- Publication number
- JPH0620784Y2 JPH0620784Y2 JP7589288U JP7589288U JPH0620784Y2 JP H0620784 Y2 JPH0620784 Y2 JP H0620784Y2 JP 7589288 U JP7589288 U JP 7589288U JP 7589288 U JP7589288 U JP 7589288U JP H0620784 Y2 JPH0620784 Y2 JP H0620784Y2
- Authority
- JP
- Japan
- Prior art keywords
- concrete block
- long hole
- locking groove
- hook
- hook receiving
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Description
【考案の詳細な説明】 (産業上の利用分野) 本考案は、中央に穴を設けたコンクリートブロックの吊
上げ,移送,運搬に使用する吊具に関する。[Detailed Description of the Invention] (Industrial field of application) The present invention relates to a hoisting tool used for hoisting, transferring, and transporting a concrete block having a hole in the center.
(従来の技術) 従来、中央に穴を設けたコンクリートブロックの吊上
げ,移送,運搬作業はコンクリートの穴部にワイヤを通
して、同ワイヤをフックに掛けてクレーンでもって持ち
上げて移動させていた。(Prior Art) Conventionally, for lifting, transferring, or carrying a concrete block having a hole in the center, a wire is passed through a hole in the concrete, the wire is hung on a hook, and the crane is lifted and moved.
(考案が解決しようとする課題) 従来の方法ではコンクリートブロックのワイヤ掛けで吊
るため、コンクリートブロックの吊り姿が不安定で危険
を伴い、又コンクリートブロックの着地における姿勢の
制御が難しいという欠点があった。又、そのため作業効
率も低いものであった。本考案の課題はかかる従来の欠
点を解決し、安定して所要の姿勢に出来、しかも作業効
率の良い吊具を提供することにある。(Problems to be solved by the invention) In the conventional method, since the concrete block is hung by the wire hanging, the suspended state of the concrete block is unstable and dangerous, and it is difficult to control the attitude of the concrete block when landing. It was Moreover, the work efficiency was also low. An object of the present invention is to solve the above-mentioned drawbacks of the related art and to provide a lifting tool that can be stably placed in a desired posture and that has a high work efficiency.
(課題を解決するための手段) かかる課題を解決した本考案の要旨は、 1)下方水平部先端をやや上方に突設した略コ字状吊具
本体の上部に水平長く伸びて、その水平終端から短く下
方に傾いた長孔を設け、又吊具本体の下方に垂直の長孔
を設け、上方の長孔及び下方の長孔それぞれにフック受
軸を摺動自在に取付け、更に上方の長孔の左右終端及び
水平終端の傾き始点の上辺位置にフック受軸の係止溝を
形成し、下方の長孔の上下終端の右辺位置にフック受軸
の係止溝を設けたことを特徴とするコンクリートブロッ
ク吊具 2)吊具本体の下方水平部に移動防止枠を枢着した請求
項1記載のコンクリートブロック吊具にある。(Means for Solving the Problems) The gist of the present invention which has solved the above problems is as follows: 1) Extend horizontally horizontally to the upper part of a substantially U-shaped hanging device main body with the tip of the lower horizontal part projecting slightly upward, A long hole that is short and tilted downward from the end is provided, and a vertical long hole is provided below the suspender body, and hook receiving shafts are slidably attached to the upper long hole and the lower long hole, respectively. The hook receiving shaft locking groove is formed at the upper side position of the left and right ends of the long hole and the tilt starting point of the horizontal end, and the hook receiving shaft locking groove is provided at the right side position of the upper and lower ends of the lower hole. 2) The concrete block suspension according to claim 1, wherein a movement prevention frame is pivotally attached to a lower horizontal portion of the suspension main body.
