means 24 causes the data storage means 2 to operate.
The preheating control time zone is set by treating the time data of plural days 3 with equal weights, and when the instruction switch is turned on, the preheating control time zone is set by weighting as described above, or Alternatively, the preheat control time zone may be set based only on the time data of the latest date.

【0035】さらにまた、準備動作制御手段24を図1
4に示すようなニューラルネット構成とし、新しい日の
時間データを古い日の時間データよりも重要視して得ら
れる最小偏差時間データを、現在時刻、室温等のデータ
とともにニューラルネットに入力して予熱制御の要否を
予測し、予熱制御時間帯を設定したり、或いは、上述し
たデータをファジィ推論して予熱制御時間帯を設定する
ようにしても良い。
Furthermore, the preparatory movement control means 24 is shown in FIG.
With the neural network configuration shown in Fig. 4, the minimum deviation time data obtained by giving more importance to the time data of the new day than the time data of the old day is input to the neural network together with the data such as the current time and room temperature, and preheated. The necessity of control may be predicted and the preheat control time zone may be set, or the preheat control time zone may be set by fuzzy inference of the above data.

【0036】[0036]

【発明の効果】この発明は以上説明したように、入切ス
イッチが「切」のときのオフモード中に入切スイッチが
「入」のときのオンモードのための準備動作を行う機器
において、データ保存手段に保存された複数日の時間デ
ータを基準として、所要時間オフモードでの準備動作が
行われるようにしたので、使用者の使用状況に応じた準
備動作が行われるようにしながら、準備動作のための電
力消費を極力低減させることができ、しかも、データ保
存手段の複数日の時間データのうち、新しい日の時間デ
ータが古い日の時間データよりも重要視して処理される
ので、ある日、突然に使用状況が変化しても、翌日、そ
の使用状況にあった準備動作を行わせることができ、使
い勝手に優れたものである。また、請求項2に記載のも
のについても同様である。
As described above, according to the present invention, in an apparatus that performs a preparatory operation for an on mode when the on / off switch is "on" during an off mode when the on / off switch is "off", Since the preparatory operation in the required time off mode is performed based on the time data of multiple days stored in the data storage means, the preparatory operation according to the usage status of the user is performed while the preparation operation is performed. It is possible to reduce the power consumption for operation as much as possible, and moreover, among the time data of a plurality of days of the data storage means, the time data of the new day is processed with a higher priority than the time data of the old day. Even if the usage situation suddenly changes one day, the preparation operation suitable for the usage situation can be performed the next day, which is excellent in usability. The same applies to the second aspect.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明の一実施例を示す石油ファンヒータ
(機器)の制御装置を示すブロック図である。
FIG. 1 is a block diagram showing a control device for an oil fan heater (apparatus) showing an embodiment of the present invention.

【図2】同じく石油ファンヒータの斜視図である。FIG. 2 is a perspective view of the oil fan heater.

【図3】同じく石油ファンヒータの内部構造説明図であ
る。
FIG. 3 is an explanatory diagram of the internal structure of the oil fan heater.

【図4】制御装置のマイクロコンピュータの運転中にお
ける動作説明用のフローチャートである。
FIG. 4 is a flowchart for explaining an operation during operation of the microcomputer of the control device.

【図5】マイクロコンピュータの燃焼量制御特性を示す
説明図である。
FIG. 5 is an explanatory diagram showing a combustion amount control characteristic of a microcomputer.

【図6】マイクロコンピュータの送風機制御特性を示す
説明図である。
FIG. 6 is an explanatory diagram showing blower control characteristics of the microcomputer.

【図7】マイクロコンピュータの運転停止中における動
作説明用のフローチャートである。
FIG. 7 is a flowchart for explaining an operation when the microcomputer is out of operation.

【図8】データ保存手段23の時間データの1例を示す
説明図である。
FIG. 8 is an explanatory diagram showing an example of time data in a data storage unit 23.

【図9】時間データから得られた予想運転時間の1例を
示す説明図である。
FIG. 9 is an explanatory diagram showing an example of expected operating time obtained from time data.

【図10】時間データから得られた予想運転時間の他の
1例を示す説明図である。
FIG. 10 is an explanatory diagram showing another example of the expected operation time obtained from time data.

【図11】準備動作制御手段24による時間データの処
理例を示す説明図である。
FIG. 11 is an explanatory diagram showing a processing example of time data by the preparation operation control means 24.

【図12】準備動作制御手段24による時間データの具
体的な処理例を示す説明図である。
FIG. 12 is an explanatory diagram showing a specific processing example of time data by the preparation operation control means 24.

【図13】予想運転時間と予熱制御時間帯との関係を示
す説明図である。
FIG. 13 is an explanatory diagram showing a relationship between an expected operation time and a preheating control time zone.

