JPH0619530A - Digital controller - Google Patents
Digital controllerInfo
- Publication number
- JPH0619530A JPH0619530A JP17521692A JP17521692A JPH0619530A JP H0619530 A JPH0619530 A JP H0619530A JP 17521692 A JP17521692 A JP 17521692A JP 17521692 A JP17521692 A JP 17521692A JP H0619530 A JPH0619530 A JP H0619530A
- Authority
- JP
- Japan
- Prior art keywords
- digital controller
- control
- unit
- sampling period
- signal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Feedback Control In General (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は、石油,化学,鉄鋼など
のプロセス制御に用いられるディジタル調節計であり、
この調節計に外部接続させるプログラム装置によって定
められた制御動作を行なうプログラマブルディジタル調
節計に関し、特に、上記プログラム量に制約を与えるサ
ンプリング周期を、フレキシブルに自動変化させる手段
を具備したディジタル調節計に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a digital controller used for process control of petroleum, chemical, steel, etc.
The present invention relates to a programmable digital controller that performs a control operation determined by a programming device externally connected to the controller, and more particularly to a digital controller that includes means for flexibly and automatically changing a sampling period that restricts the program amount.
【0002】[0002]
【従来の技術】ディジタル調節計は、サンプリング周期
間に、信号取り込み処理と信号出力処理の完了の他に、
サンプリング時刻の入力データを基に制御演算を実行
し、操作量を決定しなければならない。この制約のため
に、ディジタル調節計は、サンプリング周期(制御周期
ともいう)内で制御演算が完了するように、制御演算プ
ログラムを調節計の記憶媒体にセーブする前に、全制御
演算の実行速度のチェックを行なっている。ディジタル
調節計のサンプリング周期は、固定式のものが多いが、
中には大きなプログラムを可変にする可変式のものもあ
る。可変式の場合は、制御演算プログラムにサンプリン
グ周期の変更を宣言しなければならない。2. Description of the Related Art A digital controller, in addition to the completion of signal acquisition processing and signal output processing during a sampling period,
A control calculation must be executed based on the input data at the sampling time to determine the manipulated variable. Due to this limitation, the digital controller must execute all control calculations before saving the control calculation program in the storage medium of the controller so that the control calculation is completed within the sampling period (also referred to as the control period). Is being checked. The digital controller often has a fixed sampling period,
There is also a variable type that makes a large program variable. In the case of variable type, the change of sampling period must be declared in the control calculation program.
【0003】このように、コントローラは、実行速度を
考慮しなければならないため、プログラム実行速度認識
による使用限界のチェックが行なわれる。特開昭59−98
212号広報には、シーケンスコントローラの実行速度確
認方式が記されているが、PID演算を主とするディジ
タル調節計においても同様の実行速度の確認を実施して
いる。As described above, since the controller has to consider the execution speed, the usage limit is checked by recognizing the program execution speed. JP 59-98
In the 212 bulletin, the execution speed confirmation method of the sequence controller is described, but the same execution speed is confirmed in the digital controller mainly for PID calculation.
【0004】[0004]
【発明が解決しようとする課題】ディジタル調節計に使
用するICチップの少容量化,処理速度の高速化に伴
い、記憶容量の大容量化,制御演算実行時間の高速化が
進んでいる。これによって、調節計は様々な処理を大規
模に行なえることが要求されている。制御演算を多数組
み立てて、一連の制御動作処理にしたものを機能接続プ
ログラムと呼ぶが、このプログラムのステップ数は、デ
ィジタル調節計の記憶容量の制約の他に、実行速度の制
約がある。前記したように、記憶容量の問題は解消され
つつあるが、サンプリング周期による実行速度の制約
は、機能接続プログラムを作成するプログラマーにとっ
て所望の制御演算動作が構築できるかできないかの選択
を余儀なくされるので、問題である。通常、機能接続プ
ログラムが大きくなって組み込めないときは、サンプリ
ング周期可変形の場合、可能な限り広げて設定するが、
それでもサンプリング周期を考慮して作成する必要があ
る。As the capacity of the IC chip used in the digital controller is reduced and the processing speed is increased, the storage capacity is increased and the control calculation execution time is increased. Therefore, the controller is required to be able to perform various processes on a large scale. A large number of control operations are assembled into a series of control operation processes, which is called a function connection program. The number of steps of this program is limited in execution speed in addition to the storage capacity of the digital controller. As described above, although the problem of the storage capacity is being solved, the restriction of the execution speed by the sampling cycle necessitates the programmer who creates the function connection program to select whether or not the desired control operation can be constructed. So it's a problem. Normally, when the function connection program becomes too large to be installed, in the case of the variable sampling cycle type, set it as wide as possible.