(作用) 本考案では、穴が水平になる状態に横臥されたコンクリ
ートブロックを移動させる場合はまず、上方の長孔の水
平終端の傾き始点の係止溝にフック受軸を移動させ、こ
の位置でフックに掛けて吊具を降下させ、コンクリート
ブロックの穴にその下部水平部分を挿入する。この状態
では吊具の水平部分は水平に維持され、穴への挿入が容
易である。(Operation) In the present invention, when moving the concrete block lying down so that the hole becomes horizontal, first move the hook bearing shaft to the locking groove at the starting point of the inclination of the horizontal end of the upper long hole, and move this position. Use the hook to drop the hanger, and insert the lower horizontal part into the hole in the concrete block. In this state, the horizontal part of the hanger is kept horizontal and can be easily inserted into the hole.
次に、フック受軸を上方の長孔の水平部分の左端係止溝
まで動かす。その後、フックを上昇させてコンクリート
ブロックを左端係止溝において吊り上げ、所要の方向に
水平移動させて目的の位置で降下させる。このように吊
具の下部水平部分をコンクリートブロックの穴部に挿入
するときは、吊具自体の重心の水平位置に近い上部の長
孔の右端で吊り、コンクリートブロックを吊り上げる場
合は、コンクリートブロックの重心の水平位置に近い長
孔の左端でもって吊る。更にコンクリートブロックを反
転させる場合は、吊具の下部水平部分を挿入した後、フ
ック受軸をその水平終端の傾き始点の位置の係止溝に止
めてコンクリート躯体にセットする。そしてこの位置で
吊上げればコンクリートブロックはやや傾いた状態に保
持され、この状態で移動させ、再び所要の場所にコンク
リートブロックに降ろしていくと、コンクリートブロッ
クは接地して、その接地点を支点にしてコンクリートブ
ロックはその自重で下方に倒れてゆき、フック受軸も長
孔の傾き部分を滑って右端の係止溝まで移動してコンク
リートブロックはスムーズに反転する。コンクリートブ
ロックが接地点を中心に転倒するとき、吊具の上方の長
孔の水平部分の右端の係止溝にあるフック受軸もこの接
地点まわりに回転しようとする。このときの回転開始時
は、フック受軸の移動方向は左方向の水平方向が主であ
るため、フック受軸はフックから離脱する方向に動くこ
とになるが、この右端から下方向に傾斜した長孔は吊具
の傾きのため、大略水平となる状態となっているので、
フック受軸は吊具とともに回転せずに、この傾斜した長
孔部分に逃げてフック受軸はフックとともにあまり動か
ないでコンクリートブロックは傾く。これによって、フ
ック受軸がフックから離脱し難く、安全に吊ることがで
きる。コンクリートブロック・吊具が大きく回転した状
態では、フックの水平移動は少なく垂直方向の移動が主
となるため、フック受軸がフックから外れることはほと
んどない。Next, the hook receiving shaft is moved to the left end locking groove of the horizontal portion of the upper slot. After that, the hook is lifted to lift the concrete block in the left end locking groove, horizontally moved in a desired direction, and lowered at a target position. In this way, when inserting the lower horizontal part of the lifting device into the hole of the concrete block, hang it at the right end of the upper slot near the horizontal position of the center of gravity of the lifting device itself. Hang with the left end of the slot near the horizontal position of the center of gravity. When further inverting the concrete block, after inserting the lower horizontal portion of the suspender, the hook receiving shaft is set in the concrete skeleton by being stopped in the engaging groove at the position where the horizontal end of the slant starts. If you lift it at this position, the concrete block will be held in a slightly tilted state, move it in this state, and lower it to the concrete block at the required place again, ground the concrete block and use that ground point as a fulcrum. The concrete block falls down by its own weight, and the hook receiving shaft also slides on the inclined part of the long hole to the locking groove at the right end, and the concrete block is smoothly inverted. When the concrete block falls about the grounding point, the hook bearing shaft in the locking groove at the right end of the horizontal portion of the elongated hole above the hanger also tries to rotate around this grounding point. At this time, at the start of rotation, the hook receiving shaft moves mainly in the leftward horizontal direction, so the hook receiving shaft moves in the direction in which it separates from the hook. Because the long hole is almost horizontal due to the inclination of the hanger,
The hook receiving shaft does not rotate together with the hanger, but escapes into this slanted long hole portion, the hook receiving shaft does not move much with the hook, and the concrete block tilts. As a result, the hook receiving shaft does not easily come off from the hook and can be safely hung. When the concrete block / hanging tool is largely rotated, the hook does not move horizontally and the vertical movement is the main one, so the hook receiving shaft hardly comes off from the hook.
