JPH0615960Y2 - Dredge bucket - Google Patents

Dredge bucket

Info

Publication number
JPH0615960Y2
JPH0615960Y2 JP1986196546U JP19654686U JPH0615960Y2 JP H0615960 Y2 JPH0615960 Y2 JP H0615960Y2 JP 1986196546 U JP1986196546 U JP 1986196546U JP 19654686 U JP19654686 U JP 19654686U JP H0615960 Y2 JPH0615960 Y2 JP H0615960Y2
Authority
JP
Japan
Prior art keywords
rope
upper frame
ropes
suspension
opening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1986196546U
Other languages
Japanese (ja)
Other versions
JPS63100482U (en
Inventor
雅人 仲沢
Original Assignee
株式会社光栄鉄工所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社光栄鉄工所 filed Critical 株式会社光栄鉄工所
Priority to JP1986196546U priority Critical patent/JPH0615960Y2/en
Publication of JPS63100482U publication Critical patent/JPS63100482U/ja
Application granted granted Critical
Publication of JPH0615960Y2 publication Critical patent/JPH0615960Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Description

【考案の詳細な説明】 産業上の利用分野 本考案は浚渫用バケットに関し、特にはシェル部の開閉
ロープと全体の吊支ロープを上部フレームの上面におい
て同一線上に配置させることにより、ロープの張力差を
なくし、その耐久性を向上せしめ、又より大容量の浚渫
機能を保持することができるようにしたものである。
TECHNICAL FIELD The present invention relates to a dredging bucket, and in particular, by arranging the shell opening / closing rope and the entire suspension support rope on the same line on the upper surface of the upper frame, the rope tension is increased. The difference is eliminated, the durability is improved, and a larger capacity dredging function can be maintained.

従来の技術 従来の浚渫用バケットについて第4図から第6図を参照
して説明すると、左右対称構成に係る一対のシェル部
1、1は下部フレーム2に軸3、3を介し回動自在に軸
支され、また左右の連結枠4、4を介し上部フレーム5
に回動可能に軸支されている。上部フレーム5及び下部
フレーム2にはそれぞれ所定個数のシーブ6、7が回転
自在に軸支されていて、これらのシーブ6、7間には左
右対称で2本の開閉ローブ8、8が掛回され、シェル部
1、1の開閉をする。この開閉ロープ8、8は上部フレ
ーム2の上面に配置されたガイドローラー9、9を介し
て上方へ延び、浚渫船などのクレーン(図示略)から吊
支される。一方上部フレーム5の上面には浚渫用バケッ
ト全体を前記クレーンから昇降自在に吊支するための2
本の吊支ロープ10、10が吊環11を介して連結され
ている。第6図に示したように、吊環11は上部フレー
ム5の上面略中心部に配置され、またガイドローラー
9、9は上部フレーム5の対角部にそれぞれ配設されて
いた。
2. Description of the Related Art A conventional dredging bucket will be described with reference to FIGS. 4 to 6. A pair of shell parts 1 and 1 having a bilaterally symmetrical structure are rotatably attached to a lower frame 2 via shafts 3 and 3. The upper frame 5 is pivotally supported and also via the left and right connecting frames 4 and 4.
It is rotatably supported by. A predetermined number of sheaves 6 and 7 are rotatably supported on the upper frame 5 and the lower frame 2, respectively, and two open / close lobes 8 and 8 are symmetrically provided between the sheaves 6 and 7. Then, the shell parts 1 and 1 are opened and closed. The open / close ropes 8, 8 extend upward through guide rollers 9, 9 arranged on the upper surface of the upper frame 2, and are suspended and supported by a crane (not shown) such as a dredging boat. On the other hand, on the upper surface of the upper frame 5, there is provided 2 for suspending and suspending the entire dredging bucket from the crane.
Book suspension ropes 10 and 10 are connected via a suspension ring 11. As shown in FIG. 6, the suspension ring 11 was arranged substantially in the center of the upper surface of the upper frame 5, and the guide rollers 9, 9 were arranged at the diagonal portions of the upper frame 5, respectively.

考案が解決しようとする問題点 しかしながら、上記従来の浚渫用バケットによれば、開
閉ロープ8、8と吊支ロープ10、10は上部フレーム
2の略対角線上に位置するので、バケット全体が前後左
右に揺動したとき、各ロープに張力差が生じ易く、した
がってロープの損傷が生じて交換を余技なくさせられ、
そのため、大容量のバケットを吊支し、かつ、開閉操作
することはできなかった。
However, according to the conventional dredging bucket, since the opening and closing ropes 8 and 8 and the suspension support ropes 10 and 10 are located on a substantially diagonal line of the upper frame 2, the entire bucket is front, rear, left and right. When swinging, the ropes tend to have different tensions, which damages the ropes and necessitates replacement.
Therefore, it was not possible to suspend and operate a large capacity bucket.