Even so, it is necessary to consider the sampling period.
【0005】本発明が解決しようとしている問題点は、
プログラマーがサンプリング周期を意識しながら、機能
接続プログラムを作成しなければならない煩わしい手続
きであり、本発明の目的は、このような煩わしい手続き
を解消し、プログラム作成後の修正をできる限りなくす
ことである。The problem that the present invention is to solve is as follows.
This is a troublesome procedure in which the programmer has to create the function connection program while being aware of the sampling cycle, and an object of the present invention is to eliminate such troublesome procedure and eliminate the modification after the program creation as much as possible. .
【0006】[0006]
【課題を解決するための手段】この発明は、機能接続プ
ログラムによる制御動作をディジタル調節計に実行させ
るのに必要なサンプリング周期を導出する機能を設け、
自動的にサンプリング周期を変更する機能を採用するこ
とにより、発明の目的を達成する。The present invention is provided with a function for deriving a sampling period necessary for causing a digital controller to execute a control operation by a function connection program.
The object of the invention is achieved by adopting the function of automatically changing the sampling period.
【0007】機能接続プログラムは、PID制御演算と
か開平演算などのブロック化した制御要素を組み合わせ
て作成するが、この制御要素には、あらかじめ測定した
演算実行時間が付されている。ディジタル調節計は、機
能接続プログラムをローディングした後、演算実行時間
を先頭から加算し、全部の制御要素の演算時間までを加
算し終えたとき、その総演算時間と第1信号変換部のA
/D変換処理時間と第2信号変換部のD/A変換処理時
間を加えた値からサンプリング周期を導き出す周期導出
部がはたらき、ディジタル調節計のサンプリング周期と
して設定され動作する。サンプリング周期間の実行処理
順は、A/D変換による入力取り込みの後、調節計の自
己判断処理(メモリーチェック)を行ない、その後制御
演算処理を行なう。そのうえ再度自己診断処理(マイク
ロプロセッサを監視するウォッチドックタイマ)を行な
った後、D/A変換による出力処理が行なわれる。D/
A変換は、次周期の直前に実施しなければならないた
め、サンプリング周期に合わせて、D/A変換処理もシ
フトさせなければならない。これは、制御演算にサンプ
リング周期を使った積分演算や微分演算があるためで、
出力をサンプリング周期間隔で出さなければ、正しい制
御演算が求まらないためである。D/A変換処理時間
は、一定時間であるため、サンプリング周期からD/A
変換処理時間を引いた時間がその周期におけるD/A変
換処理の開始時間である。出力処理スタート制御部は、
D/A変換処理の開始時間を求め、出力処理を開始する
トリガーを与える。The function connection program is created by combining blocked control elements such as PID control calculation and square root calculation, and these control elements have a pre-measured calculation execution time. The digital controller adds the calculation execution time from the beginning after loading the function connection program, and when the calculation times of all the control elements have been added, the total calculation time and the A of the first signal conversion unit are calculated.
