JPH06299565A - Method for constructing wall and retaining wall - Google Patents

Method for constructing wall and retaining wall

Info

Publication number
JPH06299565A
JPH06299565A JP5112135A JP11213593A JPH06299565A JP H06299565 A JPH06299565 A JP H06299565A JP 5112135 A JP5112135 A JP 5112135A JP 11213593 A JP11213593 A JP 11213593A JP H06299565 A JPH06299565 A JP H06299565A
Authority
JP
Japan
Prior art keywords
pile
wall material
wall
vertical hole
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP5112135A
Other languages
Japanese (ja)
Other versions
JPH07122272B2 (en
Inventor
Katsuya Hiraoka
勝也 平岡
Tatsuichi Miyazaki
辰一 宮崎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP5112135A priority Critical patent/JPH07122272B2/en
Publication of JPH06299565A publication Critical patent/JPH06299565A/en
Publication of JPH07122272B2 publication Critical patent/JPH07122272B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Fencing (AREA)
  • Retaining Walls (AREA)

Abstract

PURPOSE:To decrease the amount of surplus soil of excavation to simplify construction and set a retaining wall in a narrow area by embedding a pile with a box nut in a vertical hole excavated at predetermined intervals and fixing a PC wall member on the pile by means of a bolt. CONSTITUTION:Vertical holes 9 are excavated at predetermined intervals and a cylindrical pile 1 including therein a box nut 4 is embedded into the hole 9 in such a manner that the upper end of the pile comes to a level with the surface of the ground. Next, a PC wall member 14 having a bolt through-hole 18 is placed on the pile 1 and a bolt 20 is threaded into the box nut 4 to fix the PC wall member 14. And a continuous footing extending the entire length of the wall is not needed and the amount of removed soil which is excavated is decreased and the wall can be easily fixed. It follows that a retaining wall can be installed even in a narrow area at low cost.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、塀や擁壁の施工方
法,更に詳しくは、狭い場所でも塀や擁壁を簡単に構築
できる方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of constructing a fence or retaining wall, and more particularly to a method of easily constructing a fence or retaining wall even in a narrow space.

【0002】[0002]

【従来の技術】従来、塀や擁壁を構築する施工方法は、
地面に布基礎を塀や擁壁の全長にわたって長く構築し、
この布基礎上に壁材を設置固定するものである。
2. Description of the Related Art Conventionally, construction methods for constructing walls and retaining walls are
Build a cloth foundation on the ground over the entire length of the fence and retaining wall,
The wall material is installed and fixed on this cloth foundation.

【0003】[0003]

【発明が解決しようとする課題】ところで、上記従来の
施工方法は、布基礎の構築のために掘削土の量が多くな
り、その残土処理が困難であると共に、布基礎の構築及
び布基礎上への壁材の固定に手間と時間がかかり、その
分工期が長くなり、施工コストが高くつくという問題が
ある。
By the way, in the above-mentioned conventional construction method, since the amount of excavated soil is large due to the construction of the cloth foundation, it is difficult to treat the remaining soil, and the construction of the cloth foundation and the cloth foundation are performed. It takes time and effort to fix the wall material to the wall, which lengthens the construction period and raises the construction cost.

【0004】また、布基礎の構築及び壁材の固定には広
い作業スペースが必要になり、狭い場所での施工が行な
えないという問題がある。
Further, a wide working space is required for constructing the cloth foundation and fixing the wall material, and there is a problem that construction cannot be performed in a narrow place.

【0005】そこで、この発明は、残土処理が少なくて
よく、工期短縮とコストダウンが図れ、狭い場所での施
工も支障なく行なえる塀,擁壁の施工方法を提供するこ
とを課題としている。
Therefore, an object of the present invention is to provide a method of constructing a fence or retaining wall, which requires less residual soil treatment, can shorten the construction period and cost, and can be constructed in a narrow place without trouble.

【0006】[0006]

【課題を解決するための手段】上記のような課題を解決
するため、第1の発明は、地面に縦孔を掘削し、各縦孔
内に杭をその上端が地面上に臨むよう埋設し、この杭上
にPC壁材を設置し、PC壁材と杭をボルトで締結する
構成を採用したものである。
In order to solve the above problems, a first aspect of the present invention excavates vertical holes in the ground and buries piles in each vertical hole so that the upper ends of the vertical holes face the ground. The PC wall material is installed on the pile, and the PC wall material and the pile are fastened with bolts.