【図14】準備動作制御手段24の内部構成例を示すブ
ロック図である。
FIG. 14 is a block diagram showing an internal configuration example of a preparation operation control means 24.

【符号の説明】[Explanation of symbols]

15 マイクロコンピュータ 16 運転スイッチ(入切スイッチ) 23 データ保存手段 24 準備動作制御手段(制御手段) 15 Microcomputer 16 Operation Switch (On / Off Switch) 23 Data Storage Means 24 Preparatory Operation Control Means (Control Means)

───────────────────────────────────────────────────── フロントページの続き (72)発明者 伊藤 博司 大阪府守口市京阪本通2丁目18番地 三洋 電機株式会社内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Hiroshi Ito 2-18 Keihan Hondori, Moriguchi City, Osaka Sanyo Electric Co., Ltd.

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 入切スイッチが「切」のときのオフモー
ド中に入切スイッチが「入」のときのオンモードのため
の準備動作を行う機器において、機器の複数日の運転時
間データを保存するデータ保存手段と、これらの時間デ
ータを基準として所要時間オフモードでの準備動作を制
御する制御手段とを備え、この制御手段はデータ保存手
段の複数日の時間データのうち、新しい日の時間データ
を古い日の時間データよりも重要視して処理するように
構成されていることを特徴とする機器の制御装置。
1. A device that performs a preparatory operation for an on-mode when the on / off switch is "on" during an off mode when the on / off switch is "off" The data storage means for storing and the control means for controlling the preparation operation in the required time off mode on the basis of these time data are provided. A device control device configured to process time data with a higher priority than time data of an old day.
【請求項2】 入切スイッチが「切」のときのオフモー
ド中に入切スイッチが「入」のときのオンモードのため
の準備動作を行う機器において、機器の複数日の運転時
間データを保存するデータ保存手段と、これらの時間デ
ータを基準として所要時間オフモードでの準備動作を制
御する制御手段とを備え、データ保存手段の複数日の時
間データのうち、新しい日の時間データには古い日の時
間データよりも大きな重みが付与されていることを特徴
とする機器の制御装置。
2. A device that performs a preparatory operation for an on mode when the on / off switch is "on" during an off mode when the on / off switch is "off" The data storage means for storing and the control means for controlling the preparation operation in the required time off mode on the basis of these time data are provided. A device control device characterized by being given a greater weight than the time data of the old days.
JP4169197A 1992-06-26 1992-06-26 Control device of equipment Pending JPH0612101A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4169197A JPH0612101A (en) 1992-06-26 1992-06-26 Control device of equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4169197A JPH0612101A (en) 1992-06-26 1992-06-26 Control device of equipment

Publications (1)

Publication Number Publication Date
JPH0612101A true JPH0612101A (en) 1994-01-21

Family

ID=15882014

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4169197A Pending JPH0612101A (en) 1992-06-26 1992-06-26 Control device of equipment

Country Status (1)

Country Link
JP (1) JPH0612101A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4853734A (en) * 1986-12-26 1989-08-01 Canon Kabushiki Kaisha Disposition of a flexible printed circuit board in a camera

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4853734A (en) * 1986-12-26 1989-08-01 Canon Kabushiki Kaisha Disposition of a flexible printed circuit board in a camera

Similar Documents

Publication Publication Date Title
JPH0771747A (en) Starting method of heating apparatus
US7195010B2 (en) Space heater
JP3423009B2 (en) Equipment control device
JP3423010B2 (en) Equipment control device
JP2522072B2 (en) heater
JPH0861664A (en) Combustion control device
JP3296586B2 (en) Equipment control device
JPH0628013A (en) Equipment controller
JP2599025B2 (en) Combustion control device
JP2845776B2 (en) Combustion equipment control apparatus and method
JPH05240974A (en) Controlling device for machinery and apparatus
JP3143178B2 (en) Equipment control device
KR100330393B1 (en) Hot air heater
JPH0861662A (en) Combustion controller and combustion controlling method
JP3370858B2 (en) Burner control device for vaporized oil combustor
JP2951022B2 (en) Combustor control device
JPH11248252A (en) Heating system
JP3346162B2 (en) Liquid fuel combustion control device
JPH05332615A (en) Hot air heater
JP2001174067A (en) heater
JP3148313B2 (en) Liquid fuel combustion device
JPH05250006A (en) Controller for equipment
JP2000111167A (en) heater
JPH10332140A (en) Liquid fuel combustion equipment
JPH10504887A (en) Apparatus for supplying air / fuel mixture to a complete premix burner

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040629

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Effective date: 20050201

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050301

R150 Certificate of patent (=grant) or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 4

Free format text: PAYMENT UNTIL: 20090311

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100311

Year of fee payment: 5

LAPS Cancellation because of no payment of annual fees