A cycle deriving unit that derives a sampling cycle from a value obtained by adding the / D conversion processing time and the D / A conversion processing time of the second signal conversion unit operates, and is set and operates as the sampling cycle of the digital controller. As for the execution processing order between sampling cycles, after the input is taken in by A / D conversion, self-determination processing (memory check) of the controller is performed, and then control calculation processing is performed. In addition, self-diagnosis processing (watchdog timer for monitoring the microprocessor) is performed again, and then output processing by D / A conversion is performed. D /
Since the A conversion must be performed immediately before the next cycle, the D / A conversion process must also be shifted according to the sampling cycle. This is because there are integral calculation and differential calculation using the sampling period in the control calculation.
This is because a correct control calculation cannot be obtained unless the output is output at sampling cycle intervals. Since the D / A conversion processing time is a fixed time, the D / A conversion processing time
The time obtained by subtracting the conversion processing time is the start time of the D / A conversion processing in that cycle. The output processing start control unit
The start time of the D / A conversion process is obtained, and a trigger for starting the output process is given.
【0008】[0008]
【作用】ディジタル調節計内部にサンプリング周期を求
め、そのサンプリング周期でディジタル制御を行なうの
で、機能演算プログラムのプログラマーは、サンプリン
グ周期内に制御演算が完了するかどうかを心配せずに済
む。記憶容量の許す限り複雑な制御演算を書き込むこと
ができる。プログラマーがこの結果注意しなければなら
ないことは、調節計内部で求めたサンプリング周期は、
制御対象を制御する上で問題がないかというチェックだ
けである。10分の1秒単位で制御しなければならない
ような流量制御に対し、秒単位のサンプリング周期が設
定されたら、制御対象の制御量は、調節計で満足できる
ようには制御できない。また、サンプリング周期による
エリアシングが生じ、正しい信号が取得できなくなるこ
とも生ずる。したがって、プログラマーは、サンプリン
グ周期を気にしながら、プログラムを組む労力は避けら
れるが、プログラムの結果求まったサンプリング周期
で、制御対象が制御しえるかどうかのチェックは必要で
ある。これらのチェックは、プログラム装置でチェック
するか、調節計の表示部にサンプリング周期を表示させ
てチェックすれば良く、大きな支障とはならない。Since the sampling period is obtained in the digital controller and the digital control is performed at the sampling period, the programmer of the functional calculation program does not have to worry about whether the control calculation is completed within the sampling period. Complex control operations can be written as far as the storage capacity allows. As a result, the programmer must be careful that the sampling period found inside the controller is
It is only a check to see if there is any problem in controlling the controlled object. In contrast to the flow rate control that needs to be controlled in units of tenths of a second, if a sampling cycle in units of seconds is set, the control amount of the control target cannot be controlled to be satisfactory by the controller. In addition, aliasing due to the sampling period may occur, and a correct signal may not be acquired. Therefore, the programmer can avoid the labor of forming a program while paying attention to the sampling cycle, but it is necessary to check whether or not the control target can be controlled at the sampling cycle obtained as a result of the program. These checks may be performed by a programming device or by displaying the sampling period on the display unit of the controller, and there is no great obstacle.
【0009】[0009]
【実施例】本発明の一実施例を図1を用いて詳細に説明
する。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described in detail with reference to FIG.