【0007】同第2の発明は、地面に所定の間隔で縦孔
を掘削し、吊り下げ治具で上下に位置調整が自在となる
よう吊り下げた杭を上記縦孔内に挿入し、吊り下げ治具
を接地させて杭上端のレベル出し後に杭を縦孔内に埋設
し、吊り下げ治具の取り外し後に杭上にPC壁材を設置
し、PC壁材と杭をボルトで締結する構成を採用したも
のである。
In the second aspect of the invention, vertical holes are excavated on the ground at a predetermined interval, and a pile suspended so that the position can be vertically adjusted by a suspending jig is inserted into the vertical hole and suspended. A structure in which the hanging jig is grounded and the pile top is leveled, then the pile is embedded in the vertical hole, the PC wall material is installed on the pile after removing the hanging jig, and the PC wall material and the pile are fastened with bolts. Is adopted.

【0008】同第3の発明は、地面に縦孔を掘削し、各
縦孔内に杭をその上端が地面上に臨むよう埋設した後、
杭の上部で並列方向にワイヤを張設配置し、このワイヤ
に滑車とチエンブロックを介してPC壁材を吊り下げ、
PC壁材をワイヤに沿って所定の杭上まで移動させ、こ
のPC壁材を杭上に降してボルトで杭と締結する構成を
採用したものである。
According to the third aspect of the invention, vertical holes are excavated in the ground, and the piles are buried in the vertical holes so that their upper ends face the ground.
Wires are arranged in parallel in the upper part of the pile, and the PC wall material is hung on this wire via the pulley and chain block.
This is a structure in which the PC wall material is moved along a wire to a predetermined pile, and the PC wall material is lowered onto the pile and fastened to the pile with bolts.

【0009】[0009]

【作用】地面に縦孔を掘削し、この縦孔内に杭を挿入又
は現場造製し、杭の周囲を埋込んで地面に固定化し、次
にPC壁材を杭上に搬送して設置し、杭とPC壁材をボ
ルトで締結すれば、塀又は擁壁を構築することができ、
杭の転倒摩擦と地耐力によってPC壁材を支えることが
できる。
[Operation] A vertical hole is excavated in the ground, and a pile is inserted or built in the vertical hole, the periphery of the pile is embedded and fixed to the ground, and then the PC wall material is transported and installed on the pile. If the pile and the PC wall material are fastened with bolts, a fence or retaining wall can be constructed.
The PC wall material can be supported by the falling friction of the pile and the bearing capacity.

【0010】[0010]

【実施例】以下、この発明の実施例を添付図面に基づい
て説明する。
Embodiments of the present invention will be described below with reference to the accompanying drawings.

【0011】図1(A)(B)は地面に掘削した縦孔内
に埋設する円筒状の杭1であり、上端面に固定した円形
端板2の中央に透孔3を設け、この端板2の下面で透孔
3の部分に袋ナット4が固定され、更に透孔3を挾む両
側の位置に設けた円形孔5の下面にナット6が溶接さ
れ、このナット6にレベル調整用のボルト7がナット6
への螺合によって取付けられ、ボルト7は円形孔5内に
頭部が納まり、工具での回動によって上下に位置調整が
可能になる。
1 (A) and 1 (B) show a cylindrical pile 1 buried in a vertical hole excavated in the ground, in which a through hole 3 is provided at the center of a circular end plate 2 fixed to the upper end surface. A cap nut 4 is fixed to the through hole 3 on the lower surface of the plate 2, and a nut 6 is welded to the lower surfaces of circular holes 5 provided on both sides of the through hole 3 for level adjustment. Bolt 7 is nut 6
The head of the bolt 7 is housed in the circular hole 5, and the bolt 7 can be vertically adjusted by turning with a tool.