次に据付作業の場合、下方の長孔の上方の係止溝でその
フック受軸を移動させてこの位置で吊具を吊ってコンク
リートブロックの穴に下方水平部を垂直状態にして挿入
する。その後、フック受軸を下方の係止溝に移動させて
吊上げ,移動,降下の作業を行ってコンクリートブロッ
クを据付けるものである。このように、穴部が垂直とな
っている状態のコンクリートブロックを吊上げ・移動・
降下させる場合において、まず吊具のみを移動させると
きは、吊具の重心位置に近い下方の長孔の上端の係止溝
にフック受軸をもってきて、この位置でフックで吊るこ
とで吊具を安定して動かすことができる。次に、この状
態のコンクリートブロックを吊り上げて移動させるとき
は、コンクリートブロックの重心位置に近い下方の長孔
の下端の係止溝にフック受軸をもってきて、この位置で
吊ることによってコンクリートブロックを安定して吊上
げ・移動できる。更に、移動防止枠を枢着させることで
吊具の移動を防ぐことができ、より安全なものにでき
る。Next, in the case of installation work, the hook receiving shaft is moved in the locking groove above the lower elongated hole, the hanging tool is hung at this position, and the lower horizontal portion is inserted vertically into the hole of the concrete block. After that, the hook receiving shaft is moved to the lower engaging groove to lift, move, and descend to install the concrete block. In this way, concrete blocks with vertical holes are lifted, moved, and
When lowering only the hanger when lowering, bring the hook receiving shaft into the locking groove at the upper end of the lower long hole near the center of gravity of the hanger and hang it with the hook at this position. Can be moved stably. Next, when hoisting and moving the concrete block in this state, bring the hook receiving shaft into the locking groove at the lower end of the lower slot near the center of gravity of the concrete block, and hang it at this position. Can be stably lifted and moved. Further, by pivotally attaching the movement prevention frame, movement of the hanger can be prevented, and a safer one can be obtained.
(実施例) 以下、実施例を図面に基づいて説明する。(Example) Hereinafter, an example will be described with reference to the drawings.
第1図は本実施例を示す正面図、第2図は同平面図、第
3図は移動防止枠の取付構造を示す説明図、第4図は上
方の長孔の形状を示す説明図、第5図は下方の長孔の形
状を示す説明図、第6,7,8図は使用状態を示す説明
図である。FIG. 1 is a front view showing the present embodiment, FIG. 2 is a plan view of the same, FIG. 3 is an explanatory view showing a mounting structure of a movement prevention frame, and FIG. 4 is an explanatory view showing a shape of an upper long hole, FIG. 5 is an explanatory view showing the shape of the lower long hole, and FIGS. 6, 7 and 8 are explanatory views showing the usage state.