【0010】本発明のディジタル調節計は、制御対象で
あるプロセスに操作出力を電気信号で伝え、この操作出
力によって制御されたプロセスが出力するプロセス量を
電気信号で取り込んでPID制御演算などを行ない、操
作信号を求め、再びこの信号を電気信号に変換したもの
をプロセスに与えるような周期動作をするものである。
プロセス量を取り込んでから、操作信号として出力する
までの周期をサンプリング周期と呼ぶ。プロセス量を取
り込んでから操作信号を出力する直前までの操作出力
は、前周期で出力した操作出力に等しい。つまり前周期
で出力した操作出力がホールドされる。ディジタル調節
計は、通常このサンプルホールド動作を行なっている。
プロセス量はアナログ量として取り込まれるが、A/D
変換によりマイクロコンピュータで扱うデータに変換さ
れる。このデータをPV値と呼ぶ。ディジタル調節計
は、調節計に設定された設定値(SV値)にPV値が一致
するように、これらの量から操作出力値を導出する。導
出に用いる演算アルゴリズムを制御演算と呼ぶ。本発明
のディジタル調節計は、この制御演算をプログラムによ
り自由に変更できるタイプのプログラマブル調節計であ
る。制御演算を規定するプログラムは、図3に示す機能
接続プログラム形式で行なう。機能接続プログラムは、
制御要素もしくは演算要素を表わすオペランドと、これ
らの演算にデータを渡すアーギュメントからなる。オペ
ランドから得られる演算時間は、プログラム装置が自動
的に付加する。機能接続プログラム及び演算時間は、ユ
ーザROMを媒体とする第1記憶部に書き込まれる。ユ
ーザROMは、着脱可能なROMか,EEPROMであ
り、前者の場合は、プログラム装置に取り付け、機能接
続プログラムと演算時間を書き込んだ後、調節計に取り
付ける。後者の場合、プログラム装置と調節計を通信回
線で結びダウンロードする形式で調節計に機能接続プロ
グラムを設定する。機能接続プログラムは、演算要素の
オペランドしか記載されていないため、オペランドが指
し示す演算処理ルーチンに制御演算アルゴリズムをあら
かじめ記憶させなければならない。この制御演算処理プ
ログラムは、システムROMと呼ばれる第2記憶部に記
憶されている。制御演算解読機能部8は、マイクロプロ
セッサによって実現できる。制御演算解読機能部8は、
ユーザROMに書かれているオペランドとアーギュメン
トを読み込み、オペランドが指し示す演算処理ルーチン
にアーギュメントを引渡し演算処理を実行する。In the digital controller of the present invention, an operation output is transmitted to the process to be controlled by an electric signal, and the process amount output by the process controlled by the operation output is fetched by the electric signal to perform PID control calculation and the like. , The operation signal is obtained, and the operation signal is converted into an electric signal again to give a process a periodic operation.
The period from the capture of the process amount to the output as the operation signal is called the sampling period. The operation output from when the process amount is captured to immediately before the operation signal is output is equal to the operation output output in the previous cycle. That is, the operation output output in the previous cycle is held. The digital controller normally performs this sample hold operation.
The process amount is taken in as an analog amount, but A / D
By conversion, it is converted into data handled by the microcomputer. This data is called a PV value. The digital controller derives an operation output value from these amounts so that the PV value matches the set value (SV value) set in the controller. The calculation algorithm used for derivation is called control calculation. The digital controller of the present invention is a programmable controller of the type in which this control calculation can be freely changed by a program. The program defining the control calculation is performed in the function connection program format shown in FIG. The function connection program is
Operands that represent control elements or operation elements and arguments that pass data to these operations. The calculation time obtained from the operand is automatically added by the programming device. The function connection program and the calculation time are written in the first storage unit having a user ROM as a medium. The user ROM is a removable ROM or an EEPROM. In the former case, the user ROM is attached to the programming device, and after writing the function connection program and the operation time, it is attached to the controller. In the latter case, the function connection program is set in the controller in a format in which the program device and the controller are connected via a communication line and downloaded. Since the function connection program only describes the operands of the operation elements, the control operation algorithm must be stored in advance in the operation processing routine indicated by the operands. This control calculation processing program is stored in a second storage section called a system ROM. The control operation decoding function unit 8 can be realized by a microprocessor. The control operation decoding function unit 8
The operand and the argument written in the user ROM are read, the argument is passed to the arithmetic processing routine indicated by the operand, and the arithmetic processing is executed.