【0012】上記杭1は、コンクリート杭やPC杭の如
き既成の杭のほかに型枠を用いて築造する現場打杭であ
ってもよく、その上下長さと直径は構築せんとする塀や
擁壁の条件に合わせて設定すればよく、例えば直径30
0mmで長さが1000mm程度が一般的である。また、端
板2は杭1の鉄筋8と溶接等によって固定されている。
The pile 1 may be an existing pile such as a concrete pile or a PC pile, or may be a cast-in-place pile which is constructed by using a form, and the vertical length and diameter of the pile 1 are a fence or a retainer to be constructed. It may be set according to the conditions of the wall, for example, a diameter of 30
Generally, the length is 0 mm and the length is about 1000 mm. The end plate 2 is fixed to the reinforcing bar 8 of the pile 1 by welding or the like.

【0013】図2(A),(B)は地面に掘削した縦孔
9に既成の杭1を組込むために用いる吊り下げ治具10
を示し、チャンネル材を用いた吊り下げ杆11の両端部
にベースジャッキ12を設けると共に、吊り下げ杆11
の途中に複数のセット用吊ボルト13を装着し、吊り下
げ杆11の中央部をクレーン等の重機で吊り下げるよう
になっている。
2 (A) and 2 (B) are suspension jigs 10 used for incorporating the existing piles 1 into the vertical holes 9 excavated in the ground.
And the base jacks 12 are provided at both ends of the suspension rod 11 using the channel material.
A plurality of hanging bolts 13 for setting are attached in the middle of, and the central portion of the hanging rod 11 is hung by a heavy machine such as a crane.

【0014】上記のセット用吊ボルト13は、吊り下げ
杆11を回動によって上下に位置調整が自在となるよう
貫通し、下端の雄ねじを杭1の袋ナット4に螺合するこ
とにより、吊り下げ杆11の下部に杭1を上下に調整で
きるよう吊り下げるようになっている。
The above-mentioned hanging bolt 13 for setting penetrates the hanging rod 11 by pivoting so that the position can be adjusted up and down, and the male screw at the lower end is screwed into the cap nut 4 of the pile 1 to suspend it. The pile 1 is hung below the hanging rod 11 so that the pile 1 can be adjusted up and down.

【0015】図3(A)乃至(C)は杭1上に設置固定
するPC壁材14を示し、下部ベース部15と直立部1
6でL字状に形成され、下部ベース部15の両端部の位
置に、上面側の凹入段部17と、この凹入段部17内か
ら下面に貫通する貫通孔18とが設けられ、凹入段部1
7内に納まる座金19上から貫通孔18を貫通する締結
ボルト20を杭1の袋ナット4に螺締することにより、
杭1上に締結固定化される。
3 (A) to 3 (C) show a PC wall material 14 installed and fixed on the pile 1, and the lower base portion 15 and the upright portion 1 are shown.
6 is formed in an L shape, and at the positions of both ends of the lower base portion 15, a recessed step portion 17 on the upper surface side and a through hole 18 penetrating from the recessed step portion 17 to the lower surface are provided. Recessed step 1
By screwing the fastening bolt 20 penetrating the through hole 18 from the washer 19 housed in the 7 into the cap nut 4 of the pile 1,
It is fastened and fixed on the pile 1.

【0016】上記下部ベース部15には、上面で開口し
て貫通孔18内と連通するグラウト材注入路21が設け
られ、締結ボルト20の周囲をモルタル等のグラウト材
22で覆うことができるようになっている。
The lower base portion 15 is provided with a grout material injection passage 21 which opens at the upper surface and communicates with the inside of the through hole 18, so that the periphery of the fastening bolt 20 can be covered with a grout material 22 such as mortar. It has become.

【0017】図4は、縦孔9内に杭1を埋設した後、P
C壁材14を杭1上に運搬するための手段を示してお
り、埋設後の並列する杭1の両端部寄りの拾杭上に袋ナ
ット4への螺合によって仮設柱23を立設し、両仮設柱
23の上端間にワイヤ24を張設し、ワイヤ24の両端
は埋設した拾杭1や適宜固定物に固定化することによっ
て反力を取るようにし、上記ワイヤ24に滑車25とチ
エンブロック26を介してPC壁材14を吊り下げる。
FIG. 4 shows that after the pile 1 is buried in the vertical hole 9,
The means for carrying the C wall material 14 on the pile 1 is shown, and the temporary column 23 is erected by screwing into the cap nut 4 on the piled-up piles near both ends of the piles 1 in parallel after burying. A wire 24 is stretched between the upper ends of both temporary columns 23, and both ends of the wire 24 are fixed to the buried pile 1 or a fixed object as appropriate so as to take a reaction force. The PC wall material 14 is suspended via the chain block 26.