図中(A)は作業対象のコンクリートブロック、(1)は
二枚の厚手鋼板を連結して形成した吊具本体、(2)は下
方水平部、(3)は同下方水平部先端の突出部、(4)は上方
の長孔、(5)は下方の長孔、(6)は長孔(4)の左端係止
溝、(7)は長孔(4)の水平部終端の傾き始点の位置の係止
溝、(8)は長孔(5)の右端の係止溝、(9)は長孔(5)の上方
右辺の係止溝、(10)は長孔(5)の下方右辺の係止溝、(1
1)は長孔(4)に取付けられたフック受軸、(12)は長孔(5)
に取付けられたフック受軸、(13)は吊具本体(1)の下方
水平部(2)の中央に枢支された移動防止枠、(14)は同移
動防止枠の枢軸、(15)は移動防止枠に結着したワイヤ、
(a)はコンクリートブロック(A)の中央の穴、
(b)はコンクリートブロック(A)の脚部である。In the figure, (A) is a concrete block to be worked, (1) is a suspender body formed by connecting two thick steel plates, (2) is a lower horizontal part, and (3) is a protrusion of the tip of the lower horizontal part. Part, (4) is the upper slot, (5) is the lower slot, (6) is the left end locking groove of the slot (4), (7) is the inclination of the horizontal end of the slot (4). Locking groove at the starting point, (8) is the locking groove at the right end of the slot (5), (9) is the locking groove on the upper right side of the slot (5), (10) is the slot (5) Lower right side of the locking groove, (1
1) is the hook bearing shaft attached to the long hole (4), (12) is the long hole (5)
The hook receiving shaft attached to the, (13) is a movement preventing frame pivotally supported at the center of the lower horizontal portion (2) of the lifting device body (1), (14) is a pivot of the movement preventing frame, (15) Is the wire attached to the movement prevention frame,
(A) is a hole in the center of the concrete block (A),
(B) is a leg part of the concrete block (A).
この実施例では、コンクリートブロック(A)が横に置
かれている場合は第1図実線の様にセットし、吊上げて
移動させて、所要の場所でそのまま垂直にして降ろして
もよいし、一端着地後吊具を移動させ、第7図の様にコ
ンクリートブロック(A)を傾けて正常の設置状態にす
ることが出来る。又、勿論設置状態の姿勢のものを第8
図に示す様にそのまま持ち上げて、そのまま所要の場所
に置くこともできる。In this embodiment, when the concrete block (A) is placed laterally, it may be set as shown by the solid line in FIG. 1, lifted and moved, and vertically lowered at a required place, or may be lowered. After landing, the hanger can be moved and the concrete block (A) can be tilted as shown in FIG. 7 to bring it into a normal installation state. Also, of course, the posture of the installed state is the 8th
As shown in the figure, you can lift it up and place it where you want it.
(考案の効果) 以上の様に本考案によれば、比較的簡単に穴付コンクリ
ートブロックを縦・横いずれの状態でも容易に吊上げ、
確実且つ安全に移動でき、移動作業の効率を大巾に高め
ることができる。(Effect of the Invention) As described above, according to the present invention, the concrete block with holes can be relatively easily lifted in both vertical and horizontal states.
It can be moved reliably and safely, and the efficiency of moving work can be greatly enhanced.
第1図は実施例を示す正面図、第2図は同平面図、第3
図は移動防止枠の取付構造を示す説明図、第4図は上方
の長孔の形状を示す説明図、第5図は下方の長孔の形状
を示す説明図、第6〜8図は使用状態を示す説明図であ
る。 (A):コンクリートブロック (a):穴、(b)…脚部 (1):吊具本体、(2):下方水平部 (3):突出部、(4),(5):長孔 (6),(7),(8),(9),(10):係止溝 (11),(12):フック受軸1 is a front view showing an embodiment, FIG. 2 is a plan view of the same, and FIG.