【0011】ディジタル調節計は、1サンプリング周期
間に図2に示す処理を行なう。最初に、A/D変換を行
ない、プロセス量をマイクロプロセッサで処理できるデ
ータ形式にする。次に、コントローラのRAS機能を増
すために、メモリチェックを行なう。その後、前述した
制御演算解読機能部がインタプリタ方式で、制御演算処
理を実行する。制御演算処理の後にウォッチドックタイ
マによるプログラム暴走監視用の自己診断を行なう。次
に通信処理などを行なうためにアイドリングした後、制
御演算処理で求めた操作出力値をD/A変換する処理を
行なう。D/A変換する処理は、一定周期で実行されな
ければ正しい制御演算が行なえないため、D/A変換を
開始するトリガー信号をつくり出さなければならない。The digital controller performs the processing shown in FIG. 2 during one sampling period. First, A / D conversion is performed to make the process amount into a data format that can be processed by a microprocessor. Next, a memory check is performed to increase the RAS function of the controller. After that, the control operation decoding function unit described above executes the control operation processing by an interpreter method. After the control calculation processing, self-diagnosis for program runaway monitoring by the watchdog timer is performed. Next, after idling to perform communication processing and the like, processing for D / A converting the operation output value obtained by the control calculation processing is performed. Since the D / A conversion process cannot perform a correct control calculation unless it is executed at a constant cycle, a trigger signal for starting the D / A conversion must be generated.
【0012】本発明のディジタル調節計は、最初、ユー
ザROMに書き込まれている演算時間を先頭から読み取
り、加算する加算器がはたらく。加算した結果を総演算
時間として周期導出部4に伝える。周期導出部4は、サ
ンプリング周期内で、図2に示す処理が行なえる最小の
サンプリング周期を求め、周期制御部6と出力処理スタ
ート制御部5にその周期を伝える。周期制御部6は、サ
ンプリング周期が巡るたびに、A/D変換処理からD/
A変換処理にいたる一連の処理を行なうように制御す
る。出力処理スタート制御部5は、サンプリング周期か
らD/A変換処理に要する時間引いたものを出力処理ス
タート時間として周期制御部に渡す。周期制御部6は、
この時間を基にD/A変換処理をスタートさせる。In the digital controller of the present invention, first, the adder that reads the operation time written in the user ROM from the beginning and adds it is operated. The added result is transmitted to the cycle deriving unit 4 as the total calculation time. The cycle deriving unit 4 obtains the minimum sampling cycle in which the processing shown in FIG. 2 can be performed within the sampling cycle, and sends the cycle to the cycle control unit 6 and the output processing start control unit 5. The cycle control unit 6 performs D / A conversion processing every time the sampling cycle is completed.
Control is performed so as to perform a series of processes up to the A conversion process. The output processing start control section 5 passes the sampling cycle minus the time required for the D / A conversion processing to the cycle control section as the output processing start time. The cycle control unit 6
The D / A conversion process is started based on this time.
【0013】上記のように構成したディジタル調節計
は、制御演算時間が増えるにしたがってサンプリング周
期を増やすため、常にサンプリング周期内で制御演算処
理が完了するように機能する。The digital controller configured as described above increases the sampling cycle as the control calculation time increases, and therefore functions so that the control calculation process is always completed within the sampling cycle.
【0014】求まったサンプリング周期は、ディジタル
調節計に設けられた表示部に表示できる。これにより、
現在動作している調節計がいくつのサンプリング周期で
制御動作を行なっているかの確認ができる。The obtained sampling period can be displayed on the display unit provided in the digital controller. This allows
It is possible to confirm how many sampling cycles the currently operating controller is performing the control operation.
【0015】また、調節計内で設定できるサンプリング
周期には限界があるので、限界のサンプリング周期以上
の値が周期導出部が求めたときのプロテクトがあった方
が誤動作防止に役立つ。したがって、このようなケース
発生時にサンプリング周期設定エラーを表示させる機能
を設けた方がユーザに親切である。しかし、実際はこの
ようなエラーが生じることがないように、サンプリング
周期の設定レンジに余裕をもたせるため、生じない。Further, since the sampling period that can be set in the controller has a limit, it is more useful to prevent malfunction when the period deriving unit obtains a value equal to or larger than the limit sampling period. Therefore, it is kinder to the user to provide the function of displaying the sampling cycle setting error when such a case occurs. However, in practice, the error does not occur because a margin is set in the setting range of the sampling period so that such an error does not occur.