ところで、近時はより大容量のバケットの需要が多く、
使用すべきワイヤロープもそれに見合う強度と耐久性が
要求されている。しかしながら、ワイヤロープ自体の強
度と耐久性を図るべくワイヤロープの径が大きいものを
用いたり、特殊構造とするならば、ワイヤロープの重量
増加を来たし、逆にバケットの容量を小さくしなければ
ならない矛盾をも生じさせることとなる。
By the way, recently, there is much demand for larger capacity buckets,
The wire rope to be used is also required to have strength and durability commensurate with it. However, if a wire rope with a large diameter is used to achieve strength and durability of the wire rope or if the wire rope has a special structure, the weight of the wire rope increases, and the capacity of the bucket must be reduced. It will also cause contradiction.

問題点を解決するための手段 そこで、本考案は上記事情に鑑み、浚渫用バケットの吊
支ロープ及び開閉ロープが張力差を生じることがないよ
うにするため、吊支ロープで上部フレームを連結し、開
閉ロープを上部フレーム及び下部フレームにそれぞれ回
転自在に軸支したシーブに掛け回してシェル部を開閉可
能にした浚渫用バケットにおいて、前記開閉ロープは上
部フレームの中央部に2本、左右両側付近にそれぞれ1
本を配置するとともに、前記吊支ロープは上部フレーム
の中央部と左右両側との間に各1本及び左右両側の最外
側に各1本を配置し、それぞれ上部フレームの上面にお
けるシェル部の開閉方向に直交する方向の略中心線に沿
って配置したものである。
Therefore, in view of the above-mentioned circumstances, the present invention connects the upper frame with the suspension rope in order to prevent the tension difference between the suspension rope and the opening / closing rope of the dredging bucket. In the dredging bucket in which the open / close rope is hung around the sheave rotatably supported on the upper frame and the lower frame to open and close the shell part, the open / close rope is two in the center of the upper frame, near the left and right sides. 1 for each
Along with arranging the books, one suspension rope is provided between the central portion of the upper frame and the left and right sides, and one at the outermost sides of the left and right sides, and the opening and closing of the shell portion on the upper surface of the upper frame is performed. It is arranged along a substantially center line in a direction orthogonal to the direction.

作用 上記構成の本考案によれば、吊支ロープと開閉ロープと
はそれぞれ上部フレームの上面において同一線上に配置
されているから、浚渫用バケットの荷重に偏りが生じて
も張力差を生じることなく均等に負荷させ、ワイヤロー
プに無理を生じさせない。
Effect According to the present invention having the above-described configuration, since the suspension rope and the opening / closing rope are arranged on the same line on the upper surface of the upper frame, there is no difference in tension even if the load of the dredging bucket is biased. Load evenly and do not overload the wire rope.

実施例 以下に本考案を図示の一実施例に基づいて説明する。Embodiment Hereinafter, the present invention will be described based on an illustrated embodiment.

第1図は本考案に係る浚渫用バケットの一実施例を示す
正面図、第2図はその側面図、第3図はその要部平面図
で、図中前記第4図から第6図と同符号部は同一又は相
当する部分を示す。
FIG. 1 is a front view showing an embodiment of the dredging bucket according to the present invention, FIG. 2 is a side view thereof, and FIG. 3 is a plan view of an essential part thereof. The same reference numerals indicate the same or corresponding parts.

前記従来例と比較して明らかな如く、上部フレーム5及
び下部フレーム2、並びに左右の連結枠4、4はともに
大型化され、シェル部1、1も大型化されている。そし
て、上部フレーム5に連結される吊支ロープ10は合計
4本で、それぞれワイヤソケット12を介し上部フレー
ム5に固定したブラケット13に止着されている。ま
た、開閉ロープ8は吊支ロープ10の間に挟まれて合計
4本がガイドローラー9を通過して下部フレーム2に回
転自在に軸支されたシーブ7に巻回されて次に上部フレ
ーム5内に上昇して入り、上部フレーム5内に回転自在
に軸支されたシーブ6に巻回され、以後順次この要領に
てシーブ7及びシーブ6を巻回してシェル部1、1に連
結されている。よって、シェル部1、1はそれぞれ軸
3、3を中心として回動自在であって、開閉ロープ8の
操作によって開閉自在である。
As is clear from comparison with the above-mentioned conventional example, the upper frame 5, the lower frame 2, and the left and right connecting frames 4, 4 are both upsized, and the shell parts 1, 1 are also upsized. The total number of suspension ropes 10 connected to the upper frame 5 is four, and they are fixed to the brackets 13 fixed to the upper frame 5 via the wire sockets 12, respectively. Further, the open / close rope 8 is sandwiched between the suspension ropes 10, and a total of four ropes pass through the guide rollers 9 and are wound around the sheave 7 rotatably supported by the lower frame 2, and then the upper frame 5 It goes up inside and is wound around a sheave 6 which is rotatably supported in the upper frame 5. After that, the sheave 7 and the sheave 6 are sequentially wound in this manner and connected to the shell parts 1 and 1. There is. Therefore, the shell portions 1 and 1 are rotatable about the shafts 3 and 3, respectively, and can be opened and closed by operating the opening / closing rope 8.