FIG. 4 is an explanatory view showing the mounting structure of the movement prevention frame, FIG. 4 is an explanatory view showing the shape of the upper long hole, FIG. 5 is an explanatory view showing the shape of the lower long hole, and FIGS. It is explanatory drawing which shows a state. (A): Concrete block (a): Hole, (b) ... Leg (1): Lifting tool body, (2): Lower horizontal part (3): Projection, (4), (5): Long hole (6), (7), (8), (9), (10): Locking groove (11), (12): Hook bearing shaft
Claims (2)
字状吊具本体の上部に水平長く伸びて、その水平終端か
ら短く下方に傾いた長孔を設け、又吊具本体の下方に垂
直の長孔を設け、上方の長孔及び下方の長孔それぞれに
フック受軸を摺動自在に取付け、更に上方の長孔の左右
終端及び水平終端の傾き始点の上辺位置にフック受軸の
係止溝を形成し、下方の長孔の上下終端の右辺位置にフ
ック受軸の係止溝を設けたことを特徴とするコンクリー
トブロック吊具。1. A substantially U-shaped hoisting tool main body having a tip of a lower horizontal part projecting slightly upward, extending horizontally horizontally, and providing a long hole which is short and inclined downward from the horizontal end of the hoisting tool main body. A vertical long hole is provided in the lower part, and hook receiving shafts are slidably attached to the upper long hole and the lower long hole, respectively. A concrete block hanger, characterized in that a locking groove for the shaft is formed, and a locking groove for the hook receiving shaft is provided on the right side of the upper and lower ends of the lower slot.
した請求項1記載のコンクリートブロック吊具。2. The concrete block hanger according to claim 1, wherein a movement preventing frame is pivotally attached to a lower horizontal portion of the hanger body.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP7589288U JPH0620784Y2 (en) | 1988-06-07 | 1988-06-07 | Concrete block hanger |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP7589288U JPH0620784Y2 (en) | 1988-06-07 | 1988-06-07 | Concrete block hanger |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH01180484U JPH01180484U (en) | 1989-12-26 |
| JPH0620784Y2 true JPH0620784Y2 (en) | 1994-06-01 |
Family
ID=31300942
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP7589288U Expired - Fee Related JPH0620784Y2 (en) | 1988-06-07 | 1988-06-07 | Concrete block hanger |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0620784Y2 (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5861996B2 (en) * | 2010-07-05 | 2016-02-16 | 株式会社大林組 | Posture changing apparatus and posture changing method |
| JP2012184040A (en) * | 2011-03-03 | 2012-09-27 | Powrex Corp | Lifting jig |
| JP5765112B2 (en) * | 2011-07-21 | 2015-08-19 | 富士通株式会社 | Tool suspension device and tool suspension system |
| JP2025108923A (en) * | 2024-01-11 | 2025-07-24 | コベルコ建機株式会社 | Running gear hoisting tool and running gear hoisting method |
-
1988
- 1988-06-07 JP JP7589288U patent/JPH0620784Y2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH01180484U (en) | 1989-12-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH0620784Y2 (en) | Concrete block hanger | |
| JPH07137979A (en) | Hanging equipment | |
| JPH0625276U (en) | Hanging jig | |
| JP3124695U (en) | Automatic lifting device | |
| JP2508198Y2 (en) | Pallet hanger | |
| JPH0453392Y2 (en) | ||
| JP3873102B2 (en) | Converter lining method and hanging brick laying equipment used therefor | |
| JPH0624426Y2 (en) | Pile cap hanging device | |
| JPS5876655A (en) | Apparatus for hanging up outer wall material | |
| JP2000274080A (en) | Wall member mounting method for building frame and traverser for mounting the wall member | |
| JP2548084B2 (en) | Lifting tool for U-shaped groove block | |
| JPH0720140Y2 (en) | Jig for tilting long cylinder | |
| JPH0861294A (en) | Pump unit lifting device for pull-out type submerged motor pump | |
| JPH06255981A (en) | Hanging equipment | |
| JPH08231179A (en) | Method of hoisting long columns and hoisting equipment | |
| JPH058027B2 (en) | ||
| JP2516443Y2 (en) | Concrete block lifting equipment | |
| JPH0589387U (en) | Block hanging bracket | |
| JPS6034713Y2 (en) | Hanging bracket | |
| JPS6323408Y2 (en) | ||
| JPH02300092A (en) | Suspension tool for wave extinguishing block | |
| JPS6117989Y2 (en) | ||
| JPH072378U (en) | Block lifting equipment | |
| JPH0748882Y2 (en) | Panel hangings | |
| JP2002179380A (en) | Block moving method, device therefor and block |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| LAPS | Cancellation because of no payment of annual fees |