【0016】[0016]
【発明の効果】所望の制御動作をディジタル調節計に行
なわせるには、プログラミング量の制限を取り除かなけ
ればならない。プログラムの記憶容量は、小型大容量化
するROMによって解消できるが、プログラムを実行す
る時間は、ディジタル調節計のサンプリング周期(制御
周期)によって制限される。In order for the digital controller to perform the desired control action, the programming amount limitation must be removed. The storage capacity of the program can be solved by a ROM that is smaller and larger in capacity, but the time for executing the program is limited by the sampling cycle (control cycle) of the digital controller.
【0017】制御演算時間に合わせてサンプリング周期
を調節する機能をディジタル調節計内部にはたらかされ
ることによって、プログラム量が増えるに併せて増加す
る制御演算実行処理が、サンプリング周期内で終了する
ことが可能となる。これによって、サンプリング周期を
考慮しながら、プログラム量を制限調整する煩わしい手
続きが解消される。Since the function of adjusting the sampling period according to the control calculation time is provided inside the digital controller, the control calculation execution process that increases as the program amount increases can be completed within the sampling period. It will be possible. This eliminates the troublesome procedure of limiting and adjusting the program amount while considering the sampling period.
【図1】本発明の実施例を示す説明図である。FIG. 1 is an explanatory diagram showing an embodiment of the present invention.
【図2】ディジタル調節計が1サンプリング周期で行な
う処理順序を示す説明図である。FIG. 2 is an explanatory diagram showing a processing sequence performed by a digital controller in one sampling cycle.
【図3】機能接続プログラムの説明図である。FIG. 3 is an explanatory diagram of a function connection program.
1…第1記憶部、2…第2記憶部、3…加算器、4…周
期導出部、5…出力処理スタート制御部、6…周期制御
部、7…第1信号変換部、8…制御演算解読機能部、9
…第2信号変換部。1 ... 1st memory | storage part, 2 ... 2nd memory | storage part, 3 ... adder, 4 ... period derivation | leading-out part, 5 ... output process start control part, 6 ... period control part, 7 ... 1st signal conversion part, 8 ... control Operation decoding function section, 9
... Second signal converter.
Claims (3)
を行なうディジタル調節計において、前記ディジタル調
節計の制御動作順序を表す機能接続プログラムを格納す
る第1記憶部と、前記機能接続プログラムで記された制
御演算名で定義された制御演算処理プログラムを格納す
る第2記憶部と、前記ディジタル調節計の入力端子が加
わる電気信号をA/D変換し、マイクロコンピュータで
処理できる信号データに変換する第1信号変換部と、そ
の反対に演算処理したデータを電気信号にD/A変換す
る第2信号変換部と、前記第1記憶部に格納された機能
接続プログラムを解読し、その制御動作に従って前記第
2記憶部に格納させた制御演算処理プログラムをインタ
プリンタ方式で実行する制御演算解読機能部と、前記機
能接続プログラムを構成する個々の演算要素に付随する
演算時間をカウントする加算部と、加算した結果得られ
た総演算時間から、第1信号変換部が電気信号取り込む
サンプリング周期を決定する周期導出したサンプリング
周期を決定する周期導出部と、導出したサンプリング周
期を基に、第2信号変換部の処理開始をシフトさせる出
力処理スタート制御部とを具備したことを特徴とするデ
ィジタル調節計。1. A digital controller for controlling a process and subjecting sample values to control, a first storage unit storing a function connection program representing a control operation sequence of the digital controller, and the function connection program. A second storage unit for storing a control calculation processing program defined by the control calculation name and an A / D conversion of an electric signal applied to the input terminal of the digital controller, and a signal data which can be processed by a microcomputer. One signal conversion unit, conversely, a second signal conversion unit for D / A converting the processed data into an electric signal, and the function connection program stored in the first storage unit are decoded, and according to the control operation, A control operation decoding function unit for executing the control operation processing program stored in the second storage unit by an interprinter method, and the function connection program An addition unit that counts the calculation time associated with each of the constituent calculation elements, and a total calculation time obtained as a result of the addition, determines a sampling cycle for determining the sampling cycle for capturing the electrical signal by the first signal conversion unit. A digital controller, comprising: a cycle deriving unit for controlling the output of the second signal; and an output processing start control unit for shifting the processing start of the second signal converter based on the derived sampling cycle.