一方、第3図に示したように、前記吊支ロープ10及び
開閉ロープ8は上部フレーム5の上面において同一線上
に配置されている。すなわち、上部フレーム5の上面に
おける、シェル部1、1 の開閉方向に直交する方向の
略中心線上に沿って、ガイドローラー9に支持された開
閉ロープ8を上部フレーム5の中央部に2本、左右両側
付近にそれぞれ1本を配置するとともに、ブラケット1
3に連結された吊支ロープ10を上部フレーム5の中央
部と左右両側との間に各1本及び左右両側の最外側に各
1本を配置している。ガイドローラー9は上部フレーム
5の上面に固着された一対のガイドローラーフレーム1
4、14間に上方で一対のガイドローラー9が、また下
方で上記ガイドローラー9と直交して回転自在に上部フ
レーム5に固定された一対の溝付きローラー15、15
とからなる。
On the other hand, as shown in FIG. 3, the suspension rope 10 and the opening / closing rope 8 are arranged on the same line on the upper surface of the upper frame 5. That is, two opening / closing ropes 8 supported by the guide rollers 9 are provided in the central portion of the upper frame 5 along the substantially center line in the direction orthogonal to the opening / closing direction of the shell portions 1, 1 on the upper surface of the upper frame 5. Place one on each of the left and right sides and attach the bracket 1
One suspension rope 10 connected to 3 is arranged between the central portion of the upper frame 5 and the left and right sides, and one rope is disposed on the outermost side of the left and right sides. The guide rollers 9 are a pair of guide roller frames 1 fixed to the upper surface of the upper frame 5.
A pair of guide rollers 9 is fixed between the upper and lower frames 5 and 15 between the upper and lower frames 4 and 14 so that a pair of guide rollers 9 are provided on the upper side and are orthogonal to the guide rollers 9 on the lower side.
Consists of.

かくして、吊支ロープ10と開閉ロープ8は同一線上に
配置したから、浚渫用バケットが揺動しても、各ロープ
に与えられる負荷は均一化されて偏寄ることなく、しか
も吊支ロープ10と開閉ロープ8をそれぞれ4本として
合計8本のワイヤロープで支えるので大容量のバケット
を吊支し開閉操作できる。
Thus, since the suspension rope 10 and the opening / closing rope 8 are arranged on the same line, even if the dredging bucket swings, the load applied to each rope is uniformized and not biased, and the suspension rope 10 and Since each of the opening and closing ropes 8 is supported by a total of 8 wire ropes, a large capacity bucket can be suspended and opened and closed.

考案の効果 以上説明した本考案によれば、吊支ロープと開閉ロープ
を上部フレームの上面において同一線上に、即ち上部フ
レームの上面における、シェル部開閉方向に直交する方
向の略中心線上に沿って配置したから、浚渫用バケット
全体としての前後左右への揺動が生じても、各ロープの
張力に大差を生じさせることがなく、したがってロープ
の損傷が少なく耐久性が向上する。また、吊支ロープと
開閉ロープの本数を増大して少なくとも8本のワイヤロ
ープで浚渫用バケットを支え開閉操作できるので、ワイ
ヤロープ自体の径大化、特殊化を図ることなくバケット
容量の増大を図ることができる。
Effect of the Invention According to the present invention described above, the suspension support rope and the opening / closing rope are collinear on the upper surface of the upper frame, that is, on the upper surface of the upper frame along a substantially central line in a direction orthogonal to the shell opening / closing direction. Since they are arranged, even if the dredging bucket as a whole swings back and forth and to the left and right, there is no great difference in the tension of each rope, and therefore the rope is less damaged and the durability is improved. In addition, since the number of suspension ropes and open / close ropes can be increased and at least eight wire ropes can support and open / close the dredging bucket, the bucket capacity can be increased without increasing the diameter or specializing the wire rope itself. Can be planned.