【0018】ワイヤ24に吊り下げたPC壁材14は、
ワイヤ24に沿って移動させることによって所望する杭
1上に臨ませることができ、重量のあるPC壁材14を
狭い場所でも簡単に運搬することができる。
The PC wall material 14 suspended on the wire 24 is
By moving it along the wire 24, it can be exposed to the desired pile 1, and the heavy PC wall material 14 can be easily transported even in a narrow space.

【0019】次に、塀,擁壁の具体的な施工方法を説明
する。先ず塀や擁壁を構築せんとする地面に縦孔9を掘
削する。
Next, a concrete construction method of the fence and the retaining wall will be described. First, the vertical hole 9 is excavated in the ground where the wall or retaining wall is to be constructed.

【0020】この縦孔9は杭1よりも少し大きめの直径
と深さに掘削すると共に、PC壁材14の貫通孔18の
間隔に合わせて上記構築方向に配置する。
The vertical holes 9 are excavated to have a diameter and depth slightly larger than the pile 1, and are arranged in the above-mentioned construction direction in accordance with the intervals of the through holes 18 of the PC wall material 14.

【0021】次に、図2(A)のように、吊り下げ治具
11に複数の杭1をセット用吊ボルト13で取り付け、
吊り下げ治具11をクレーンで吊ることによって吊り上
げ、杭1を縦孔9上に臨ませた状態で降し、杭1を縦孔
9内へ吊り下げたまま挿入し、ジャッキベース12を接
地させた状態でセット用吊ボルト13を回動操作し、杭
1の上端が所定の高さになって地面上に臨むようレベル
出しを行なう。
Next, as shown in FIG. 2A, a plurality of piles 1 are attached to the hanging jig 11 with hanging bolts 13 for setting,
The hanging jig 11 is hoisted by a crane, and the pile 1 is lowered while facing the vertical hole 9, and the pile 1 is inserted into the vertical hole 9 while being suspended, and the jack base 12 is grounded. In this state, the setting suspension bolt 13 is rotated to level the upper end of the pile 1 so that the upper end of the pile 1 reaches a predetermined height and faces the ground.

【0022】図2(A)の如く、杭1の挿入後、縦孔9
内の下部に砂27を打込んだ後、杭1の外周と縦孔9の
空間にコンクリート28を打設し、地面に対して杭1を
固定化する。
As shown in FIG. 2A, the vertical hole 9 is inserted after the pile 1 is inserted.
After the sand 27 is driven into the lower part of the inside, concrete 28 is placed in the outer periphery of the pile 1 and the space of the vertical hole 9 to fix the pile 1 to the ground.

【0023】コンクリート28が硬化後に、吊り下げ治
具11を取り外し、杭1上にPC壁材14を運搬して下
部ベース部15の貫通孔18が袋ナット4上に位置する
よう載置する。
After the concrete 28 hardens, the hanging jig 11 is removed, and the PC wall material 14 is carried on the pile 1 and placed so that the through hole 18 of the lower base portion 15 is located on the cap nut 4.

【0024】このとき、必要ならば、ボルト7によって
PC壁材14が水平になるようレベル調整を行なってお
く。
At this time, if necessary, level adjustment is performed by the bolt 7 so that the PC wall material 14 becomes horizontal.

【0025】上記PC壁材14の杭1上への移送は、図
4に示したように、ワイヤ24を用い、滑車25とチエ
ンブロック26を用いて吊り下げ運搬すれば、重機の入
らないような狭い場所でも簡単に運搬することができ
る。
When the PC wall material 14 is transferred onto the pile 1, as shown in FIG. 4, if a wire 24 is used and it is hung and carried using a pulley 25 and a chain block 26, a heavy machine will not enter. It can be easily transported even in a narrow space.