をディジタル調節計の表示部に出力することを特徴とす
る請求項1記載のディジタル調節計。2. The digital controller according to claim 1, wherein the sampling period obtained by the period deriving unit is output to a display unit of the digital controller.
が最大サンプリング周期を越えるときは、サンプリング
周期設定エラーをディジタル調節計の表示部に出力する
ことを特徴とする請求項1記載のディジタル調節計。3. The digital controller according to claim 1, wherein when the sampling period obtained by the period deriving unit exceeds the maximum sampling period, a sampling period setting error is output to the display unit of the digital controller. .
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP17521692A JPH0619530A (en) | 1992-07-02 | 1992-07-02 | Digital controller |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP17521692A JPH0619530A (en) | 1992-07-02 | 1992-07-02 | Digital controller |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH0619530A true JPH0619530A (en) | 1994-01-28 |
Family
ID=15992327
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP17521692A Pending JPH0619530A (en) | 1992-07-02 | 1992-07-02 | Digital controller |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0619530A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000148204A (en) * | 1998-11-09 | 2000-05-26 | Yamatake Corp | PID parameter readjustment method, storage medium storing PID parameter readjustment program, and PID parameter readjustment device |
| JP2009180643A (en) * | 2008-01-31 | 2009-08-13 | Yamatake Corp | Differential pressure transmitter |
-
1992
- 1992-07-02 JP JP17521692A patent/JPH0619530A/en active Pending
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000148204A (en) * | 1998-11-09 | 2000-05-26 | Yamatake Corp | PID parameter readjustment method, storage medium storing PID parameter readjustment program, and PID parameter readjustment device |
| JP2009180643A (en) * | 2008-01-31 | 2009-08-13 | Yamatake Corp | Differential pressure transmitter |
| US8326550B2 (en) | 2008-01-31 | 2012-12-04 | Azbil Corporation | Differential pressure transmitter |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5127824B2 (en) | Axis position control method, position adjuster, and data medium | |
| US20150317260A1 (en) | Conversion device, peripheral device and programmable logic controller | |
| JP4271159B2 (en) | Interactive numerical controller | |
| US20020178209A1 (en) | Method and device for determining the load of a computing element | |
| US6795738B1 (en) | Programmable controller | |
| CN117631725A (en) | Temperature control method, device, equipment and readable storage medium | |
| JP2799009B2 (en) | Programmable controller | |
| JPH0822305A (en) | Process control equipment | |
| JPS58222357A (en) | Drive control program debugging method | |
| JPH11316685A (en) | Device for performing remote control and/or operation of field device via field bus using controller and | |
| JPH034921B2 (en) | ||
| JPH04332056A (en) | Microcomputer | |
| JPH0619518A (en) | Program calling system | |
| JPS595370A (en) | Processing time controlling system | |
| JPS6217807A (en) | PID control device | |
| JPH04127202A (en) | Memory card using method for one-loop controller | |
| JPS62210511A (en) | Method for executing sequence program in programmable controller | |
| JPH0797331B2 (en) | Operation abnormality diagnosis method | |
| JPS63310003A (en) | Sequence control system | |
| JPH09258973A (en) | Programming console | |
| JPH0830537A (en) | I / O processor | |
| JPH05334098A (en) | Interrupt control method and interrupt control device | |
| JPH0239346A (en) | Screen shift control system | |
| JPH0212536A (en) | Memory information collecting system | |
| JPH0485627A (en) | Conditional branching instruction control method |