【図面の簡単な説明】[Brief description of drawings]

第1図は本考案に係る浚渫用バケットの一実施例を示す
正面図、第2図はその側面図、第3図はその要部平面
図、第4図は従来の浚渫用バケットを示す断面図、第5
図はその側面図、第6図はその部分平面図である。 1……シェル部、2……下部フレーム 4……連結枠、5……上部フレーム 6、7……シーブ、8……開閉ロープ 9……ガイドローラー、10……吊支ロープ 12……ソケット、13……ブラケット
FIG. 1 is a front view showing an embodiment of a dredging bucket according to the present invention, FIG. 2 is a side view thereof, FIG. 3 is a plan view of relevant parts, and FIG. 4 is a cross section showing a conventional dredging bucket. Figure, fifth
The drawing is a side view thereof, and FIG. 6 is a partial plan view thereof. 1 ... Shell part, 2 ... Lower frame 4 ... Connection frame, 5 ... Upper frame 6, 7 ... Sheave, 8 ... Open / close rope 9 ... Guide roller, 10 ... Suspension rope 12 ... Socket , 13 …… Bracket

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】吊支ロープで上部フレームを連結し、開閉
ロープを上部フレーム及び下部フレームにそれぞれ回転
自在に軸支したシーブに掛け回してシェル部を開閉可能
にした浚渫用バケットにおいて、 前記開閉ロープは上部フレームの中央部に2本、左右両
側付近にそれぞれ1本を配置するとともに、前記吊支ロ
ープは上部フレームの中央部と左右両側との間に各1本
及び左右両側の最外側に各1本を配置し、それぞれ上部
フレームの上面におけるシェル部の開閉方向に直交する
方向の略中心線に沿って配置したことを特徴とする浚渫
用バケット。
1. A dredging bucket in which an upper frame is connected by a suspension rope, and an opening / closing rope is hung around a sheave rotatably supported on an upper frame and a lower frame to open and close a shell portion. Two ropes are arranged in the center of the upper frame, and one rope is arranged near each of the left and right sides, and one suspension rope is provided between the center of the upper frame and each of the left and right sides, and at the outermost sides of the left and right sides. A dredging bucket, characterized in that one of each is arranged, and each is arranged along a substantially center line in a direction orthogonal to the opening / closing direction of the shell portion on the upper surface of the upper frame.
JP1986196546U 1986-12-20 1986-12-20 Dredge bucket Expired - Lifetime JPH0615960Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1986196546U JPH0615960Y2 (en) 1986-12-20 1986-12-20 Dredge bucket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1986196546U JPH0615960Y2 (en) 1986-12-20 1986-12-20 Dredge bucket

Publications (2)

Publication Number Publication Date
JPS63100482U JPS63100482U (en) 1988-06-29
JPH0615960Y2 true JPH0615960Y2 (en) 1994-04-27

Family

ID=31155468

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1986196546U Expired - Lifetime JPH0615960Y2 (en) 1986-12-20 1986-12-20 Dredge bucket

Country Status (1)

Country Link
JP (1) JPH0615960Y2 (en)

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS53118282U (en) * 1977-02-28 1978-09-20

Also Published As

Publication number Publication date
JPS63100482U (en) 1988-06-29

Similar Documents

Publication Publication Date Title
JPS61203095A (en) Counterbalance type crane
JPH0615960Y2 (en) Dredge bucket
JP2796514B2 (en) A jib crane equipped with a winding device that can be fixed while the rope passes through the bridle bail
JPH0355599Y2 (en)
JP2022062769A (en) crane
JPH047248Y2 (en)
JPS6348798B2 (en)
JPS6315268Y2 (en)
JPH0250448U (en)
JP3036563U (en) Jib crane
JPS61235290A (en) Method of installing hatch cover of middle deck
JPH0730747Y2 (en) Three-point support pile driver
JPH07291587A (en) Tower crane
JP3031410U (en) Grab bucket
JP2528863Y2 (en) Hook block storage device for mobile crane
SU1634144A3 (en) Dumping cantilever of spreader
JPH1111874A (en) Tower crane
JPH09151075A (en) Dredging grab bucket
CN109019292A (en) A kind of hanging method of dumper power assembly
JPS5935830B2 (en) Large crane boom elevation device
JPH0246792U (en)
JPH0323191A (en) Method for transporting object to be transported by crane
JP2681862B2 (en) Chain block
SU680983A1 (en) Load lifting crane
JP2578249Y2 (en) Hook block storage device for self-propelled cranes