【0026】杭1上にPC壁材14を載置すると、図3
(C)のように座金19に挿通した締結ボルト20を貫
通孔18内に挿入し、杭1の袋ナット4に螺締すること
により、杭1に対してPC壁材14を固定化する。
When the PC wall material 14 is placed on the pile 1, as shown in FIG.
As shown in (C), the fastening bolt 20 inserted into the washer 19 is inserted into the through hole 18 and screwed into the cap nut 4 of the pile 1 to fix the PC wall material 14 to the pile 1.

【0027】この後、注入路21から貫通孔18内に向
けてグラウト材22を注入し、貫通孔18内及び凹段部
17内をグラウト材22で埋めることにより、締結ボル
ト20及び座金19を覆い、錆の発生を防止する。
After that, the grout material 22 is injected from the injection path 21 into the through hole 18, and the through hole 18 and the recessed step portion 17 are filled with the grout material 22, so that the fastening bolt 20 and the washer 19 are fixed. Cover to prevent rust.

【0028】上記のように、杭1上に順次PC壁材14
を並べて固定化すれば、必要な長さの塀又は擁壁を構築
することができ、地中に埋設した杭1の転倒摩擦及び地
耐力によって安定した強度の塀又は擁壁が得られること
になる。
As described above, the PC wall material 14 is sequentially mounted on the pile 1.
By arranging and fixing them, a fence or retaining wall of the required length can be constructed, and a fence or retaining wall with stable strength can be obtained by the overturning friction and the bearing capacity of the pile 1 buried in the ground. Become.

【0029】[0029]

【発明の効果】以上のように、この発明によると、上記
のような構成であるので、以下に列挙する効果がある。
As described above, according to the present invention, since it has the above-mentioned structure, the following effects can be obtained.

【0030】(I)杭を所定の間隔で埋設してその上に
PC壁材を固定化するので、塀や擁壁の構築が簡単に行
なえ、狭い場所でも容易に施工できる。 (II)縦孔を掘削して並べるので、掘削土量が少なく、
残土処理が簡単になる。 (III)地中に埋設した杭の転倒摩擦と地耐力により、強
度的に優れた塀や擁壁を構築できる。 (IV)杭上にPC壁材をボルトで締結するので、PC壁
材のセッティングが簡単に行なえ、工期の短縮とコスト
ダウンを図ることができる。 (V)PC壁材をワイヤに吊り下げて移送するので、重
量のあるPC壁材を狭い場所でも簡単に運搬することが
できる。
(I) Since the piles are embedded at a predetermined interval and the PC wall material is fixed on the piles, a fence or a retaining wall can be easily constructed and can be easily constructed even in a narrow place. (II) Since the vertical holes are excavated and lined up, the amount of excavated soil is small,
Remaining soil treatment becomes easy. (III) It is possible to construct fences and retaining walls with excellent strength by the overturning friction and the bearing capacity of piles buried in the ground. (IV) Since the PC wall material is fastened to the pile with bolts, the PC wall material can be easily set, and the construction period and cost can be reduced. (V) Since the PC wall material is hung on a wire and transferred, a heavy PC wall material can be easily transported even in a narrow place.

【図面の簡単な説明】[Brief description of drawings]

【図1】(A)は杭の縦断面図、(B)は同上の平面
図。
1A is a vertical cross-sectional view of a pile, and FIG. 1B is a plan view of the same.

【図2】(A)は杭の吊り下げ治具を示す縦断正面図、
(B)は同上を拡大した縦断側面図。
FIG. 2 (A) is a vertical sectional front view showing a pile hanging jig;
(B) The vertical side view which expanded the same as the above.

【図3】(A)はPC壁材と杭の固定を示す縦断面図、
(B)は同上の平面図、(C)は同上要部の拡大断面
図。
FIG. 3 (A) is a vertical cross-sectional view showing fixing of a PC wall material and a pile,
FIG. 3B is a plan view of the same as above, and FIG.

【図4】PC壁材の吊り下げ運搬を示す説明図。FIG. 4 is an explanatory diagram showing the suspended transportation of PC wall material.

【符号の説明】[Explanation of symbols]

1 杭 2 端板 4 袋ナット 7 レベル調整用のボルト 9 縦孔 10 吊り下げ治具 13 セット用吊ボルト 14 PC壁材 18 貫通孔 20 締結ボルト 24 ワイヤ 25 滑車 26 チエンブロック 1 Pile 2 End plate 4 Cap nut 7 Level adjustment bolt 9 Vertical hole 10 Hanging jig 13 Set hanging bolt 14 PC wall material 18 Through hole 20 Fastening bolt 24 Wire 25 Pulley 26 Chain block

Claims (7)

【特許請求の範囲】[Claims] 【請求項1】 地面に縦孔を掘削し、各縦孔内に杭をそ
の上端が地面上に臨むよう埋設し、この杭上にPC壁材
を設置し、PC壁材と杭をボルトで締結することを特徴
とする塀,擁壁の施工方法。
1. A vertical hole is drilled in the ground, a pile is buried in each vertical hole so that the upper end of the vertical hole faces the ground, a PC wall material is installed on the pile, and the PC wall material and the pile are bolted. Construction method for fences and retaining walls characterized by fastening.
【請求項2】 縦孔内に埋設する杭に既成のコンクリー
ト杭又はPC杭を用いることを特徴とする請求項1記載
の塀,擁壁の施工方法。
2. The method for constructing a fence or retaining wall according to claim 1, wherein an existing concrete pile or a PC pile is used as the pile buried in the vertical hole.
【請求項3】 縦孔内に埋設する杭に縦孔内で築造する
現場打杭を用いることを特徴とする請求項1記載の塀,
擁壁の施工方法。
3. The fence according to claim 1, wherein the pile to be buried in the vertical hole is a cast-in-place pile to be built in the vertical hole.
Retaining wall construction method.
【請求項4】 地面に所定の間隔で縦孔を掘削し、吊り
下げ治具で上下に位置調整が自在となるよう吊り下げた
杭を上記縦孔内に挿入し、吊り下げ治具を接地させて杭
上端のレベル出し後に杭を縦孔内に埋設し、吊り下げ治
具の取り外し後に杭上にPC壁材を設置し、PC壁材と
杭をボルトで締結することを特徴とする塀,擁壁の施工
方法。
4. A vertical hole is excavated on the ground at a predetermined interval, and a pile is hung so that the vertical position of the vertical jig can be adjusted by a hanging jig, and the hanging jig is grounded. The fence is characterized in that the pile is buried in the vertical hole after leveling the upper end of the pile, the PC wall material is installed on the pile after removing the hanging jig, and the PC wall material and the pile are fastened with bolts. , Retaining wall construction method.
【請求項5】 地面に縦孔を掘削し、各縦孔内に杭をそ
の上端が地面上に臨むよう埋設した後、杭の上部で並列
方向にワイヤを張設配置し、このワイヤに滑車とチエン
ブロックを介してPC壁材を吊り下げ、PC壁材をワイ
ヤに沿って所定の杭上まで移動させ、このPC壁材を杭
上に降してボルトで杭と締結することを特徴とする塀,
擁壁の施工方法。
5. A vertical hole is excavated in the ground, a pile is buried in each vertical hole so that the upper end of the vertical hole faces the ground, and a wire is stretched and arranged in parallel in the upper part of the pile. And a PC wall material is hung via a chain block, the PC wall material is moved along a wire to a predetermined pile, and the PC wall material is lowered onto the pile and fastened to the pile with bolts. Fence,
Retaining wall construction method.
【請求項6】 杭上にレベル調整用ボルトを装着してお
き、PC壁材の設置時にボルトでPC壁材のレベル調整
を行なうことを特徴とする請求項1乃至5の何れかに記
載の塀,擁壁の施工方法。
6. The level adjusting bolt is mounted on the pile in advance, and the level of the PC wall material is adjusted with the bolt when the PC wall material is installed. How to build walls and retaining walls.
【請求項7】 杭の上部に袋ナットを固定しておき、P
C壁材の貫通孔に挿通したボルトを袋ナットに締結して
杭とPC壁材を固定し、ボルト締結部分をグラウト材で
覆うことを特徴とする請求項1乃至6の何れかに記載の
塀,擁壁の施工方法。
7. A cap nut is fixed to the upper part of the pile, and P
The bolt inserted through the through hole of the C wall material is fastened to the cap nut to fix the pile and the PC wall material, and the bolt fastening portion is covered with the grout material. How to build walls and retaining walls.
JP5112135A 1993-04-14 1993-04-14 Construction method for walls and retaining walls Expired - Lifetime JPH07122272B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5112135A JPH07122272B2 (en) 1993-04-14 1993-04-14 Construction method for walls and retaining walls

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5112135A JPH07122272B2 (en) 1993-04-14 1993-04-14 Construction method for walls and retaining walls

Publications (2)

Publication Number Publication Date
JPH06299565A true JPH06299565A (en) 1994-10-25
JPH07122272B2 JPH07122272B2 (en) 1995-12-25

Family

ID=14579093

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5112135A Expired - Lifetime JPH07122272B2 (en) 1993-04-14 1993-04-14 Construction method for walls and retaining walls

Country Status (1)

Country Link
JP (1) JPH07122272B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002038499A (en) * 2000-07-28 2002-02-06 Tsuneo Goto Fixing method of retaining wall
CN106948606A (en) * 2017-03-30 2017-07-14 中建四局第五建筑工程有限公司 Cover type artificial digging pile aperture means of defence and its device
CN117328737A (en) * 2023-09-25 2024-01-02 中交第三公路工程局有限公司 A kind of highway foundation pit safety protection equipment

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5358141A (en) * 1976-11-04 1978-05-25 Onoda Cement Co Ltd Method for building wall panel for garden or boundary
JPH0198242U (en) * 1987-12-15 1989-06-30
JPH0321452U (en) * 1989-07-07 1991-03-04
JPH03156034A (en) * 1989-11-10 1991-07-04 Fuji Concrete Kogyo Kk Retaining wall

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5358141A (en) * 1976-11-04 1978-05-25 Onoda Cement Co Ltd Method for building wall panel for garden or boundary
JPH0198242U (en) * 1987-12-15 1989-06-30
JPH0321452U (en) * 1989-07-07 1991-03-04
JPH03156034A (en) * 1989-11-10 1991-07-04 Fuji Concrete Kogyo Kk Retaining wall

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002038499A (en) * 2000-07-28 2002-02-06 Tsuneo Goto Fixing method of retaining wall
CN106948606A (en) * 2017-03-30 2017-07-14 中建四局第五建筑工程有限公司 Cover type artificial digging pile aperture means of defence and its device
CN117328737A (en) * 2023-09-25 2024-01-02 中交第三公路工程局有限公司 A kind of highway foundation pit safety protection equipment

Also Published As

Publication number Publication date
JPH07122272B2 (en) 1995-12-25

Similar Documents

Publication Publication Date Title
US4592678A (en) Modular block retaining wall
US5123209A (en) Earth engineering apparatus and method
US6659692B1 (en) Apparatus and method for supporting a structure with a pier and helix
US4911583A (en) Structure and method for shoring a face of an excavation
US7025537B2 (en) Subterranean structures and methods for constructing subterranean structures
KR20040076713A (en) Retaining Wall using Permanent Anchor and Pre-Cast Concrete Panel and its Construction Method
US5433557A (en) Method for underpinning an existing footing
US4999966A (en) Method of forming an-before "immured"
US5806262A (en) Post and method of emplacing a post
JPH06299565A (en) Method for constructing wall and retaining wall
JP3612600B2 (en) Unit anchor and structural steel foundation beam
GB2314860A (en) Post support
JPH10317371A (en) Method for erecting pile-column in building using pile as column, and pile-column support band for use therein
JP3244324B2 (en) Mountain retaining method
JPH10317391A (en) Steel tower foundation structure and steel tower foundation construction method
JP6792239B2 (en) Scuttling prevention device for steel pipe piles and scuttling prevention method
JP2876182B2 (en) Joint foundation for temporary shutter
JP7622570B2 (en) How to build a building
KR20240088019A (en) Supporting anchor for mounting structures underground and construction method of structures using it
JP3162654B2 (en) Construction method of floor slab support structure in building structure using pile as pillar
KR102613254B1 (en) Self-standing fixing type pile and construction method of earth retaining facilities including it
RU2056478C1 (en) Method for reinforcing bases and foundations on sagging ground in hindered conditions
JPH10317486A (en) Bearing structure of floor slab in building structure utilizing pile for column
JPH02164933A (en) Architecture foundation construction method
JPH09125405A (en) Deep foundation for inclined tower leg